Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SPACECRAFT CONFIGURATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

A component modes projection and assembly model reduction methodology for articulated, multi-flexible body structures

A two-stage model reduction methodology, combining the classical Component Mode Synthesis (CMS) method and the newly developed Enhanced Projection and Assembly (EP&A) method is proposed in this research. The first stage of this methodology, called COmponent Mode Projection and Assembly model REduction (COMPARE) method, involves the generations of CMS mode sets, such as the MacNeal-Rubin mode sets. These mode sets are then used to reduce the order of each component model in the Rayleigh-Ritz sense. The resultant component models are then combined to generate reduced-order system models at various system configurations. A composite mode set which retains important system modes at all system configurations is then selected from these reduced-order system models. In the second stage, the EP&A model reduction method is employed to reduce further the order of the system model generated in the first stage. The effectiveness of the COMPARE methodology has been successfully demonstrated on a high-order, finite-element model of the cruise-configured Galileo spacecraft.

Lee, Allan Y.↗

BALLIST: A computer program to empirically predict the bumper thickness required to prevent perforation of the Space Station by orbital debris

A computer program called BALLIST that is intended to be a design tool for engineers is described. BALLlST empirically predicts the bumper thickness required to prevent perforation of the Space Station pressure wall by a projectile (such as orbital debris) as a function of the projectile's velocity. 'Ballistic' limit curves (bumper thickness vs. projectile velocity) are calculated and are displayed on the screen as well as being stored in an ASCII file. A Whipple style of spacecraft wall configuration is assumed. The predictions are based on a database of impact test results. NASA/Marshall Space Flight Center currently has the capability to generate such test results. Numerical simulation results of impact conditions that can not be tested (high velocities or large particles) can also be used for predictions.

Rule, William Keith↗

A component modes projection and assembly model reduction methodology for articulated, multi-flexible body structures

A two-stage model reduction methodology, combining the classical Component Mode Synthesis (CMS) method and the newly developed Enhanced Projection and Assembly (EP&A) method, is proposed in this research. The first stage of this methodology, called the COmponent Modes Projection and Assembly model REduction (COMPARE) method, involves the generation of CMS mode sets, such as the MacNeal-Rubin mode sets. These mode sets are then used to reduce the order of each component model in the Rayleigh-Ritz sense. The resultant component models are then combined to generate reduced-order system models at various system configurations. A composite mode set which retains important system modes at all system configurations is then selected from these reduced-order system models. In the second stage, the EP&A model reduction method is employed to reduce further the order of the system model generated in the first stage. The effectiveness of the COMPARE methodology has been successfully demonstrated on a high-order, finite-element model of the cruise-configured Galileo spacecraft.

Lee, Allan Y.↗

Validation of the AMSU-B Bias Corrections Based on Satellite Measurements from SSM/T-2

The NOAA-15 Advanced Microwave Sounding Unit-B (AMSU-B) was designed in the same spirit as the Special Sensor Microwave Water Vapor Profiler (SSM/T-2) on board the DMSP F11-14 satellites, to perform remote sensing of spatial and temporal variations in mid and upper troposphere humidity. While the SSM/T-2 instruments have a 48 km spatial resolution at nadir and 28 beam positions per scan, AMSU-B provides an improvement with a 16 km spatial resolution at nadir and 90 beam positions per scan. The AMSU-B instrument, though, has been experiencing radio frequency interference (RFI) contamination from the NOAA-15 transmitters whose effect is dependent upon channel, geographic location, and current spacecraft antenna configuration. This has lead to large cross-track biases reaching as high as 100 Kelvin for channel 17 (150 GHz) and 50 Kelvin for channel 19 (183 +/-3 GHz). NOAA-NESDIS has recently provided a series of bias corrections for AMSU-B data starting from March, 1999. These corrections are available for each of the five channels, for every third field of view, and for three cycles within an eight second period. There is also a quality indicator in each data record to indicate whether or not the bias corrections should be applied. As a precursor to performing retrievals of mid and upper troposphere humidity, a validation study is performed by statistically analyzing the differences between the F14 SSM/T-2 and the bias corrected AMSU-B brightness temperatures for three months in the spring of 1999.

