Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “avoiding communication”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

The Integrated Hazard Analysis Integrator

Hazard analysis addresses hazards that arise in the design, development, manufacturing, construction, facilities, transportation, operations and disposal activities associated with hardware, software, maintenance, operations and environments. An integrated hazard is an event or condition that is caused by or controlled by multiple systems, elements, or subsystems. Integrated hazard analysis (IHA) is especially daunting and ambitious for large, complex systems such as NASA s Constellation program which incorporates program, systems and element components that impact others (International Space Station, public, International Partners, etc.). An appropriate IHA should identify all hazards, causes, controls and verifications used to mitigate the risk of catastrophic loss of crew, vehicle and/or mission. Unfortunately, in the current age of increased technology dependence, there is the tendency to sometimes overlook the necessary and sufficient qualifications of the integrator, that is, the person/team that identifies the parts, analyzes the architectural structure, aligns the analysis with the program plan and then communicates/coordinates with large and small components, each contributing necessary hardware, software and/or information to prevent catastrophic loss. As viewed from both Challenger and Columbia accidents, lack of appropriate communication, management errors and lack of resources dedicated to safety were cited as major contributors to these fatalities. From the accident reports, it would appear that the organizational impact of managers, integrators and safety personnel contributes more significantly to mission success and mission failure than purely technological components. If this is so, then organizations who sincerely desire mission success must put as much effort in selecting managers and integrators as they do when designing the hardware, writing the software code and analyzing competitive proposals. This paper will discuss the necessary and sufficient requirements of one of the significant contributors to mission success, the IHA integrator. Discussions will be provided to describe both the mindset required as well as deleterious assumptions/behaviors to avoid when integrating within a large scale system.

Morris, A. Terry↗

Studies of acoustic-electric feed-throughs for power transmission through structures

There are numerous engineering design problems where the use of wires to transfer power and communicate data thru the walls of a structure is prohibitive or significantly difficult that it may require a complex design. Using physical feedthroughs in such systems may make them susceptible to leakage of chemicals or gasses, loss of pressure or vacuum, as well as difficulties in providing adequate thermal or electrical insulation. Moreover, feeding wires thru a wall of a structure reduces the strength of the structure and makes the structure prone to cracking due to fatigue that can result from cyclic loading and stress concentrations. One area that has already been identified to require a wireless alternative to electrical feedthroughs is the container of the Mars Sample Return Mission, which will need wireless sensors to sense a pressure leak and to avoid potential contamination. The idea of using elastic or acoustic waves to transfer power was suggested recently by [Y. Hu, et al., July 2003]. This system allows for the avoidance of cabling or wiring. The technology is applicable to the transfer of power for actuation, sensing and other tasks inside any sealed container or vacuum/pressure vessel. An alternative approach to the modeling presented previously [Sherrit et a., 2005] used network analysis to solve the same problem in a clear and expandable manner. Experimental tests on three different designs of these devices were performed. The three designs used different methods of coupling the piezoelectric element to the wall. In the first test the piezoelectric material was bolted using a backing structure. In the second test the piezoelectric was clamped after the application of grease and finally the piezoelectric element was attached using a conductive epoxy. The mechanical clamp with grease produced the highest measured efficiency of 53% however this design was the least practical from a fabrication viewpoint. The power transfer efficiency of conductive epoxy joint was 40% and the stress bolts (12%).

ultrasonics↗

Space Shuttle Main Engine Joint Data List Applying Today's Desktop Technologies to Facilitate Engine Processing

