Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Technical”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

INDEPENDENT TECHNICAL ASSESSMENT OF MANAGEMENT OF STORMWATER AND WASTEWATER AT THE SEPARATIONS PROCESS RESEARCH UNIT (SPRU) DISPOSITION PROJECT, NEW YORK

The U.S. Department of Energy (DOE) is currently evaluating the water management procedures at the Separations Process Research Unit (SPRU). The facility has three issues related to water management that require technical assistance: (1) due to a excessive rainfall event in October, 2010, contaminated water collected in basements of G2 and H2 buildings. As a result of this event, the contractor has had to collect and dispose of water offsite; (2) The failure of a sump pump at a KAPL outfall resulted in a Notice of Violation issued by the New York State Department of Environment and Conservation (NYSDEC) and subsequent Consent Order. On-site water now requires treatment and off-site disposition; and (3) stormwater infiltration has resulted in Strontium-90 levels discharged to the storm drains that exceed NR standards. The contractor has indicated that water management at SPRU requires major staff resources (at least 50 persons). The purpose of this review is to determine if the contractor's technical approach warrants the large number of staff resources and to ensure that the technical approach is compliant and in accordance with federal, state and NR requirements.

54 ENVIRONMENTAL SCIENCES↗

International Standards Development for Marine and Hydrokinetic Renewable Energy - Final Report on Technical Status

This report summarizes the progress toward development of International Standards for Marine and Hydrokinetic Renewable Energy, as funded by the U.S. Department of Energy (DOE) under the International Electrotechnical Commission (IEC) Technical Committee 114. The project has three main objectives: 1. Provide funding to support participation of key U.S. industry technical experts in 6 (originally 4) international working groups and/or project teams (the primary standards-making committees) and to attend technical meetings to ensure greater U.S. involvement in the development of these standards. 2. Provide a report to DOE and industry stakeholders summarizing the IEC standards development process for marine and hydrokinetic renewable energy, new international standards and their justifications, and provide standards guidance to industry members. 3. Provide a semi-annual (web-based) newsletter to the marine renewable energy community. The newsletter will educate industry members and stakeholders about the processes, progress, and needs of the US efforts to support the international standards development effort. The newsletter is available at www.TC114.us

16 TIDAL AND WAVE POWER↗

Cavity Light-Emitting Diode for Durable, High-Brightness and High-Efficiency Lighting Applications: First Budget Period Technical Report

A COLED device consists of a top electrode (anode) and a bottom electrode (cathode) separated by a thin dielectric layer. In this metal/dielectric stack, numerous small wells, or cavities, are etched through the top electrode and the dielectric layer. These cavities are subsequently filled with LEP molecules. When a voltage is applied between the top and bottom electrodes, holes (from the top electrode) and electrons (from the bottom electrode) are injected into the polymer. Light emission is generated upon recombination of holes and electrons within the polymer along the perimeters of cavities. Figure 1 compares the structures of the COLED and the traditional OLED. The existing COLED fabrication process flow is illustrated in Figure 2. A COLED can potentially be 5 times more efficient and can operate at as much as 100 times higher current density with much longer lifetime than an OLED. To fully realize these potential advantages, the COLED technology must overcome the following technical barriers, which were the technical focused points for Years 1 and 2 (Phase I) of this project: (1) Construct optimum thickness dielectric layer: In the traditional OLED structure, the optimal thickness of the LEP film is approximately 80-100 nm. In a COLED device, the effective LEP thickness roughly equals the thickness of the dielectric layer. Therefore, the optimal dielectric thickness for a COLED should also be roughly equal to 80-100 nm. Generally speaking, it is technically challenging to produce a defect-free dielectric layer at this thickness with high uniformity, especially over a large area. (2) Develop low-work-function cathode: A desired cathode should have a low work function that matches the lowest unoccupied molecular orbital (LUMO) level of the LEP molecules. This is usually achieved by using a low-work-function metal such as calcium, barium, lithium, or magnesium as the cathode. However, these metals are very vulnerable to oxygen and water. Since the cathode of the COLED will be exposed to air and processing chemicals during the COLED fabrication process, these low-work-function metals cannot be used directly in the COLED structure. Thus, new materials with low work function and better chemical stability are needed for the COLED cathode. (3) Increase active device area: Since photons are only generated from perimeters of the cavities, the actual active area in a COLED device is smaller than the device surface area. The cavity diameter and cavity spacing of the COLED devices previously produced at SRI by conventional photolithography processing are typically in the range of 3 to 7 μm with an estimated active area of 2-3%. To achieve the same brightness of a traditional OLED at the same applied voltage, the active device area of a COLED should be at least 20% (1/5) of the device surface area, provided the COLED has 5 times higher EQE. This requires reducing the cavity diameter and cavity spacing to the sub-micrometer region, which can be achieved by electron-beam lithography or nanoimprint lithography. (4) Improve metal/polymer interfaces: The polymer/metal interfaces are critical issues to improve and optimize since they directly affect the effectiveness and balance of hole and electron injection, and consequently the device performance. Conventional approaches for improving a metal/polymer interface include deposition of a special interfacial material on the selected electrode surface or applying a proper surface treatment prior to deposition of the LEP. Since these approaches are generally nonselective to the cathode and anode, they cannot be directly adopted for COLED devices. Generally, the interface integration in current OLED technology still needs a better chemical approach. Hence, advanced methodology developed for the COLED technology as promoted in this project may be also suitable for other OLED devices.

