Stocking of Offsite Waters for Hungry Horse Dam Mitigation Creston National Fish Hatchery, FY 2006 Annual Report.

A total of 350,000, M012 strain, westslope cutthroat trout (WCT) eggs were received from Montana Fish Wildlife & Parks (MFWP), Washoe Park State Fish Hatchery in June of 2005 to accomplish this fishery management objective. These eggs were incubated, hatched and reared entirely inside the hatchery nursery building using a protected well water supply. Fish grew according to schedule and survival was excellent. The hatchery achieved a 0.78 feed fed to pounds gained conversion ratio for this group of WCT. Not all of the progenies from this fish lot were used for Hungry Horse Dam Fishery Mitigation Implementation. Some were used for other regional fishery management projects. Westslope cutthroat trout were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook and also utilizing a regimen adapted for hatchery specific site conditions. The fish health for these WCT was very good. Survival from first feeding fry stage to stocking was 79%. The hatchery had an annual fish health inspection performed by the USFWS Bozeman Fish Health Center in mid March of 2006. This inspection found all fish lots at Creston to be disease free. The Montana State Fish Health Board has placed the hatchery under a limited quarantine since May of 2005 due to an epizootic of Furunculosis. This classification has allowed the Creston NFH to stock disease free fish in locations approved by regional fish managers. The hatchery has been working with the State Fish Pathologist to remove the limited quarantine classification from the facility. Although fish health for all station fish lots remains disease free, MFWP has asserted it will not remove the limited quarantine until the new influent water treatment system, including the ultraviolet disinfection unit, is running full time, year round. The USFWS is working to secure the additional funding necessary to operate the treatment building year round. Distribution of the WCT took place from March through June. The stocking locations on the Flathead Reservation and State managed waters were identified by Confederated Salish and Kootenai Tribe (CSKT) and MFWP fishery biologists. Post release survival and angler success is monitored routinely by CSKT and MFWP fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and adaptive management decisions. A total of 99,126 WCT were stocked during nine distribution trips in management approved waters (see Table 1). The average size of WCT at stocking was 3.91-inches. A total of 101,600, Arlee strain, rainbow trout (RBT) eggs were received from the Ennis National Fish Hatchery, Ennis, Montana, in December of 2005 and 35,000 Kamloops strain eggs were received from Murray Springs SFH, Eureka, Montana, in March of 2006 to accomplish this fishery management objective. The RBT were reared using approved fish culture techniques as recommended in the USFWS Fish Hatchery Management Handbook. There was no fish health related problems associated with this lot of fish. Survival from swim up fry stage to stocking was 93% for the Arlee's and 79% for the Kamloops. The hatchery achieved a 0.68 feed fed to pounds gained conversion ratio for the Arlee and 0.97 for the Kamloops RBT. The excellent feed conversion ratio can be attributed to refined feeding techniques and the use of an extruded high performance fry feed made with premium fish meal and marine fish oil. The Arlee strain of rainbow trout is requested for this fishery mitigation objective because the chosen stocking locations are terminal basin reservoirs or lakes, habitat conditions prevent natural spawning runs and returns to the creel are more favorable then for native westslope cutthroat trout. MFWP also requested a fall plant of Kamloops strain RBT and they will be evaluated for performance and future fall stockings in Echo Lake. Post release survival and angler success is monitored routinely by the Confederated Salish and Kootenai Tribe (CSKT) and Montana Fish Wildlife & Parks (MFWP) fishery technicians. Stocking numbers and locations vary annually based on the results of biological monitoring, creel evaluations and habitat conditions. The RBT were stocked in six distribution trips from June through September. The number of fish stocked and the receiving waters are identified below (see Table 2).

13 HYDRO ENERGY↗

Make the right measurement: Discovery of an allosteric inhibition site for p300-HAT

Histone acetyltransferases (HATs) and histone deacetylases (HDACs) catalyze the dynamic and reversible acetylation of proteins, an epigenetic regulatory mechanism associated with multiple cancers. Indeed, HDAC inhibitors are already approved in the clinic. The HAT paralogs p300 and CREB-binding protein (CBP) have been implicated in human pathological conditions including several hematological malignancies and androgen receptor-positive prostate cancer. Others have reported CoA-competitive inhibitors of p300 and CBP with cell-based activity. Here, we describe 2 compounds, CPI-076 and CPI-090, discovered through p300-HAT high throughput screening screening, which inhibit p300-HAT via binding at an allosteric site. We present the high resolution (1.7 and 2.3 Å) co-crystal structures of these molecules bound to a previously undescribed allosteric site of p300-HAT. Derivatization yielded actionable structure-activity relationships, but the full-length enzymatic assay demonstrated that this allosteric HAT inhibitor series was artifactual, inhibiting only the HAT domain of p300 with no effect on the full-length enzyme.

