Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Procurement”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Production of Copper-Plated Beamline Bellows and Spools for LCLS-II

The SLAC National Accelerator Laboratory is currently constructing a major upgrade to its accelerator, the Linac Coherent Light Source II (LCLS-II). Several Department of Energy national laboratories, including the Thomas Jefferson National Accelerator Facility (JLab) and Fermi National Accelerator Laboratory (FNAL), are participating in this project. The 1.3-GHz cryomodules for this project consist of eight cavities separated by bellows (expansion joints) and spools (tube sections), which are copper plated for RF conduction. JLab is responsible for procurement of these bellows and spools, which are delivered to JLab and FNAL for assembly into cryomodules. Achieving accelerator-grade copper plating is always a challenge and requires careful specification of requirements and application of quality control processes. Due to the demanding technical requirements of this part, JLab implemented procurement strategies to make the process more efficient as well as provide process redundancy. This paper discusses the manufacturing challenges that were encountered and resolved, as well as the strategies that were employed to minimize the impact of any technical issues.

Wilson, Katherine M.↗

Status of the Perpendicular Biased 2nd Harmonic Cavity for the Fermilab Booster

This is a status report on the 2nd harmonic cavity for the Fermilab Booster as part of the Proton Improvement Plan (PIP) for increasing beam transmission efficiency, and thus reducing losses. A set of tuner rings has been procured and is undergoing quality control tests. The Y567 tube for driving the cavity has been successfully tested at both injection and extraction frequencies. A cooling scheme for the tuner and cavity has been developed after a thorough thermal analysis of the system. RF windows have been procured and substantial progress has been made on the mechanical designs of the cavity and the bias solenoid. Finally, the goal is to have a prototype cavity ready for testing by the end of 2017.

42 ENGINEERING↗

Design of the 650 MHz High Beta Prototype Cryomodule for PIP-II at Fermilab

The Proton Improvement Plan II (PIP-II) is the first U.S. accelerator project that will have significant contributions from international partners. The prototype High Beta 650 MHz cryomodule (pHB650 CM) is designed by an integrated design team, consisting of Fermilab (USA), CEA (France), UKRI-STFC (UK), and RRCAT (India). The manufacturing & assembly of this prototype cryomodule will be done at Fermilab, whereas the production cryomodules will be manufactured and/or assembled by UKRI-STFC, RRCAT, or Fermilab. Similar to the prototype Single Spoke Resonator 1 cryomodule (pSSR1 CM), this cryomodule is based on a strong-back at room temperature supporting the coldmass. The pSSR1 CM led to significant lessons being learnt on the design, procurement, and assembly processes. These lessons were incorporated into the design and processes for the pHB650 CM. Amongst many challenges faced, the main challenges of the pHB650 CM design were to make the cryomodule compatible to overseas transportation and to design components that can be procured in USA, Europe, and India.

43 PARTICLE ACCELERATORS↗

Status and Outlook for the U.S. Non-Automotive Fuel Cell Industry: Impacts of Government Policies and Assessment of Future Opportunities

Fuel cells (FCs) are considered essential future energy technologies by developed and developing economies alike. Several countries, including the United States, Japan, Germany, and South Korea have established publicly funded R&D and market transformation programs to develop viable domestic FC industries for both automotive and non-automotive applications. Important non-automotive applications include large scale and small scale distributed combined heat and electrical power, backup and uninterruptible power, material handling and auxiliary power units. The U.S. FC industry is in the early stages of development, and is working to establish sustainable markets in all these areas. To be successful, manufacturers must reduce costs, improve performance, and overcome market barriers to new technologies. U.S. policies are assisting via research and development, tax credits and government-only and government-assisted procurements. Over the past three years, the industry has made remarkable progress, bringing both stack and system costs down by more than a factor of two while improving durability and efficiency, thanks in part to government support. Today, FCs are still not yet able to compete in these markets without continued policy support. However, continuation or enhancement of current policies, such as the investment tax credit and government procurements, together with continued progress by the industry, appears likely to establish a viable domestic industry within the next decade.