Boeing-Rocketdyne's Space Shuttle Main Engine (SSME) is the world's first large reusable liquid rocket engine. The space shuttle propulsion system has three SSMEs, each weighing 7,400 lbs and providing 470,000 lbs of thrust at 100% rated power level. To ensure required safety and reliability levels are achieved with the reusable engines, each SSME is partially disassembled, inspected, reassembled, and retested at Kennedy Space Center between each flight. Maintenance processing must be performed very carefully to replace any suspect components, maintain proper engine configuration, and avoid introduction of contaminants that could affect performance and safety. The long service life, and number, complexity, and pedigree of SSME components makes logistics functions extremely critical. One SSME logistics challenge is documenting the assembly and disassembly of the complex joint configurations. This data (joint nomenclature, seal and fastener identification and orientation, assembly sequence, fastener torques, etc.) must be available to technicians and engineers during processing. Various assembly drawings and procedures contain this information, but in this format the required (practical) joint data can be hard to find, due to the continued use of archaic engineering drawings and microfilm for field site use. Additionally, the release system must traverse 2,500 miles between design center and field site, across three time zones, which adds communication challenges and time lags for critical engine configuration data. To aid in information accessibility, a Joint Data List (JDL) was developed that allows efficient access to practical joint data. The published JDL has been a very useful logistics product, providing illustrations and information on the latest SSME configuration. The JDL identifies over 3,350 unique parts across seven fluid systems, over 300 joints, times two distinct engine configurations. The JDL system was recently converted to a web-based, navigable electronic manual that contains all the required data and illustrations in expanded view format using standard PC products (Word, Excel, PDF, Photoshop). The logistics of accurately releasing this information to field personnel was greatly enhanced via the utilization of common office products to produce a more user-friendly format than was originally developed under contract to NASA. This was done without reinventing the system, which would be cost prohibitive on a program of this maturity. The brunt of the joint part tracking is done within the logistics organization and disseminated to all field sites, without duplicating effort at each site. The JDL is easily accessible across the country via the NASA intranet directly at the SSME workstand. The advent of this logistics data product has greatly enhanced the reliability of tracking dynamic changes to the SSME and greatly reduces engineering change turnaround time and potential for errors. Since the inception of the JDL system in 1997, no discrepant parts have propagated to engine assembly operations. This presentation focuses on the challenges overcome and the techniques used to apply today's desktop technologies to an existing logistics data source.

Jacobs, Kenneth↗

Dynamic wake prediction and visualization with uncertainty analysis

A dynamic wake avoidance system utilizes aircraft and atmospheric parameters readily available in flight to model and predict airborne wake vortices in real time. A novel combination of algorithms allows for a relatively simple yet robust wake model to be constructed based on information extracted from a broadcast. The system predicts the location and movement of the wake based on the nominal wake model and correspondingly performs an uncertainty analysis on the wake model to determine a wake hazard zone (no fly zone), which comprises a plurality of wake planes, each moving independently from another. The system selectively adjusts dimensions of each wake plane to minimize spatial and temporal uncertainty, thereby ensuring that the actual wake is within the wake hazard zone. The predicted wake hazard zone is communicated in real time directly to a user via a realistic visual representation. In an example, the wake hazard zone is visualized on a 3-D flight deck display to enable a pilot to visualize or see a neighboring aircraft as well as its wake. The system substantially enhances the pilot's situational awareness and allows for a further safe decrease in spacing, which could alleviate airport and airspace congestion.

Holforty, Wendy L.↗

An Automated Medical Inventory System (AMIS) to Enable Earth-Independent Medical Operations

BACKGROUND: Inventory of medical consumables and durables (medications, treatment aids, diagnostic equipment, etc.) aboard the International Space Station is a manual process whereby crewmembers reach out to their flight surgeon to relay when items are used. Performing a full medical system inventory is time intensive. However, as exploration progresses to long duration missions with little to no resupply or evacuation capabilities, maintaining an accurate account of inventory and location for medical systems across the mission will become increasingly critical. A new system must be developed for future exploration missions to meet the need for a crew-facing, real time method of managing medical inventory. OVERVIEW: NASA’s Exploration Medical Integrated Product Team (XMIPT) is funding the AMIS project to mature the technology readiness level and to conduct a flight demonstration of a medical inventory capability. AMIS will leverage lessons learned from a Medical Consumables Tracking project previously demonstrated aboard the ISS in 2016 and 2017. Key components of AMIS include a database, supporting hardware and software, and interfaces to power, communications, or other vehicle or medical systems. Some medical inventory capability may be provided by the vehicle inventory management system which relies upon RFID-based technology and can track larger items such as medical kits or medical hardware. AMIS will augment these capabilities to enable tracking of individual medical kit contents. Efforts are underway to characterize the optimal solution trade space by comparing system specifications (e.g. mass and volume, etc.) across maintenance and operational use cases (e.g. crew time saved, total inventory automated, etc). DISCUSSION: The contents of a Mars Medical System have not been fully defined which poses challenges to defining an inventory system and requires assumptions regarding medical kit contents and medical system design. Other important considerations include minimizing crew time required, avoiding access restrictions to medical inventory in the event of an emergency, and ensuring that data is accessible to other medical system elements to enable crew autonomy in provision of medical care.

