Annual Report on U.S. Wind Power Installation, Cost, and Performance Trends: 2006 (Presentation)
Presentation on the key trends in the U.S. wind industry in 2006.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Presentation on the key trends in the U.S. wind industry in 2006.
Presentation on the key trends in the U.S. wind industry in 2007.
There are a multitude of studies completed and ongoing related to the cost of wind integration. However, the results are not easy to compare. An international forum for exchange of knowledge of power system impacts of wind power has been formed under the IEA Implementing Agreement on Wind Energy. IEA WIND R and D Task 25 on 'Design and Operation of Power Systems with Large Amounts of Wind Power' produced a state-of-the-art report in October 2007, where the most relevant wind-power grid integration studies were analyzed, especially regarding methodologies and input data. This paper summarizes the results from 18 case studies, with discussion on differences in methodology as well as issues that have been identified to impact the cost of wind integration.
The report addresses the implementation of central wind power forecasting by electric utilities and regional transmission organizations in North America.
The strong projected growth of wind power will require a stream of trained and qualified workers to manufacture, construct, operate, and maintain the wind energy facilities.
The funds from this project were used to purchase tools and instrumentation to help replicate actual on-the-job wind energy scenarios which provided the students with the practical or applied components of wind energy jobs. This project enhanced the educational experiences provided for the students in terms of engineering and science components of wind energy by using electronics, control systems, and electro-mechanical instrumentation to help students learn standardized wind-specific craftsman skills. In addition the tools and instrumentation helped the students learn the safety necessary to work in the wind industry.
The role of Northeast Utilities in the Kaman/NASA large wind generator study is reviewed. The participation falls into four principal areas: (1) technical assistance; (2) economic analysis; (3) applications; and (4) institutional and legal. A model for the economic viability of wind power is presented.
The Boulder Wind Power (BWP) Advanced Gearless Drivetrain Project explored the application of BWP's innovative, axial-gap, air-core, permanent-magnet direct-drive generator in offshore wind turbines. The objective of this CRADA is to assess the benefits that result from reduced towerhead mass of BWP's technology when used in 6 MW offshore turbines installed on a monopile or a floating spar foundation.
Integration of high wind penetration levels will require fast-ramping combined cycle and steam cycles that, due to higher operating costs, will require proper pricing of ancillary services or other forms of compensation to remain viable. Several technical and policy recommendations are presented to help realign the generation mix to properly integrate the wind. (author)
Wake effects cause wind turbine generators (WTGs) within a wind power plant (WPP) to produce different levels of active power and subsequent reactive power capabilities. Further, the impedance between a WTG and the point of interconnection (POI)-which depends on the distance between them-impacts the WPP's reactive power injection capability at the POI. This paper proposes a voltage control scheme for a WPP based on the available reactive current of the doubly-fed induction generators (DFIGs) and its impacts on the POI to improve the reactive power injection capability of the WPP. In this paper, a design strategy for modifying the gain of DFIG controller is suggested and the comprehensive properties of these control gains are investigated. In the proposed scheme, the WPP controller, which operates in a voltage control mode, sends the command signal to the DFIGs based on the voltage difference at the POI. The DFIG controllers, which operate in a voltage control mode, employ a proportional controller with a limiter. The gain of the proportional controller is adjusted depending on the available reactive current of the DFIG and the series impedance between the DFIG and the POI. The performance of the proposed scheme is validated for various disturbances such as a reactive load connection and grid fault using an EMTP-RV simulator. Furthermore, simulation results demonstrate that the proposed scheme promptly recovers the POI voltage by injecting more reactive power after a disturbance than the conventional scheme.
This report summarizes an assessment of improved short-term wind power forecasting in the California Independent System Operator (CAISO) market and provides a quantification of its potential value.
This letter proposes a machine learning-based linear programming model that quickly establishes the nonparametric prediction intervals of wind power by integrating extreme learning machine and quantile regression. The proportions of quantiles can be adaptively determined via sensitivity analysis. The proposed method has been proven to be significantly efficient and reliable, with a high application potential in power systems.
As wind power facilities age, project owners are faced with plant end of life decisions. This report is intended to inform policymakers and the business community regarding the history, opportunities, and challenges associated with plant end of life actions, in particular repowering. Specifically, the report details the history of repowering, examines the plant age at which repowering becomes financially attractive, and estimates the incremental market investment and supply chain demand that might result from future U.S. repowering activities.