Kolodner, Marc A.↗

Cassini Orbit Trim Maneuvers at Saturn - Overview of Attitude Control Flight Operations

The Cassini spacecraft has been in orbit around Saturn since July 1, 2004. To remain on the planned trajectory which maximizes science data return, Cassini must perform orbit trim maneuvers using either its main engine or its reaction control system thrusters. Over 200 maneuvers have been executed on the spacecraft since arrival at Saturn. To improve performance and maintain spacecraft health, changes have been made in maneuver design command placement, in accelerometer scale factor, and in the pre-aim vector used to align the engine gimbal actuator prior to main engine burn ignition. These and other changes have improved maneuver performance execution errors significantly since 2004. A strategy has been developed to decide whether a main engine maneuver should be performed, or whether the maneuver can be executed using the reaction control system.

spacecraft configuration↗

Interfacing Space Communications and Navigation Network Simulation with Distributed System Integration Laboratories (DSIL)

NASA's planned Lunar missions will involve multiple NASA centers where each participating center has a specific role and specialization. In this vision, the Constellation program (CxP)'s Distributed System Integration Laboratories (DSIL) architecture consist of multiple System Integration Labs (SILs), with simulators, emulators, testlabs and control centers interacting with each other over a broadband network to perform test and verification for mission scenarios. To support the end-to-end simulation and emulation effort of NASA' exploration initiatives, different NASA centers are interconnected to participate in distributed simulations. Currently, DSIL has interconnections among the following NASA centers: Johnson Space Center (JSC), Kennedy Space Center (KSC), Marshall Space Flight Center (MSFC) and Jet Propulsion Laboratory (JPL). Through interconnections and interactions among different NASA centers, critical resources and data can be shared, while independent simulations can be performed simultaneously at different NASA locations, to effectively utilize the simulation and emulation capabilities at each center. Furthermore, the development of DSIL can maximally leverage the existing project simulation and testing plans. In this work, we describe the specific role and development activities at JPL for Space Communications and Navigation Network (SCaN) simulator using the Multi-mission Advanced Communications Hybrid Environment for Test and Evaluation (MACHETE) tool to simulate communications effects among mission assets. Using MACHETE, different space network configurations among spacecrafts and ground systems of various parameter sets can be simulated. Data that is necessary for tracking, navigation, and guidance of spacecrafts such as Crew Exploration Vehicle (CEV), Crew Launch Vehicle (CLV), and Lunar Relay Satellite (LRS) and orbit calculation data are disseminated to different NASA centers and updated periodically using the High Level Architecture (HLA). In addition, the performance of DSIL under different traffic loads with different mix of data and priorities are evaluated.

Traffic Measuring and Monitoring↗

Using Automated Scheduling for Mission Design: A Case Study for EMIT

The Earth Surface Mineral Dust Source InvesTigation (EMIT) is an Earth Ventures-Instrument (EVI-4) mission to map the surface mineralogy of arid dust source regions. EMIT used automated scheduling technology to analyze aspects of the mission design. The automated scheduling technology was used to construct schedules which were then automatically analyzed with respect to science acquired. These analyses can be performed for a range of spacecraft hardware configurations, observation strategies, and science requirements. By studying the effects of changes on the above inputs, better hardware configurations, observation strategies, and science requirements can be formulated. The use of a pointing mirror on EMIT was under consideration, and this analysis aided in determining whether or not to keep it as part of the design of the instrument. Clouds will also have a large impact on the coverage of science targets achievable by the mission. Analysis was done on how clouds could impact the coverage achievable as well as the data volume. This analysis with clouds also aided in determining the coverage criteria for the mission. It was necessary to find a criteria that was achievable with some margin as well as satisfies the science goals of the mission.

Thompson, David R.↗

Validation of the Mars 2020 Fault Protection Design: Navigating the Infinity of the Off-Nominal

On July 30th 2020, the Mars 2020 mission successfully launched out of Cape Canaveral, Florida, passed through the Earth’s shadow, and began its short cruise to Mars. Less than seven months later, the Perseverance rover touched down safely in Jezero Crater to begin its ambitious mission that includes looking for signs of ancient life and collecting samples for future return to Earth. Getting to the successful landing, or “Tango Delta Nominal,” could not have been achieved without also considering the off-nominal. One of the teams supporting this ambitious mission is the fault protection (FP) team. This team is tasked with assessing the various failures, or faults, that could prevent mission success and with ensuring that the autonomous behaviors built into the software and hardware can detect faults and recover the vehicle to a safe state. As part of its charter, the FP team designed a test campaign to provide confidence in the system’s robustness to off-nominal scenarios across all of Mars 2020’s mission phases. The greatest challenge associated with designing such a validation campaign was reducing the infinite number of anomalous scenarios into a finite test suite. In addition, the tests needed to be executed efficiently in order to utilize the team’s limited test venue access, but still needed to maintain a level of rigor that guaranteed confidence in the test outcomes. Given that each test scenario generated massive amounts of data, the team also developed methods for quickly ascertaining whether the autonomous fault protection behaviors maintained vehicle safety in the presence of an anomaly. This paper summarizes the processes that the Mars 2020 fault protection team employed to execute its off-nominal validation campaign. It captures both the methods of generating a suite of off-nominal tests, as well as reducing it to a subset that can be realistically executed within schedule and resource constraints. It also describes the various processes and philosophies that the team utilized to execute the tests efficiently, including creating a standardized procedure template, keeping the test cases modular so that they could be easily interchanged, and capturing common fault injections in a change-controlled database. Finally, it will describe the tools and processes for assessing the test data, focusing in particular on a tool that evaluated vehicle state using “secondary” sources of data to validate that the software had truly configured the spacecraft to the expected safe state.

