Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

A Historical Review of the Safe Transport of Spent Nuclear Fuel

This report meets the requirements of M3 milestone M3SF-21OR020302066 for the Office of Integrated Waste Management (IWM) and is a revision to M3 milestone M3FT-16OR090402028 for the former Nuclear Fuels Storage and Transportation Planning Project (NFST), “Safety Record of SNF Shipments.” The US Department of Energy (DOE) has since established the IWM, which builds on the work begun by NFST, to develop an integrated waste management system for spent nuclear fuel (SNF), including the development of a large-scale transportation system for the safe transport of SNF to storage or disposal facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Modelling the Liquid Waste Operation at the Savannah River Site

Modeling Successes Dounreay – Site Closure Optimization and Risk Reduction Re-structuring and streamlining a complex project plan to achieve site decommissioning in reduced time and at reduced cost, through automated task prioritization. Idaho AMWTP – Multi-stream Optimization Speeding up a complex facility with many process lines, by utilizing all of the process lines more efficiently and reducing overall plant downtime, by coordinating repairs and shutdowns. AWE –Waste Repackaging and Relocation Relocating schedule for waste material from an old storage facility to a new purpose-built one, safely, and in a timely fashion that removed the need to reassure the safety of the old facility. Sellafield – Effluent, Sludge and HAW Treatment Improving a wide range of chemical engineered processes including aqueous effluent treatment, chemically-reactive sludge management and waste vitrification processing. Strategic Petroleum Reserve – Cavern Management Linking chemistry models of petroleum prediction, through engineering cavern management to financial modeling of gasoline sales to benefit US government

Jung, Andrew W.↗

Sustainable Aviation Fuel State-of-Industry Report: Hydroprocessed Esters and Fatty Acids Pathway

Climate change is a pressing issue that requires immediate and decisive action to ensure a sustainable future. To reduce CO 2 emissions and speed up the transition to net-zero aviation, the Biden administration has launched the "Sustainable Aviation Fuels (SAF) Grand Challenge" to scale up production of SAF. The challenge aims to achieve 20% reduction in aviation emissions by producing 3 billion gallons per year (BGPY) of SAF by 2030 and to meet 100% of aviation fuel demand by producing 35 BGPY of SAF by 2050. In this report, we provide an overview of the current state of the hydroprocessed esters and fatty acids (HEFA) SAF industry, guided by the perspectives of the interviewed experts. Currently, the HEFA pathway is the only commercially deployed method to produce significant amounts of SAF. As a result, SAF produced via the HEFA pathway is expected to make the largest contribution to achieving the 2030 production target and play a key role in boosting and establishing the SAF market. Announced SAF's total capacity, including alcohol-to-jet, FT, and power-to-liquid facilities, is expected to reach 2 BGPY by 2030 (1), with the expected from HEFA. Total HEFA capacity, including construction and planned projects, is expected to reach about 9 BGPY by 2030; if completely executed, this would contribute to renewable diesel (RD) and SAF. The production ratio of SAF and RD will depend on market conditions, incentives, and the capabilities of facilities. While some stakeholders believe that the 2030 goal may be achieved solely via HEFA, others believe that overly relying on HEFA may be detrimental to the development of other necessary pathways to meet 2050 goals. Our conclusion is that the HEFA pathway alone will not be sufficient to reach the 2030 target. It is crucial to implement additional pathways to reach the goal. This report conducts a comprehensive analysis and evaluation of the HEFA SAF value chain. Our aim is to provide current status of the industry and to identify potential challenges that could hinder the commercial production and use of SAF produced through the HEFA pathway. We have had extensive discussions, consultations, and collaborative sessions with stakeholders in the HEFA SAF value chain, including HEFA feedstocks, potential volume of HEFA SAF, economic and sustainability metrics when compared to petroleum, and assessment of the HEFA SAF industry's ability to grow and contribute to achieving the "SAF Grand Challenge." Since the HEFA pathway produces both SAF and RD, this report compares both pathways: HEFA to SAF and HEFA to RD.

