Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “UNITS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Physical properties of Meridiani Sinus-type units in the central equatorial region of Mars

Classification and mapping of surficial units in the central equatorial region of Mars (30 degrees N to 20 degrees S, 57 degrees E to 75 degrees W) using enhanced color images and Mars Consortium data identified four major color/albedo units in the dark, reddish-gray regions that form the classical dark albedo markings of Mars, including Meridiani Sinus. The darkest, least red (relatively 'blue') materials form splotches (some with dune forms) in craters, inter-crater depressions, and part of Valles Marineris. These form the 'Dark Blue' Meridiani unit. Abundant materials that have higher albedos and are somewhat redder than the 'Dark Blue' unit have uniquely high green/(violet + red) color ratios in Viking Orbiter images. These materials, named 'Green-blue' Meridiani surround and mix with 'Dark Blue' Meridiani patches and are abundant on crater rims and local elevations. Discontinuous, patchy deposits with still higher albedos and much redder colors have morphologies classified of the Type Ib bright depositional dust streaks and sheets that were classified by Thomas et al. These dust deposits, which appear to be optically thin and patchy and are darker and not as red as other Type Ib dust deposits on Mars, and their Meridiani substrates, were designated the 'Red' Meridiani unit. Distinctive deposits that form highly eroded mesas and escarpments in northern Meridiani Sinus were named 'Light Blue' Meridiani, since they are not as red as other materials with moderately high albedos. Large areas dominated by these units form Meridiani Province in the central equatorial region of Mars.

Strickland, Edwin L., III↗

Approximating the stress field within the unit cell of a fabric reinforced composite using replacement elements

This report concerns the prediction of the elastic moduli and the internal stresses within the unit cell of a fabric reinforced composite. In the proposed analysis no restrictions or assumptions are necessary concerning yarn or tow cross-sectional shapes or paths through the unit cell but the unit cell itself must be a right hexagonal parallelepiped. All the unit cell dimensions are assumed to be small with respect to the thickness of the composite structure that it models. The finite element analysis of a unit cell is usually complicated by the mesh generation problems and the non-standard, adjacent-cell boundary conditions. This analysis avoids these problems through the use of preprogrammed boundary conditions and replacement materials (or elements). With replacement elements it is not necessary to match all the constitutional material interfaces with finite element boundaries. Simple brick-shaped elements can be used to model the unit cell structure. The analysis predicts the elastic constants and the average stresses within each constituent material of each brick element. The application and results of this analysis are demonstrated through several example problems which include a number of composite microstructures.

Foye, R. L.↗

Charge-Control Unit for Testing Lithium-Ion Cells

A charge-control unit was developed as part of a program to validate Li-ion cells packaged together in batteries for aerospace use. The lithium-ion cell charge-control unit will be useful to anyone who performs testing of battery cells for aerospace and non-aerospace uses and to anyone who manufacturers battery test equipment. This technology reduces the quantity of costly power supplies and independent channels that are needed for test programs in which multiple cells are tested. Battery test equipment manufacturers can integrate the technology into their battery test equipment as a method to manage charging of multiple cells in series. The unit manages a complex scheme that is required for charging Li-ion cells electrically connected in series. The unit makes it possible to evaluate cells together as a pack using a single primary test channel, while also making it possible to charge each cell individually. Hence, inherent cell-to-cell variations in a series string of cells can be addressed, and yet the cost of testing is reduced substantially below the cost of testing each cell as a separate entity. The unit consists of electronic circuits and thermal-management devices housed in a common package. It also includes isolated annunciators to signal when the cells are being actively bypassed. These annunciators can be used by external charge managers or can be connected in series to signal that all cells have reached maximum charge. The charge-control circuitry for each cell amounts to regulator circuitry and is powered by that cell, eliminating the need for an external power source or controller. A 110-VAC source of electricity is required to power the thermal-management portion of the unit. A small direct-current source can be used to supply power for an annunciator signal, if desired.

