Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “baseline program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

LArIAT: Liquid Argon In A Testbeam

Liquid Argon Time Projection Chambers (LArTPCs) are ideal detectors for precision neutrino physics. These detectors, when located deep underground, can also be used for measurements of proton decay, and astrophysical neutrinos. The technology must be completely developed, up to very large mass scales, and fully mastered to construct and operate these detectors for this physics program. As part of an integrated plan of developing these detectors, accurate measurements in LArTPC of known particle species in the relevant energy ranges are now deemed as necessary. The LArIAT program aims to directly achieve these goals by deploying LArTPC detectors in a dedicated calibration test beam line at Fermilab. The set of measurements envisaged here are significant for both the short-baseline (SBN) and long-baseline (LBN) neutrino oscillation programs in the US, starting with MicroBooNE in the near term and with the adjoint near and far liquid argon detectors in the Booster beam line at Fermilab envisioned in the mid-term, and moving towards deep underground physics such as with the long-baseline neutrino facility (LBNF) in the longer term.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Planning assistance for the 30/20 GHz program, volume 2

In the baseline concept development the communications payload on Flight 1 was specified to consist of on-board trunking and emergency communications systems (ECS). On Flight 2 the communications payloads consisted of trunking and CPS on-board systems, the CPS capability replacing the Flight 1 ECS. No restriction was placed on the launch vehicle size. Constraints placed on multiple concept development effort were that launch vehicle size for Concept 1 was restricted to SUSS-D and for Concept 2 a SUSS-A. The design concept development was based on satisfying the baseline requirements set forth in the SOW for a single demonstration flight system. Key constraints on contractors were cost and launch vehicle size. Five major areas of new technology development were reviewed: (1) 30 GHz low noise receivers; (2) 20 GHz Power Amplifiers; (3) SS-TDMA switch; (4) Baseband Processor; (5) Multibeam Antennas.

Al-Kinani, G.↗

Superfluid helium on orbit transfer (SHOOT)

A number of space flight experiments and entire facilities require superfluid helium as a coolant. Among these are the Space Infrared Telescope Facility (SIRTF), the Large Deployable Reflector (LDR), the Advanced X-ray Astrophysics Facility (AXAF), the Particle Astrophysics Magnet Facility (PAMF or Astromag), and perhaps even a future Hubble Space Telescope (HST) instrument. Because these systems are required to have long operational lifetimes, a means to replenish the liquid helium, which is exhausted in the cooling process, is required. The most efficient method of replenishment is to refill the helium dewars on orbit with superfluid helium (liquid helium below 2.17 Kelvin). To develop and prove the technology required for this liquid helium refill, a program of ground and flight testing was begun. The flight demonstration is baselined as a two flight program. The first, described in this paper, will prove the concepts involved at both the component and system level. The second flight will demonstrate active astronaut involvement and semi-automated operation. The current target date for the first launch is early 1991.

Dipirro, Michael J.↗

Design of an effective radiological effluent and environmental surveillance program - history of Savannah River site environmental monitoring program design - 15308

An effective radiological effluent and surveillance program is critical for a nuclear facility to (1) comply with applicable regulations, (2) assess the potential impacts of operations to the environment and public, and (3) inform stakeholders and members of the public of any impacts. Radiological environmental monitoring includes three program elements - effluent monitoring, environmental surveillance, and dose assessments. The key to an effective program is defining the baseline and objectives based on regulatory requirements, identification of the critical exposure pathways, determining the spatial and temporal boundaries for the monitoring, and defining the reporting and action levels. Another key to an effective program is through continuous improvement by transforming the program based on operational facility changes and responding to technology advancements in the field of environmental monitoring. The history of the Savannah River Site's (SRS) environmental monitoring program is an example of an effective program that has transitioned, changed, and improved over the years based on the site missions and operations. From the beginning of five production reactors and two chemical separations facilities to the current Site missions of Environmental Stewardship, National Security, and Clean Energy, the SRS environmental monitoring program has evolved. SRS has a unique ecological environment with the Site area covering 80,300 hectares, five major streams that lead to the Savannah River, various water bodies, and varied meteorological conditions. Airborne and liquid pathways to human exposure are complex and it is necessary to use a graded approach when monitoring these pathways. The SRS environmental monitoring program is designed and effective in ensuring and verifying that there is a minimal exposure impact on the public and the environment from Site operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of MCAERO wing design panel method with interactive graphics module