59 BASIC BIOLOGICAL SCIENCES↗

Closure Report for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks Nevada National Security Site, Nevada with ROTCs 1-2, Revision 0

This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 539: Areas 25 and 26 Railroad Tracks, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 539 are located within Areas 25 and 26 of the Nevada National Security Site. Corrective Action Unit 539 comprises the following CASs: • 25-99-21, Area 25 Railroad Tracks • 26-99-05, Area 26 Railroad Tracks The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 539 were met. To achieve this, the following actions were performed: • Reviewed documentation on historical and current site conditions, including the concentration and extent of contamination. • Conducted radiological walkover surveys of railroad tracks in both Areas 25 and 26. • Collected ballast and soil samples and calculated internal dose estimates for radiological releases. • Collected in situ thermoluminescent dosimeter measurements and calculated external dose estimates for radiological releases. • Removed lead bricks as potential source material (PSM) and collected verification samples. • Implemented corrective actions as necessary to protect human health and the environment. • Properly disposed of corrective action and investigation wastes. • Implemented an FFACO use restriction (UR) for radiological contamination at CAS 25-99-21. The approved UR form and map are provided in Appendix F and will be filed in the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Facility Information Management System; the FFACO database; and the NNSA/NSO CAU/CAS files. From November 29, 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: • At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. • At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed low-level radioactive waste. Wastes were disposed of in the appropriate onsite landfills. The NNSA/NSO provides the following recommendations: • Clean closure is required at CAS 26-99-05. • Closure in place is required at CAS 25-99-21. • A UR is required at CAS 25-99-21. • A Notice of Completion to the NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 539. • Corrective Action Unit 539 should be moved from Appendix III to Appendix IV of the FFACO.

54 ENVIRONMENTAL SCIENCES↗

The Status of the Taiwan Photon Source

NSRRC has been operating a 1.5 GeV synchrotron light source, the Taiwan Light Source (TLS), for over 15 years and has established a large user community. For the future development of synchrotron radiation research in Taiwan, a feasibility study report to construct a 3.0 GeV low-emittance storage ring, the Taiwan Photon Source (TPS), was issued in July 2005. The government approval of the TPS project was obtained in December 2007 and the machine will be built at current site of NSRRC. The project has progressed steadily since and reached several major milestones now: the architect firm has finished the site plan and civil design, the accelerator design has been fixed, and purchase of long-lead items begins its course. The TPS storage ring has a circumference of 518.4 meters with a concentric booster of 496.8 meters. The storage ring adopted a 24-cell double-bend structure with a 1.6 nm-rad natural emittance. There are six 12-m and eighteen 7-m ID straights. For user research, five new beamlines have been selected for the Phase I operations: the micro protein crystallography, the materials sub-micron diffraction, the inelastic soft x-ray scattering, the coherent x-ray scattering, and the nano probe beamlines. The civil construction is getting ready to start. The commissioning of the TPS storage ring is targeted for 2013.

43 PARTICLE ACCELERATORS↗

The PhEDEx next-gen website

PhEDEx is the data-transfer management solution written by CMS. It consists of agents running at each site, a website for presentation of information, and a web-based data-service for scripted access to information. The website allows users to monitor the progress of data-transfers, the status of site agents and links between sites, and the overall status and behaviour of everything about PhEDEx. It also allows users to make and approve requests for data-transfers and for deletion of data. It is the main point-of-entry for all users wishing to interact with PhEDEx. For several years, the website has consisted of a single perl program with about 10K SLOC. This program has limited capabilities for exploring the data, with only coarse filtering capabilities and no context-sensitive awareness. Graphical information is presented as static images, generated on the server, with no interactivity. It is also not well connected to the rest of the PhEDEx codebase, since much of it was written before the data-service was developed. All this makes it hard to maintain and extend. We are re-implementing the website to address these issues. The UI is being rewritten in Javascript, replacing most of the server-side code. We are using the YUI toolkit to provide advanced features and context-sensitive interaction, and will adopt a Javascript charting library for generating graphical representations client-side. This relieves the server of much of its load, and automatically improves server-side security. The Javascript components can be re-used in many ways, allowing custom pages to be developed for specific uses. In particular, standalone test-cases using small numbers of components make it easier to debug the Javascript than it is to debug a large server program. Information about PhEDEx is accessed through the PhEDEx data-service, since direct SQL is not available from the clients browser. This provides consistent semantics with other, externally written monitoring tools, which already use the data-service. It also reduces redundancy in the code, yielding a simpler, consolidated codebase. In this talk we describe our experience of re-factoring this monolithic server-side program into a lighter client-side framework. We describe some of the techniques that worked well for us, and some of the mistakes we made along the way. We present the current state of the project, and its future direction.