Reid, Concha M.↗

Habitat Demonstration Unit Project Leadership and Management Strategies

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Habitat Demonstration Unit Project: Leadership and Management Strategies for a Rapid Prototyping Project

This paper gives an overview of the National Aeronautics and Space Administration (NASA) led multi-center Habitat Demonstration Unit (HDU) project leadership and management strategies being used by the NASA HDU team for a rapid prototyping project. The HDU project team constructed and tested an analog prototype lunar surface habitat/laboratory called the Pressurized Excursion Module (PEM) during 2010. The prototype unit subsystems were integrated in a short amount of time, utilizing a tiger team rapid prototyping approach that brought together over 20 habitation-related technologies and innovations from a variety of NASA centers. This paper describes the leadership and management strategies as well as lessons learned pertaining to leading and managing a multi-center diverse team in a rapid prototype environment. The PEM configuration went from a paper design to an operational surface habitat demonstration unit in less than 12 months. The HDU project is part of the strategic plan from the Exploration Systems Mission Directorate (ESMD) Directorate Integration Office (DIO) and the Exploration Mission Systems Office (EMSO) to test destination elements in analog environments. The 2011 HDU-Deep Space Habitat (DSH) configuration will build upon the PEM work, and emphasize validity of crew operations (remote working and living), EVA operations, mission operations, logistics operations, and science operations that might be required in a deep space context for Near Earth Object (NEO) exploration mission architectures. The 2011 HDU-DSH will be field-tested during the 2011 Desert Research and Technologies Studies (DRaTS) field tests. The HDU project is a "technology-pull" project that integrates technologies and innovations from multiple NASA centers. This project will repurpose the HDU 2010 demo unit that was field tested in the 2010 DRaTS, adding habitation functionality to the prototype unit. This paper will describe the strategy of establishing a multi-center project management team that put in place the key multi-center leadership skills and disciplines to enable a successful tiger team approach. Advocacy was established with key stakeholders and NASA Headquarters (HQ) by defining a strategic vision, mission, goals and objectives for the project and team. As a technology-pull testbed capability the HDU project was able to collaborate and leverage the Exploration Technology Development Program (ETDP) and individual NASA center investments which capitalized on their respective center core competencies and skills. This approach enable the leveraging of over $7.5m of value to create an operational habitat demonstration unit 2010 PEM configuration.

Kennedy, Kriss J.↗

Seven Years of Permanent Running of MELFI-1 on Board the ISS and Utilisation of the Three MELFI Units Refrigeration Pool

The pool of three Minus Eighty Laboratory freezer for ISS (MELFI) units continues providing the scientific community with robust and permanent freezer and refrigeration capabilities for life science experiments on the International Space Station (ISS). Launched in 2006, the first unit will complete, by summer 2013, seven years of continuous operations without intervention on the internal Nitrogen gas cycle, while all necessary hardware and operations were initially planned for preventive maintenance every two years. This unit has demonstrated outstanding performance on orbit and proved the technical decisions made during the development program. Current utilization of MELFI units in the ISS is taking full benefit of the initial specifications, which allows for wide adaptations to cope with the mission scenario imposed by the life extension in orbit. The two other MELFI units, launched respectively in 2008 and 2009, are supporting the first unit providing additional conditioned volume necessary for the science on board, and also for preparing thermal mass used to protect the samples on their way down to earth. The MELFI pool is outfitted with all supporting hardware to allow for extended operation on orbit including preventive and corrective maintenance. The internal components were designed to allow for easy on board maintenance. Spare equipment was installed in the MELFI rack on ISS and specific maintenance means were developed which required crew training before the cold gas cycle could be accessed. The paper will present first how the design choices made for the initial missions are identifying features necessary for extended duration missions, and will then give highlights on the utilization of the MELFI refrigeration pool during the recent years in ISS.

Chegancas, Jean↗

High Input Voltage, Silicon Carbide Power Processing Unit Performance Demonstration

A silicon carbide brassboard power processing unit has been developed by the NASA Glenn Research Center in Cleveland, Ohio. The power processing unit operates from two sources - a nominal 300-Volt high voltage input bus and a nominal 28-Volt low voltage input bus. The design of the power processing unit includes four low voltage, low power supplies that provide power to the thruster auxiliary supplies, and two parallel 7.5 kilowatt power supplies that are capable of providing up to 15 kilowatts of total power at 300-Volts to 500-Volts to the thruster discharge supply. Additionally, the unit contains a housekeeping supply, high voltage input filter, low voltage input filter, and master control board, such that the complete brassboard unit is capable of operating a 12.5 kilowatt Hall Effect Thruster. The performance of unit was characterized under both ambient and thermal vacuum test conditions, and the results demonstrate the exceptional performance with full power efficiencies exceeding 97. With a space-qualified silicon carbide or similar high voltage, high efficiency power device, this design could evolve into a flight design for future missions that require high power electric propulsion systems.