36 MATERIALS SCIENCE↗

Plutonium Equivalent Inventory for Belowground Radioactive Waste at the Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility - Fiscal Year 2011

The Los Alamos National Laboratory (LANL) generates radioactive waste as a result of various activities. Many aspects of the management of this waste are conducted at Technical Area 54 (TA-54); Area G plays a key role in these management activities as the Laboratory's only disposal facility for low-level radioactive waste (LLW). Furthermore, Area G serves as a staging area for transuranic (TRU) waste that will be shipped to the Waste Isolation Pilot Plant for disposal. A portion of this TRU waste is retrievably stored in pits, trenches, and shafts. The radioactive waste disposed of or stored at Area G poses potential short- and long-term risks to workers at the disposal facility and to members of the public. These risks are directly proportional to the radionuclide inventories in the waste. The Area G performance assessment and composite analysis (LANL, 2008a) project long-term risks to members of the public; short-term risks to workers and members of the public, such as those posed by accidents, are addressed by the Area G Documented Safety Analysis (LANL, 2011a). The Documented Safety Analysis uses an inventory expressed in terms of plutonium-equivalent curies, referred to as the PE-Ci inventory, to estimate these risks. The Technical Safety Requirements for Technical Area 54, Area G (LANL, 2011b) establishes a belowground radioactive material limit that ensures the cumulative projected inventory authorized for the Area G site is not exceeded. The total belowground radioactive waste inventory limit established for Area G is 110,000 PE-Ci. The PE-Ci inventory is updated annually; this report presents the inventory prepared for 2011. The approach used to estimate the inventory is described in Section 2. The results of the analysis are presented in Section 3.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Class 1 Permit Modification Notification Addition of Structures within Technical Area 54, Area G, Pad 11, Dome 375 Los Alamos National Laboratory Hazardous Waste Facility Permit, July 2012

The purpose of this letter is to notify the New Mexico Environment Department-Hazardous Waste Bureau (NMED-HWB) of a Class 1 Permit Modification to the Los Alamos National Laboratory (LANL) Hazardous Waste Facility Permit issued to the Department of Energy (DOE) and Los Alamos National Security, LLC (LANS) in November 2010. The modification adds structures to the container storage unit at Technical Area (TA) 54 Area G, Pad 11. Permit Section 3.1(3) requires that changes to the location of a structure that does not manage hazardous waste shall be changed within the Permit as a Class 1 modification without prior approval in accordance with Code of Federal Regulations, Title 40 (40 CFR), {section}270.42(a)(1). Structures have been added within Dome 375 located at TA-54, Area G, Pad 11 that will be used in support of waste management operations within Dome 375 and the modular panel containment structure located within Dome 375, but will not be used as waste management structures. The Class 1 Permit Modification revises Figure 36 in Attachment N, Figures; and Figure G.12-1 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Descriptions of the structures have also been added to Section A.4.2.9 in Attachment A, TA - Unit Descriptions; and Section 2.0 in Attachment G.12, Technical Area 54, Area G, Pad 11 Outdoor Container Storage Unit Closure Plan. Full description of the permit modification and the necessary changes are included in Enclosure 1. The modification has been prepared in accordance with 40 CFR {section}270.42(a)(l). This package includes this letter and an enclosure containing a description of the permit modification, text edits of the Permit sections, and the revised figures (collectively LA-UR-12-22808). Accordingly, a signed certification page is also enclosed. Three hard copies and one electronic copy of this submittal will be delivered to the NMED-HWB.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical reference for hydrogen compatibility of materials