Egeland, R.↗

Immobilized Low-Activity Waste Glass Release Data Package for the Integrated Disposal Facility Performance Assessment

The Hanford Site in southeastern Washington State has been used extensively by the U.S. Department of Energy (DOE) to produce nuclear materials for the U.S. defense arsenal. A large inventory of radioactive and mixed waste has accumulated in 177 buried single- and double-shell tanks. Liquid waste recovered from the tanks will be pretreated to separate the low-activity fraction from the high-level and transuranic wastes. The low-activity waste (LAW) is planned to be immobilized in glass, via vitrification, and placed into a near-surface disposal system on the Hanford Site. Before the immobilized low-activity waste (ILAW) can be placed into the disposal system, DOE must approve a performance assessment (PA), which documents the assumptions and provides the quantitative demonstration of compliance with the performance objectives for the long-term protection of the public and the environment. A critical component of the PA will be to demonstrate that releases from the selected glass waste form do not result in the performance objectives being exceeded. The PA must also, for purposes of establishing limits on radionuclides that may be buried near-surface, assess impacts to a hypothetical intruder and impacts to water resources. The key information presented in this data package consists of the specific glass compositions and associated glass dissolution rate law parameters for five ILAW glasses. In addition, the results of geochemical modeling performed on several glasses that are not specifically described in this document are provided as supplemental data to help identify potential end-point alteration phases that may form during the weathering of ILAW glasses. These data (glass compositions, rate law parameters, and potential alteration phases) will be used to identify contaminant release source terms for the Integrated Disposal Facility PA. In addition, a general discussion on nuclear waste glass corrosion and a brief overview of modeling approaches and corresponding uncertainties are discussed. Table ES.1 through Table ES.4 provide the specific data to be used to support the 2017 PA.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

PTSFA QA Review of Container Procurements: Information Use Procedure

The purpose of this Packaging and Transportation Safety Functional Area (PTSFA) procedure is to describe the process in which the PTSFA Quality Assurance Engineer (QAE) or designee reviews and approves the documentation associated with the procurements of containers to be used for onsite transfer or off-site transportation of hazardous materials and waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Internationally supported data acquisition for solar system exploration in the 1990's

Procedures that could be followed for cooperative agreements between countries with large ground station antennas to help provide mission telemetry support for increasing solar system exploration are outlined. It is noted that mission cost reductions, and thereby greater chances that missions will be approved, are offered by the opportunity to make planetary probes multinational efforts. The Canberra station is a suitable site for the Japanese Planet A Halley's comet intercept probe. The French have requested U.S. cooperation in developing VLBI stations in the L-band to receive signals from the Venus balloons and landers being sent as part of a joint French-Soviet mission to Venus and Halley's comet. The construction of the stations would extend the capabilities already present with NASA's deep space network, particularly for tracking the Voyager visits to Uranus and Neptune.

Reid, M. S.↗

Advances in Integral and Separate Effects Experiments for Water Cooled Small Modular Reactors

This paper focuses on the progress being made in water-cooled small modular reactor (SMR) advanced integral effects and separate effects experiments for reactor licensing. SMRs, considered modular in design, are mostly factory-built and then shipped to the reactor site. Of the several types of SMR designs available, water-cooled SMRs are likely to receive regulatory approval faster than others, as most of the technologies involved (e.g., the fuel and coolant technologies) are matured. However, the unique safety systems of SMRs, which depend on specific SMR design features, require integral and separate effects experiments to achieve reactor licensing. Thus, of the many SMR designs being proposed, only a few have successfully undergone licensing and reached the final development and demonstration stage. Many nuclear vendors and newcomer companies are investing millions of dollars to develop integral and separate effects testing facilities for preparing final safety analysis reports to include in licensing applications. Development and analysis of these experimental facilities is costly and takes about four to five years. The unique challenges involved can be reduced when stakeholders synergistically apply lessons learned, knowing the critical role played by advancements in experiments that support the licensing of SMR safety systems. Identification of knowledge/research gaps with the phenomena identification and ranking table (PIRT) and designing experimental facilities focusing on the phenomena of interest (POI) and figures of merit (FOMs) are pivotal to select the critical path to successful design demonstration and licensing application.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Status of LILW Complex Disposal Facility Construction in Korea - 17123

