Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “RACKS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

International Space Station (ISS) Payload Autonomous Operations Past, Present and Future

Draper Laboratorys Timeliner is a scripting and automation system that runs onboard computers in the International Space Station (ISS). Timeliner is fully integrated with ISS and can be used to automate ISS operations tasks. Some of the most challenging aspects of operating a payload in low earth orbit are communication delays, ground equipment failures, and human errors. How does a Payload Developer (PD) know their equipment is operating nominally and collecting science in the most efficient way possible or even powered at any given time? During a ground Loss of Signal (LOS) data outage, PDs have no insight into their experiments state, and benefit greatly from Timeliner scripts executing on ISS to perform telemetry monitoring and commanding operations. This paper will discuss current software designs, and new operational uses for Timeliner. Existing Timeliner capabilities discussed will include: autonomous EXPRESS Rack activation and deactivation; autonomous science data downlinks; Minus Eighty Degree Freezer (MELFI) Dewar autonomous safing; JAXA and ESA module autonomous payload facility safing; as well as many others. New operational concepts discussed will include allowing Timeliner on the payload computer to issue core commands (Thermal, Power, Fire Detection), creation of new ground tools that will monitor the current status of Payload Racks as well as all the messaging from autonomous scripts executing, decreasing approval time for Timeliner bundles, and opening up the Payload MDM Enhanced Processor Integrated Communications Card (EPIC) interface. The EPIC interface could provide a new crew interface for PL Timeliner execution. The new interface could operate on either a Payload Computer System (PCS) or a Station Support Computer (SSC) that is plugged into either the Payload LAN or the Operations LAN which will make communicating to the PL MDM more flexible and greatly increase band width for communication.

Space Mission Automation↗

SERFE Project Overview

NASA has been developing a new spacesuit, called the Exploration Extravehicular Mobility Unit (xEMU) for over a decade. This spacesuit is underdevelopment to support missions to the International Space Station (ISS) and also to the Moon. Improvements in the life and robustness of the Portable Life Support System (PLSS) has been a major objective of these efforts. The Suit Water Membrane Evaporator (SWME) was chosen as the technology to provide cooling to the xEMU and has undergone several iterations of development over this period. An ISS flight experiment centered around the SWME and other thermal loop technologies was developed and has been under test in an ISS EXpedite PRocessing of Experiments to the Space Station (EXPRESS) rack since November of 2020. In addition to the SWME, The SWME EXPRESS Rack Flight Experiment (SERFE) contains several technology demonstrations from the xEMU project and has been demonstrating their performance in micro-gravity and over an extended duration. This paper summarizes the design and operation of the SERFE experiment and provides a basis for subsequent papers to focus on more specific aspects of performance of individual technologies.

SERFE↗

SERFE Thermal Performance Results

NASA has been developing a new spacesuit, called the Exploration Extravehicular Mobility Unit (xEMU) for over a decade. This spacesuit is underdevelopment to support missions to the International Space Station (ISS) and also to the Moon. Improvements in the life and robustness of the Portable Life Support System (PLSS) has been a major objective of these efforts. The Suit Water Membrance Evaporator (SWME) was chosen as the technology to provide cooling to the xEMU and has undergone several iterations of development over this period. An ISS flight experiment centered around the SWME and other thermal loop technologies was developed and has been under test in an ISS EXpedite PRocessing of Experiments to the Space Station (EXPRESS) rack since November of 2020. In addition to the SWME, The SWME EXPRESS Rack Flight Experiment (SERFE) contains several technology demonstrations from the xEMU project and has been demonstrating their performance in micro-gravity and over an extended duration. In addition to the SWME, these include two dissimilar water pumps, custom check valves, custom bypass relieve valves, a custom thermal control valve, development pressure and temperature sensors, and the Thermal Loop Controller. This paper presents thermal and fluids testing results of the system as a whole and of key components.