Morantz, Chaz↗

Autonomous Constrained Control for Arbitrary Configurations of Gimbaling Thrusters in SE(3)

In order to develop robust autonomy in spacecraft, it is desirable to develop methods for controlling a spacecraft in various configurations with any combination of thrusters of various types and both for static RCS thrusters and gimbaling thrusters. In the case of a stuck thruster imposing unplanned and undesired motion both translational and rotational or in the case of a malfunctioning thruster, it is desirable for that spacecraft to have the ability to identify and overcome that problem without human intervention. To that end, a spacecraft must be able to rapidly and autonomously reconfigure thruster firing histories and update guidance protocols. In this paper, a method for a spacecraft to autonomously select thrusters of any configuration is presented. The residual motion imposed by off-nominal or not-fully-controllable thruster configurations is identified by the spacecraft and solved for, both for static reaction control systems and gimbaling engines.

Matthew M. Witta↗

Lunar Lander Structural Design Studies at NASA Langley

The National Aeronautics and Space Administration is currently developing mission architectures, vehicle concepts and flight hardware to support the planned human return to the Moon. During Phase II of the 2006 Lunar Lander Preparatory Study, a team from the Langley Research Center was tasked with developing and refining two proposed Lander concepts. The Descent-Assisted, Split Habitat Lander concept uses a disposable braking stage to perform the lunar orbit insertion maneuver and most of the descent from lunar orbit to the surface. The second concept, the Cargo Star Horizontal Lander, carries ascent loads along its longitudinal axis, and is then rotated in flight so that its main engines (mounted perpendicular to the vehicle longitudinal axis) are correctly oriented for lunar orbit insertion and a horizontal landing. Both Landers have separate crew transport volumes and habitats for surface operations, and allow placement of large cargo elements very close to the lunar surface. As part of this study, lightweight, efficient structural configurations for these spacecraft were proposed and evaluated. Vehicle structural configurations were first developed, and preliminary structural sizing was then performed using finite element-based methods. Results of selected structural design and trade studies performed during this activity are presented and discussed.

Wu, K. Chauncey↗

Autonomous Constrained Control for Arbitrary Thruster Configurations of Gimbaling Thrusters in SE(3)

In order to develop robust autonomy in spacecraft, it is desirable to develop methods for guiding and controlling arbitrarily-configured spacecraft with any combination of thrusters of various types, i.e. either static reaction control system thrusters and gimbaling thrusters. Scenarios in which autonomous selection of thrusters may be needed include the case of a stuck or inhibited thruster that restricts the motion of the vehicle, vehicles with changing mass properties such as logistics modules or tugs, or vehicles that have imposed constraints on thrusters during docking in order to avoid plume impingement on a space station or adjacent spacecraft. To that end, a spacecraft must be able to rapidly and autonomously reconfigure thruster firing histories and update guidance protocols in accordance with newly imposed constraints. In this paper, a methodology is presented that enables a spacecraft to autonomously select thrusters of any configuration and type in order to optimally match a desired 6-degree-of-freedom navigation and control within the special Euclidean SE(3) framework. The residual motion imposed by off-nominal thruster configurations or thrusters that are not fully controllable is identified by the spacecraft and solved for over time, both for static reaction control systems and for the case of gimbaling thrusters.

GN&C↗

Optimal thruster configurations for the GP-B spacecraft

Thruster locations and control schemes which make the most efficient use of the available propellant of a constant flow propulsion system are investigated. A set of three necessary and sufficient conditions are established for a thruster system to be optimal in the sense of maximizing the smallest magnitude force which can be generated by the thrusters. Analytical expressions are derived for the 'the envelope of least authority' which is defined as the smallest force magnitude versus moment magnitude which can be generated by any given thruster system. Several thruster configurations are proposed for the GP-B spacecraft and their performance is compared with respect to their envelopes of least authority. The results are applicable to any system composed of thrusters which saturate at some finite value.