Technology↗

Development Unit for In-Space Pneumatic Helium Transfer Compressor

High-pressure gaseous helium (GHe) plays a critical role in spacecraft propulsion due to its near exclusive use for pressurization of propellant tanks. Several different designs for helium compressor technologies have been developed for use on Earth; however, significant design changes are required to meet the power, thermal/heat dissipation, vacuum, vibration/shock, size, mass, and efficiency requirements needed for space and launch environments. Currently, no capability exists for mass efficient on-orbit GHe (or xenon) transfer, nor has it ever been attempted. This effort proposed several challenging requirements for the vendor to develop a one-of-a-kind pneumatic compressor prototype. In order to develop a compressor prototype at a TRL 4, a partnership with Air Squared, Inc. was established. This CIF project concluded with the receipt of a prototype along with a proposed design for a flight unit; however, it will not be built due to funding limitations. The vendor had moderate success with initial testing of the prototype at lower pressures (with shimming configured for low pressure). There were delays with testing since the unit was built for higher pressures and the low pressure shimming was challenging to implement. It was found that operation of the compressor at lower pressures caused increased friction on the motor shaft which resulted in the unit drawing more power (current). This was initially thought to be a motor or controller defect. Subsequent high pressure testing at KSC showed that the friction was reduced for the optimal design point (with a high pressure shimming configuration) and the motor (and controller) performed nominally. Following the vendor testing, the unit was tuned/shimmed for a nominal inlet pressure and shipped to KSC for high pressure testing using the custom-designed setup in the Vehicle Assembly Building. The unit performed well, showing the capability to achieve over higher pressure of compression. The pressure differential could likely increase, however, the maximum output of the power supply used for testing was reached, limiting the compressor motor’s capability. Following the GN2 testing, the test setup was converted to GHe with at high pressure. It was shown that although the unit was unable to achieve similar high pressure differentials due to reverse leakage of the GHe through the scroll tip seals, it did achieve the desired GHe compression. This may still be useful for some applications, however, for the purpose of on-orbit GHe transfer, the single stage design would need to be changed to include multiple stages to achieve the compression goals initially proposed by the project.

Brian Nufer↗

Quick setup of unit test for accelerator controls system

Testing a single hardware unit of an accelerator control system often requires the setup of a program with graphical user interface. Developing a dedicated application for a specific hardware unit test could be time consuming and the application may become obsolete after the unit tests. This paper documents a methodology for quick design and setup of an interface focused on performing unit tests of accelerator equipment with minimum programming work. The method has three components. The first is a generic accelerator device object (ADO) manager which can be used to setup, store, and log testing controls parameters for any unit testing system. The second involves the design of a TAPE (Tool for Automated Procedure Execution) sequence file that specifies and implements all te testing and control logic. The sting third is the design of a PET (parameter editing tool) page that provides the unit tester with all the necessary control parameters required for testing. This approach has been used for testing the horizontal plane of the Stochastic Cooling Motion Control System at RHIC.

43 PARTICLE ACCELERATORS↗

Comparison of Radon Results in 4- Versus 6-Plex Townhouse Units

In this work, to determine whether there were any significant differences in radon frequency between 4-unit (4-plex) and 6- unit (6-plex) multifamily buildings, an analysis was performed on three different populations of townhouses: one located within an Environmental Protection Agency (EPA) Radon Zone 1 site (Population A) and two others, both located in an EPA Radon Zone 3 site (Populations B and C). Within their respective population grouping, all units were two stories, identical in construction and floor plan, and were constructed by the same contractor over a 1- to 2-year period. In addition, each unit had its own separate, ducted forced-air heat pump. Long-term radon testing was performed using alpha track detectors (ATDs) for a period of 180 days. All detectors were placed in accordance with EPA residential sampling protocols (EPA 402-R-92-003) along the centerline of each unit. Followup testing (short-term, 7-day electret) was performed in all units in which the ATD test results were ≥4 pCi/L, and all elevated results were confirmed.

61 RADIATION PROTECTION AND DOSIMETRY↗

Economic Dispatch Optimization of Multi-Unit SMR Site

With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

RELAP5-3D British and SI Unit Conversion Task

The RELAP5-3D code uses conversion factors throughout the code to convert values between British and SI units. Conversion factors are typically in each of the separate routines that perform unit conversion. This results in inconsistent unit conversion and increases the likelihood of errors being introduced in the conversion factors. Unit conversion factors were relocated to a centralized module so that these values are only entered in one location. The unit conversion values were then replaced in the various locations with a unit conversion variable. The code was tested using the verification test set after making these changes and the results were analyzed. As expected, all the cases that use British input were found to have changed. In addition, three other cases changed due to changes in conversion factors.