In this paper, the experiences and directions of the construction of the LILW disposal facility in Korea are discussed. The LILW disposal facility is being constructed in Gyeongju-si, Korea. The disposal facility is officially called 'Wolsong Low and Intermediate Level Radioactive Waste Disposal Center (WLDC)'. It can dispose of 800,000 drums (hereafter, 'drums' means '200 liter drum equivalents' unless specified otherwise) of radioactive waste in a site of 2,060,000 m{sup 2}. The first stage of the LILW facility construction was completed in June 2014, and approved for use by Nuclear Safety and Security Commission (NSSC) in December 2014. The first stage of the LILW facility is a type of underground silo with disposal capacity of 35,200 m{sup 3} (100,000 drums). The first stage of the LILW facility consists of a construction tunnel, an operation tunnel, an access shaft and six silos, etc. Silo for final disposal is located 80∼130 m below sea level, 25 m in diameter and 50 m in height. The capacity of each silo is approximately 16,700 drums. The second stage of the LILW facility is under construction to be completed by December 2019. Site construction is currently underway. The second stage of the LILW facility is a type of near-surface disposal with disposal capacity of 32,875 m{sup 3} (125,000 drums). This stage of the LILW disposal facility consists of an underground gallery, three movable cranes and twenty vaults, etc. Vault for final disposal is located 70 m above sea level, 20 m in width, 20 m length and 10 m in height. The capacity of each vault is approximately 6,250 drums. These stages of the LILW disposal facilities are together called LILW complex disposal facility. It's the world's first LILW disposal facility with two different types of disposal facilities in one site. For efficient operation, these disposal facilities share a reception and storage building, waste water treatment system, measurement and monitoring system, etc. After construction of the first two stages is completed, LILW disposal facilities will be incrementally expanded, and as the whole LILW disposal facilities are completed, all LILW in Korea will be managed safely in WLDC. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Broadband Acoustic Environment at a Tidal Energy Site in Puget Sound

Admiralty Inlet has been selected as a potential tidal energy site. It is located near shipping lanes, is a highly variable acoustic environment, and is frequented by the endangered southern resident killer whale (SRKW). Resolving environmental impacts is the first step to receiving approval to deploy tidal turbines. Several monitoring technologies are being considered to determine the presence of SRKW near the turbines. Broadband noise level measurements are critical for determining design and operational specifications of these technologies. Acoustic environment data at the proposed site was acquired at different depths using a cabled vertical line array from three different cruises during high tidal period in February, May, and June 2011. The ambient noise level decreases approximately 25 dB re 1 μPa per octave from frequency ranges of 1 kHz to 70 kHz, and increases approximately 20 dB re 1 μPa per octave for the frequency from 70 kHz to 200 kHz. The difference of noise pressure levels in different months varies from 10 to 30 dB re 1 μPa for the frequency range below 70 kHz. Commercial shipping and ferry vessel traffic were found to be the most significant contributors to sound pressure levels for the frequency range from 100 Hz to 70 kHz, and the variation could be as high as 30 dB re 1 μPa. These noise level measurements provide the basic information for designing and evaluating both active and passive monitoring systems proposed for deploying and operating for tidal power generation alert system.

16 TIDAL AND WAVE POWER↗

California Energy Incentive Programs: An Annual Update on Key Energy Issues and Financial Opportunities for Federal Sites in California

A spate of recently enacted energy legislation and associated program changes is providing numerous opportunities to help California federal energy managers cut costs and meet their renewables, energy efficiency and GHG emissions goals. In April 2011, Governor Jerry Brown approved the nation’s most ambitious renewable portfolio standard (RPS), which requires 33% of the state’s electricity to come from renewable energy sources by 2020. Policy changes that will support the RPS include expanded eligibility rules that fill previous gaps in incentives for certain sizes of on-site renewable energy systems. Program updates described in this document include: $200 million more in funding for California Solar Initiative rebates to commercial and industrial customers; an increase in the eligible system size for the Feed-In-Tariff (FIT) from 1.5MW to 3MW; and pending changes that may allow customer-side systems to sell tradable renewable energy credits (TRECs) to entities with RPS compliance obligations in California.