30 DIRECT ENERGY CONVERSION↗

Final Technical Report for DE-SC0002014- July 29, 2011

The project titled “National Biorepository for Children’s and Women’s Cancer”. The funding received by the Biopathology Center (BPC) at the Research Institute at Nationwide Children’s Hospital was utilized to procure equipment and add resources to establish a national digital archive of tissues of children and women’s cancers to advance treatment and research. As planned in the proposal, the project allowed the BPC to procure two high-speed imaging robots and hire imaging technicians to scan a large collection of Children’s and Women’s cancer tissues. The BPC team focused on completed clinical trials, with some dating back nearly 30 years, conducted by the Children’s Oncology Group (and its precursor groups) as well as the Gynecologic Oncology Group. A total of 139 clinical trials were imaged as part of the archive project allowing the team to generate 29, 488 images that are currently stored at the Ohio Supercomputer Center located in Columbus Ohio. The images are now integrated with the Virtual Imaging for Pathology, Education and Research (VIPER) application. The VIPER application allows the BPC to make the digital archive available via the Internet to approved researchers remotely eliminating the use of glass slides for this collection. The elimination of glass slides reduces costs associated with shipping, reduces breakage of glass slides and allows for the review of these cases quickly by experts on a standard desktop computer.

99 GENERAL AND MISCELLANEOUS↗

Ocean Thermal Energy Conversion Life Cycle Cost Assessment, Final Technical Report, 30 May 2012

The Ocean Thermal Energy Conversion (OTEC) Life Cycle Cost Assessment (OLCCA) is a study performed by members of the Lockheed Martin (LM) OTEC Team under funding from the Department of Energy (DOE), Award No. DE-EE0002663, dated 01/01/2010. OLCCA objectives are to estimate procurement, operations and maintenance, and overhaul costs for two types of OTEC plants: -Plants moored to the sea floor where the electricity produced by the OTEC plant is directly connected to the grid ashore via a marine power cable (Grid Connected OTEC plants) -Open-ocean grazing OTEC plant-ships producing an energy carrier that is transported to designated ports (Energy Carrier OTEC plants) Costs are developed using the concept of levelized cost of energy established by DOE for use in comparing electricity costs from various generating systems. One area of system costs that had not been developed in detail prior to this analysis was the operations and sustainment (O&S) cost for both types of OTEC plants. Procurement costs, generally referred to as capital expense and O&S costs (operations and maintenance (O&M) costs plus overhaul and replacement costs), are assessed over the 30 year operational life of the plants and an annual annuity calculated to achieve a levelized cost (constant across entire plant life). Dividing this levelized cost by the average annual energy production results in a levelized cost of electricity, or LCOE, for the OTEC plants. Technical and production efficiency enhancements that could result in a lower value of the OTEC LCOE were also explored. The thermal OTEC resource for Oahu, Hawaii and projected build out plan were developed. The estimate of the OTEC resource and LCOE values for the planned OTEC systems enable this information to be displayed as energy supplied versus levelized cost of the supplied energy; this curve is referred to as an Energy Supply Curve. The Oahu Energy Supply Curve represents initial OTEC deployment starting in 2018 and demonstrates the predicted economies of scale as technology and efficiency improvements are realized and larger more economical plants deployed. Utilizing global high resolution OTEC resource assessment from the Ocean Thermal Extractable Energy Visualization (OTEEV) project (an independent DOE project), Global Energy Supply Curves were generated for Grid Connected and Energy Carrier OTEC plants deployed in 2045 when the predicted technology and efficiencies improvements are fully realized. The Global Energy Supply Curves present the LCOE versus capacity in ascending order with the richest, lowest cost resource locations being harvested first. These curves demonstrate the vast ocean thermal resource and potential OTEC capacity that can be harvested with little change in LCOE.

99 GENERAL AND MISCELLANEOUS↗

A World-Class University-Industry Consortium for Wind Energy Research, Education, and Workforce Development (Final Technical Report)

During the two-year project period, the consortium members have developed control algorithms for enhancing the reliability of wind turbine components. The consortium members have developed advanced operation and planning tools for accommodating the high penetration of variable wind energy. The consortium members have developed extensive education and research programs for educating the stakeholders on critical issues related to the wind energy research and development. In summary, The Consortium procured one utility-grade wind unit and two small wind units. Specifically, the Consortium procured a 1.5MW GE wind unit by working with the world leading wind energy developer, Invenergy, which is headquartered in Chicago, in September 2010.