The Technical Reference for Hydrogen Compatibility of Materials summarizes materials data related to hydrogen-assisted fracture (also called hydrogen embrittlement) in gaseous hydrogen environments, with emphasis on hydrogen permeation and structural properties. The Technical Reference generally does not provide specific recommendations for materials selection as the suitability of a given material depends on service conditions, in particular the mechanical and environmental conditions associated with a particular component, as well as the details of the materials microstructure. In substance, the Technical Reference is a collection of stand-alone documents organized by materials class, which have been compiled into this composite report.

San Marchi, Christopher W.↗

Solicitation and Selection of Partner Projects, Technical Team Leads, and Measurement and Validation Contractors for the American Recovery and Reinvestment Act (ARRA) Funded Commercial Building Partnerships (CBP-2)

In March 2010, Pacific Northwest National Laboratory (PNNL) joined two other labs receiving ARRA funding, Lawrence Berkeley National Laboratory (LBNL) and the National Renewable National Laboratory (NREL), to began weekly conference calls with the goal of coordinating a joint lab solicitation to support the ARRA-funded CBP project. Two solicitations were identified for: 1) new CBP Partners; 2) technical contractors to provide technical assistance and measurement and verification (M&V) contractors. The M&V contractors support the work by providing model reviews and conducting monitoring studies to verify building performance. This report documents the process used by the labs for the solicitations, and describes the process and outcomes for PNNL, selection of candidate Partners, technical teams, and M&V contractors.

Nesse, Ronald J.↗

Light Water Reactor Sustainability Program: Technical Basis Guide Describing How to Perform Safety Margin Configuration Risk Management

The INL has carried out a demonstration of the RISMC approach for the purpose of configuration risk management. We have shown how improved accuracy and realism can be achieved by simulating changes in risk – as a function of different configurations – in order to determine safety margins as the plant is modified. We described the various technical issues that play a role in these configuration-based calculations with the intent that future applications can take advantage of the analysis benefits while avoiding some of the technical pitfalls that are found for these types of calculations. Specific recommendations have been provided on a variety of topics aimed at improving the safety margin analysis and strengthening the technical basis behind the analysis process.

97 MATHEMATICS AND COMPUTING↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance: Installation Management Command - Southeast (IMCOM-SE), Fast Pyrolysis Technology Demonstration, Fort Bragg, North Carolina #72

FEMP technical assistance for the ESTCP Fast Pyrolysis project. Results from a 2009 Pacific Northwest National Laboratory (PNNL) assessment of renewable energy generation potential in the Southeast revealed that biomass presents the greatest opportunity. The Renewable Oil International LLC was pursuing a demonstration of a fast pyrolysis process to convert wood waste, paper waste, and tree chips into BioOil. The Installation Management Command, Southeast and Environmental Security Technology Certification Program (ESTCP) initiated a project to construct the equipment and test the process at the landfill on Fort Bragg, North Carolina. The process will test the relative efficiency of several feedstocks including wood pallet waste, paper and cardboard waste, and whole tree chips. The resulting BioOil will be tested and analyzed to determine energy content, cost to produce and environmental impact. PNNL was requested to provide technical assistance, which included: 1. Preparing the Technology Demonstration Plan and initial information for the Cost and Performance report, 2. Providing technical review of the process and end products, 3. Defining techniques for measuring feedstock characteristics, BioOil energy balance, and resulting emissions from each feedstock, and 4. Identifying testing laboratories for various BioOil tests needed to determine potential future uses of the end products.

09 BIOMASS FUELS↗

Technical Needs for Prototypic Prognostic Technique Demonstration for Advanced Small Modular Reactor Passive Components

