Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Remote operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Sandia Nuclear Cartridge Concept

Nuclear power offers the promise of long-term electrical power for remote areas. Recent advances in passive safety and long-life cores make a reactor that can be operated autonomously for 20 years or more a real possibility. This white paper discusses a reactor concept that offers the potential for further development, resulting in a permanently hermetically-sealed "nuclear cartridge." The term "nuclear cartridge" is meant to imply a nuclear energy source that can be inserted into a site and operated autonomously until its energy has been depleted, then withdrawn and replaced by another cartridge. The concept can be scaled for various sizes, ranging from about 1 megawatt-electric (MWe) to about 100 MWe. The paper also discusses the concept of Integrated Safety, Operations, Security, and Safeguards (ISOSS) by design as it applies to this reactor design. Finally, a discussion of smart grids and how they can benefit the transfer of power to the end user is included. The Nuclear Cartridge concept has been developed with the following characteristics in mind: highly reliable autonomous operation coupled with international monitoring, requiring minimal on-site operations personnel; walkaway passively safe design; cartridge replacement cycle on the order of 20 years; load following capability; physical security by design requiring minimal security personnel during operations; and proliferation resistance by design. As illustrated in figure 1, integrating the reactor with advanced power conversion, smart grids, and other sources of energy results in a resilient and sustainable energy source.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

H-Canyon Jumper Gasket Sealing Evaluation

H-Canyon Documented Safety Analysis approved December 2019 credits the leak integrity of H-Canyon (HCA) process tanks, piping, and jumpers in preventing the release of radioactive material in a post seismic environment. Demonstration of leak tightness capability for this equipment was achieved through substantial analytical effort. However, one potential weak point that affects leak integrity exists at the gasketed joint between Hanford Connectors (HC) and nozzles. Review of the HCA Crane Log over a three-year period indicates the HCs periodically leak. Savannah River National Laboratory (SRNL) was requested to perform gasket compression tests that evaluate gasket relaxation characteristics, i.e., creep, and provide improvements to the HC installation process that can reduce or eliminate the frequency of leaks at HCs. A HC torque value of 312 ft-lbf is the target value used because it is the minimum torque value, with 95% confidence, when an unlubricated HC is impacted for standard sealing period of 9 seconds. In the HCA pipe-jumper connections are installed remotely by using HCs. HCs inherently add to the uncertainty of a gasketed joint because a calibrated torque value cannot be applied. The gasket material is a special material made of asbestos-fiber impregnated with Teflon. This material has been used for decades and generally performs well but does leak intermittently as gaskets creep and preloaded torque is lost. Gasket types are either snap-ring (SR) or lampshade (LS). Both gasket types cover the same seating area. The SR gasket is designed to remain with the jumper when the jumper is removed leaving the nozzle faces clean of any debris. SR gaskets are initially installed when the jumper is fabricated. Changing gaskets is time consuming and the radioactive environment presents risks to personnel. When jumpers are removed LS gaskets could be used to better seal the connection to reduce down time and ALARA concerns. That is, an LS gasket would be remotely positioned over the nozzle and the HC reinstalled. Testing also included two situations not typical of plant operation. One situation was the use of the non-standard double-layered gaskets (DG), and the other situation was the use of a LS without removal of the installed SR gasket. The DG was used when the supply of LS gaskets ended, so that testing could continue. It was of interest to demonstrate this gasket’s creep response because the DG, which was two gaskets glued together, was thicker than the LS gasket and the thicker material was expected to elicit a greater creep characteristics. The second situation of using two gaskets together by installing an LS gasket without removing the installed gasket is not allowed by the ASME Codes. However, by demonstrating the creep history of such a gasket arrangement it could be considered as an option that could possibly seal a connection while significantly reducing operational down time and personnel risk. Forty tests were conducted, and the overall results demonstrate the initial applied force and how the gasket changes with time. The change in sealing force, in terms of torque, was then measured to obtain a force history as the gaskets creep. This report documents the results of those tests as well as the method used to perform the tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A nuclear power plant digital twin for developing robot navigation and interaction