Wiktor, P.↗

Considerations and Architectures for Inter-Satellite Communications in Distributed Spacecraft Systems

This paper will identify the important characteristics and requirements necessary for inter-satellite communications in distributed spacecraft systems and present analysis results focusing on architectural and protocol comparisons. Emerging spacecraft systems plan to deploy multiple satellites in various "distributed" configurations ranging from close proximity formation flying to widely separated constellations. Distributed spacecraft configurations provide advantages for science exploration and operations since many activities useful for missions may be better served by distributing them between spacecraft. For example, many scientific observations can be enhanced through spatially separated platforms, such as for deep space interferometry. operating multiple distributed spacecraft as a mission requires coordination that may be best provided through inter-satellite communications. For example, several future distributed spacecraft systems envision autonomous operations requiring relative navigational calculations and coordinated attitude and position corrections. To conduct these operations, data must be exchanged between spacecraft. Direct cross-links between satellites provides an efficient and practical method for transferring data and commands. Unlike existing "bent-pipe" relay networks supporting space missions, no standard or widely-used method exists for cross-link communications. Consequently, to support these future missions, the characteristics necessary for inter-satellite communications need to be examined. At first glance, all of the missions look extremely different. Some missions call for tens to hundreds of nano-satellites in constant communications in close proximity to each other. Other missions call for a handful of satellites communicating very slowly over thousands to hundreds of thousands of kilometers. The paper will first classify distributed spacecraft missions to help guide the evaluation and definition of cross-link architectures and approaches. Based on this general classification, the paper will examine general physical layer parameters, such as frequency bands and data rates, necessary to support the missions. The paper will also identify classes of communication architectures that may be employed, ranging from fully distributed to centralized topologies. Numerous factors, such as number of spacecraft, must be evaluated when attempting to pick a communications architecture. Also important is the stability of the formation from a communications standpoint. For example, do all of the spacecraft require equal bandwidth and are spacecraft allowed to enter and leave a formation? The type of science mission being attempted may also heavily influence the communications architecture. In addition, the paper will assess various parameters and characteristics typically associated with the data link layer. The paper will analyze the performance of various multiple access techniques given the operational scenario, requirements, and communication topologies envisioned for missions. This assessment will also include a survey of existing standards and their applicability for distributed spacecraft systems. An important consideration includes the interoperability of the lower layers (physical and data link) examined in this paper with the higher layer protocols(network) envisioned for future space internetworking. Finally, the paper will define a suggested path, including preliminary recommendations, for defining and developing a standard for intersatellite communications based on the classes of distributed spacecraft missions and analysis results.

Edwards, Bernard↗

Minimum time attitude slewing maneuvers of a rigid spacecraft

The problems of large-angle attitude maneuvers of a spacecraft have gained much consideration in recent years. The configurations of the spacecraft considered are: completely rigid, a combination of rigid and flexible parts, or gyrostat-type systems. The performance indices usually include minimum torque integration, power criterion, and frequency-shaped cost functionals. The minimum time slewing problem of a rigid spacecraft was examined. Optimal control theory (Maximum Principal) was applied to the slewing motion of a general rigid spacecraft. Control torque about all three axes was computed. The equations for the system are composed of the Euler dynamical equations in the spacecraft body axes and the quaternion kinematical equation. By introducing the costates for the quaternion and the angular velocity, the Hamiltonian of the system can be formed and the optimal control obtained. Finally the methods are applied to the SCOLE slewing motion. The control variables include three control moments on the Shuttle and two control forces on the reflector. Numerical results are discussed.

Li, Feiyue↗

LANDSAT D: X-band analysis study

The effects of the use of an X-band carrier frequency on the transmission link margins and on the affected ground station equipment are investigated. The specific effects of the X-band carrier frequency allocation on the link margin are detailed. This includes an examination of a Local User Terminal's (LUT) coverage circle radius requirements, detailed elements of the link calculation, and specific spacecraft and ground configurations that would satisfy the link requirements. The requirements that spacecraft signal acquisition and tracking place on the front-end of the ground station equipment are also examined. The availability of the required ground station equipment and representative costs for these items are included. The costs considered shall be both for procurement of a new ground station (front-end only) and for modification of an existing S-band station to X-band.

Alexander, L.↗