Initial Progress on Tank Bottom Repair for the DOE EM Tank Waste R&D Program - 25089
Several years prior to the Lab23-EM001 Call Announcement, Washington River Protection Solutions (WRPS) had done a review in identifying tank repair feasibility. [1, 2] The most viable methods of repair identified for the Floor of a Primary Tank identified were Grout Stabilization and Polymer Grout. Grout Stabilization was described as a self-leveling grout which fills the entire bottom of the tank and creates a new or false bottom. These types of materials have been used at the Savannah River Site (SRS) to fill and close waste tanks as well as contaminated spaces within decommissioned reactors. No mention was made as to the chemical composition of these Stabilizing Grouts in the review, however, grouts used at SRS for the mentioned applications have always been a cementitious grout material. A thickness of approximately 12 inches was suggested in the review. It was also suggested that an additional polymeric coating could be applied to this fresh and clean grout surface.