As robot technologies are rapidly improving, an increasing number of new ideas on utilizing robots for automated operation and maintenance tasks in nuclear power plants (NPPs) are being studied. However, due to safety concerns, researchers hardly found opportunities to test their new robot solutions on physical NPPs. In that sense, an efficient and realistic simulation environment plays a vital role in the development of automation systems for an NPP. In this paper, we propose the design of a 3D digital twin system capable of simulating NPP in real-time. This system obtains the data from a full-scope NPP simulator to reproduce the operating conditions of the plant. In addition, a scenario of a team of robots performing inspection tasks like temperature and pressure measurements will highlight its usability. This system enables development of intelligent robot swarms to deploy for inspection and maintenance purposes. It will positively impact autonomous control and operations for many types of reactors by reducing uncertainty in autonomous control and providing the tools necessary for remote intervention.

Energy & Fuels↗

Integrating Commercial Ready Autonomous Robotic Platforms to Enhance Worker Safety and Efficiency - 20053

This paper will explore the challenges and triumphs of implementing advanced robotic systems and the supporting technology for the waste management industry. Deployment-ready solutions for autonomous robotic platforms are new to the radioactive waste management industry and have been slow to implement across the complex. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground-based autonomous robotic platforms to enhance workforce safety and efficiency. The first objective of the project is to demonstrate safe operation of autonomous instrumented robots, followed by a scaling up of capabilities for the platform to meet any additional requests of internal stakeholders. Autonomous robotics platforms offer a fantastic range of capabilities that will aid in decreasing long-term liability of radioactive waste management industry by enhancing clean-up efforts and worker safety. Over the past five years, deployment-ready solutions for autonomous robotic platforms have come a long way. Autonomous robotic platforms are increasingly available to purchase from many vendors, often for prices under $100,000. Additionally, the vendors who produce these products are efficient in accommodating customized solutions to unique challenges, such as those often found in the radioactive waste management industry. However, the newness of this technology to the radioactive waste management industry and has resulted in a slow implementation across the complex. This paper will explore the challenges and triumphs of implementing advanced robotic systems and supporting technology for the waste management industry. Specifically, it will explore Hanford Tank Operations Contractor's implementation of ground based autonomous robotic platforms to enhance workforce safety and efficiency. While the company has utilized robots in many parts of the tank farms mission, this was first attempted in the deployment of an autonomous platform that required no operator with only minor maintenance and created challenges not yet encountered. These challenges included stakeholder buy-in, operational safety, procurement uncertainties, adaption of 'off the shelf products, overcoming the 'Fukushima complexity' perception, security concerns, and the initial criteria down select. Hanford Tank Operations Contractor's management identified the need for a workforce protecting low cost robotics solution in the fall of 2017. The project scope generated was part of the response to the Tank Vapor Assessment Team recommendation to enhance the safety of the workforce by utilizing new technology. Since the projects inception, it has been incorporated into the Tank Stewardship Plan. This project was unique to Hanford Tank Operations Contractor, as the company does not frequently incorporate advanced technology for field deployment quickly. The project was also progressive to the Hanford Tank Operations Contractor as it functions as a partnership project with a local university. The first objective of the project is to demonstrate safe operations of autonomous instrumented robotics, monitoring and collecting data, and the wireless transmission of data to a central computing system. Following the completion of this first objective, the project will scale up capabilities of the platform to meet the requests of additional internal stakeholders throughout the tank farms - including completion of specific in-field tasks. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Powering Up Secure and Reliable Operations at the Port of Honolulu's Kapalama Container Terminal

The National Laboratory of the Rockies (NLR) is providing resilience planning support to the Pasha Group, the operator of Kapalama Container Terminal (KCT) at the Port of Honolulu, by exploring how distributed clean energy resources could help the terminal sustain a 36-hour outage and continue emergency operations. The Department of Energy's Energy Transitions Initiative (ETI) aims to advance self-reliant island and remote communities by promoting resilient, affordable, and sustainable clean energy resources.