SERFE↗

SERFE Water Quality Results

NASA has been developing a new spacesuit, called the Exploration Extravehicular Mobility Unit (xEMU) for over a decade. This spacesuit is underdevelopment to support missions to the International Space Station (ISS) and also to the Moon. Improvements in the life and robustness of the Portable Life Support System (PLSS) has been a major objective of these efforts. Water quality, and how that impacts the performance of the life support system hardware, are areas where improvements could greatly help to achieve these goals. The Suit Water Membrane Evaporator (SWME) was chosen as the technology to provide cooling to the xEMU and has undergone several iterations of development over this period. An ISS flight experiment centered around the SWME and other thermal loop technologies was developed and has been under test in an ISS EXpedite PRocessing of Experiments to the Space Station (EXPRESS) rack since November of 2020. In addition to the SWME, The SWME EXPRESS Rack Flight Experiment (SERFE) contains several technology demonstrations from the xEMU project and has been demonstrating their performance in micro-gravity and over an extended duration. This paper will summarize the results of the water quality analysis performed to date throughout the SERFE testing program. Special care was taken to select materials, process hardware, and control the quality of the feedwater used in SERFE testing so that it would be representative of a thermal control system that could be used on a spacesuit for a lunar mission. In addition, the testing schedule, including periods of quiescence in between tests, was also selected to simulate a real mission profile in ways that would be critical to water quality. Results include data and analysis on microbial activity, biocidal iodine, metals, organic carbon, and several other customary indicators of water quality in an operational system. Testing spans over a year and a half of wetted life of the SERFE Flight Unit and the SERFE Ground Unit.

Colin Campbell↗

xPLSS Structural Backplate Design, Manufacture, and Test Overview

NASA Johnson Space Center (JSC) has been developing and building a new detailed design of the Exploration Extravehicular Mobility Unit (xEMU) space suit to support future International Space Station (ISS) and Lunar Artemis missions. The Exploration Portable Life Support System (xPLSS) of the xEMU contains some clever new technologies to meet the requirements to provide Extra Vehicular Activity (EVA) capability on the ISS and the Moon. The suit must interface with and fit through ports and airlocks of at least three vehicles: ISS, Human Landing System (HLS), and Gateway. The first partial xPLSS experimental flight unit called SWME EXPRESS Rack Flight Experiment (SERFE) that was a rack-deployed thermal control system payload on the ISS for two years (2020-2022). The first complete assembly of the xEMU was built as a Design Verification Test (DVT) unit (2022); similar to but more extensive than an Engineering Development Unit (EDU). The xPLSS Backplate serves not only as the structural backbone of the xPLSS and SERFE systems but also contains innovative design features to reduce the: mass, complexity, parts count, number ofseals (and therefore leak potential), and outer dimensions of the entire assembly. This paper provides an overview of these new design features, manufacturing processes, system interfaces, and SERFE/DVT test results of the Backplate as part of the xPLSS/xEMU.

xPLSS↗

SERFE PLSS Component Lessons Learned from ISS

NASA has been developing a new spacesuit, called the Exploration Extravehicular Mobility Unit (xEMU) for over a decade. This spacesuit is under development to support missions to the International Space Station (ISS) and also to the Moon. Improvements in the life and robustness of the Portable Life Support System (PLSS) has been a major objective of these efforts. The Suit Water Membrane Evaporator (SWME) was chosen as the technology to provide cooling to the xEMU and has undergone several iterations of development over this period. An ISS flight experiment centered around the SWME and other thermal control loop (TCL) technologies was developed and tested in an ISS EXpedite PRocessing of Experiments to the Space Station (EXPRESS) rack from November of 2020 to August of 2022. In addition to the SWME, the SWME EXPRESS Rack Flight Experiment (SERFE) contains several technologies from the xEMU project and demonstrated their performance in micro-gravity and over an extended duration. These included two dissimilar water pumps, custom check valves, custom bypass relieve valves, a custom thermal control valve, development pressure and temperature sensors, and the thermal loop controller. This paper presents PLSS component lessons learned after return of the SERFE flight unit in August of 2022. The SERFE team took the flight unit apart and handed hardware components over to hardware owners to see how parts of the TCL managed after almost 2 years on the ISS and 25 simulated EVAs (Exploration Extravehicular Activity) on orbit. The team performed inspection, testing, and analysis and provided lessons learned on PLSS components for NASA’s prototype spacesuit. This analysis included how well SWME maintained its heat rejection capability, as well as looked at the robustness of the other TCL hardware.