Automated Medical Inventory System↗

Graphical interface between the CIRSSE testbed and CimStation software with MCS/CTOS

This research is concerned with developing a graphical simulation of the testbed at the Center for Intelligent Robotic Systems for Space Exploration (CIRSSE) and the interface which allows for communication between the two. Such an interface is useful in telerobotic operations, and as a functional interaction tool for testbed users. Creating a simulated model of a real world system, generates inevitable calibration discrepancies between them. This thesis gives a brief overview of the work done to date in the area of workcell representation and communication, describes the development of the CIRSSE interface, and gives a direction for future work in the area of system calibration. The CimStation software used for development of this interface, is a highly versatile robotic workcell simulation package which has been programmed for this application with a scale graphical model of the testbed, and supporting interface menu code. A need for this tool has been identified for the reasons of path previewing, as a window on teleoperation and for calibration of simulated vs. real world models. The interface allows information (i.e., joint angles) generated by CimStation to be sent as motion goal positions to the testbed robots. An option of the interface has been established such that joint angle information generated by supporting testbed algorithms (i.e., TG, collision avoidance) can be piped through CimStation as a visual preview of the path.

Hron, Anna B.↗

Study of Pairwise Deconfliction Metrics to Analyze Air Traffic Complexity in Upper Class E Airspace

Upper Class E Traffic Management (ETM) is envisioned to cooperatively facilitate operations of a diverse set of aerial vehicles, such as high-altitude long-endurance fixed-wing unmanned aircraft (low-speed and high-speed), high-altitude platforms, airships, stratospheric balloons, supersonic unmanned and commercial aircraft, etc., with a wide variety of mission types, performance characteristics, communication, navigation and surveillance capabilities, maneuverability, and on-board avionics in the National Airspace System (NAS) ’above’ 60,000 feet above mean sea level, without an active and direct control from human air traffic controllers. A diverse mixture of aerial vehicle types creates significant challenges in understanding air traffic complexity, which may not correlate strongly with air traffic density. One key step for determining air traffic complexity in upper class E airspace is to first understand pairwise deconfliction metrics such as reachability, reserve area, and reserve flight time for each pair of unique aerial vehicle types under potential conflict. Therefore, pairwise deconfliction metrics are first defined, and analytical equations are derived for conflict resolution using the heading change maneuver. Next, case studies are performed to analyze deconfliction metrics to avoid secondary conflicts in upper class E airspace. The study shows that pairwise deconfliction metrics are functions of maneuverability, performance characteristics, uncertainty in position and velocity, heading angle change, and conflict angle of aerial vehicles. The next step for this research is to build a mathematical model for air traffic complexity using pairwise deconfliction metrics and validate it in an upper Class E simulation environment.

Airspace Complexity↗

Study of Pairwise Deconfliction Metrics to Analyze Air Traffic Complexity in Upper Class E Airspace

Upper Class E Traffic Management (ETM) is envisioned to cooperatively facilitate operations of a diverse set of aerial vehicles, such as high-altitude long-endurance fixed-wing unmanned aircraft (low-speed and high-speed), high-altitude platforms, airships, stratospheric balloons, supersonic unmanned and commercial aircraft, etc., with a wide variety of mission types, performance characteristics, communication, navigation and surveillance capabilities, maneuverability, and on-board avionics in the National Airspace System (NAS) ’above’ 60,000 feet above mean sea level, without an active and direct control from human air traffic controllers. A diverse mixture of aerial vehicle types creates significant challenges in understanding air traffic complexity, which may not correlate strongly with air traffic density. One key step for determining air traffic complexity in upper class E airspace is to first understand pairwise deconfliction metrics such as reachability, reserve area, and reserve flight time for each pair of unique aerial vehicle types under potential conflict. Therefore, pairwise deconfliction metrics are first defined, and analytical equations are derived for conflict resolution using the heading change maneuver. Next, case studies are performed to analyze deconfliction metrics to avoid secondary conflicts in upper class E airspace. The study shows that pairwise deconfliction metrics are functions of maneuverability, performance characteristics, uncertainty in position and velocity, heading angle change, and conflict angle of aerial vehicles. The next step for this research is to build a mathematical model for air traffic complexity using pairwise deconfliction metrics and validate it in an upper Class E simulation environment.