A reliable and efficient iterative method has been developed for designing wing section contours corresponding to a prescribed subcritical pressure distribution. The design process is initialized by using MCAERO (MCAIR 3-D Subsonic Potential Flow Analysis Code) to analyze a baseline configuration. A second program DMCAERO is then used to calculate a matrix containing the partial derivative of potential at each control point with respect to each unknown geometry parameter by applying a first-order expansion to the baseline equations in MCAERO. This matrix is calculated only once but is used in each iteration cycle to calculate the geometry perturbation and to analyze the perturbed geometry. The potential on the new geometry is calculated by linear extrapolation from the baseline solution. This extrapolated potential is converted to velocity by numerical differentiation, and velocity is converted to pressure by using Bernoulli's equation. There is an interactive graphics option which allows the user to graphically display the results of the design process and to interactively change either the geometry or the prescribed pressure distribution.

Hawk, J. D.↗

Factors in International Space Station Integration Feasibility Assessments

The International Space Station, ISS, is a growing vehicle. The ISS configuration changes internally and externally with each ISS flight. Each flight adds resources and capabilities such as docking/berthing ports, power, stowage volume, heat rejection, and data processing capability. The configuration, capabilities and performance characteristics of the vehicle will be in flux until assembly complete. At the same time the knowledge about what is required to support humans involved in long duration space flight is also being greatly expanded. In addition to the changes occurring on-orbit, the situation on the ground is also very dynamic. Proposals for new ISS elements, proposed deletions of elements, changes to the ISS requirements, and changes to the planned configuration are always under evaluation. Furthermore, budgetary issues have driven the need to explore alternative options for the ISS . This environment has made the role of the technical integrator in the ISS program unique in that the baseline against which proposals are evaluated is always changing. The nature of the International Space Station Program adds another dimension to the integrators task. ISS program activities are spread across several centers: KSC, MSFC, GRC, DFRC, ARC and JSc. There are six International Partners/participants each with their own unique organizations. The prime contractor is in Texas, California and Alabama. And, the Space Shuttle Program as the launch vehicle provider is another major interface. In spite of the fluidity of the technical baseline, projections and organizational complexity, in the course of evaluating proposals and producing feasibility assessments there are factors, which frequently emerge as significant. These factors tend to be the limiting conditions when they come into play. The finite resources, which tend to limit the options for ISS are: upmass, life support and crew rescue capability, crew time, utilities, exercise equipment, and docking/berthing ports. Upmass requirements need to be developed for each option proposed. Short term and long term impacts to upmass are the result of the implementation and long term operations. The upmass requirements need to be met by the existing launch vehicles and any change in flight rate will be a significant cost driver. In addition, when any item is brought to the ISS careful consideration must be given to the on-board stowage and crew time available to unpack, transfer, stow and use these items. If stowage is not available then something must be returned, use of non-standard stowage negotiated or the item in question stays on the ground. Additional crew time requirements will impact available utilization time or crew off-duty time. When the human element is affected, such as, by increasing the number of crew members or changing the duration of the crew stay (longer or shorter) there is an additional set of factors that come into play. The main considerations are: rescue capability, exercise requirements and availability of equipment, resupply, and life support capability.

Watson, Patricia M.↗

Assessment of Cislunar Staging Orbits to Support the Artemis III Lunar Surface Mission

Since NASA’s selection of an L2 9:2 lunar synodic resonant Near Rectilinear Halo Orbit (NRHO) as the baseline for the Gateway Program, the agency has worked to mature its understanding of this orbit and its use for the Artemis III, IV, and V missions. In parallel with these efforts, NASA has investigated alternative staging orbits to perform the Artemis III lunar surface landing mission and compared those options to the baseline NRHO. This paper evaluates a number of alternative orbits on their feasibility and favorability and compares them to the agency baseline NRHO.