SERFE↗

xPLSS Structural Backplate Design, Manufacture, and Test Overview

NASA Johnson Space Center (JSC) has been developing and building a new detailed design of the Exploration Extravehicular Mobility Unit (xEMU) space suit to support future International Space Station (ISS) and Lunar Artemis missions. The Exploration Portable Life Support System (xPLSS) of the xEMU contains some clever new technologies to meet the requirements to provide Extra Vehicular Activity (EVA) capability on the ISS and the Moon. The suit must interface with and fit through ports and airlocks of at least three vehicles: ISS, Human Landing System (HLS), and Gateway. The first partial xPLSS experimental flight unit called SWME EXPRESS Rack Flight Experiment (SERFE) that was a rack-deployed thermal control system payload on the ISS for two years (2020-2022). The first complete assembly of the xEMU was built as a Design Verification Test (DVT) unit (2022); similar to but more extensive than an Engineering Development Unit (EDU). The xPLSS Backplate serves not only as the structural backbone of the xPLSS and SERFE systems but also contains innovative design features to reduce the: mass, complexity, parts count, number ofseals (and therefore leak potential), and outer dimensions of the entire assembly. This paper provides an overview of these new design features, manufacturing processes, system interfaces, and SERFE/DVT test results of the Backplate as part of the xPLSS/xEMU.

xPLSS↗

SERFE PLSS Component Lessons Learned from ISS

NASA has been developing a new spacesuit, called the Exploration Extravehicular Mobility Unit (xEMU) for over a decade. This spacesuit is under development to support missions to the International Space Station (ISS) and also to the Moon. Improvements in the life and robustness of the Portable Life Support System (PLSS) has been a major objective of these efforts. The Suit Water Membrane Evaporator (SWME) was chosen as the technology to provide cooling to the xEMU and has undergone several iterations of development over this period. An ISS flight experiment centered around the SWME and other thermal control loop (TCL) technologies was developed and tested in an ISS EXpedite PRocessing of Experiments to the Space Station (EXPRESS) rack from November of 2020 to August of 2022. In addition to the SWME, the SWME EXPRESS Rack Flight Experiment (SERFE) contains several technologies from the xEMU project and demonstrated their performance in micro-gravity and over an extended duration. These included two dissimilar water pumps, custom check valves, custom bypass relieve valves, a custom thermal control valve, development pressure and temperature sensors, and the thermal loop controller. This paper presents PLSS component lessons learned after return of the SERFE flight unit in August of 2022. The SERFE team took the flight unit apart and handed hardware components over to hardware owners to see how parts of the TCL managed after almost 2 years on the ISS and 25 simulated EVAs (Exploration Extravehicular Activity) on orbit. The team performed inspection, testing, and analysis and provided lessons learned on PLSS components for NASA’s prototype spacesuit. This analysis included how well SWME maintained its heat rejection capability, as well as looked at the robustness of the other TCL hardware.

SERFE↗

Mechanically-reattachable liquid-cooled cooling apparatus

An apparatus comprising a rack having a row of shelves, each shelf supporting an electronics circuit board, each one of the circuit boards being manually removable from the shelve supporting the one of the circuit boards and having a local heat source thereon. The apparatus also comprises a cooler attached to the rack and being able to circulate a cooling fluid around a channel forming a closed loop. The apparatus further comprises a plurality of heat conduits, each heat conduit being located over a corresponding one of the circuit boards and forming a path to transport heat from the local heat source of the corresponding one of the circuit boards to the cooler. Each heat conduit is configured to be manually detachable from the cooler or the circuit board, without breaking a circulation pathway of the fluid through the cooler.

42 ENGINEERING↗

Data center cooling system

A data center cooling system may include heat transfer equipment to cool a liquid coolant without vapor compression refrigeration, and the liquid coolant is used on a liquid cooled information technology equipment rack housed in the data center. The system may also include a controller-apparatus to regulate the liquid coolant flow to the liquid cooled information technology equipment rack through a range of liquid coolant flow values based upon information technology equipment temperature thresholds.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Update on the use of Neutron Absorbers for Storage Applications at Y-12

The Y-12 National Security Complex has a high density enriched uranium storage system at the Highly Enriched Uranium Materials Facility (HEUMF) that has been deployed for nearly 10 years. A robust neutron absorber system is provided through the design of Rackable Can Storage Boxes (RCSBs) and their configuration into storage racks. The requirements from ANSI/ANS-8.21, Use of Fixed Neutron Absorbers in Nuclear Facilities outside Reactors, are met with the RCSB and rack system at HEUMF through various design aspects, verification criteria, functional testing, and simulation modeling. Previous publications on a neutron absorber storage system at Y-12 were present at ANS in 2001 and 2002, when the RCSBs were still in a conceptual phase. The publications focused on ongoing studies at the time of what materials worked best for storage applications and how to test those materials, as well the practical design of the unit. The RCSBs have proven to provide a safe, static, and low maintenance storage system, with some minor design issues and several opportunities for future improvement.