09 BIOMASS FUELS↗

Z Facility Sustainment Status (April FY 2023) [Slides]

98% of the budget is deployed, remaining $325,000 to be assigned by the end of May. Costs plus Commitments total 58% of the deployed budget. 29 projects have been kicked off and are in progress. Five project plans are being finalized and will be kicked off early summer. The February start has contributed to the risk of not costing all of the FY23 budget.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Data Acquisition and Control for Marine Energy Devices: Cost Considerations

This document discusses the process involved with developing a data acquisition system specifically in the context of applications for Marine Renewable Energy (MRE) technologies however, much of what is presented is applicable to applications requiring data acquisition in general. The detail on the process is provided to highlight the critical steps and needs for a successful measurement campaign and to understand what can impact the overall outcome, cost, and schedule. The process presented is an amalgamation of best practices, lessons learned, recommendations, and prudent technical project planning and management. Data acquisition systems may be tightly integrated with or into the device under measurement and it often has its own dependencies that must be met. Therefore, early consideration and planning for the data acquisition system are stressed throughout this document.

13 HYDRO ENERGY↗

Research at UC Berkeley on the SPICE and HeRALD Dark Matter Experiments (Technical Report for DE-SC0022354)

The McKinsey and Pyle groups have taken on the responsibility to complete a number of critical tasks necessary for the successful completion of the TESSERACT project planning phase. In particular: 1) Transition Edge Sensor testing, characterization, and electromagnetic noise mitigation; 2) Design and testing of the athermal phonon detectors along with vibrational noise characterization and mitigation; 3) Testing and characterization of prototype detectors using silica, sapphire, gallium arsenide, and superfluid helium as detector materials. This grant supported efforts of graduate student Roger Romani toward these goals.

47 OTHER INSTRUMENTATION↗

MRCI Subtask 2.3: Developing Industrial Partnerships and Regional Technical Collaboration Final Technical Summary Report

Under the objective of regional data collection and helping accelerate deployment, MRCI collaborated with industrial stakeholders in their project planning, characterization, and analysis. Some examples of these collaborations are given below. The data and information shared by the industrial collaborations added to the regional CCS framework development and were incorporated into the overall datasets, while addressing any proprietary data requirements. Three examples of collaborative partnerships with industry that have provided geologic characterization data relevant and beneficial to the MRCI program are discussed below, including: the UIC Class II Injection Facility in Eastern Ohio, the Core Energy CO2-EOR (enhanced oil recovery) operation in Otsego County Michigan, and the Marquis ethanol plant in Hennepin Illinois.

CCS,CCUS,MRCI,Midwest USA,Technical Challenges,inj↗

Solar and Storage Integration in the U.S. Southeast: Implications for Resource Adequacy

Resource adequacy concerns may be very different in electricity systems that have higher levels of solar and storage, requiring changes to existing planning models. This study explores a novel approach to evaluating resource adequacy under future scenarios with higher solar and storage in the Southeast U.S. It uses NREL’s Probabilistic Resource Adequacy Suite (PRAS), a collection of probabilistic resource adequacy modeling tools, and compares results when interacting PRAS and a portfolio planning tool with a more traditional modeling approach. The results suggest that traditional models perform reasonably well with lower levels of solar PV, but at higher levels of solar probabilistic tools better capture the changes in resource adequacy concerns—such as winter energy availability—associated with higher solar systems. This is the final study in the Preparing Southeast Markets for Reliable and Affordable Integration of Solar into Operations and Planning project. Two prior reports can be found at: Solar and Storage Integration in the Southeastern United States: Economics, Reliability, and Operations. https://emp.lbl.gov/publications/solar-and-storage-integration Solar and Wind Forecast Error Reserve Sharing in a Multi-Utility Region. https://eta-publications.lbl.gov/sites/default/files/2024-11/multiutility_fe_reserve_sharing_final.pdf

14 SOLAR ENERGY↗

Production of NBL PO plutonium isotopic standards CRM 136A, CRM 137A, and CRM 138A

Lawrence Livermore National Laboratory (LLNL) produced approximately 1 mg units of purified Pu from the parent New Brunswick Laboratory (NBL) certified reference materials (CRM) 137, 136 and 138 isotopic standards for the NBL Program Office (NBL PO) as detailed in the revised project plan. As stated in the plan, three representative units of each material were dispensed at the same time to be characterized at LLNL and provide informational values for the quantity of Pu and progeny nuclides in each unit. NBL PO intends to collect and evaluate isotopic measurement data from multiple laboratories and certify these materials as new isotopic standards C137A, C136A, and C138A, respectively. Soon after production eleven units of each analytical standard were shipped to other analytical laboratories for the certification effort, and 121, 119, and 119 units of C137A, C136A and C138A, respectively were shipped to Mickey Finch at Y12 NBL distribution center in November 2024 (30-gallon drum, TID 003777 PRL 7000005043). Residual purified Pu from the effort is being stored indefinitely in B332 at LLNL. Detailed methods can be found in the production plan, and this report describes and documents aspects of the production effort that are not in or were modified from the original production plan.