17 WIND ENERGY↗

Tanks 18 And 19-F Structural Flowable Grout Fill Material Evaluation And Recommendations

Cementitious grout will be used to close Tanks 18-F and 19-F. The functions of the grout are to: 1) physically stabilize the final landfill by filling the empty volume in the tanks with a non-compressible material; 2) provide a barrier for inadvertent intrusion into the tank; 3) reduce contaminant mobility by a) limiting the hydraulic conductivity of the closed tank and b) reducing contact between the residual waste and infiltrating water; and 4) providing an alkaline, chemically reducing environment in the closed tank to control speciation and solubility of selected radionuclides. The objective of this work was to identify a single (all-in-one) grout to stabilize and isolate the residual radionuclides in the tank, provide structural stability of the closed tank and serve as an inadvertent intruder barrier. This work was requested by V. A. Chander, High Level Waste (HLW) Tank Engineering, in HLW-TTR-2011-008. The complete task scope is provided in the Task Technical and QA Plan, SRNL-RP-2011-00587 Revision 0. The specific objectives of this task were to: 1) Identify new admixtures and dosages for formulating a zero bleed flowable tank fill material selected by HLW Tank Closure Project personnel based on earlier tank fill studies performed in 2007. The chemical admixtures used for adjusting the flow properties needed to be updated because the original admixture products are no longer available. Also, the sources of cement and fly ash have changed, and Portland cements currently available contain up to 5 wt. % limestone (calcium carbonate). 2) Prepare and evaluate the placement, compressive strength, and thermal properties of the selected formulation with new admixture dosages. 3) Identify opportunities for improving the mix selected by HLW Closure Project personnel and prepare and evaluate two potentially improved zero bleed flowable fill design concepts; one based on the reactor fill grout and the other based on a shrinkage compensating flowable fill mix design. 4) Prepare samples for hydraulic property measurements for comparison to the values in the F- and H- Tank Farm Performance Assessments (PAs). 5) Identify a grout mix for the Tanks 18-F and 19-F Grout Procurement Specification. Results for two flowable zero bleed structural fill concepts containing 3/8 inch gravel (70070 Series and LP#8 Series) and a sand only mix (SO Series) are provided in this report. Tank Farm Engineering and SRNL Project Management selected the 70070 mix as the base case for inclusion in Revision 0 of the Tanks 18-F and 19-F grout procurement specification and requested admixture recommendations and property confirmation for this formulation. Lower cementitious paste mixes were formulated because the 70070 mix is over designed with respect to strength and generates more heat from hydration reactions than is desirable for mass pour application. Work was also initiated on a modification of the recommended mix which included shrinkage compensation to mitigate fast pathways caused by shrinkage cracking and poor physical bonding to the tank and ancillary equipment. Testing of this option was postponed to FY12. Mix, LP#8-16 is recommended for inclusion in the specification for furnishing and delivering tank closure grout for Tanks 18-F and 19-F. A shrinkage compensating variation of this mix, LP#16C, has not been fully developed and characterized at this time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reductions without Regret: Defining the Needed Capabilities