42 ENGINEERING↗

Process for large-scale ammonothermal manufacturing of semipolar gallium nitride boules

Methods for large-scale manufacturing of semipolar gallium nitride boules are disclosed. The disclosed methods comprise suspending large-area single crystal seed plates in a rack, placing the rack in a large diameter autoclave or internally-heated high pressure apparatus along with ammonia and a mineralizer, and growing crystals ammonothermally. A bi-faceted growth morphology may be maintained to facilitate fabrication of large area semipolar wafers without growing thick boules.

D'Evelyn, Mark P.↗

Process for large-scale ammonothermal manufacturing of semipolar gallium nitride boules

Methods for large-scale manufacturing of semipolar gallium nitride boules are disclosed. The disclosed methods comprise suspending large-area single crystal seed plates in a rack, placing the rack in a large diameter autoclave or internally-heated high pressure apparatus along with ammonia and a mineralizer, and growing crystals ammonothermally. A bi-faceted growth morphology may be maintained to facilitate fabrication of large area semipolar wafers without growing thick boules.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Inspection workcell

An inspection workcell includes an equipment rack for securing one or more part trays comprising inspection parts, one or more inspection stations for inspecting the inspection parts, and a robotic manipulator for transporting the one or more part trays from the equipment rack to the one or more inspection stations.

Burchard, Ross L.↗

Remote-Controlled Removal of Bricks from a Reactor Shaft: An Unconventional Approach - 16406

The first German prototype Fast Breeder Nuclear Reactor (KNK) is currently being dismantled after being the only operating Fast Breeder-type reactor in Germany. The complete dismantling is based on 10 decommissioning permits. Package 3 of the 9. decommissioning permit, which is currently under preparation, comprises the dismantling of the biological shield. Package 2 comprised the dismantling of the Primary Shield. In preparation to lift the 14 primary shield segments on height of the reactor core, these were milled at 16 positions and equipped with a total of 26 holes. As a result of the milling and drilling process, an estimated amount of 500-600 kg cast iron swarfs accumulated at the bottom of the 12 m deep reactor shaft. The cobalt in the cast iron was activated to cobalt-60 during operation. This results in a measurable dose-rate of 30-35 mSv/h. At the conical bottom of the reactor shaft were still the remaining parts of the thermal insulation consisting of a lining with brick stones, covered with loose remnants of the thermal insulation, loose metallic residues and cut-off wheels of the angel grinder. For the next dismantling step, the removal of the activated part of the biological shield, it is necessary that the cast iron swarfs must be removed as well as the remains of the thermal insulation. Firstly, this is necessary to reduce the dose rate inside the shaft for subsequent breakthrough operations and, secondly to have a statically resilient surface for the installation of a necessary working platform for next dismantling tools. There was no access for personnel. A manual removal was also not possible due to the existing dose rate. The cast iron swarfs supposed to be removed by a remote controlled suction unit, which was installed on top of a drum and mounted in a special rack. The complete system was lowered into the reactor shaft by using a crane. After removing the major amount of swarfs, the remaining swarfs as well as the sheet metal liner should be collected with a magnetic grabber. The solution for the metal removal was easy to realize, but there was no idea how to remove the remaining bricks remote controlled out of the reactor shaft. Another boundary was that only existing facilities were supposed to be used in addition to the new suction system, i.e. the existing cranes, gripper, as well as the double lid lock of the encasing for the handling of the vacuum cleaner, the transport of the drum and the lock procedure. The design essentially consists of a suction unit and a collecting unit. Both units are connected hooked by the three single suspension chains on the rack on the traverse and connection of the suction tube. Subsequently the entire unit was drained in the 12 m deep reactor shaft. The entire unit has been lifted out of the reactor shaft and placed on a defined set-down position. At this position, now both of the units could be separated by using the Master-Slave-Manipulator in the encasing (A100). By using different suction pipes the reactor shaft bottom could be exempted from the cast iron swarfs within a few days. The suction unit worked in such a positive way that it was decided to remove the loose refractory bricks, metallic residues, cut off wheels, etc., too. Metal parts remaining on the ground were removed by a magnet. This pragmatic approach avoided additional complex design works and the need of constructing special solutions and thus, massively saved time, cost and dose rate. The duration of planning, permission including implementation amounted to approximately 3 to 4 months. The additional work could be performed directly after the actual dismantling step.