Artemis↗

Programmed schedule holds for improving launch vehicle holds

Baseline definition and system optimization are used for the analysis of programmed holds developed through prelaunch system analysis. Identification of design specifications for ground support equipment and maintenance concepts, and design specifications are used to describe the functional utilization of the overall flow process.

Gralow, F. H.↗

An iterative bidirectional gradient boosting approach for CVR baseline estimation

Here this paper presents a novel Iterative Bidirectional Gradient Boosting Model (IBi-GBM) for estimating the baseline of Conservation Voltage Reduction (CVR) programs. In contrast to many existing methods, we treat CVR baseline estimation as a missing data retrieval problem. The approach involves dividing the load and its corresponding temperature profiles into three periods: pre-CVR, CVR, and post-CVR. To restore the missing load profile during the CVR period, the method employs a three-step process. First, a forward-pass GBM is executed using data from the pre-CVR period as inputs. Subsequently, a backward-pass GBM is applied using data from the post-CVR period. The two restored load profiles are reconciled, considering pre-calculated weights derived from forecasting accuracy, and only the leftmost and rightmost points are retained. The newly restored points are then included as inputs for the subsequent iteration. This iterative procedure continues until the original load data in the CVR period is fully restored. We develop IBi-GBM using actual smart meter and Supervisory Control and Data Acquisition (SCADA) data. Our results demonstrate that IBi-GBM exhibits robust performance across various data resolutions and in different seasons and outperforms existing methods by achieving a 1-2% reduction in normalized Root Mean Square Error (nRMSE).

42 ENGINEERING↗

Demand Response in Industrial Facilities: Peak Electric Demand

The US Department of Energy’s (DOE’s) Better Buildings, Better Plants Program (Better Plants) is a voluntary energy efficiency leadership initiative for US manufacturers and water/wastewater entities. The program encourages organizations to commit to reducing the energy intensity of their US operations over a 10-year period, typically by 25%. Companies joining Better Plants are recognized by DOE for their leadership in implementing energy efficiency practices and for reducing their energy intensity. Better Plants Partners are assigned to a Technical Account Manager, who can help companies establish energy intensity baselines, develop energy management plans, and identify key resources and incentives from DOE, other federal agencies, states, utilities, and other organizations that can enable them to reach their goals. Better Plants Partners are expected to report their progress to DOE once a year. This involves establishing an energy intensity baseline upon joining the program and then tracking their progress over time. Demand Response in Industrial Facilities: Peak Electrical Demand is intended to help companies understand peak demand response programs offering by their local utility. Manufacturing industries can learn about time-varying rates and smart technologies they can use to help them reduce their energy bills. This guidance document is applicable to companies participating at either the program or challenge level. Although this guide is intended primarily to assist companies participating in Better Plants, the methodologies and guidance within the document are applicable to any organization interested in understanding peak demand response programs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Demand Response in Industrial Facilities: Peak Electric Demand

The US Department of Energy’s (DOE’s) Better Buildings, Better Plants Program (Better Plants) is a voluntary energy efficiency leadership initiative for US manufacturers and water/wastewater entities. The program encourages organizations to commit to reducing the energy intensity of their US operations over a 10-year period, typically by 25%. Companies joining Better Plants are recognized by DOE for their leadership in implementing energy efficiency practices and for reducing their energy intensity. Better Plants Partners are assigned to a Technical Account Manager, who can help companies establish energy intensity baselines, develop energy management plans, and identify key resources and incentives from DOE, other federal agencies, states, utilities, and other organizations that can enable them to reach their goals. Better Plants Partners are expected to report their progress to DOE once a year. This involves establishing an energy intensity baseline upon joining the program and then tracking their progress over time. Demand Response in Industrial Facilities: Peak Electrical Demand is intended to help companies understand peak demand response programs offering by their local utility. Manufacturing industries can learn about time-varying rates and smart technologies they can use to help them reduce their energy bills. This guidance document is applicable to companies participating at either the program or challenge level. Although this guide is intended primarily to assist companies participating in Better Plants, the methodologies and guidance within the document are applicable to any organization interested in understanding peak demand response programs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrated System Test of an Airbreathing Rocket (ISTAR)