Airspace Complexity↗

Prototyping Operational Autonomy for Space Traffic Management

Current state of the art in Space Traffic Management (STM) relies on a handful of providers for surveillance and collision prediction, and manual coordination between operators. Neither is scalable to support the expected 10x increase in spacecraft population in less than 10 years, nor does it support automated manuever planning. We present a software prototype of an STM architecture based on open Application Programming Interfaces (APIs), drawing on previous work by NASA to develop an architecture for low-altitude Unmanned Aerial System Traffic Management. The STM architecture is designed to provide structure to the interactions between spacecraft operators, various regulatory bodies, and service suppliers, while maintaining flexibility of these interactions and the ability for new market participants to enter easily. Autonomy is an indispensable part of the proposed architecture in enabling efficient data sharing, coordination between STM participants and safe flight operations. Examples of autonomy within STM include syncing multiple non-authoritative catalogs of resident space objects, or determining which spacecraft maneuvers when preventing impending conjunctions between multiple spacecraft. The STM prototype is based on modern micro-service architecture adhering to OpenAPI standards and deployed in industry standard Docker containers, facilitating easy communication between different participants or services. The system architecture is designed to facilitate adding and replacing services with minimal disruption. We have implemented some example participant services (e.g. a space situational awareness provider/SSA, a conjunction assessment supplier/CAS, an automated maneuver advisor/AMA) within the prototype. Different services, with creative algorithms folded into then, can fulfil similar functional roles within the STM architecture by flexibly connecting to it using pre-defined APIs and data models, thereby lowering the barrier to entry of new players in the STM marketplace. We demonstrate the STM prototype on a multiple conjunction scenario with multiple maneuverable spacecraft, where an example CAS and AMA can recommend optimal maneuvers to the spacecraft operators, based on a predefined reward function. Such tools can intelligently search the space of potential collision avoidance maneuvers with varying parameters like lead time and propellant usage, optimize a customized reward function, and be implemented as a scheduling service within the STM architecture. The case study shows an example of autonomous maneuver planning is possible using the API-based framework. As satellite populations and predicted conjunctions increase, an STM architecture can facilitate seamless information exchange related to collision prediction and mitigation among various service applications on different platforms and servers. The availability of such an STM network also opens up new research topics on satellite maneuver planning, scheduling and negotiation across disjoint entities.

space traffic management↗

Risk of Performance and Behavioral Health Decrements Due to Inadequate Cooperation, Coordination, Communication, and Psychosocial Adaptation within a Team

A team is defined as: "two or more individuals who interact socially and adaptively, have shared or common goals, and hold meaningful task interdependences; it is hierarchically structured and has a limited life span; in it expertise and roles are distributed; and it is embedded within an organization/environmental context that influences and is influenced by ongoing processes and performance outcomes" (Salas, Stagl, Burke, & Goodwin, 2007, p. 189). From the NASA perspective, a team is commonly understood to be a collection of individuals that is assigned to support and achieve a particular mission. Thus, depending on context, this definition can encompass both the spaceflight crew and the individuals and teams in the larger multi-team system who are assigned to support that crew during a mission. The Team Risk outcomes of interest are predominantly performance related, with a secondary emphasis on long-term health; this is somewhat unique in the NASA HRP in that most Risk areas are medically related and primarily focused on long-term health consequences. In many operational environments (e.g., aviation), performance is assessed as the avoidance of errors. However, the research on performance errors is ambiguous. It implies that actions may be dichotomized into "correct" or "incorrect" responses, where incorrect responses or errors are always undesirable. Researchers have argued that this dichotomy is a harmful oversimplification, and it would be more productive to focus on the variability of human performance and how organizations can manage that variability (Hollnagel, Woods, & Leveson, 2006) (Category III1). Two problems occur when focusing on performance errors: 1) the errors are infrequent and, therefore, difficult to observe and record; and 2) the errors do not directly correspond to failure. Research reveals that humans are fairly adept at correcting or compensating for performance errors before such errors result in recognizable or recordable failures. Astronauts are notably adept high performers. Most failures are recorded only when multiple, small errors occur and humans are unable to recognize and correct or compensate for these errors in time to prevent a failure (Dismukes, Berman, Loukopoulos, 2007) (Category III). More commonly, observers record variability in levels of performance. Some teams commit no observable errors but fail to achieve performance objectives or perform only adequately, while other teams commit some errors but perform spectacularly. Successful performance, therefore, cannot be viewed as simply the absence of errors or the avoidance of failure Johnson Space Center (JSC) Joint Leadership Team, 2008). While failure is commonly attributed to making a major error, focusing solely on the elimination of error(s) does not significantly reduce the risk of failure. Failure may also occur when performance is simply insufficient or an effort is incapable of adjusting sufficiently to a contextual change (e.g., changing levels of autonomy).