This is the second of three papers (in addition to an introductory summary) aimed at providing a framework for evaluating future reductions or modifications of the U.S. nuclear force, first by considering previous instances in which nuclear-force capabilities were eliminated; second by looking forward into at least the foreseeable future at the features of global and regional deterrence (recognizing that new weapon systems currently projected will have expected lifetimes stretching beyond our ability to predict the future); and third by providing examples of past or possible undesirable outcomes in the shaping of the future nuclear force, as well as some closing thoughts for the future. This paper begins with a discussion of the current nuclear force and the plans and procurement programs for the modernization of that force. Current weapon systems and warheads were conceived and built decades ago, and procurement programs have begun for the modernization or replacement of major elements of the nuclear force: the heavy bomber, the air-launched cruise missile, the ICBMs, and the ballistic-missile submarines. In addition, the Nuclear Weapons Council has approved a new framework for nuclear-warhead life extension not fully fleshed out yet that aims to reduce the current number of nuclear explosives from seven to five, the so-called "3+2" vision. This vision includes three interoperable warheads for both ICBMs and SLBMs (thus eliminating one backup weapon) and two warheads for aircraft delivery (one gravity bomb and one cruise-missile, eliminating a second backup gravity bomb). This paper also includes a discussion of the current and near-term nuclear-deterrence mission, both global and regional, and offers some observations on future of the strategic deterrence mission and the challenges of regional and extended nuclear deterrence.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

ARIES Oxide Production Program Monthly Report – April 2014

A summary of the accomplishments, milestones, financial summary, project performance and issues facing the Oxide Production Program for the end of April 2014 is presented in this Executive Summary. PF-4 and ARIES operations remain paused in order to resolve issues and perform an extent-of-condition review for Criticality Safety and Conduct of Operations. On April 28th, Jeff Yarbrough issued a memorandum updating status on the “pause” of PF-4 programmatic operations. He reported that 150 of the procedures that control programmatic operations in PF-4 have successfully resumed. These 150 procedures represent about ½ of the total that will enable us to meet FY14 programmatic commitments. No formal letter of direction will be provided to LANS via the NNSA Field Office contracting officer to address the direction relative to shipments, analytical chemistry sampling and guidance for financial adjustments in FY14 and FY15. LANS will provide a revised plan based on the funding profile included in the President’s Budget Request for the remainder of FY14 and FY15 to include revised FY14 milestones and proposed FY15 milestones. The ARIES Pit Cutter project met the NNSA milestone (Complete Design of Simple Pit Disassembly Equipment [ARIES Pit Cutter] – Due 8/15/14) by completing the fabrication design on 4/3/14, well in advance of the 8/15/14 due date. The project team has started procurement of long-lead items in preparation of the prototype fabrication and cold testing. The fabrication is scheduled to complete in FY14 and the cold testing will begin in FY14 and complete in early FY15. LANL and PNNL met on April 14 to discuss the path forward for PNNL criticality support to the program. The consensus was that PNNL resources can be effectively applied to the generation of detailed CSEs to support the program independent of the current ESS strategy. FY15 program planning is underway. The team is working on planning/drafting the work packages and developing the schedule under the assumption that operations will begin October 1, 2014. A planning schedule has been finalized and the team is meeting regularly to discuss details at the work package and WBS levels. The FY15 PMP is also in the process of being updated. The goal is to have all the drafts reviewed/approved and finalized prior to the start of the FY. MQ personnel have completed ADPSM Management Assessment: Evaluate Quality Roles and Responsibility Agreements between ADPSM and LANL Technical Support Organizations (PFITS 2011-1943). Two findings and four opportunities for improvement were reported. The robotic lathe controller upgrade has entered the construction phase of the project. The controller cabling IWD pre-job meeting was completed. The initial robotic lathe functional test was completed. The existing controller power supply disconnect is scheduled for early May. The NDA Cage project team received notification on 3/28/14 to restart the NDA cage project. Since then the team have been busy with activities that include assigning a planner, getting the construction work package ready for construction and getting the USQ completed. The electrical services installation for the new welding skid for the Inner Can Welder was completed. A gas bottle rack, used to support welding operations, will be installed in early May. The Outer Can Welder design is complete and the IWD is in development to execute construction. Installation materials have been ordered. Work continues on the MD-2 preliminary design. The project engineer is performing a technical evaluation of the Project Management Plan that was submitted by the design agent in response to the LANL Request for Proposal. If all requirements have been captured, LANL procurement will develop a contract and give the design agent notice to proceed on the preliminary design. Estimated completion is scheduled for September 2014. The design for the TA-55 Bldg. 314 warehouse was issued at 90% complete and has begun the last review process. A constructability review is scheduled for early May. The Project Manager has been working with the LANL estimating group to get the class 3 estimate for review. The Oxide Production Cage Upgrade project has kicked-off efforts on the 30% design. Requirements documentation has been drafted. The floor space was walked-down with other project managers and stakeholders and the boundaries were agreed upon.