Rocket Based Combined Cycle (RBCC) propulsion system development and ground test is being conducted as part of the NASA Marshall Space Flight Center Integrated System Test of an Airbreathing Rocket (ISTAR) program. Rocketdyne, Aerojet and Pratt & Whitney have teamed as the Rocket Based Combined Cycle Consortium (RBC3) to work the propulsion system development. Each company offered unique RBCC propulsion concepts as candidates for the ISTAR propulsion system. A team of engine contractor, vehicle contractor and NASA representatives reviewed the concepts proposed by each company, reviewed the available data and selected the Aerojet RBCC propulsion system concept as the team propulsion system baseline for the ISTAR program. The ISTAR program is currently in a "Jumpstart" phase for development of the engine system leading to ground test of a thermally and power balanced RBCC propulsion system at Stennis Space Center in 2005. A parallel flight test demonstration of this propulsion system is anticipated to lead to first flight in the 2007 timeframe.

Faulkner, Robert F.↗

The NOvA Test Beam Program

NOvA is a long-baseline off-axis beam neutrino experiment at Fermilab and Ash River, Minnesota. By measuring νμ \nu_\mu disappearance and νe \nu_e appearance at the 14 kiloton NOvA Far Detector, the experiment is addressing outstanding questions in neutrino physics, including the neutrino mass hierarchy and existence of leptonic CP violation. The NOvA Test Beam program, under deployment at the Fermilab Test Beam Facility, will use a scaled-down NOvA detector to sample beams of tagged electrons, muons, pions, and protons in the momentum range of 0.3 to 2 GeV/c. It will further the NOvA physics reach by precisely measuring the detector's muon energy scale and electromagnetic and hadronic response, and provide real data for detailed studies of particle identification techniques. Ongoing efforts on beamline instrumentation, data acquisition, simulation, momentum reconstruction and particle identification are presented. Implications for the neutrino oscillation measurements are discussed.

Huang, Junting [Texas U.]↗

Radial Deconsolidation of Leach-Burn-Leach of AGR-3/4 Compacts 3-3, 12-1, and 12-3

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program was established to perform the requisite research and development on tristructural isotropic (TRISO)-coated particle fuel to support deployment of a high-temperature gas-cooled reactor (HTGR). The work continues as part of the Advanced Reactor Technologies (ART) TRISO Fuel Program. The overarching goal of the program is to provide a baseline fuel qualification data set to support licensing and operation of an HTGR. To achieve these goals, the program includes the elements of fuel fabrication, irradiation, post-irradiation examination (PIE) and safety testing, fuel performance modeling, and fission product transport (INL 2016). A series of fuel irradiation experiments is being performed at the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL). These experiments are intended to provide data on fuel performance under irradiation, support fuel fabrication process development, qualify fuel for operating and accident conditions, provide irradiated fuel for accident testing, and support development of fuel performance and fission product transport models.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Heating Tests of AGR-2 Compact 6-4-1 Loose Kernels and AGR-3/4 Compacts 3-2 and 10-4

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program was established to perform research and development on tristructural isotropic (TRISO)-coated particle fuel to support deployment of a high-temperature gas-cooled reactor (HTGR). The work continues as part of the Advanced Reactor Technologies (ART) TRISO Fuel Program. The overarching goal of the program is to provide a baseline fuel qualification data set to support licensing and operation of an HTGR. To achieve these goals, the program includes the elements of fuel fabrication, irradiation, post-irradiation examination (PIE) and safety/heating testing, fuel performance modeling, and fission product transport (INL 2016). Several fuel irradiation experiments have been performed at the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), and additional irradiations are planned. These experiments are intended to provide data on fuel performance under irradiation, support fuel fabrication process development, qualify fuel for operating and accident conditions, provide irradiated fuel for accident testing, and support development of fuel performance and fission product transport models.