25 ENERGY STORAGE↗

5G Enabled Energy Innovation: Advanced Wireless Networks for Science (Workshop Report)

Rapidly expanding, new telecommunications infrastructure based on 5G technologies will disrupt and transform how we design, build, operate, and optimize scientific infrastructure and the experiments and services enabled by that infrastructure, from continental-scale sensor networks to centralized scientific user facilities, from intelligent Internet of Things devices to supercomputers. Concurrently, 5G will introduce, or exacerbate, challenges related to protecting infrastructure and associated scientific data as well as to fully leveraging opportunities related to expanded infrastructure scale and complexity. The U.S. Department of Energy (DOE) Office of Science operates scientific infrastructure, supporting some of the nation’s most advanced intellectual discoveries, spanning the country and including 30 world-class user facilities from supercomputers to accelerators. Along with field experiments and remote observatories, every aspect of DOE’s scientific enterprise will be affected by 5G, which amounts to a complete renovation of the underpinnings of the nation’s information infrastructure. In this report we explore the scientific opportunities and new research challenges associated with 5G, ranging from scalability to heterogeneity to cybersecurity. The rapid commercial deployment of 5G opens the opportunity to rethink and reinvent DOE’s scientific infrastructure and experimentation, from intelligent sensor networks at unprecedented scales to a digital continuum of cyberinfrastructure spanning low-power sensors, high-performance computing embedded within and at the edge of the network, and DOE’s large-scale user instrument and computing facilities. New programming paradigms, workflow and data frameworks, and AI-based system design, operation, and autonomous adaptation and optimization will be necessary in order to exploit these new opportunities. Field deployments and centralized scientific instruments can also be revolutionized, moving (without traditional performance penalties) from wired to wireless connectivity for data and control systems, improving flexibility, and opening new sensing modalities, including the use of the 5G electromagnetic spectrum itself as an environmental probe. For DOE science, in contrast to commercial 5G applications and settings, devices will be deployed in extreme environments such as cryogenically cooled instrument control systems and in remote settings with harsh conditions, requiring the design of new materials for RF communication and edge processing to operate in these regimes. Concurrently, 5G infrastructure comprises both hardware and sophisticated software systems - currently closed and proprietary. The cybersecurity challenges to 5G-empowered reinvention mirror the complexity and variety of new 5G features, from virtualization to private network slices to ubiquitous access. Research is also needed in order to accelerate the development of secure and open 5G software infrastructure, reducing reliance on hardware and software produced outside the United States and providing the transparency and rigorous evaluation and testing afforded through open software. Twelve broad research thrusts are laid out in four chapters, with a companion fifth chapter (and three additional research thrusts) underscoring the needs and opportunities for an aggressive testbed program co-designed by networking experts and scientists involved in the 15 research thrusts. The urgency of undertaking this research is fueled by a global, accelerating deployment of new telecommunications infrastructure that is designed for entertainment and commercial applications - barely scratching the surface of what 5G can do to extend U.S. leadership in scientific discovery.

42 ENGINEERING↗

1.2.4.404 - Data-Driven Approach for Hydropower Plant Controller Prototyping Using Remote Hardware in the Loop (DR-HIL)

Real-time prototyping of hydropower plant controls is important for reducing the cost and the risk of field deployment. This project will 1) collect design and operational data from actual hydro plants and 2) use a physics-informed machine learning approach for real-time emulation of hydropower plants, including hydro turbine and hydrodynamics. The data-driven models will be interfaced with digital real-time simulation at NREL’s Flatirons campus for hardware-in-the-loop (HIL) testing of the governor hardware device or controller-HIL (CHIL). The proposed approach will also establish the connectivity based remote CHIL testing capability using real-time data streams from an actual hydro plant. This integrated hydro-plant emulation with CHIL will be used to prototype hydro-governor controls and eventually provide an opportunity to test hydropower integrated with various technologies (e.g. conventional and renewable generation, energy conversion, etc.) as HIL.

controls prototyping↗

Doppler Lidar (DL) Instrument Handbook

The Doppler lidar (DL) is an active remote sensing instrument that provides range- and time-resolved measurements of radial velocity and attenuated backscatter. The principle of operation is similar to radar in that pulses of energy are transmitted into the atmosphere; the energy scattered back to the transceiver is collected and measured as a time-resolved signal. From the time delay between each outgoing transmitted pulse and the backscattered signal, the distance to the scatterer is inferred. The radial or line-of-sight velocity of the scatterers is determined from the Doppler frequency shift of the backscattered radiation. The DL uses a heterodyne detection technique in which the return signal is mixed with a reference laser beam (i.e., local oscillator) of known frequency. An onboard signal processing computer then determines the Doppler frequency shift from the spectra of the heterodyne signal. The energy content of the Doppler spectra can also be used to determine attenuated backscatter.