California, Incentive, Energy, Financial, Federal↗

Digital Safety Analysis for Small Modular Nuclear Reactors (SMRs)

The licensing process for any nuclear installation generally requires the review and approval of numerous documents by a regulatory body. Alternate approaches are needed where similar nuclear installations are planned to be built and operated at multiple sites around the world. Such is the case for the deployment of small modular nuclear reactors (SMRs) under development by multiple enterprises in multiple countries. As a use case for this paper, the authors propose an alternative to the Documented Safety Analysis (DSA) required by the United States Department of Energy (DOE) for the licensing of its nuclear installations. The DSA is a DOE construct that requires the review and approval of numerous documents. It includes an in-depth description of hazards, safe boundaries, and hazard controls.

Microreactors↗

TANK FARM RETRIEVAL LESSONS LEARNED AT THE HANFORD SITE

One of the environmental remediation challenges facing the nation is the retrieval and permanent disposal of approximately 90 million gallons of radioactive waste stored in underground tanks at the U. S. Department of Energy (DOE) facilities. The Hanford Site is located in southeastern Washington State and stores roughly 60 percent of this waste. An estimated 53 million gallons of high-level, transuranic, and low-level radioactive waste is stored underground in 149 single-shell tanks (SSTs) and 28 newer double-shell tanks (DSTs) at the Hanford Site. These SSTs range in size from 55,000 gallons to 1,000,000 gallon capacity. Approximately 30 million gallons of this waste is stored in SSTs. The SSTs were constructed between 1943 and 1964 and all have exceeded the nominal 20-year design life. Sixty-seven SSTs are known or suspected to have leaked an estimated 1,000,000 gallons of waste to the surrounding soil. The risk of additional SST leakage has been greatly reduced by removing more than 3 million gallons of interstitial liquids and supernatant and transferring this waste to the DST system. Retrieval of SST saltcake and sludge waste is underway to further reduce risks and stage feed materials for the Hanford Site Waste Treatment Plant. Regulatory requirements for SST waste retrieval and tank farm closure are established in the Hanford Federal Facility Agreement and Consent Order (HFFACO), better known as the TriParty Agreement, or TPA. The HFFACO was signed by the DOE, the State of Washington Department of Ecology (Ecology), and U. S. Environmental Protection Agency (EPA) and requires retrieval of as much waste as technically possible, with waste residues not to exceed 360 fe in 530,000 gallon or larger tanks; 30 fe in 55,000 gallon or smaller tanks; or the limit of waste retrieval technology, whichever is less. If residual waste volume requirements cannot be achieved, then HFFACO Appendix H provisions can be invoked to request Ecology and EPA approval of an exception to the waste retrieval criteria for a specific tank. Tank waste retrieval has been conducted at the Hanford Site over the last few decades using a method referred to as Past Practice Hydraulic Sluicing. Past Practice Hydraulic Sluicing employs large volumes of DST supernatant and water to dislodge, dissolve, mobilize, and retrieve tank waste. Concern over the leak integrity of SSTs resulted in the need for tank waste retrieval methods capable of using smaller volumes of liquid in a more controlled manner.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technical Basis for Certification of Seismic Design Criteria for the Waste Treatment Plant, Hanford, Washington