This report identifies a number of requirements for prognostics health management of passive systems in AdvSMRs, documents technical gaps in establishing a prototypical prognostic methodology for this purpose, and describes a preliminary research plan for addressing these technical gaps. AdvSMRs span multiple concepts; therefore a technology- and design-neutral approach is taken, with the focus being on characteristics that are likely to be common to all or several AdvSMR concepts. An evaluation of available literature is used to identify proposed concepts for AdvSMRs along with likely operational characteristics. Available operating experience of advanced reactors is used in identifying passive components that may be subject to degradation, materials likely to be used for these components, and potential modes of degradation of these components. This information helps in assessing measurement needs for PHM systems, as well as defining functional requirements of PHM systems. An assessment of current state-of-the-art approaches to measurements, sensors and instrumentation, diagnostics and prognostics is also documented. This state-of-the-art evaluation, combined with the requirements, may be used to identify technical gaps and research needs in the development, evaluation, and deployment of PHM systems for AdvSMRs. A preliminary research plan to address high-priority research needs for the deployment of PHM systems to AdvSMRs is described, with the objective being the demonstration of prototypic prognostics technology for passive components in AdvSMRs. Greater efficiency in achieving this objective can be gained through judicious selection of materials and degradation modes that are relevant to proposed AdvSMR concepts, and for which significant knowledge already exists. These selections were made based on multiple constraints including the analysis performed in this document, ready access to laboratory-scale facilities for materials testing and measurement, and potential synergies with other national laboratory and university partners.

Advanced Small Modular Reactors↗

Crowder College MARET Center (Final Scientific Technical Report)

Following decades of success in solar energy projects, the Missouri Legislature designated Crowder College in 1992 as the State's renewable energy education center. The resulting Missouri Alternative and Renewable Energy Technology (MARET) Center is recognized internationally for its contributions to the energy field. The mission of the MARET Center is to expand renewable energy throughout the region with education, applied research, and economic development. Educational programs include certification and transfer degrees encompassing green construction, solar thermal energy, solar electricity, and wind. The MARET Center also assists in new product development and other business support services in renewable energy. The Missouri Alternative and Renewable Energy Technology (MARET) Center at Crowder College hopes to eventually develop a 27,500 ft 2 facility as a living laboratory to support solar and other renewable and sustainable energy development through professional degrees, new product development and commercialization, renewable energy business incubation, and consumer education. The primary objective of the current project was to complete Stage One of this building, with solar, wind, and geothermal technologies installed to power its 9,216 ft 2 office, classroom, and research spaces. This MARET Center includes a modular roof structure that permits both solar module mounting and daylighting, PV/thermal hybrid modules pioneered in Crowder Solar Decathlon homes, modular electrical management subsystems; and modular delivery systems for heating and cooling the structure. The MARET Facility will operate as a Net Positive energy building, consistently producing surplus energy for distributed generation on the utility grid. The modular design of the energy systems within the building is to serve as a scalable and repeatable model for a wide variety of building applications and climate zones. As a living laboratory of renewable energy, exploring and validating new applications of solar and other renewable technologies, the MARET Facility will house a wide variety of programs which will advance implementation of renewable energy throughout the region. These program goals include; Curriculum in renewable energy for pre-engineering transfer programs; Certification and degree programs for technical degrees for Energy Efficiency, Wind, Photovoltaic and Solar Thermal professionals; Short courses and workshops for building management and design professionals; Public education and demonstration projects in renewable energy through conferences and K-12 educational outreach; Technical degree offering in building construction incorporating “best practices” for energy efficiency and renewables; and Business incubators for new renewable energy businesses and new product development. The new MARET facility will support the mission of the US Department of Energy (DOE) Solar Program, “to improve America’s security, environmental quality, and economic prosperity through public-private partnerships that bring reliable and affordable solar energy technologies to the marketplace,” through a variety of educational and business assistance programs. Further, technical innovations planned for the MARET facility and its applied research activities will advance the Solar Program strategic goals to “reduce the cost of solar energy to the point it becomes competitive in relevant energy markets (e.g., buildings, power plants) and for solar technology to enable a sustainable solar industry.” Overarching Goals relative to program needs, future expansion, flexibility, quality of materials, and construction and operational costs:; Experimental: The structure and systems of the building operate as an educational resource. The systems are meant to be a source for data collection and study for building users and instructors; Educational: Part of the evolution of this building and its ongoing goals is to use the building as an educational tool, one where new ideas developed in the world and especially at Crowder can be tested further as part of MARET's curriculum; LEED Platinum: achieve highest level of LEED certification; Net Zero: The building will utilize existing wind and alternate energy sources on campus and add solar PVT panels and achieve as close as possible to a net zero energy usage; and Phase II: The phase II portion of this project will expand the Internet student area, additional classrooms, and labs, as well as an auditorium and exhibit area.