ARIES↗

Business Case Analysis for Replacing the Mazak 30Y Mill-Turn Machine in SM-39. Summary

Business case studies are being looked at to support procurement of new machines and capital equipment in the SM-39 and TA-03-0102 machine shops. The first effort conducted economic analysis of replacing the Mazak 30Y Mill-Turn Machine located in SM-39. To determine the value of switching machinery, a baseline scenario was compared with a future scenario where new machinery was purchased and installed. The conditions under the two scenarios were defined via interviews with subject matter experts in terms of one-time and periodic costs. The results of the analysis were compiled in a life-cycle cost/benefit table. The costs of procuring, installing, and maintaining a new machine were balanced against the costs avoided by replacing older machinery. Productivity savings were included as a measure to show the costs avoided by being able to produce parts at a quicker and more efficient pace.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

HPC - Platforms Penta Chart

Strategy, Planning, Acquiring- very large scale computing platforms come and go and planning for immensely scalable machines often precedes actual procurement by 3 years. Procurement can be another year or more. Integration- After Acquisition, machines must be integrated into the computing environments at LANL. Connection to scalable storage via large scale storage networking, assuring correct and secure operations. Management and Utilization – Ongoing operations, maintenance, and trouble shooting of the hardware and systems software at massive scale is required.

Computer Hardware↗

High Tonnage Forest Biomass Production Systems from Southern Pine Energy Plantations