In August 2007, Secretary of Energy Samuel W. Bodman approved the final seismic and ground motion criteria for the Waste Treatment and Immobilization Plant (WTP) at the Department of Energy's (DOE) Hanford Site. Construction of the WTP began in 2002 based on seismic design criteria established in 1999 and a probabilistic seismic hazard analysis completed in 1996. The design criteria were reevaluated in 2005 to address questions from the Defense Nuclear Facilities Safety Board (DNFSB), resulting in an increase by up to 40% in the seismic design basis. DOE announced in 2006 the suspension of construction on the pretreatment and high-level waste vitrification facilities within the WTP to validate the design with more stringent seismic criteria. In 2007, the U.S. Congress mandated that the Secretary of Energy certify the final seismic and ground motion criteria prior to expenditure of funds on construction of these two facilities. With the Secretary's approval of the final seismic criteria in the summer of 2007, DOE authorized restart of construction of the pretreatment and high-level waste vitrification facilities. The technical basis for the certification of seismic design criteria resulted from a two-year Seismic Boreholes Project that planned, collected, and analyzed geological data from four new boreholes drilled to depths of approximately 1400 feet below ground surface on the WTP site. A key uncertainty identified in the 2005 analyses was the velocity contrasts between the basalt flows and sedimentary interbeds below the WTP. The absence of directly-measured seismic shear wave velocities in the sedimentary interbeds resulted in the use of a wider and more conservative range of velocities in the 2005 analyses. The Seismic Boreholes Project was designed to directly measure the velocities and velocity contrasts in the basalts and sediments below the WTP, reanalyze the ground motion response, and assess the level of conservatism in the 2005 seismic design criteria. The characterization and analysis effort included 1) downhole measurements of the velocity properties (including uncertainties) of the basalt/interbed sequences, 2) confirmation of the geometry of the contact between the various basalt and interbedded sediments through examination of retrieved core from the core-hole and data collected through geophysical logging of each borehole, and 3) prediction of ground motion response to an earthquake using newly acquired and historic data. The data and analyses reflect a significant reduction in the uncertainty in shear wave velocities below the WTP and result in a significantly lower spectral acceleration (i.e., ground motion). The updated ground motion response analyses and corresponding design response spectra reflect a 25% lower peak horizontal acceleration than reflected in the 2005 design criteria. These results provide confidence that the WTP seismic design criteria are conservative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Developments in the Regulatory Framework of Interim Storage of Spent Nuclear Fuel (SNF) in Germany - 17374

According to article 6 of the German Atomic Energy Act, storage of nuclear fuel requires a license, granted by the competent authority in this field, which has been the Federal Office of Radiation Protection (BfS) until July 2016 and currently is the Federal Office for the Safety of Nuclear Waste Management (BfE). A first license was granted in 1983 for storage of spent nuclear fuel (SNF) and vitrified high level waste (HAW) at the interim storage facility in Gorleben. This license was reviewed in 1995. Dry Interim storage at the NPP sites in its current form started in 2002 in the interim storage facility next to the NPP Lingen. Since that time at each site of an operational NPP storage facilities were licensed and erected. Thus additionally to the three central storage facilities (Ahaus, Gorleben and Rubenow) there are now 12 storage facilities onsite the NPPs. All of these facilities use dry storage in metallic dual purpose casks (DPCs). The actual storage licenses for SNF and the HAW (which is stored in Gorleben and Rubenow) are limited to 40 years after closing the transport and storage cask. The first license to expire will be the storage license for the interim storage facility in Gorleben in the year 2034. The German 'Programme for the safe and responsible management of spent fuel and radioactive waste' expects to take the disposal facility into operation in the year 2050. Thus necessary preparations for interim storage till that time have to be taken on the side of the regulator. In the German Atomic Energy Act precautions have already been taken and a consulting of the German parliament (Bundestag) is mandatory if inevitable events would require an extension of currently licensed interim storage period. In the year 2016, the regulatory body in Germany was given a new structure. The BfS was formerly competent authority in the field of radiation protection since 1989. It had competencies for ionizing and non-ionizing radiation protection (e.g. mobile phone radiation, high voltage power lines and the effects of electric fields), licensing storage of spent nuclear fuel and as the operator of facilities for final disposal. Now there is a new structure with two Federal Offices (BfS and BfE) and a federal company for final disposal (BGE). The BfE is responsible for regulation in the field of nuclear disposal since 30.07.2016. So the package design approval for DPCs and the storage licenses for SNF are now granted by this office. The search for a repository site will be coordinated there as well. The site selection, construction and operation of the repository will be in the responsibility of BGE. The parts of the former BfS dealing with recovery of the waste from Asse (a former salt mine used for disposal research) and the construction of the repository Konrad (for low and medium level radioactive waste) will be transferred into that company. It is planned to incorporate the German company for construction and management of waste disposal facilities (DBE) which is owned by the German utilities as well. The BfS will focus on the scientific foundations and further advancement of radiation protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Tank Waste Retrieval Lessons Learned at the Hanford Site

