Flexible thermal cycle test equipment for concentrator solar cells

A system and method for performing thermal stress testing of photovoltaic solar cells is presented. The system and method allows rapid testing of photovoltaic solar cells under controllable thermal conditions. The system and method presents a means of rapidly applying thermal stresses to one or more photovoltaic solar cells in a consistent and repeatable manner.

14 SOLAR ENERGY↗

Atomic oxygen testing with thermal atom systems - A critical evaluation

The use of thermal atom (kinetic energy near 0.04 eV) test methods as a materials selection and screening technique for LEO spacecraft is critically evaluated in this paper. The physics and chemistry of the thermal atom environments are shown to produce specific mass loss rates (mg/sq cm per min) and reaction efficiencies (Re) radically different from those produced in the LEO environment. A response surface study shows that specific mass loss rates change rapidly with plasma-asher parameters and seldom agree with flight data. FEP Teflon is shown to react by a different mechanism than Kapton, polyethylene, or graphite. The Re (Re = volume of material removed/oxygen atom) of Kapton, polyethylene, Mylar, Tedlar, FEP Teflon, and graphite measured in a flowing afterglow apparatus are 0.001 to 0.0001 those measured with high-energy atoms (kinetic energy 1.5 eV or greater) in beam systems or in LEO. The effect of sample temperature and atom impact energy on Re is discussed. A simple kinetic model describing the reaction of atomic oxygen with polymer surfaces is developed. Guidelines and recommendations for thermal atom testing and interpretation of test results are presented.

Koontz, Steven L.↗

Transient Heater Analysis for Orion Thermal Vacuum Testing

The Space Environments Complex (SEC) at NASA's Plum Brook Station is currently being prepared to perform thermal vacuum testing of the Orion spacecraft. This thermal vacuum, or T-VAC test will be run for a period of 60 days, which will be the longest such test ever conducted at SEC. The Orion Crew Module (CM) and Service Module (SM) will undergo T-VAC testing in SEC's Space Simulation Vacuum Chamber to ensure the functionality of these systems in a high vacuum environment at extremely cold temperatures. The T-VAC test setup in SEC was modeled and simulated in Thermal Desktop. The initial results from thermal analysis showed areas on the chamber floor to reach very low temperatures, which were below the minimum operating range of certain hardware located on or near the chamber floor. These hardware including elastomeric seals on the GN2 piping, bearing pads and O-rings are essential to both test and the operation of the SEC facility, and must be kept well above -20°F throughout the duration of the T-VAC test. Thus, further analysis was conducted to include the placement of patch heaters on the chamber floor in an effort to increase the temperature near colder areas on the floor. The results and findings from this analysis showed that using these heaters will result in a favorable temperature distribution on the chamber floor. This paper will discuss the methods used in the analysis, and the results obtained to determine the optimal configuration of these heaters on the chamber floor.

Wilhite, Jarred↗

Transient Heater Analysis for Orion Thermal Vacuum Testing

The Space Environments Complex (SEC) at NASA’s Plum Brook Station is currently being prepared to perform thermal vacuum testing of the Orion spacecraft. This thermal vacuum, or T-VAC test will be run for a period of 60 days, which will be the longest such test ever conducted at SEC. The Orion Crew Module (CM) and Service Module (SM) will undergo T-VAC testing in SEC’s Space Simulation Vacuum Chamber to ensure the functionality of these systems in a high vacuum environment at extremely cold temperatures. The T-VAC test setup in SEC was modeled and simulated in Thermal Desktop. The initial results from thermal analysis showed areas on the chamber floor to reach very low temperatures, which were below the minimum operating range of certain hardware located on or near the chamber floor. These hardware including elastomeric seals on the GN2 piping, bearing pads and O-rings are essential to both test and the operation of the SEC facility, and must be kept well above -20°F throughout the duration of the T-VAC test. Thus, further analysis was conducted to include the placement of patch heaters on the chamber floor in an effort to increase the temperature near colder areas on the floor. The results and findings from this analysis showed that using these heaters will result in a favorable temperature distribution on the chamber floor. This paper will discuss the methods used in the analysis, and the results obtained to determine the optimal configuration of these heaters on the chamber floor.