Landon, Lauren Blackwell↗

Statistical Analysis of Interference Between Earth Stations and Earth-Orbiting Satellites

Determination of the potential for radio frequency interference between Earth stations and orbiting spacecraft is often desirable. This information can be used to select frequencies for radio systems to avoid interference or it can be used to determine if coordination between radio systems is necessary. Also, it is useful for planning emission standards and filtering requirements for future telecommunications equipment. A model is developed that will determine the statistics of interference between Earth stations and elliptical orbiting spacecraft. The model uses orbital dynamics, detailed antenna patterns, and spectral characteristics to obtain accurate levels of interference at the victim receiver. The model is programmed into a computer simulation to obtain long term statistics of interference.

satellite communications interference geometry↗

Exploring the Effectiveness of Maneuvering Guidelines for Space Traffic Management

The number of objects in space has been increasing rapidly, and the risk of collision has grown as well. Many spacecraft operators are now receiving multiple collision warnings a day. Despite this, systems to manage space traffic have been limited: there are no broadly agreed upon guidelines or rules governing the response to predicted potential collisions. Instead, spacecraft operators generally determine whether, when, and how to respond to these warnings on a manual and ad hoc basis. Coordination between operators, if it occurs, often requires repeated communication and negotiation. Some space actors have suggested that the space community should develop right of way rules, similar to those in the ground, sea, and air domains, to guide collision response decisions. However, it is unclear whether such rules would be effective, and it’s unknown whether such rules would have an equitable impact across various spacecraft operators. To address these issues, we developed the Virtual Environment for Space Traffic Analysis (VESTA), a software tool that was used to simulate the space environment with a recent catalog of objects obtained from the U.S. Space-Track.org system. We implemented multiple potential right of way rules within this model. The analysis confirmed that the choice of right of way rule makes a meaningful difference in terms of both efficiency and distributional effects in terms of collision avoidance maneuvers. For example, our analysis shows that rules in which the less massive satellite is required to maneuver results in a more equitable distribution of maneuver responsibility among space actors and also requires less fuel mass, compared to a rule in which the more massive satellite maneuvers.

space traffic management↗

Lunar Base Construction Overview

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews (NASA Apollo program). The next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and the European Union of nations, have all expressed interest in either collaborating or competing with NASA on the Moon. This next phase has an over arching goal of achieving a permanent human presence on the Moon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment. Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity (EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve. In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give an overview of the required construction tasks and related equipment that will be required to robotically build a lunar base using in-situ resources. It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Construction↗

Terminal weather information management

Since the mid-1960's, microburst/windshear events have caused at least 30 aircraft accidents and incidents and have killed more than 600 people in the United States alone. This study evaluated alternative means of alerting an airline crew to the presence of microburst/windshear events in the terminal area. Of particular interest was the relative effectiveness of conventional and data link ground-to-air transmissions of ground-based radar and low-level windshear sensing information on microburst/windshear avoidance. The Advanced Concepts Flight Simulator located at Ames Research Center was employed in a line oriented simulation of a scheduled round-trip airline flight from Salt Lake City to Denver Stapleton Airport. Actual weather en route and in the terminal area was simulated using recorded data. The microburst/windshear incident of July 11, 1988 was re-created for the Denver area operations. Six experienced airline crews currently flying scheduled routes were employed as test subjects for each of three groups: (1) A baseline group which received alerts via conventional air traffic control (ATC) tower transmissions; (2) An experimental group which received alerts/events displayed visually and aurally in the cockpit six miles (approx. 2 min.) from the microburst event; and (3) An additional experimental group received displayed alerts/events 23 linear miles (approx. 7 min.) from the microburst event. Analyses of crew communications and decision times showed a marked improvement in both situation awareness and decision-making with visually displayed ground-based radar information. Substantial reductions in the variability of decision times among crews in the visual display groups were also found. These findings suggest that crew performance will be enhanced and individual differences among crews due to differences in training and prior experience are significantly reduced by providing real-time, graphic display of terminal weather hazards.