97 MATHEMATICS AND COMPUTING↗

Split HPWHs as an Efficient Solution for Multifamily Buildings with In-Unit Water Heaters: Preprint

A quarter of all housing units in the country are found in multifamily buildings but few efficiency innovations have been made to improve electric water heating systems in this building type. Domestic hot water in multifamily buildings can either be provided by a large central water heater or smaller in-unit water heaters. Integrated heat pump water heaters that are installed in single family homes are often a poor fit for individual multifamily units since the water heaters are often located in small internal closets. This confined space can limit the air flow to the heat pump and the cold exhaust air can cause discomfort and reduced efficiency. Split CO2 HPWHs separate the tank from the heat pump, which allows for installation location flexibility. Further, CO2 heat pumps can operate under colder ambient conditions, making them a better fit for multifamily units across a wide range of climate regions. As part of a larger project to characterize split HPWH performance, we evaluated the feasibility of installing an additional, parallel tank that could provide hot water to a second housing unit using a single CO2 heat pump. This approach would reduce the first costs of these more expensive units. Based on the high draw volume that we imposed on both tanks, the same heat pump may be able to support more tanks, depending on hot water usage. This paper will describe the split CO2 HPWH technology, how the two-tank system was controlled, and results from our laboratory evaluation.

CO2 HPWH↗

Principles on Radiological Characterization of the Unit 1 at Ignalina NPP for Decommissioning Purposes

There is only one nuclear power plant in Lithuania - Ignalina NPP (INPP). The INPP operated two similar units with installed capacity of 1500 MW(each). They were commissioned in 12/1983 and 08/1987, and the original design lifetime was projected out to 2010 and 2015 respectively. But the first Unit of Ignalina NPP was shutdown December 31, 2004, and second Unit will be closed down before 2010 taking into consideration substantial long-term financial assistance from the EU, G7 and other states as well as international institutions. Implementation of dismantling activities requires detailed knowledge of the radiological situation at the Unit 1. General Programme of Radiological Survey for Ignalina NPP Unit 1 based on NUREG-1575 was prepared in 2005- 2006 by Consortium led by Lithuanian Energy Institute and approved by Regulatory Bodies. It includes such main steps as historical site assessment, scoping, characterization, remedial actions/decontamination support surveys and final status surveys. General Programme of Radiological Survey defines content and principles of the surveys, and preliminary survey considerations, including identification of the contaminants, establishment of the free release levels, principles on areas classification depending on contamination potential, identification of the final survey units, criteria for selection survey instrumentation, techniques and methods etc. So, in the paper information on these principles and the content of the different stages in General Programme of Radiological Survey is presented. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Use of XRF to characterize pre-Hanford orchards in the 100-OL-1 operable unit - 15717

Prior to 1943, Hanford site included several small towns with approximately 5,000 acres of orchards; at the time lead arsenate (PbHAsO{sub 4}) was the most commonly used pesticide. High concentration of lead and arsenic have been recorded where trees and stumps are still visible. Pre-Hanford orchards have been designated as 100-OL-1 Operable Unit. An Optimization study evaluated optimal counting time and position of the XRF from soils collected at the site. A Pilot Study included the evaluation of a field portable x-ray fluorescence (XRF) analyzer determining if performance results meet quality assurance criteria for cleanup. XRF has only previously been used as a screening tool. Four Decision Units (DUs) are to be analyzed: Ol-14. OL-32. OL-IU6-4 and OL-FR2-1. The DUs vary in size and have had distinct historic activities; such as 46.4 acres OL-14 having a military camp in the 1950's unlike OL-FR2-1 having been disturbed as it is near the F area reactor. Together the DUs provide an adequate representation of the Operable Unit. Screening criteria for lead (250 mg/kg) and arsenic (20 mg/kg). Six samples were collected ranging above, at, and below the screening criteria of 250 mg/kg for Pb and 20 mg/kg for As at the Decision Units OL-14 and OL-IU6-4, and labeled respectively. Samples were hand sieved, homogenized and placed in sample cups. Three replicates were prepared for each sample. Each sample cup was analyzed 3 times for 30 sec. A Standard Reference Material (SRM) was analyzed after every 20 readings. Three samples were selected for 15, 30, 45, 60, 90, 120, 150 and 180 second fixed and variable analysis. Two transects at OL-14, and one at OL-IU6-4 were created by selecting locations 90. around ground zero at distances of 0.5, 1, 2, 4, 8 and 12 feet (16 ft for OL-14). Locations were scanned in triplicate for 60 seconds each. 4 Decision Units spanning roughly 370 acres were chosen to represent 100-OL-1 Operable Unit. 40 locations within each DU were selected using Visual Sample Plan (VSP) with a random start and systematic grid pattern. Each location would be analyzed with 3 replicates and a 60 second count time. The Standard Reference Material (SRM) and blank are analyzed after every 20 counts to ensure accuracy. Data is extracted from XRF to be implemented in GIS for visual representation of site with 1943 and 2013 aerial imagery. Discussion/Conclusion: - XRF provided a good indication of precision and accuracy relative to ICP with a linear correlation R{sup 2} value higher than anticipated at .9735; - MDL proved the detection limit is significantly lower than the screening criteria; - When comparing results from the first 40 locations of OL-14 to the total 80 locations of OL-14, the same variability was seen; - We expect high concentrations of Pb and As to be where past orchards are present though this does not occur as all sites. Significance: - XRF is competent for decision making as values fall within ±20% ICP data; - The highest concentrations are not where expected, which may be an issue for sites outside of Hanford that have had more development; - The size of the DU does not affect the number of samples measured. Future Work: - Verification and validation of the XRF Data (QA/QC); - Revise conceptual site model; - Statistical evaluations to investigate: Estimation of variability in surface soils, appropriate size for DU, and sample size per DU; - Coordinating sample results through CORE; - Displaying sample results in PHOENIX (GIS tool)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Scaling and Units of the Elastic Response Term for Rayleigh Waves that is Output by Computer Programs in Seismology (CPS)