One of the environmental remediation challenges facing the nation is the retrieval and permanent disposal of approximately 90 million gallons of radioactive waste stored in underground tanks at the U. S. Department of Energy (DOE) facilities. The Hanford Site is located in southeastern Washington State and stores roughly 60 percent of this waste. An estimated 53 million gallons of high-level, transuranic, and low-level radioactive waste is stored underground in 149 single-shell tanks (SSTs) and 28 newer double-shell tanks (DSTs) at the Hanford Site. These SSTs range in size from 55,000 gallons to 1,000,000 gallon capacity. Approximately 30 million gallons of this waste is stored in SSTs. The SSTs were constructed between 1943 and 1964 and all have exceeded the nominal 20-year design life. Sixty-seven SSTs are known or suspected to have leaked an estimated 1,000,000 gallons of waste to the surrounding soil. The risk of additional SST leakage has been greatly reduced by removing more than 3 million gallons of interstitial liquids and supernatant and transferring this waste to the DST system. Retrieval of SST salt-cake and sludge waste is underway to further reduce risks and stage feed materials for the Hanford Site Waste Treatment Plant. Regulatory requirements for SST waste retrieval and tank farm closure are established in the Hanford Federal Facility Agreement and Consent Order (HFFACO), better known as the Tri- Party Agreement, or TPA. The HFFACO was signed by the DOE, the State of Washington Department of Ecology (Ecology), and U.S. Environmental Protection Agency (EPA) and requires retrieval of as much waste as technically possible, with waste residues not to exceed 360 ft{sup 3} in 530,000 gallon or larger tanks; 30 ft{sup 3} in 55,000 gallon or smaller tanks; or the limit of waste retrieval technology, whichever is less. If residual waste volume requirements cannot be achieved, then HFFACO Appendix H provisions can be invoked to request Ecology and EPA approval of an exception to the waste retrieval criteria for a specific tank. Tank waste retrieval has been conducted at the Hanford Site over the last few decades using a method referred to as Past Practice Hydraulic Sluicing. Past Practice Hydraulic Sluicing employs large volumes of DST supernatant and water to dislodge, dissolve, mobilize, and retrieve tank waste. Concern over the leak integrity of SSTs resulted in the need for tank waste retrieval methods capable of using smaller volumes of liquid in a more controlled manner. Retrieval of SST waste in accordance with HFFACO requirements was initiated at the Hanford Site in April 2003. New and innovative tank waste retrieval methods that minimize and control the use of liquids are being implemented for the first time. These tank waste retrieval methods replace Past Practice Hydraulic Sluicing and employ modified sluicing, vacuum retrieval, and in-tank vehicle techniques. Waste retrieval has been completed in seven Hanford Site SSTs (C-106, C-103, C-201, C-202, C-203, C-204, and S-112) in accordance with HFFACO requirements. Three additional tanks are currently in the process of being retrieved (C-108, C-109 and S-102) Preparation for retrieval of two additional SSTs (C-104 and C-110) is ongoing with retrieval operations forecasted to start in calendar year 2008. Tank C-106 was retrieved to a residual waste volume of 470 ft{sup 3} using oxalic acid dissolution and modified sluicing. An Appendix H exception request for Tank C-106 is undergoing review. Tank C-103 was retrieved to a residual volume of 351 ft{sup 3} using a modified sluicing technology. This approach was successful at reaching the TPA limits for this tank of less than 360 ft{sup 3}and the limits of the technology. Tanks C-201, C-202, C-203, and C-204 are smaller (55,000 gallon) tanks and waste removal was completed in accordance with HFFACO requirements using a vacuum retrieval system. Residual waste volumes in each of these four tanks were less than 25 ft{sup 3}. Tank S-112 retrieval was completed February 28, 2007, meeting the TPA Limits of less than 360 cu ft using salt-cake dissolution, modified sluicing, in-tank vehicle with high pressure water spray and caustic dissolution. Tanks C-108 and C-109 have been retrieved to 90% and 85% respectively. Modified sluicing was no longer effective at retrieving the remaining 5,000 to 10,000 gallons of residual. A Mobile Retrieval Tool (FoldTrac) is scheduled for installation early in 2008 to assist in breaking up chunks of waste and mobilizing the waste for transfer. Lessons learned from application of new tank waste retrieval methods are being documented and incorporated into future retrieval operations. They address all phases of retrieval including process design, equipment procurement and installation, supporting documentation, and system operations. Information is obtained through interviews with retrieval project personnel, focused workshops, review of problem evaluation requests, and evaluation of retrieval performance data. This paper presents current retrieval successes and lessons learned from retrieval of tank waste at the Hanford Site and discusses how this information is used to optimize retrieval system efficiency, improve overall cost effectiveness of retrieval operations, and ensure that HFFACO requirements are met. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Groundwater Monitoring and Control Before Decommissioning of the Research Reactor VVR-S from Magurele-Bucharest