14 SOLAR ENERGY↗

Lake Charles CCS Project (Final Technical Report, Phase 2)

In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture and Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2 ) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Advanced Solar Resource Modeling and Analysis (Final Technical Report)

The SunShot Initiative coordinates research, development, demonstration, and deployment activities aimed at dramatically reducing the total installed cost of solar power. The SunShot Initiative focuses on removing critical technical and non-technical barriers to installing and integrating solar energy into the electricity grid. Uncertainty in projected power and energy production from solar power systems contributes to these barriers by increasing financial risks to photovoltaic (PV) deployment and by exacerbating the technical challenges to integration of solar power on the electricity grid. The dominant contribution to uncertainty in projected power and energy from solar power systems arises from uncertainty in the estimated solar resource. Most often, the solar resource is estimated from satellite measurements which may be supplemented by on-site ground measurements. To project system power and energy, irradiance must be estimated over the system’s footprint, separated into direct and diffuse components, and translated into the array’s plane. Uncertainty in the estimated irradiance thus arises from uncertainty in the models that: translate satellite measurements to estimated irradiance; portray the spatial and temporal variation in irradiance over a power plant’s footprint, or over a fleet of solar power systems; and separate global horizontal irradiance into its beam and diffuse components.

14 SOLAR ENERGY↗

Final Technical Report Advanced Solar Resource Modeling and Analysis.

The SunShot Initiative coordinates research, development, demonstration, and deployment activities aimed at dramatically reducing the total installed cost of solar power. The SunShot Initiative focuses on removing critical technical and non-technical barriers to installing and integrating solar energy into the electricity grid. Uncertainty in projected power and energy production from solar power systems contributes to these barriers by increasing financial risks to photovoltaic (PV) deployment and by exacerbating the technical challenges to integration of solar power on the electricity grid.

14 SOLAR ENERGY↗

Assessment of the Technical Maturity of Generation IV Concepts for Test or Demonstration Reactor Applications, Revision 2

The United States Department of Energy (DOE) commissioned a study the suitability of different advanced reactor concepts to support materials irradiations (i.e. a test reactor) or to demonstrate an advanced power plant/fuel cycle concept (demonstration reactor). As part of the study, an assessment of the technical maturity of the individual concepts was undertaken to see which, if any, can support near-term deployment. A Working Group composed of the authors of this document performed the maturity assessment using the Technical Readiness Levels as defined in DOE’s Technology Readiness Guide . One representative design was selected for assessment from of each of the six Generation-IV reactor types: gas-cooled fast reactor (GFR), lead-cooled fast reactor (LFR), molten salt reactor (MSR), supercritical water-cooled reactor (SCWR), sodium-cooled fast reactor (SFR), and very high temperature reactor (VHTR). Background information was obtained from previous detailed evaluations such as the Generation-IV Roadmap but other technical references were also used including consultations with concept proponents and subject matter experts. Outside of Generation IV activity in which the US is a party, non-U.S. experience or data sources were generally not factored into the evaluations as one cannot assume that this data is easily available or of sufficient quality to be used for licensing a US facility. The Working Group established the scope of the assessment (which systems and subsystems needed to be considered), adapted a specific technology readiness scale, and scored each system through discussions designed to achieve internal consistency across concepts. In general, the Working Group sought to determine which of the reactor options have sufficient maturity to serve either the test or demonstration reactor missions.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A Technical and Economic Optimization Approach to Exploring Offshore Renewable Energy Development in Hawaii

This study was conducted with the support of the U.S. Department of Energy’s (DOE’s) Wind and Water Power Technologies Office (WWPTO) as part of ongoing efforts to minimize key risks and reduce the cost and time associated with permitting and deploying ocean renewable energy. The focus of the study was to discuss a possible approach to exploring scenarios for ocean renewable energy development in Hawaii that attempts to optimize future development based on technical, economic, and policy criteria. The goal of the study was not to identify potentially suitable or feasible locations for development, but to discuss how such an approach may be developed for a given offshore area. Hawaii was selected for this case study due to the complex nature of the energy climate there and DOE’s ongoing involvement to support marine spatial planning for the West Coast. Primary objectives of the study included 1) discussing the political and economic context for ocean renewable energy development in Hawaii, especially with respect to how inter-island transmission may affect the future of renewable energy development in Hawaii; 2) applying a Geographic Information System (GIS) approach that has been used to assess the technical suitability of offshore renewable energy technologies in Washington, Oregon, and California, to Hawaii’s offshore environment; and 3) formulate a mathematical model for exploring scenarios for ocean renewable energy development in Hawaii that seeks to optimize technical and economic suitability within the context of Hawaii’s existing energy policy and planning.