Lee, Alfred T.↗

Design Considerations for a Variable Autonomy Executive for UAS in the NAS

This paper describes research targeted towards an autonomy executive (AOS) for UAS in the National Air Space (NAS). The project goal is to incrementally provide the knowledge and intelligence onboard a UAS to safely fly in the National Air Space, eventually autonomous from remote human ground crews and communicating directly with air traffic control. Longer-term, the goal is to provide the capability for pilotless air vehicles such as air taxis that will be key for new transportation concepts such as air mobility-on-demand. For both of these targeted applications, AOS is incorporating artificial intelligence capabilities that operationally meet human pilot competencies. Even when autonomy is achieved from a remote human ground crew, AOS will have variable degrees of autonomy with respect to air traffic control (ATC), just as human pilots do now. AOS has the capability of interacting in natural language with ATC, as well as through data link protocols. AOS can adapt to varying levels of autonomy and control directed by ATC in standard and relaxed FAA phraseology- from being vectored moment by moment, to accepting broad directives such as following a specified aircraft or sighting and avoiding traffic. AOS can autonomously manage contingencies such as vehicle systems degradations and failures. It incorporates a decision maker that takes information from multiple diagnostic reasoners, disambiguates (if needed) sensor results to specific failures using active mode changes, then projects forward the impact of the degradation on the nominal plan. If the nominal plan is no longer viable, then alternative plans are formulated, and subsequently selected and executed, including abort options.

Lowry, Michael↗

Proposed Mars Surveyor Landing Sites in Northern Meridiani Sinus, Southern Elysium Planitia, and Argyre Planitia