The research reactor type VVR-S (tank type, water is cooler, moderator and reflector, thermal power- 2 MW, thermal energy- 9. 52 GW d) was put into service in July 1957 and, in December 1997 was shout down. In 2002, Romanian Government decided to put the research reactor in the permanent shut-down in order to start the decommissioning. This nuclear facility was used in nuclear research and radioisotope production for 40 years, without events, incidents or accidents. Within the same site, in the immediate vicinity of the research reactor, there are many other nuclear facilities: Radioactive Waste Treatment Plant, Tandem Van der Graaf heavy ions accelerator, Cyclotron, Industrial Irradiator, Radioisotope Production Center. The objectives of this work were dedicated on the water underground analyses described in the following context: - presentation of the approaches in planning the number of drillings, vertical soil profiles (characteristics, analyses, direction of the flow of underground water, uncertainties in measurements); - presentation of the instrumentation used in analyses of water, soil and vegetation samples - analyses and final conclusions on results of the measurements; - comparison of the results of measurements on underground water from drillings with the measurements results on samples from the town and the system of drinking water - supplied from the second level of underground water. According to the analysis, in general, no values higher than the Minimum Detectable Activity were detected in water samples (MDA) for Pb{sup 212}, Bi{sup 214}, Pb{sup 214}, Ac{sup 228}, but situated under values foreseen in drinking water. Distribution of Uranium As results of the Uranium determination, values higher than 0,004 mg/l (4 ppb) were detected, values that represent the average contents in the underground water. The higher values, 2-3 times higher than background, were detected in the water from the drillings F15, F12, F5, F13, drillings located between RWTP (Radioactive Waste Treatment Plant) - the 300 m{sup 3} tanks and the Spent Filters Storage (SFS). At south of this area, on the leaking direction of the underground water layer, in the drillings F1, F2, F3, F18 and at east, in F6, F7, the natural Uranium values are within the background for the underground-water. Distribution of Radon For the Radon determination with RAD 7 equipment, water samples were taken from the same piezo-metrical drilling, 2 or 4 times during of six months period, and then, the average contents were calculated, which varied between 0,35 - 2,1 Bq/l. The values higher than 1,1 -1,2 Bq/l were detected in the water taken from the drillings located in the northern part (F10, F11) and in the eastern part (F6, F8) of the Institute fences (around of the radioactive waste storage facilities). The concentrations of 0,3 - 0,5 Bq/l are in the underground-water layer 'intercepted' by the piezo-metrical drillings (F1, F2, F3) located near the Nuclear Reactor. Concentration of heavy metals: 0.04-0.08 mg/l Pb in F5, F14, F7, F8 exceeding MCA-Maximum Admissible Concentration (0.01 mg/l) for Pb, and for Zn in F5, F7, F8, F14 are 0.2-0.5 mg/l situated under MCA , and 0.18 mg/l in F18, in accordance with tendency of decreasing of concentration of contaminants. After 50 years of deploying nuclear activities on the site the underground water quality is in very good condition. Taking into consideration the direction of the underground water flow, it results that, only in the area of underground pipe, around of the research reactor and radioactive waste treatment plant, the quality of water is influenced, and remediation actions are not necessary. Based on measurements executed in F18, the water quality is the same with any other part of the region. During the decommissioning of the Research Reactor, the samples from 18 drillings will be analysed monthly, and the contents of the heavy metals, Pb and Zn, will be monitored carefully, together with all the factors: air, soil, vegetation, subsoil, water surface and underground water. A great attention will be paid to the dismantlement of the underground structures, the 30 m{sup 3} tank, that collects all the liquid radioactive waste from the reactor, the pipes that connects this tank to the other two 300 m{sup 3} tanks, from RWTP, the ventilation ducts between the Spent Filters Storage and reactor's stack, in order to prevent contamination of surface and underground water. Engineering Absorbent Barriers will be used both for hydrophilic substances and for hydrophobic substances, tents will be used for preventing the spread of possible contaminants from the pipes and tanks, owing to the precipitation or wind, and the tanks and pipes will be drained to eliminate the spills. Since we are dealing with a multinuclear facility site, the on site and off site Monitoring Program of Institute will be properly upgraded, taking into account the values of the derived emission limit approved by Regulatory Body, before, during and after the completion of the works with impact on underground water. In another work will be presented radiological map of land associated of decommissioning project (on surface, at 0.15 m and 0.30 m in depth of soil) and estimation of migration rate in soil up to ground water level. Applying these measures, taking account of the radiological status at the beginning of the project, will mean savings and a good protection of the environment in completing the decommissioning project.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