and nuclear chemistry↗

System Advisor Model (SAM) Improvements for Emerging Solar Thermal Applications

The System Advisor Model (SAM) is an open-source tool developed by NREL to simulate the techno-economic performance of technologies like photovoltaics, solar thermal, wind, and geothermal. NREL has recently completed, active, and planned projects to improve the solar thermal models in SAM and its underlying code base to represent emerging component technologies, systems, and applications. This poster describes new capabilities in the SolarPILOT optical modeling tool, supercritical carbon dioxide (sCO2) power cycles, and solar industrial process heat.

14 SOLAR ENERGY↗

National Hydropower Fish Passage Database User's Guide and Methodology

Fish passage facilities are used to mitigate the impacts of hydropower dams on migratory fish in rivers, but information on the location, types, and characteristics of this infrastructure is incomplete at a national scale. Researchers at Oak Ridge National Laboratory partnered with federal agency and industry stakeholders to create the first national-scale database of fish passage infrastructure at U.S. hydropower developments. This database contains information of great value to a broad range of stakeholders; it includes fish passage facility engineering characteristics, targeted fish species, operational schedules, and costs. This data resource addresses a large gap in knowledge of the deployment of fish passage technology and is freely available to members of the hydropower community, including federal and state regulators and resource agencies, non-governmental organizations, industry, and other user groups to support project planning and regulatory (re)licensing activities. This database supports the U.S. Department of Energy Water Power Technologies Office objective to develop decision support tools and data resources that improve environmental performance and ensure hydropower’s long-term value to the American public.

13 HYDRO ENERGY↗

EV Stock and Load Forecasting for HECO [Slides]

This presentation covers the work completed for the HECO Forecasting Department for the Electric Vehicle Stock and Load Forecast for Integrated Grid Planning project. This project uses a suite of detailed analytical tools developed by the National Laboratory of the Rockies, including TEMPO and EVI-Pro, to develop future scenarios to 2050 of county-level electric vehicle adoption and associated annual hourly charging load profiles for the state of Hawaii.

33 ADVANCED PROPULSION SYSTEMS↗

Wetlands Delineation Report: Big Eddy-Ostrander Transmission Line

Pacific Northwest National Labs (PNNL) was contracted by BPA to prepare a Wetland Delineation Report to support project planning and compliance with state and federal wetland and waterway removal/fill regulations. This report documents the wetlands and waterways of the U.S./State located along the 66.5 miles of existing transmission line, the access road network, and in areas where hazard trees would be removed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Maintaining a Technology-Neutral Approach to Hydrogen Production Process Development through Conceptual Design of the Next Generation Nuclear Plant

The Next Generation Nuclear Plant (NGNP) project was authorized in the Energy Policy Act of 2005 (EPAct), tasking the U.S. Department of Energy (DOE) with demonstrating High Temperature Gas-Cooled Reactor (HTGR) technology. The demonstration is to include the technical, licensing, operational, and commercial viability of HTGR technology for the production of electricity and hydrogen. The Nuclear Hydrogen Initiative (NHI), a component of the DOE Hydrogen Program managed by the Office of Nuclear Energy, is also investigating multiple approaches to cost effective hydrogen production from nuclear energy. The objective of NHI is development of the technology and information basis for a future decision on commercial viability. The initiatives are clearly intertwined. While the objectives of NGNP and NHI are generally consistent, NGNP has progressed to the project definition phase and the project plan has matured. Multiple process applications for the NGNP require process heat, electricity and hydrogen in varied combinations and sizes. Coupling these processes to the reactor in multiple configurations adds complexity to the design, licensing and demonstration of both the reactor and the hydrogen production process. Commercial viability of hydrogen production may depend on the specific application and heat transport configuration. A component test facility (CTF) is planned by the NGNP to support testing and demonstration of NGNP systems, including those for hydrogen production, in multiple configurations. Engineering-scale demonstrations in the CTF are expected to start in 2012 to support scheduled design and licensing activities leading to subsequent construction and operation. Engineering-scale demonstrations planned by NHI are expected to start at least two years later. Reconciliation of these schedules is recommended to successfully complete both initiatives. Hence, closer and earlier integration of hydrogen process development and heat transport systems is sensible. For integration purposes, an analysis comparing the design, cost and schedule impact of maintaining a technology neutral approach through conceptual design or making an early hydrogen process technology selection was performed. Early selection does not specifically eliminate a technology, but rather selects the first hydrogen technology for demonstration. A systems-engineering approach was taken to define decision-making criteria for selecting a hydrogen technology. The relative technical, cost and schedule risks of each approach were analyzed and risk mitigation strategies were recommended, including provisions to maintain close collaboration with the NHI. The results of these analyses are presented here.