Our objective is to propose two landing sites that the Mars Surveyor 2001 Lander and Athena Rover could go to on Mars that should meet the safety requirements of the spacecraft landing system and optimize surface operations (chiefly driven by power and communications requirements). An additional site within Argyre Planitia, initially proposed by Parker to the Mars Surveyor Landing Site program, is also proposed for potential consideration for post-2001 missions to Mars, as it is well outside the current latitude limits for the Athena Rover. All three sites are designed to be situated as close to a diversity of geologic units within a few kilometers of the landing site so that diversity can be placed in a geologic context. This objective is very different from the Mars Pathfinder requirement to land at a site with a maximum chance for containing a diversity of rocks within a few tens of meters of the lander. That requirement was driven by the Sojourner mobility limit of a few tens of meters. It can be argued that the Athena project, with its much larger mobility capability, might actually want to avoid such a site, because placing collected samples in geologic context would be difficult. While it has been argued, both before and after the Mars Pathfinder landing, that the provenance for local blocks may be determined by orbiter spectra, primarily from the MGS TES instrument, our ability to do so has yet to be demonstrated. Indeed, several months after conclusion of the Pathfinder mission, we have yet to reach a consensus on the composition of local materials. Our primary data set for selecting a landing site within the latitude and elevation constraints of the 2001 mission is the Viking Orbiter image archive. The site must be selected to place the landing ellipse so as to avoid obvious hazards, such as steep slopes, large or numerous craters, or abundant large knobs. For this purpose, we chose a resolution limit of better than 50 m/pixel. This necessarily excludes from the present study images from current and future orbiter spacecraft, until such data does become readily available. Within each proposed region, it may be possible to identify additional sites once these data become available. Second, the fine-component thermal inertia data, should be greater than about 5 or 6 cgs Units (10(exp -3) cal/sq cm s(exp -0.5)/K). Low thermal inertias imply dusty environments, which could pose a mobility hazard. Similarly, the albedo of the site should not be particularly high, which would also suggest dusty surfaces. Low albedos are preferred, as they often coincide with low Viking red:violet ratios and indicate less dusty surfaces. Next, the Modeled Block Abundance should also not be too high or too low. Based on the Viking Lander and Mars Pathfinder experiences, percentages of blocks should be on the order of 5-25%. Too many blocks could pose a hazard to the landing and mobility. Too few blocks could also indicate a dusty surface. Primary Landing Site: Northern Meridiani Sinus (Proposed by T. J. Parker and K., S. Edgett) Vital Statistics: (1) Latitude, Longitude: 0-3 N, 350-2 W. *Elevation (Viking): about0.5-1.5 Ian. (2) Viking Orbiter Image coverage: Excellent coverage by 15 - 25 m/pixel images (orbits 709A and 410B). Possible stereo coverage in region where two orbits overlap (probably small parallax angle, as these orbits are not listed in NASA Contractor Report 3501) (3) Albedo: about .18 -.26 (4) Block Abundance: 5-26% (5)Fine-Component Thermal Inertia: 5-9 cgs units This region consists of bright deposits similar to those described by Edgett et al, that also lie within a prominent dark albedo region. These deposits are flat-lying, to such a degree that they ramp against topography rather than draping over it. This led Edgett and Parker to suggest that they may be subaqueous sediments, possibly lacustrine or marine evaporites, laid down sometime from the late Noachian to middle Hesperian (age determination pending crater counts). A contact between this material and elevated, dissected highlands to the south was identified , and is described by Edgett et al. Our desire in proposing this landing site is to sample the edge of this deposit where it has been exposed through etching, presumably eolian deflation (the deposit, though in the highlands, is itself only lightly to moderately cratered). This should enable access to in situ stratigraphy. The actual landing site will be selected where slopes are not expected to be steep, such that the rover itself should be able to traverse them and sample layered materials on the way, either up or down the slope. Perhaps due to uncertainties at this time as to the friability or meter-scale roughness of the deposit, it might make sense to place the landing ellipse on the exhumed highland surface adjacent to the deflated margin of the deposit and plan on driving to the deposit rather than landing on it and driving downslope. This should also enable imaging the margin for evidence of layering should it prove too difficult to climb. A target ellipse on the highland surface should also allow Athena access to ancient Noachian highland materials, particularly if placed near crater ejecta or an inlier of knobby material. Secondary Landing Site: Southern Elysium Planitia (Proposed by T. J. Parker) Vital Statistics: (1) Latitude, Longitude: 1.5-3.5 S, 195-198 W. (2) Elevation (Viking): -1.0 km. (3) Viking Orbiter Image coverage: Excellent coverage by 15 - 25 m/pixel images (orbit 725). Possible stereo coverage between images from beginning and end of orbit that overlap (probably small parallax angle) (4) Albedo: about .27-.28 (5) Block Abundance: 4-7% (6) Fine-Component Thermal Inertia: about 3 cgs units This region consists of eroded knobby material, probably of Noachian age, though much of the crater population has been destroyed, that is onlapped at a sharp contact by an extensive plains unit in southern Elysium Planitia that is Amazonian in age. The plains materials have been attributed to unusually low-viscosity flood lavas from fissures south of the Elysium volcanic rise, or to lacustrine materials associated with a large, Amazonian lake at the source of Marte Vallis. Parker and Schenk presented evidence in support of the latter interpretation, though they attributed the putative shore morphology to an embayment of a northern plains ocean into the southern Elysium region. Detailed examination of the margin of the deposit, showing erosion, not simply burial, of small crater rims and fluidized ejecta blankets, also points to lacustrine or marine sedimentation rather than volcanic plains burial. The plains surface exhibits a "crusty" appearance that many researchers have attributed to pressure ridges in lava flows. In a lacustrine context, they also resemble pressure ridges in desiccated evaporite deposits and salt-rimmed pools (now dry) similar in scale and morphology to spectacular, hundred meter-scale pool rims in alkaline Lake Natron, East African Rift. The eroded highland margin surface adjacent to these plains appears to be fairly smooth, even at 15 m/pixel. Isolated knob inliers are scattered from a few kilometers to several tens of "kilometers apart. Heights of the knobs have not been measured yet but, based on experience with similar features in the Pathfinder landing ellipse, are probably typically on the order of several tens of meters high and smaller, though some of the largest knobs in the region are probably up to a few hundred meters high. Two craters larger than a kilometer in diameter, with fluidized deposits, lie nearby the proposed landing site. Very high-resolution images from MOC should help to determine whether a landing site navigable by the Athena rover could be placed in this region. The space between knobs and craters is large enough to enable placement of a target landing ellipse between them but still provide access to one or more of them and to the margin of the Elysium plains material. Post-2001 Mars Surveyor Landing Site: Argyre Planitia (Proposed by T. J. Parker) Vital Statistics: (1) Latitude, Longitude: 55-56 S, 41-43 W. (2) Elevation (Viking): 1.0 km. (3) Viking Orbiter Image coverage: Excellent coverage by 40 m/pixel images (orbits 567B, 568B, and 569B). Excellent stereo coverage with large parallax angles over the entire landing site region, and much of central and southern Argyre. (4) Albedo: about .23-.24 (5) Block Abundance: No data (6) Fine-Component Thermal Inertia: No data The floors of both the Argyre and Hellas basins contain etched layered materials that are probably thick accumulations of channel or lacustrine sediments. The deposits in Hellas are much more eroded than those in Argyre, and Hellas lacks a channel outlet. Argyre is unique in that Uzboi Vallis flowed out of the basin, requiring overflow of a standing body of water within Argyre. This makes it the largest impact basin on Mars with channels both draining into it and flowing out from it. Hellas' channels may be catastrophic flood channels, whereas Argyre was fed by modest-scale valley networks, though the outlet at Uzboi Vallis was a catastrophic flood Highland craters and basins of this kind should be high-priority landing targets for missions intended to focus on the search for either prebiotic organic materials or even simple fossil microorganisms. Basins with internally-draining valley networks should be preferred over flood channels, as they could have provided the long-term influx of water favorable to the origin of life. (Catastrophic floods are not conducive to fossil preservation, due to their very short durations and high transportation energies). They also afford an opportunity to study the evolution of the planet's climate and volatiles during the period of time between the late Noachian and early Hesperian, when a drastic change from a proposed early warm, wet climate to one more closely resembling the modern environment is thought to have occurred. Large basin