In this study, a high-tonnage harvesting system designed specifically to operate efficiently in the expected stand types of a bioenergy scenario was built, deployed, and evaluated in a production setting. Stands on which the system was evaluated exhibited the heavy stocking levels (> 600 stems per acre) and tree size distributions with significant volume in small stems (down to 2” DBH) that were expected in the modified energy plantation silvicultural approach. The harvest system also was designed to be functional in the traditional plantation stands dominating the commercial forestry landscape in the region. The Tigercat 845D feller buncher, which was a prototype machine designed for the high tonnage harvest system, used a boom-mounted prototype DT1802 shear felling head and incorporated a number of options intended to maximize its small-stem productivity, including: a high-speed shear severing system that was cheaper to operate than a saw; a large-pocket felling head that allowed larger accumulations of small stems to be built before expending the time to drop them for the skidder; efficient, low ground pressure, tracked carrier system to decrease the amount of maneuvering, saving time and minimizing soil disturbance; and various energy-saving devices to lower fuel costs and minimize air quality impacts. Overall, the feller buncher represented a quantum advance in small-stem harvesting technology. Extensive testing showed the machine’s production rate to be relatively insensitive to piece size, much less so than comparable traditional equipment. In plantation stands, the feller buncher was able to produce approximately 100 green tons of biomass per productive machine hour (PMH), and in natural stands, it produced nearly 120 green tons per PMH. The ability of the high tonnage feller buncher to maintain high productivity in stands with smaller diameter stems is something that has not been achieved in previous feller buncher designs. The Tigercat 845D feller buncher is now a production machine for Tigercat and is being sold in their current product line. The high-speed felling system was paired with a Tigercat 630D skidder and high-capacity grapple; one that could match the felling productivity when pulling small stems. The harvesting system minimized hourly costs using a single, high-capacity skidder (with a single operator), rather than two smaller ones, which is the traditional practice. The skidder itself can be considered a mid-range size and had an engine no larger than other machines in its class, but it incorporated a very large capacity 25 ft2 grapple. The large grapple is well suited to grabbing and hauling a large bunch of small-diameter trees, as produced by the high tonnage feller buncher. The grapple worked effectively in larger stems as well, but its ability to carry large numbers of small stems meant the average payload did not drop as stand DBH decreased. Tests with the machine indicated its travel speeds were nearly the same as, or perhaps slightly better than, conventionally equipped skidders, but grapple capacity was 75% larger. Productivity and cost per ton of the new skidder were better than conventional skidders for average skid distances of any length greater than 100 feet. Measured skidder productivity was as high as 143 gt/PMH. Its productivity exceeded that of the high-capacity feller buncher for skid distances out to nearly 700 feet, so system productivity could be expected to remain high for stands of a size typical in the southern U.S. The Tigercat 630D skidder is a production machine for Tigercat and the large grapple can now be ordered by customers using it for small diameter trees. When the feller buncher and skidder are analyzed as a two-machine system, overall productivity is fixed at the level of the least productive machine. Results from a set of side-by-side tests in the same density stand with conventional feller bunchers and skidders showed that the high tonnage system produced 97 gt/PMH versus 68 gt/PMH for a comparable conventional system. Machine rate costs for felling and skidding were $2.31/gt and $3.72/gt for the high tonnage, and conventional systems, respectively. However, the most significant result of the project is that the high tonnage system was shown to be relatively insensitive to tree size. This ability to maintain felling and skidding productivity and cost as tree size decreases is a breakthrough in harvesting systems for southern pine plantations. The concept of transpirational drying of woody biomass was tested at an industrial scale at multiple locations during this project. Felled trees were allowed to dry in two scenarios: 1) in bunches where they were felled, and 2) in roadside piles. Although the wood piled in large piles at roadside did experience drying, the wood left in bunches experienced a greater moisture reduction. Drying times of 72 days in the late summer resulted in mean wood moisture content of 26% for skidder bunches and 39% for the large pile at roadside as compared to moisture contents of 55% to 58% for freshly cut trees. An existing whole-tree chipper, Precision 2675, was modified to allow production of chips smaller than the traditional pulp size chip (i.e. “microchips”). Feed rates and knife placements were retained in the new design, while additional pockets were incorporated in the chipper disk to allow the attachment of either four knives for pulp chips or eight knives for microchips. This design facilitated switching between the energy and pulp chip product options at relatively low expense (about ½ day downtime). Chipping of whole-trees into pulp chips and microchips with the Precision 2675 disk chipper resulted in average productivities of 79.5 gt/PMH and 70.7 gt/PMH, respectively. Production rates of the chipper were lower when producing microchips by about 10% relative to producing pulp chips, but rates were similar to those achievable when making clean pulp chips. Particle size analysis for clean pine microchips revealed 26.6% retention on a 13 mm (slightly less than 3/8-inch) round hole screen and 25.9% retention for whole-tree pine microchips. For comparison, clean pine pulp chips had 52.2% retained. Ash content (% dry basis) was 0.54% for clean pine microchips and 0.62% for whole-tree pine microchips. Ash content for clean pine pulp chips was 0.39%. For transpirationally-dried material there was 38.1% retention for whole-tree microchips on a 13mm screen compared to 70.1% for dried clean pulp chips. Ash content was 0.78% and 0.44% respectively for these two chip types. Clean pine microchips stored at roadside had 25.2% retention on a 13 mm screen and 0.50% ash content. For mixed species (pine and hardwood), whole-tree microchips had 25.1% retention on a 13 mm screen compared to 50.6% for whole-tree pulp chips. Ash content was 2.12% and 2.74% respectively for these two chip types. Clean hardwood microchips stored at roadside had 35.0% retention on a 13 mm screen and an ash content of 1.24%. There are two significant advantages to using transpirational drying: reduced transportation costs, and reduced drying costs (capital and operating costs) for the biorefinery. This project evaluated the potential to reduce transportation costs through transpirational drying, and it included a component that tested higher capacity chip trailers (23% larger volume) to be able to transport dry wood with a lower bulk density. For transpirationally-dried chips at 35% MC, the high-capacity trailers achieved loads with a mean payload of 24 tons with maximum payloads of 29 tons. The typical legal payload on this trailer is 28.5 tons. Therefore, the project demonstrated that it is possible to achieve maximum legal payloads on chip trailers with transpirationally dried wood. Assuming that the truck is loaded to the legal payload limit, the transportation costs of chips can be reduced from $15.91/dry ton (dt) for 56% MC wood to $10.77/dt for transpirationally dried wood at 35% MC (for an example 50-mile haul distance at $0.14 per one-way ton-mile). For longer haul distances, these savings in trucking costs become even more significant. These results have demonstrated how significant savings in transportation costs can be achieved through transpirational drying. Also, these results show that it may be possible to increase the procurement radius for a biorefinery by using transpirational drying. Further cost reductions can be realized by the biorefinery when drying costs are reduced. The goal of this study was development of a timber harvesting system as productive in stands optimized for biomass production as it was in stands grown for roundwood markets. If that goal is achieved, a logger can invest in a single suite of equipment and operate efficiently in any future silvicultural regime that might include energy feedstocks as an output. It was the premise of the study that a future biomass market would shift the age distribution and stem size in stands grown for energy downward, and the key strategy in developing a harvest system for that scenario would be creating one with logging costs relatively insensitive to tree size. Our vision for such a system included a felling machine with a large capacity head to minimize time spent building bunches, plus a skidder capable of moving large volumes of small trees. The study proposed building the system and testing it against existing equipment in stands similar to those envisioned as resulting from biomass-optimized silviculture. As stated previously, the new feller buncher and skidder evaluated on their own merits showed their designs were clearly a step in the right direction - their productivity was indeed high and less sensitive to reductions in stem size. Cost projections based on extensive time and production studies of the high tonnage and benchmark operations showed modest advantages in FOB costs of the new system in both ‘average’ and simulated ‘energy’ stands (7.7% and 9.5%, respectively). But it was clear, when coupled into a traditional logging system, the in-woods productivity advantage of the modified equipment was easily overwhelmed by inefficiencies in chipping or trucking. Some additional savings can be achieved by spreading the cost of the feller buncher over multiple chipping operations (another 7.5%), but generally, in stands with average DBH above 6 inches, the in-woods equipment was not limiting productivity, and costs were driven by chipping and transport. Our results were a positive step in lowering delivered cost of trees grown for energy purposes, but they also argue strongly for a more comprehensive approach in solving this issue. The procurement system in its entirety has to be optimized to take full advantage of the productivity gains achieved with the machines and transpirational drying techniques developed in this project. We have to understand the true costs of all logistical options, particularly those of the choice in chipping strategy and in truck allocation, both of which seemed, in this study, to be the greatest source of variability in cost, and often the most expensive operations as well.