Wilhite, Jarred↗

The Ares Launch Vehicles: Critical for America's Continued Leadership in Space

This video is designed to accompany the presentation of the paper delivered at the Joint Army, Navy, NASA, Airforce (JANNAF) Propulsion Meeting held in 2009. It shows various scenes: from the construction of the A-3 test stand, construction of portions of the vehicles, through various tests of the components of the Ares Launch Vehicles, including wind tunnel testing of the Ares V, shell buckling tests, and thermal tests of the avionics, to the construction of the TPS thermal spray booth.

Cook, Stephen A.↗

Development of an Infrared Lamp Array for the Smap Spacecraft Thermal Balance Test

NASA launched the SMAP observatory in January 2015 aboard a Delta II into a sun-synchronous orbit around Earth. The science payload of a radar and a radiometer utilizes a shared rotating six-meter antenna to provide a global map of the Earth's soil moisture content and its freeze/thaw state on a global, high-resolution scale in this three-year mission. An observatory-level thermal balance test conducted in May/June 2014 validated the thermal design and demonstrated launch readiness as part of the planned environmental test campaign. An infrared lamp array was designed and used in the thermal balance test to replicate solar heating on the solar array and sunlit side of the spacecraft that would normally be seen in orbit. The design, implementation, and operation of an infrared lamp array used for this nineteen-day system thermal test are described in this paper. Instrumental to the smooth operation of this lamp array was a characterization test performed in the same chamber two months prior to the observatory test to provide insight into its array operation and flux uniformity. This knowledge was used to identify the lamp array power settings that would provide the worst case predicted on-orbit fluxes during eclipse, cold, and hot cases. It also showed the lamp array variation when adjustments in flux were needed. Calorimeters calibrated prior to testing determined a relationship between calorimeter temperature and lamp array flux. This allowed the team to adjust the lamp output for the desired absorbed flux on the solar array. Flux levels were within 10% of the desired value at the center of the solar array with an ability to maintain these levels within 5% during steady state cases. All tests demonstrated the infrared lamp array functionality and furthered lamp array understanding for modeling purposes. This method contributed to a high-fidelity environmental simulation, which was required to replicate the extreme on-orbit thermal environments.

Miller, Jennifer R.↗

Activation, Heating and Exposure Rates for Mo‐99 Experiments with 25‐Disk Targets