Parker, T. J.↗

Lunar Base Construction Planning

Previous lunar missions and campaigns have been restricted to using robotic landers and lunar orbiting satellites as well as sortie type of operations using astronaut crews(NASA Apollo program).Now, the next phase of lunar exploration has begun under NASA’s Artemis program and there has been an international response where other nations such as China, Russia, India, Canada, Japan and theEuropean Union of nations, have all expressed interest in either collaborating or competing with NASA on theMoon. This next phase has an overarching goal of achieving a permanent human presence on theMoon via sustainable methods. A lunar base with human occupancy will require infrastructure to provide shelter, utilities, landing/launch pads, roads, communications, power and all the other necessities to sustain human life and protect equipment.Since human biology is not well suited for surviving in the lunar environment, there will be many forms of automated equipment, autonomy and robotic helpers that will minimize the amount of Extra-Vehicular Activity(EVA) required by the crew. This will mean that the radiation dosage received by the crew will stay within acceptable and safe career doses. Radiation shielding via the use of regolith can also mitigate radiation dangers.The required infrastructure must be constructed, but the mass and logistics of bringing all the construction materials from Earth are prohibitive, which makes the necessary construction difficult to achieve.In-Situ Resource Utilization (ISRU) aims to solve this challenge by sourcing construction materials locally or “in-situ”. This means that their transportation can be completely eliminated, resulting in large cost savings by avoiding the launch out of Earth’s deep gravity well and subsequent trans lunar injection, lunar orbit capture and landing. This paper will give ahistorical review and current status of lunar construction planning and a high level introduction to the required infrastructure and construction equipment that will be required to robotically build a lunar base using in-situ resources.It will also organize these tasks into logical groupings so that technology development and implementation can be pursued within a framework that can be referenced by all involved.

Lunar↗

CARACaS multi-agent maritime autonomy for unmanned surface vehicles in the Swarm II harbor patrol demonstration

This paper describes new autonomy technology that enabled a team of unmanned surface vehicles (USVs) to execute cooperative behaviors in the USV Swarm II harbor patrol demonstration and provides a description of autonomy performance in the event. The new developments extend the NASA Jet Propulsion Laboratory’s CARACaS (Control Architecture for Robotic Agent Command and Sensing) autonomy architecture, which pro- vides foundational software infrastructure, core executive functions, and several default robotic technology mod- ules. In Swarm II, CARACaS demonstrated higher levels of autonomy and more complex cooperation than previous on-water exercises, using full-sized vehicles and real-world sensing and communication. The core au- tonomous behaviors to support the harbor patrol scenario included Patrol, Track, Inspect, and Trail, providing the capability of finding all vessels entering the patrol area, keeping track of them, inspecting them to infer intent, and trailing suspect vessels. Significantly, CARACaS assumed responsibility for not only executing tasks safely and efficiently but also recognizing what tasks needed to be accomplished, given the current state of the world. Since the heterogeneous USV teams shared world model that evolved, such as due to (dis)appearance of vessels in the area or a change in health or availability of a USV, CARACaS replanned to generate and reallocate the new task list. Thus, human intervention was never required in the loop to task USVs during mission execution, though a supervisory role was supported in the autonomy system for mission monitoring and exception handling. Finally, CARACaS also ensured the USVs avoided hazards and obeyed the applicable rules of the road, using its local motion planning modules.

Sandoval, Michael↗