07 ISOTOPE AND RADIATION SOURCES↗

Use of Automation in Low Level Waste Storage and Management - 19227

The Australian Nuclear Science and Technology Organisation (ANSTO) generates Low Level Waste (LLW) and Intermediate Level Waste (ILW) from various site operations such as the operation of a research Reactor and the manufacture of Molybdenum 99. The Low Level Solid Waste (LLSW) generated is stored at ANSTO before and after conditioning. The current process flow involves the storage of LLSW waste before conditioning on racks, handled using forklifts. When the unconditioned waste is ready for conditioning, it is transferred to another facility, where volume reduction and packaging is carried out. Once conditioned, the waste is placed in further storage, pending dispatch to the proposed Australian National Radioactive Waste Management Facility (NRWMF). A new purpose built facility has been constructed, adjacent to the LLSW processing facility, for the storage and management of LLSW in both unconditioned and conditioned forms. This new facility will streamline the waste management process and significantly enhance the safety and efficiency of the process. In line with international best practises, the new facility utilises automation solutions to minimise the build footprint, and minimise the use of forklifts and other mobile plant. Most importantly, it applies the principle of ALARA (As Low as Reasonably Achievable) to minimise operator activities in areas where radioactive material is stored and eliminates double handling of the waste. The automation for unconditioned waste utilises an Automated Storage and Retrieval System (ASRS), a vertical stacker crane within high density racking, to provide easy storage and retrieval for processing and/or routine inspections. This system allows operators to control it from outside of the storage area whilst utilising integrated software that allows for the required tracking of the unconditioned waste. From the ASRS storage area, unconditioned waste will have a smooth transition to the processing facility which is located adjacent to the ASRS system. Once conditioned, the waste is catalogued and returned to a designated storage area within the new facility using an automated building gantry crane with a target delivery system to eliminate the need for operators in the main storage bay. The waste will be held here in preparation for dispatch to the future repository. The utilisation of the ASRS for the purpose of storing LLSW is an innovative use of automation that will eliminate operators from active areas, reduce dose rates received and integrate with the waste tracking software. Furthermore, the system has significant advantages with operational efficiencies increased, reduced double handling of nuclear waste and maximum use of building footprint. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview of neutron absorber materials used in spent fuel pools - 14622

Spent fuel pools (SFPs) were originally designed with low density storage racks that maintained subcriticality based on geometric separation. With the increasing need for storage, due to elimination of reprocessing as a viable alternative, SFPs with high-density racks required neutron absorber materials to control reactivity and maintain criticality safety margins. The Nuclear Energy Institute (NEI) conducted an industry wide survey in 2013 and the survey was updated recently based on additional utility data provided by Electric Power Research Institute (EPRI). The survey results show that about one-quarter of the pools in the United States either do not have neutron absorber material in the SFP or do not credit it even when it is present. Also, about half of the plants in the U.S. use BORAL{sup R} as the neutron absorber material followed by Metamic, Carborundum, Alcan, and borated stainless steel. For neutron absorber monitoring, the majority of the plants rely on a coupon testing program. However, for those plants that never installed coupons or have exhausted their supply of coupons from coupon sampling, in situ measurements at periodic intervals can be performed to determine the status of the neutron absorber. In this paper, an overview of the types of neutron absorber materials used in SFPs, the distribution of absorber material use by material type, types of monitoring programs as part of aging management programs, operational experience to date with different absorber materials based on monitoring programs, and industry initiatives toward addressing long-term performance issues related to neutron absorber material degradation and monitoring are presented. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Fermilab PIP-II CDS and CM Cryogenic Controls System

Details on Final design for Cryogenic Electrical & Controls System for Fermilab' s next-gen particle accelerator PIP-II. Electrical Controls System includes instrumentation and controls of Cryogenics Distribution System and Cryomodules. Design includes Siemens PCS7 Controls System with 26 Remote IO Rittal Cabinets and 48 Relay Racks for Temperature Readouts, Valve Positioners, Level, Heater Controls etc. Electrical Drawings and Design have been completed with focus now on fabrication of the 26 Rittal Cabinets and 48 Relay Racks. All materials have been procured. EPICS will be used as a SCADA system communicating to S7 Controllers via OPC UA.

Patel, Pratik [Fermilab]↗