42 ENGINEERING↗

AGR-2 Compact 6-4-1 Post-Irradiation Examination Results

The Advanced Gas Reactor (AGR) Fuel Development and Qualification Program was established to perform research and development on tristructural isotropic (TRISO)-coated particle fuel to support deployment of a high-temperature gas-cooled reactor (HTGR). The work continues as part of the Advanced Reactor Technologies (ART) TRISO Fuel Program. The overarching goal of the program is to provide a baseline fuel qualification data set to support licensing and operation of an HTGR. To achieve these goals, the program includes the elements of fuel fabrication, irradiation, post-irradiation examination (PIE) and safety/heating testing, fuel performance modeling, and fission product transport (INL 2017). Several fuel irradiation experiments have been performed at the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL), and additional irradiations are planned. These experiments are intended to provide data on fuel performance under irradiation, support fuel fabrication process development, qualify fuel for operating and accident conditions, provide irradiated fuel for accident testing, and support development of fuel performance and fission product transport models.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RCCS Testing with the Water-based NSTF: Year-1 Single-Phase Results

Under support from the Department of Energy (DOE) and the Office of Advanced Reactor Technologies (ART), a large scale test facility has been constructed to generate validation data for passive decay heat removal systems of advanced reactors. Located at Argonne National Laboratory, the Natural convection Shutdown heat removal Test Facility (NSTF) reflects key features of a ½ scale, water-based, Reactor Cavity Cooling System (RCCS). This report serves as a summary of the single-phase testing results obtained during the programs first year of matrix testing. An introduction to the high-level program objectives is first presented, followed by a brief summary of facility design, instrumentation, and control systems. Details of the NQA-1 driven test method are included, which govern the programs quality assurance requirements and provide a background for the testing strategy and procedures. Checkout activities, including verification of gross system mass and energy balances, heat loss quantification, and isothermal facility characterization, were performed early in the first year and results presented in this report. These tests have identified relevant facility characteristics such as K-factors, frictional pressure losses, parasitic heat loss rates, and transient heating response. Results are then presented from four accepted matrix tests where the facility established a steady-state, single-phase mode of flow operation. All matrix tests were performed with an identical top-level procedure: first initiating a heater power ramp to target levels, and then holding power levels constant until the facilities structural members and network piping reached thermal equilibrium. Upon obtaining stable thermal and hydraulic conditions, active cooling was initiated off of the bulk storage tank to maintain constant riser inlet temperatures of 30°C. This steady-state period was then held for a minimum required duration, at which point the heaters were ramped down and test concluded. The two baseline tests completed reflect conditions prototypic to the full scale plant at both normal operation, and design basis Depressurized Loss of Forced Cooling (DLOFC) conditions. These parameters are defined by full RCCS decay heat loads of 1.4 MWt and 2.1 MWt, which translate to NSTF scale thermal power levels of 34.4 kWt and 51.6 kWt, respectively. Two additional tests were also conducted, which repeated baseline cases but included modification by single parameter variations in decay heat load, or heater power, at 700 kWt, and 2.8 MWt. Finally, a scoping test was performed to demonstrate the facilities ability to operate in a two-phase mode of operation. The facility successfully operated for a 3-hour period at this mode, reaching peak inventory temperatures of 105°C and condensing approximately 50 gallons of boil-off inventory. The testing parameters for this demonstration were based off the design basis DLOFC condition, and will be the reference for new baseline cases as the program moves forward with two-phase matrix testing.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Space Shuttle - The new baseline

Recent design alterations and refinements in the Space Shuttle program are considered with particular attention to the present baseline Shuttle configurations, performance characteristics, mission profiles, and flight and ground operations. Hardware and software development and testing, propulsion systems, entry trajectory events, and payload capability are covered. The refined Space Shuttle system design is characterized as one reflecting firm technical and economic considerations. Systems development is well under way, with all major contractors progressing on schedule.

Malkin, M. S.↗