We report on the scaling and units of the Rayleigh wave elastic response function A R (ω) that is output from the widely used Computer Programs in Seismology (CPS) to aid in the modeling of ground motion sourced by atmospheric explosions. The program uses mixed units (km, second, km/s, gm/cc) to keep A R (ω) near 10 0 and prevent any numerical underflow or overflow. We compare two models for the response of an elastic half space to the output from CPS. Our application inputs the recommended, mixed unit geological models to determine how researchers must scale this output to obtain physical units for A R (ω) that represents the amplitude scaling for the minimum group velocity (Airy phase) contribution to Rayleigh waves. We determine that a CPS user must scale the output for A R (ω) by 10 -12 (m/km) 2 (g/cc/m 3 /kg) to obtain MKS (meter, kg, second) units and then must multiply this result by the vertical component eigenfunction squared, that is evaluated at the free surface.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Joint state-parameter estimation for the reduced fracture model via the united filter

Here, in this paper, we introduce an effective United Filter method for jointly estimating the solution state and physical parameters in flow and transport problems within fractured porous media. Fluid flow and transport in fractured porous media are critical in subsurface hydrology, geophysics, and reservoir geomechanics. Reduced fracture models, which represent fractures as lower-dimensional interfaces, enable efficient multi-scale simulations. However, reduced fracture models also face accuracy challenges due to modeling errors and uncertainties in physical parameters such as permeability and fracture geometry. To address these challenges, we propose a United Filter method, which integrates the Ensemble Score Filter (EnSF) for state estimation with the Direct Filter for parameter estimation. EnSF, based on a score-based diffusion model framework, produces ensemble representations of the state distribution without deep learning. Meanwhile, the Direct Filter, a recursive Bayesian inference method, estimates parameters directly from state observations. The United Filter combines these methods iteratively: EnSF estimates are used to refine parameter values, which are then fed back to improve state estimation. Numerical experiments demonstrate that the United Filter method surpasses the state-of-the-art Augmented Ensemble Kalman Filter, delivering more accurate state and parameter estimation for reduced fracture models. This framework also provides a robust and efficient solution for PDE-constrained inverse problems with uncertainties and sparse observations.

Bayesian inference↗

Robust Unit Commitment Considering Uncertain Demand Response

Although price responsive demand response has been widely accepted as playing an important role in the reliable and economic operation of power system, the real response from demand side can be highly uncertain due to limited understanding of consumers' response to pricing signals. To model the behavior of consumers, the price elasticity of demand has been explored and utilized in both research and real practice. However, the price elasticity of demand is not precisely known and may vary greatly with operating conditions and types of customers. To accommodate the uncertainty of demand response, alternative unit commitment methods robust to the uncertainty of the demand response require investigation. In this paper, a robust unit commitment model to minimize the generalized social cost is proposed for the optimal unit commitment decision taking into account uncertainty of the price elasticity of demand. By optimizing the worst case under proper robust level, the unit commitment solution of the proposed model is robust against all possible realizations of the modeled uncertain demand response. Numerical simulations on the IEEE Reliability Test System show the e ectiveness of the method. Finally, compared to unit commitment with deterministic price elasticity of demand, the proposed robust model can reduce the average Locational Marginal Prices (LMPs) as well as the price volatility.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