An MCNPX model of the 25-disk target assembly inside the vacuum cube inside the shielded box was prepared. This was used to calculate heating and photon and neutron fluxes throughout the model. Production rates for photonuclear reaction products were calculated using the photon fluxes and ENDF/B-VII cross sections. Measured isomer to ground state yield ratios were used where available. Where not available the new correlation between spin deficit and isomer to ground state yield ratios presented at AccApp'11 was used. The photonuclear production rates and neutron fluxes were input to CINDER2008 for transmutation calculations. A cross section update file was used to supply (n,n') reactions missing from CINDER2008 libraries. Decay photon spectra produced by CINDER2008 were then used to calculate exposure rates using the MCNPX model. Two electron beam irradiations were evaluated. The first was for a thermal test at 15 MeV with 1300 μA incident on one target end and the second was for a production test at 35 MeV with 350 μA incident on both target ends (700 μA total current on target). For the thermal test 1, 2, 3, 4, 5 and 6 h irradiation times were simulated, each followed by decay time steps out to 42 days. For the production test 6, 12, 18, 24, 30 and 36 h irradiation times were simulated followed by the same decay periods. For all simulations beam FWHMs in x and y were both assumed to be 6 mm. Simulations were run for Mo-100 enriched and natural Mo targets for both tests. It is planned that thermal test will be run for 4 h with natural target disks and production test will be run for 24 h with enriched target disks. Results for these two simulations only are presented in this report. Other results can be made available upon request. Post irradiation exposure rates were calculated at 30 cm distances from left, right, front and back of the following configurations: (1) Shielded box with everything in it (beam pipes, cooling pipes, vacuum cube, target housing weldment and target assembly), (2) Shielded box with everything in it except the target assembly, (3) Shielded box with nothing in it, (4) Target assembly taken outside of shielded box, (5) Target disks in cradle (target assembly with thermocouple weldment and flange removed), (6) Empty cradle, and (7) Target disks alone. Decay photon spectra from the CINDER2008 calculations were used as sources for the exposure rate calculations in the same model used for the flux calculations with beam on. As components were removed to simulate the seven cases considered the material compositions were changed to air and their respective sources were turned off. The MCNPX model geometry is plotted in Figure 1. The left and right detector locations for cases 1, 2 and 3 were 30 cm from the shielded box walls and 30 cm from the beam pipe openings in the left and right sides of the model (they are not in the beam line). A zoomed in plot of the target assembly alone is in Figure 2. Exposure rates for the seven cases are plotted as a function of time after irradiation in Figures 3, 4 and 5. To aid in comparison between the cases, all of these figures have been plotted using the same scale. Figures 3 and 4 are respectively the thermal and production test results for cases 1 through 6. Figure 5 includes case 7 results for both. Differences between cases 1 and 2 for both tests are not statistically significant showing that activation of components other than the target assembly, many of which are also shielding the target assembly, dominates exposure rates outside the shielded box. Case 3 shows the contribution from activation of the shield box itself. In front where shielded box wall is thickest box activation accounts for essentially all of the exposure rate outside. Differences between cases 4 and 5 are also minimal, showing that the contribution to target assembly exposure rates from the thermocouple flange and weldment are small compared to the target disks and cradle. From the numerical results the contribution is about 1%. Results for case 6, the cradle itself, are initially about half of the target assembly exposure rates. For the thermal test maximum shielded box exposure rates with or without the target assembly in it are about 1 mR/h 1 h after shutdown versus 65 mR/h for the production test. In front of the shielded box where a person would be positioned for target removal activities the calculated exposure rate is about 20% of the maximum for the production test, and after a few hours of decay is less than 1 mR/h. However, the window was not modeled. Typically lead glass is about one quarter as effective as solid lead for the same thickness and drawing indicates a window thickness about double the front wall thickness suggesting exposure rate in front of the window will likely be comparable to what it is in the back, 25 mR/h 1 h after shutdown and about 10 mR/h at 1 d.

07 ISOTOPE AND RADIATION SOURCES↗

Molecular Accumulation during JWST’s Optical Telescope Cryogenic Thermal Vacuum Testing

Maintaining molecular cleanliness during the JWST’s Optical Telescope/Instrument Module (OTIS) Cryogenic Thermal Vacuum (TV) test campaign was critical to the success of its optical mission on orbit. In the thermal vacuum tests leading up to the final cryogenic test to validate the OTIS flight hardware, NASA Johnson Space Center’s (JSC’s) TV Chamber A was fully characterized for molecular contamination. It was found to contain common volatile condensable materials (VCM), including hydrocarbons, plasticizers, and silicones, all of which absorb in JWST’s infrared wavelength region. Due to the risks involved, cleaning molecular contamination from the OTIS mirrors was not an option and heating the Primary Mirror (PM) segments would have also been a risky and expensive endeavor. As a result, a monitoring process was developed and implemented during four different Pathfinder or risk reduction tests that were scheduled to occur prior to the flight hardware test. The goal was to quantify and assess the risk of molecular contamination depositing on the PM resulting from relatively warm chamber shrouds “leading” colder PM mirrors during warmup, by a margin of 10-50 Kelvin (K). This was accomplished using Cryogenic Quartz Crystal Microbalances (CQCMs), held at temperatures slightly cooler than the segments to signal the onset of contamination events. Per the JWST Contamination Control Plan (CCP)1, the total Primary Mirror molecular allocation requirement was 50 angstroms. In all tests, the results showed an average accumulated molecular contamination of <10 angstroms.

molecular, contamination, thermal vacuum, cryogeni↗

Largo hot water system long range thermal performance test report, addendum

The test procedure used and the test results obtained during the long range thermal performance tests of the LARGO Solar Hot Water System under natural environmental conditions are presented. Objectives of these tests were to determine the amount of energy collected, the amount of power required for system operation, system efficiency, temperature distribution, and system performance degradation.