Regional reliability organizations require power plants to validate the dynamic models that represent them to ensure that power systems studies are performed to the best representation of the components installed. In the process of validating a wind power plant (WPP), one must be cognizant of the parameter settings of the wind turbine generators (WTGs) and the operational settings of the WPP. Validating the dynamic model of a WPP is required to be performed periodically. This is because the control parameters of the WTGs and the other supporting components within a WPP may be modified to comply with new grid codes or upgrades to the WTG controller with new capabilities developed by the turbine manufacturers or requested by the plant owners or operators. The diversity within a WPP affects the way we represent it in a model. Diversity within a WPP may be found in the way the WTGs are controlled, the wind resource, the layout of the WPP (electrical diversity), and the type of WTGs used. Each group of WTGs constitutes a significant portion of the output power of the WPP, and their unique and salient behaviors should be represented individually. The objective of this paper is to illustrate the process of dynamic model validations of WTGs and WPPs, the available data recorded that must be screened before it is used for the dynamic validations, and the assumptions made in the dynamic models of the WTG and WPP that must be understood. Without understanding the correct process, the validations may lead to the wrong representations of the WTG and WPP modeled.
In this paper, a constant Volt/Hz operation applied to the Type 1 wind turbine generator. Various control aspects of Type 1 generators at the plant level and at the turbine level will be investigated.
This paper investigates the potential of using brushless excitation (BLE) for not only riding through the fault but also to damp inter-area power oscillation with the help of a synchronous generator (SG) used in Type 5 Wind Power Plant (WPP). In BLE, an auxiliary synchronous generator (ASG) behaving like an exciter is coupled and driven by the rotor of the main SG. The BLE's field current's ASG is fed by two separate loops of the automatic voltage regulator (AVR) and power system stabilizer (PSS). The AVR system implements a control loop to regulate the generator terminal voltage, VT. For the PSS, the kinetic energy of the wind turbine is utilized according to the estimated rotational speed of the synchronous generator shaft of the SG. It may mitigate the necessity of any curtailment of active power for damping. The effectiveness of the proposed control scheme is verified with a three-phase short circuit fault in a two-area power system.
This paper investigates the potential of using brushless excitation (BLE) for not only riding through the fault but also to damp inter-area power oscillation with the help of a synchronous generator (SG) used in Type 5 Wind Power Plant (WPP). In BLE, an auxiliary synchronous generator (ASG) behaving like an exciter is coupled and driven by the rotor of the main SG. The BLE's field current's ASG is fed by two separate loops of the automatic voltage regulator (AVR) and Power System Stabilizer (PSS). The AVR system implements a control loop to regulate the generator terminal voltage, VT. For the PSS, the kinetic energy of the wind turbine is utilized according to the estimated rotational speed of the synchronous generator shaft of the SG. It mitigates the necessity of any curtailment of active power for damping. The effectiveness of the proposed control scheme is verified with a three-phase short circuit fault in a two-area power system.
The total inertia stored in all rotating masses (synchronous generators, induction motors, etc.) connected to a power system grid is an essential force that keeps the system stable after disturbances. Power systems have been experiencing reduced inertia during the past few decades [1]. This trend will continue as the level of renewable generation (e.g., wind and solar) increases. Wind power plants (WPPs) and other renewable power plants with power electronic interfaces are capable of delivering frequency response (both droop and/or inertial response) by a control action; thus, the reduction in available online inertia can be compensated by designing the plant control to include frequency response. The source of energy to be delivered as inertial response is determined by the type of generation (wind, photovoltaic, concentrating solar power, etc.) and the control strategy chosen. The importance of providing ancillary services to ensure frequency control within a power system is evidenced from many recent publications with different perspectives (manufacturer, system operator, regulator, etc.) [2]-[6]. This paper is intended to provide operators with a method for the real-time assessment of the available inertia of a WPP. This is critical to managing power system stability and the reserve margin. In many states, modern WPPs are required to provide ancillary services (e.g., frequency regulation via governor response and inertial response) to the grid. This paper describes the method of estimating the available inertia and the profile of the forecasted response from a WPP.