08 HYDROGEN↗

Field Testing of a Wet FGD Additive for Enhanced Mercury Control

This document is the final report for DOE-NETL Cooperative Agreement DE-FC26-04NT42309, 'Field Testing of a Wet FGD Additive'. The objective of the project has been to demonstrate the use of two flue gas desulfurization (FGD) additives, Evonik Degussa Corporation's TMT-15 and Nalco Company's Nalco 8034, to prevent the re-emission of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project was intended to demonstrate whether such additives can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal. The project involved pilot- and full-scale tests of the additives in wet FGD absorbers. The tests were intended to determine required additive dosages to prevent Hg{sup 0} re-emissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Powder River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, Luminant Power (was TXU Generation Company LP), Southern Company, IPL (an AES company), Evonik Degussa Corporation and the Nalco Company. Luminant Power provided the Texas lignite/PRB co-fired test site for pilot FGD tests and project cost sharing. Southern Company provided the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, the pilot- and full-scale jet bubbling reactor (JBR) FGD systems tested, and project cost sharing. IPL provided the high-sulfur Eastern bituminous coal full-scale FGD test site and cost sharing. Evonik Degussa Corporation provided the TMT-15 additive, and the Nalco Company provided the Nalco 8034 additive. Both companies also supplied technical support to the test program as in-kind cost sharing. The project was conducted in six tasks. Of the six tasks, Task 1 involved project planning and Task 6 involved management and reporting. The other four tasks involved field testing on FGD systems, either at pilot or full scale. These four tasks included: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High-sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Plant Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. The pilot-scale tests were completed in 2005 and the full-scale test using high-sulfur coal was completed in 2006; only the TMT-15 additive was tested in these efforts. The Task 5 full-scale additive tests conducted at Southern Company's Plant Yates Unit 1 were completed in 2007, and both the TMT-15 and Nalco 8034 additives were tested.

01 COAL, LIGNITE, AND PEAT↗

Field Testing of a Wet FGD Additive for Enhanced Mercury Control - Task 5 Full-Scale Test Results

This Topical Report summarizes progress on Cooperative Agreement DE-FC26-04NT42309, 'Field Testing of a Wet FGD Additive'. The objective of the project is to demonstrate the use of two flue gas desulfurization (FGD) additives, Evonik Degussa Corporation's TMT-15 and Nalco Company's Nalco 8034, to prevent the re-emission of elemental mercury (Hg{sup 0}) in flue gas exiting wet FGD systems on coal-fired boilers. Furthermore, the project intends to demonstrate whether the additive can be used to precipitate most of the mercury (Hg) removed in the wet FGD system as a fine salt that can be separated from the FGD liquor and bulk solid byproducts for separate disposal. The project is conducting pilot- and full-scale tests of the additives in wet FGD absorbers. The tests are intended to determine required additive dosages to prevent Hg{sup 0} re-emissions and to separate mercury from the normal FGD byproducts for three coal types: Texas lignite/Powder River Basin (PRB) coal blend, high-sulfur Eastern bituminous coal, and low-sulfur Eastern bituminous coal. The project team consists of URS Group, Inc., EPRI, Luminant Power (was TXU Generation Company LP), Southern Company, IPL (an AES company), Evonik Degussa Corporation and the Nalco Company. Luminant Power has provided the Texas lignite/PRB co-fired test site for pilot FGD tests and cost sharing. Southern Company has provided the low-sulfur Eastern bituminous coal host site for wet scrubbing tests, as well as the pilot- and full-scale jet bubbling reactor (JBR) FGD systems tested. IPL provided the high-sulfur Eastern bituminous coal full-scale FGD test site and cost sharing. Evonik Degussa Corporation is providing the TMT-15 additive, and the Nalco Company is providing the Nalco 8034 additive. Both companies are also supplying technical support to the test program as in-kind cost sharing. The project is being conducted in six tasks. Of the six project tasks, Task 1 involves project planning and Task 6 involves management and reporting. The other four tasks involve field testing on FGD systems, either at pilot or full scale. The four tasks include: Task 2 - Pilot Additive Testing in Texas Lignite Flue Gas; Task 3 - Full-scale FGD Additive Testing in High-sulfur Eastern Bituminous Flue Gas; Task 4 - Pilot Wet Scrubber Additive Tests at Plant Yates; and Task 5 - Full-scale Additive Tests at Plant Yates. The pilot-scale tests and the full-scale test using high-sulfur coal were completed in 2005 and 2006 and have been previously reported. This topical report presents the results from the Task 5 full-scale additive tests, conducted at Southern Company's Plant Yates Unit 1. Both additives were tested there.