58 GEOSCIENCES↗

Final Technical Report

ZeaChem Inc. and US DOE successfully demonstrated the ZeaChem process for producing sugars and ethanol from high-impact biomass feedstocks. The project was executed over a 5-year period under a $31.25 million cooperative agreement (80:20 Federal:ZeaChem cost share). The project was managed by dividing it into three budget periods. Activities during Budget Period 1 were limited to planning, permitting, and other pre-construction planning. Budget Period 2 activities included engineering, procurement, construction, commissioning, start-up and initial operations through the Independent Engineer Test Runs. The scope of construction was limited to the Chem Frac and Hydrogenolysis units, as the Core Facility was already in place. Construction was complete in December 2012, and the first cellulosic ethanol was produced in February 2013. Additional operational test runs were conducted during Budget Period 3 (completed June 2015) using hybrid poplar, corn stover, and wheat straw feedstocks, resulting in the production of cellulosic ethanol and various other biorefinery intermediates. The research adds to the understanding of the Chem Frac and Hydrogenolysis technologies in that the technical performance of each unit was measured, and the resulting data and operational experience can be used as the basis for engineering designs, thus mitigating risks for deployment in future commercial facilities. The Chem Frac unit was initially designed to be operated as two-stage dilute acid hydrolysis, with first stage conditions selected to remove the hemicellulose fraction of the feedstock, and the second stage conditions selected to remove the cellulose fraction. While the Chem Frac unit met or exceeded the design capacity of 10 ton(dry)/day, the technical effectiveness of the Chem Frac unit was below expectations in its initial two-stage dilute acid configuration. The sugars yields were low, the sugars were dilute, and the sugars had poor fermentability caused by excessive inhibitors from wood breakdown products, resulting in a non-viable process from an economic point of view. Later runs with the Chem Frac unit switched to a configuration that used dilute acid pretreatment followed by enzymatic hydrolysis. This change improved yield, increased sugar concentrations, and improved fermentability of sugars. The Hydrogenolysis unit met or exceeded all expectations with respect to unit capacity, technical performance, and economic performance. The US DOE funds for the project were provided through the American Recovery and Reinvestment Act of 2009. In addition to the scientific/technical merit of the project, this project benefited the public through the creation of approximately 75 onsite direct construction-related jobs, 25 direct on-going operations-related jobs, plus numerous indirect jobs, and thus was well aligned with the goals of the American Recovery and Reinvestment Act of 2009.

09 BIOMASS FUELS↗

System-Cost-Optimized Smart EVSE for Residential Application: Final Technical Report including Manufacturing Plan

In the 2nd quarter of 2012, a program was formally initiated at Delta Products to develop smart-grid-enabled Electric Vehicle Supply Equipment (EVSE) product for residential use. The project was funded in part by the U.S. Department of Energy (DOE), under award DE-OE0000590. Delta products was the prime contractor to DOE during the three year duration of the project. In addition to Delta Products, several additional supplier-partners were engaged in this research and development (R&D) program, including Detroit Edison DTE, Mercedes Benz Research and Development North America, and kVA. This report summarizes the program and describes the key research outcomes of the program. A technical history of the project activities is provided, which describes the key steps taken in the research and the findings made at successive stages in the multi-stage work. The evolution of an EVSE prototype system is described in detail, culminating in prototypes shipped to Department of Energy Laboratories for final qualification. After the program history is reviewed, the key attributes of the resulting EVSE are described in terms of functionality, performance, and cost. The results clearly demonstrate the ability of this EVSE to meet or exceed DOE's targets for this program, including: construction of a working product-intent prototype of a smart-grid-enabled EVSE, with suitable connectivity to grid management and home-energy management systems, revenue-grade metering, and related technical functions; and cost reduction of 50% or more compared to typical market priced EVSEs at the time of DOE's funding opportunity announcement (FOA), which was released in mid 2011. In addition to meeting all the program goals, the program was completed within the original budget and timeline established at the time of the award. The summary program budget and timeline, comparing plan versus actual values, is provided for reference, along with several supporting explanatory notes. Technical information relating to the product design and test results are contained in the appendices to this report.

33 ADVANCED PROPULSION SYSTEMS↗