Source record↗

Thermal-Mechanical Testing of Hypersonic Vehicle Structures

A viewgraph presentation describing thermal-mechanical tests on the structures of hypersonic vehicles is shown. The topics include: 1) U.S. Laboratories for Hot Structures Testing; 2) NASA Dryden Flight Loads Laboratory; 3) Hot Structures Test Programs; 4) Typical Sequence for Hot Structures Testing; 5) Current Hot Structures Testing; and 6) Concluding Remarks.

Hudson, Larry↗

Thermal performance testing of the Explorer Platform

The Explorer Platform (EP) has been designed to accommodate on-orbit payload and bus module changeout via Space Transportation System (STS) servicing. Such a versatile spacecraft platform designed to experience widely different environmental exposures and operational conditions, coupled with program constraints on schedule and budget, presented a challenge to implementing a technically sound thermal vacuum/thermal balance test program. This paper discusses thermal performance tests implemented at the subsystem and system levels, and the risks accepted resulting from test sequence, configuration. and tests omitted from the program. No thermal cycling or thermal balance tests were performed on the integrated spacecraft level, although both the Payload (EUVE) and Platform (EP) received independent testing. The decision to take this approach is discussed with respect to the thermal design and the associated risks taken to maintain budget and schedule.

Wasson, David↗

Molecular Accumulation during JWST’s Optical Telescope Cryogenic Thermal Vacuum Testing

Maintaining molecular cleanliness during the JWST’s Optical Telescope/Instrument Module (OTIS) Cryogenic Thermal Vacuum (TV) test campaign was critical to the success of its optical mission on orbit. In the thermal vacuum tests leading up to the final cryogenic test to validate the OTIS flight hardware, NASA Johnson Space Center’s (JSC’s) TV Chamber A was fully characterized for molecular contamination. It was found to contain common volatile condensable materials (VCM), including hydrocarbons, plasticizers, and silicones, all of which absorb in JWST’s infrared wavelength region. Due to the risks involved, cleaning molecular contamination from the OTIS mirrors was not an option and heating the Primary Mirror (PM) segments would have also been a risky and expensive endeavor. As a result, a monitoring process was developed and implemented during four different Pathfinder or risk reduction tests that were scheduled to occur prior to the flight hardware test. The goal was to quantify and assess the risk of molecular contamination depositing on the PM resulting from relatively warm chamber shrouds “leading” colder PM mirrors during warmup, by a margin of 10-50 Kelvin (K). This was accomplished using Cryogenic Quartz Crystal Microbalances (CQCMs), held at temperatures slightly cooler than the segments to signal the onset of contamination events. Per the JWST Contamination Control Plan (CCP)1, the total Primary Mirror molecular allocation requirement was 50 angstroms. In all tests, the results showed an average accumulated molecular contamination of <10 angstroms.