01 COAL, LIGNITE, AND PEAT↗

Gulf of Mexico Regional Collaborative Final Report

This report presents the results of the Gulf of Mexico Regional Collaborative (GoMRC), a year-long project funded by NASA. The GoMRC project was organized around end user outreach activities, a science applications team, and a team for information technology (IT) development. Key outcomes are summarized below for each of these areas. End User Outreach; Successfully engaged federal and state end users in project planning and feedback; With end user input, defined needs and system functional requirements; Conducted demonstration to End User Advisory Committee on July 9, 2007 and presented at Gulf of Mexico Alliance (GOMA) meeting of Habitat Identification committee; Conducted significant engagement of other end user groups, such as the National Estuary Programs (NEP), in the Fall of 2007; Established partnership with SERVIR and Harmful Algal Blooms Observing System (HABSOS) programs and initiated plan to extend HABs monitoring and prediction capabilities to the southern Gulf; Established a science and technology working group with Mexican institutions centered in the State of Veracruz. Key team members include the Federal Commission for the Protection Against Sanitary Risks (COFEPRIS), the Ecological Institute (INECOL) a unit of the National Council for science and technology (CONACYT), the Veracruz Aquarium (NOAA’s first international Coastal Ecology Learning Center) and the State of Veracruz. The Mexican Navy (critical to coastal studies in the Southern Gulf) and other national and regional entities have also been engaged; and Training on use of SERVIR portal planned for Fall 2007 in Veracruz, Mexico Science Applications; Worked with regional scientists to produce conceptual models of submerged aquatic vegetation (SAV) ecosystems; Built a logical framework and tool for ontological modeling of SAV and HABs; Created online guidance for SAV restoration planning; Created model runs which link potential future land use trends, runoff and SAV viability; Analyzed SAV cover change at five other bays in the Gulf of Mexico to demonstrate extensibility of the analytical tools; and Initiated development of a conceptual model for understanding the causes and effects of HABs in the Gulf of Mexico IT Tool Development; Established a website with the GoMRC web-based tools at www.gomrc.org; Completed development of an ArcGIS-based decision support tool for SAV restoration prioritization decisions, and demonstrated its use in Mobile Bay; Developed a web-based application, called Conceptual Model Explorer (CME), that enables non-GIS users to employ the prioritization model for SAV restoration; Created CME tool enabling scientists to view existing, and create new, ecosystem conceptual models which can be used to document cause-effect relationships within coastal ecosystems, and offer guidance on management solutions; Adapted the science-driven advanced web search engine, Noesis, to focus on an initial set of coastal and marine resource issues, including SAV and HABs; Incorporated map visualization tools with initial data layers related to coastal wetlands and SAVs; and Supported development of a SERVIR portal for data management and visualization in the southern Gulf of Mexico, as well as training of end users in Mexican Gulf States.

54 ENVIRONMENTAL SCIENCES↗

Heavy-duty diesel engine NO{sub x} reduction with nitrogen-enriched combustion air. Final CRADA report.

The concept of engine emissions control by modifying intake combustion gas composition from that of ambient air using gas separation membranes has been developed during several programs undertaken at Argonne. These have led to the current program which is targeted at heavy-duty diesel truck engines. The specific objective is reduction of NO{sub x} emissions by the target engine to meet anticipated 2007 standards while extracting a maximum of 5 percent power loss and allowing implementation within commercial constraints of size, weight, and cost. This report includes a brief review of related past programs, describes work completed to date during the current program, and presents interim conclusions. Following a work schedule adjustment in August 2002 to accommodate problems in module procurement and data analysis, activities are now on schedule and planned work is expected to be completed in September, 2004. Currently, we believe that the stated program requirements for the target engine can be met, based upon extrapolation of the work completed. Planned project work is designed to experimentally confirm these projections and result in a specification for a module package that will meet program objectives.

33 ADVANCED PROPULSION SYSTEMS↗