99 GENERAL AND MISCELLANEOUS↗

Self-Sustainable IoT-Based Remote Sensing Powered by Energy Harvesting Using Stacked Piezoelectric Transducer and Thermoelectric Generator

We propose a self-powered remote multi-sensing system for traffic sensing which is powered by the collective energy harvested from the mechanical vibration of the road caused by the passing vehicles and from the temperature gradient between the asphalt of the road and the soil underneath. A stacked piezoelectric transducer converts mechanical vibrations into electrical energy and a thermoelectric generator harvests the thermal energy from the thermal gradient. Electrical energy signals from the stacked piezoelectric transducer and the thermoelectric generators are converted into usable DC power to recharge the battery using AC-DC and DC-DC converters working simultaneously. The multi-sensing system comprises an embedded system with a microcontroller that acquires data from the sensors and sends the sensory data to an IoT transceiver which transmits the data as RF packets to an ethernet gateway. The gateway converts the RF packets into Internet Protocol (IP) packets and sends them to a remote server. Laboratory and road-testing results showed over 98% sensory data accuracy with the system functioning solely powered by the energy harvested from the alternative energy sources. The successful maximum transmission distance obtained between the IoT, and the gateway was approximately 1 mile, which is a considerable transmission distance achieved in an urban environment. Successful operation of the self-powered multi-sensing system under both laboratory and road conditions contributes considerably to the fields of energy harvesting and self-powered remote sensing systems. The energy flow chart and efficiency for the steps in the system were found to be mechanical power from vehicles to the energy harvester of 0.25%, stacked PZT transducer efficiency was found to be 37%, and for the TEGs the efficiency is 11%. AC-to-DC and DC-to-DC converters’ efficiencies were found to be 90% and 11%. The wireless communication RF transceiver efficiency was found to be 62.5%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Power Quality and Load Capacity Evaluations of an Electric Vehicle for Multi-Robot System Applications

This paper evaluates the capability of a fully electric pickup truck, using the Ford F-150 Lightning as an example, to provide power to the circuit of a multi-robot system. The case study was conducted on a simulated INL Autonomous Pit Exploration System (APES) designed for the inspection of nuclear waste tank pits. Through a series of controlled tests, the vehicle’s power delivery consistency, load-handling capability, and battery performance were assessed under various conditions. First of all, the load test demonstrated that the vehicle provided stable power with low distortion and no unexpected interruptions. Second, during the operational limit test, the 240V system sustained loads up to 7.4 kW before tripping, providing insights into its operational limits. Last but not least, during a simulated full-scale APES operation, the vehicle’s battery depleted by only 6% over an hour, indicating sufficient capacity for extended use while retaining reserve power for transportation needs. This study highlights the potential of electric vehicles as reliable power sources for field operations, contributing to the advancement of sustainable technologies by reducing reliance on traditional fossil fuel generators and promoting the integration of clean energy solutions in remote and challenging environments.

Electric vehicle↗

PRIME: a real-time cyber-physical systems testbed: from wide-area monitoring, protection, and control prototyping to operator training and beyond

As the power grid continues to evolve with advanced wide-area monitoring, protection, and control (WAMPAC) algorithms, there is an increasing need for realistic testbed environments with industry-grade software and hardware-in-the-loop (HIL) to perform verification and validation studies. Such testbed environments serve as ideal platforms to perform WAMPAC prototyping, operator training, and also to study the impacts of different types of cyberattack scenarios on the operation of the grid. In this paper, we introduce PRIME (PNNL cybeR physIcal systeMs tEstbed): the testbed that integrates real-time transmission system simulator with commercial industry grade energy management system (EMS) software and remote hardware-in-the-loop (RHIL). PRIME is an end-to-end, modular testbed that allows high-fidelity RHIL experimentation of a power system. We present two detailed case studies (fault location and clearing in transmission system, and operator training) to showcase the capabilities of our PRIME testbed. Finally, we briefly discuss some of the potential limitations of our testbed in terms of scalability and flexibility to setup larger test systems and identify directions for future work to address those limitations.