optics↗

Impact of Drilling Operations on Lunar Volatiles Capture: Thermal Vacuum Tests

In Situ Resource Utilization (ISRU) enables future planetary exploration by using local resources to supply mission consumables. This idea of 'living off the land' has the potential to reduce mission cost and risk. On the moon, water has been identified as a potential resource (for life support or propellant) at the lunar poles, where it exists as ice in the subsurface. However, the depth and content of this resource has yet to be confirmed on the ground; only remote detection data exists. The upcoming Resource Prospector mission (RP) will 'ground-truth' the water using a rover, drill, and the RESOLVE science package. As the 2020 planned mission date nears, component level hardware is being tested in relevant lunar conditions (thermal vacuum). In August 2014 a series of drilling tests were performed using the Honeybee Robotics Lunar Prospecting Drill inside a 'dirty' thermal vacuum chamber at the NASA Glenn Research Center. The drill used a unique auger design to capture and retain the lunar regolith simulant. The goal of these tests was to investigate volatiles (water) loss during drilling and sample transfer to a sample crucible in order to validate this regolith sampling method. Twelve soil samples were captured over the course of two tests at pressures of 10(exp-5) Torr and ambient temperatures between -80C to -20C. Each sample was obtained from a depth of 40 cm to 50 cm within a cryogenically frozen bed of NU-LHT-3M lunar regolith simulant doped with 5 wt% water. Upon acquisition, each sample was transferred and hermetically sealed inside a crucible. The samples were later baked out to determine water wt% and in turn volatile loss by following ASTM standard practices. Of the twelve tests, four sealed properly and lost an average of 30% of their available water during drilling and transfer. The variability in the results correlated well with ambient temperature (lower the temperature lower volatiles loss) and the trend agreed with the sublimation rates for the same temperature. Moisture retention also correlated with quantity of sample: a larger amount of material resulted in less water loss. The drilling process took an average of 10 minutes to capture and transfer each sample. The drilling power was approximately 20 Watt with a Weight on Bit of approximately 30 N. The bit temperature indicated little heat input into formation during the drilling process.

drilling↗

Thermal cycle testing of Space Station Freedom solar array blanket coupons

Lewis Research Center is presently conducting thermal cycle testing of solar array blanket coupons that represent the baseline design for Space Station Freedom. Four coupons were fabricated as part of the Photovoltaic Array Environment Protection (PAEP) Program, NAS 3-25079, at Lockheed Missile and Space Company. The objective of the testing is to demonstrate the durability or operational lifetime of the solar array welded interconnect design within the durability or operational lifetime of the solar array welded interconnect design within a low earth orbit (LEO) thermal cycling environment. Secondary objectives include the observation and identification of potential failure modes and effects that may occur within the solar array blanket coupons as a result of thermal cycling. The objectives, test articles, test chamber, performance evaluation, test requirements, and test results are presented for the successful completion of 60,000 thermal cycles.

Scheiman, David A.↗

Shuttle active thermal control system development testing. Volume 7: Improved radiator coating adhesive tests

Silver/Teflon thermal control coatings have been tested on a modular radiator system projected for use on the space shuttle. Seven candidate adhesives have been evaluated in a thermal vacuum test on radiator panels similar to the anticipated flight hardware configuration. Several classes of adhesives based on polyester, silicone, and urethane resin systems were tested. These included contact adhesives, heat cured adhesives, heat and pressure cured adhesives, pressure sensitive adhesives, and two part paint on or spray on adhesives. The coatings attached with four of the adhesives, two silicones and two urethanes, had no changes develop during the thermal vacuum test. The two silicone adhesives, both of which were applied to the silver/Teflon as transfer laminates to form a tape, offered the most promise based on application process and thermal performance. Each of the successful silicone adhesives required a heat and pressure cure to adhere during the cryogenic temperature excursion of the thermal-vacuum test.

Reed, M. W.↗

GPHS-RTG F5R Electrically Heated Thermal Vacuum Testing

Idaho National Laboratory (INL) has been tasked with the evaluation and refurbishment of the General Purpose Heat Source (GPHS) Radioisotope Thermoelectric Generator (RTG) Flight Unit 5 (GPHS-RTG F5R or F5R) that was defueled in 2005. This paper describes the testing of F5R in the thermal vacuum chamber and evaluation of the data demonstrating the generator meets updated Cassini-Huygens requirements. The generator produced 260 We of power at the specified 4100 Wth heat source inventory. This power exceeded the power requirement for 250 We , confirming system integrity and demonstrating that the generator is capable of potential NASA missions.