42 ENGINEERING↗

Technological developments and accelerator improvements for the FRIB beam power ramp-up

The Facility for Rare Isotope Beams (FRIB) began operation with 1 kW beam power for scientific users in May 2022 upon completion of 8 years of project construction. The ramp-up to the ultimate beam power of 400 kW, planned over a 6-year period, will enable the facility to reach its full potential for scientific discovery in isotope science and applications. In December 2023, a record-high beam power of 10.4 kW uranium was delivered to the target. Technological developments and accelerator improvements are being made over the entire facility and are key to completion of the power ramp-up. Major technological developments entail the phased deployment of high-power beam-intercepting systems, including the charge strippers, the charge selection systems, the production target, and the beam dump, along with support systems, including non-conventional utilities (NCU) and remote handling facilities. Major accelerator improvements include renovations to aging legacy systems associated with experimental beam lines and system automation for improved operational efficiency and better machine availability. Experience must be gained to safely handle the increased radiological impacts associated with high beam power; extensive machine studies and advanced beam tuning procedures are needed to minimize uncontrolled beam losses for the desired operating conditions. This paper discusses the technological developments and accelerator improvements with emphasis on major R&D efforts.

43 PARTICLE ACCELERATORS↗

Modular horizontal pendulum wave energy converter: Exploring feasibility to power ocean observation applications in the U.S. pacific northwest

Abstract Marine renewable energy as a power source for ocean observation applications has the potential to allow longer deployment operations due to the consistent, higher, and denser energy available from this resource. This additionally could encourage deployments in remote locations where maintenance is costly or resource availability is low if dependent on solar power. More importantly, gaps in spatial data could be filled. This paper examines the feasibility of a modular horizontal pendulum wave energy converter to power National Data Buoy Center's Self‐Contained Ocean Observations Payload (SCOOP) off the coast of Washington State, U.S. The effect on power output was studied when the pendulum's radius arm, mass, and power take‐off damping were varied. Results using Matlab toolbox WEC‐Sim revealed positive correlation between radius arm length and mass to power output, where power maximised for optimal damping values. Seasonal trends in power were not significant, where a 20 kg pendulum mass was needed to meet the SCOOP base power requirement of 5 W throughout the year.

16 TIDAL AND WAVE POWER↗

Drone flight visible images, digital elevation maps, and geotiffs, Council, Seward Peninsula, Alaska, USA, July 2017

Remote sensing data collected from Lawrence Berkeley National Laboratory’s (LBNL) unmanned aerial system (UAS) quadcopter platform – Inspire-1 – operated by the Ameriflux Management Project (ameriflux.lbl.gov) Technical Team. The Insprire-1 is a visible imagery UAS platform that simultaneously measures very high spatial resolution optical red/green/blue (RGB) at regular intervals along each flight path. This package includes data from four flight paths over the NGEE Arctic Council Road Site near mile marker 71 in the Seward Peninsula, Alaska in July 2017. Derived image products for each flight include ortho-mosaiced RGB, an RGB-based digital surface model (DSM) using the structure from motion (SfM) technique, and a digital terrain model (DTM). Ancillary aircraft data, flight mission parameters, and general flight conditions are also included. Unprocessed and processed data products are included in this package (processing levels 0-2). This metadata document contains flight campaign, instrument and file metadata, along with a description of data processing levels, data products and file naming scheme.The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic) was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy’s Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy’s Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

Drone flight visible images, digital elevation maps, and geotiffs, Teller, Seward Peninsula, Alaska, USA, July 2017

Remote sensing data collected from Lawrence Berkeley National Laboratory’s (LBNL) unmanned aerial system (UAS) quadcopter platform – Inspire-1 – operated by the Ameriflux Management Project (ameriflux.lbl.gov) Technical Team. The Insprire-1 is a visible imagery UAS platform that simultaneously measures very high spatial resolution optical red/green/blue (RGB) at regular intervals along the flight path. This package includes data from a flight path over the NGEE Arctic Teller Site, west of mile marker 27 Bob Blodgett Highway in the Seward Peninsula, Alaska in July 2017. Derived image products include ortho-mosaiced RGB, an RGB-based digital surface model (DSM) using the structure from motion (SfM) technique, and a digital terrain model (DTM). Ancillary aircraft data, flight mission parameters, and general flight conditions are also included. Unprocessed and processed data products are included in this package (processing levels 0-2). This metadata document contains flight campaign, instrument and file metadata, along with a description of data processing levels, data products and file naming scheme.The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic) was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy’s Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy’s Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

Drone flight visible images, digital elevation maps, and geotiffs, Kougarok, Seward Peninsula, Alaska, USA, July 2017

Remote sensing data collected from Lawrence Berkeley National Laboratory’s (LBNL) unmanned aerial system (UAS) quadcopter platform – Inspire-1 – operated by the Ameriflux Management Project (ameriflux.lbl.gov) Technical Team. The Insprire-1 is a visible imagery UAS platform that simultaneously measures very high spatial resolution optical red/green/blue (RGB) at regular intervals along each flight path. This package includes data from four flight paths over the NGEE Arctic Kougarok Site, west of mile marker 64 on Kuzitrin Road in the Seward Peninsula, Alaska in July 2017. Derived image products include ortho-mosaiced RGB, an RGB-based digital surface model (DSM) using the structure from motion (SfM) technique, and a digital terrain model (DTM). Ancillary aircraft data, flight mission parameters, and general flight conditions are also included. Unprocessed and processed data products are included in this package (processing levels 0-2). This metadata document contains flight campaign, instrument and file metadata, along with a description of data processing levels, data products and file naming scheme.The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic) was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy’s Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy’s Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

54 ENVIRONMENTAL SCIENCES↗

2021 Consequence Management Hotline Drill After Action Report

In March 2021, a functional area drill was held at the Remote Sensing Laboratory–Nellis that focused on using CBRNResponder and the Digital Field Monitoring (DFM) tablets for sample hotline operations and the new paper Sample Control Forms (SCFs) for sample collection. Participants included staff trained and billeted as sample control specialists and Consequence Management Response Team (CMRT) field monitoring personnel. Teams were able to successfully gather and transfer samples to the sample control hotline staff through the manual process, though there were several noted areas for improvement. In July and October 2021, two additional functional area drills were held at Sandia National Laboratories that focused on field sample collection and custody transfer at the sample control hotline for the Consequence Management (CM) Radiological Assistance Program (RAP) program. The overarching goal of the drills was to evaluate the current CM process for sample collection, sample drop off, and sample control using the CBRNResponder mobile and web-based applications. The July 2021 drill had an additional focus to have a subset of samples analyzed by the local analytical laboratory, Radiation Protection Sample Diagnostics (RPSD) laboratory, to evaluate the Laboratory Access portal on CBRNResponder. All three drills were able to accomplish their objectives however, there were several issues noted (Observations: 25 Urgent, 29 Important, and 22 Improvement Opportunities). The observations were prioritized according to their impact on the mission as well as categorized to align with the programmatic functional area required to address the issue. This report provides additional detail on each observation for skillset/program leads and software developers to consider for future improvement or mandatory efforts.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

H3 Final Design and Technical Report

The goal of this Project was to develop a standards-compliant, fabrication-ready design of Columbia Power Technologies’ (C·Power) next-generation wave energy converter (WEC), the StingRAY H3p. The H3p is a design iteration of C·Power’s StingRAY WEC and is intended for electrical power generation suitable for micro-grids or remote loads. The H3p was designed for grid-connection and at least two years of continuous testing and operation at the proposed PacWave-South (PWS) test site.

16 TIDAL AND WAVE POWER↗