09 BIOMASS FUELS↗

Foundational Report Series: Advanced Distribution Management Systems for Grid Modernization, Implementation Strategy for a Distribution Management System

Electric distribution utilities encounter many challenges to successful deployment of Distribution Management Systems (DMSs). The key challenges are documented in this report, along with suggestions for overcoming them. This report offers a recommended list of activities for implementing a DMS. It takes a strategic approach to implementing DMS from a project management perspective. The project management strategy covers DMS planning, procurement, design, building, testing, Installation, commissioning, and system integration issues and solutions. It identifies the risks that are associated with implementation and suggests strategies for utilities to use to mitigate them or avoid them altogether. Attention is given to common barriers to successful DMS implementation. This report begins with an overview of the implementation strategy for a DMS and proceeds to put forward a basic approach for procuring hardware and software for a DMS; designing the interfaces with external corporate computing systems such as EMS, GIS, OMS, and AMI; and implementing a complete solution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Report on the Installation and Preparedness of a Protochips Fusion in-situ Heating Holder for TEM

This brief report documents the procurement and installation of a Protochips Fusion (formerly Aduro) high-temperature, high stability transmission electron microscopy (TEM) specimen holder that allows for the high spatial resolution characterization of material specimens at high temperature in situ of an electron microscope. This specimen holder was specifically procured for use with The FEI Talos F200X Scanning/Transmission Electron Microscope (STEM) in Oak Ridge National Laboratory’s (ORNL’s) Low Activation Materials Development and Analysis (LAMDA) Laboratory. The Protochips Fusion holder will enable high-resolution structural and chemical analysis of irradiated materials at high temperature, becoming a unique capability worldwide, and would encourage high-quality in situ experiments to be conducted on irradiated materials.

47 OTHER INSTRUMENTATION↗

Policies for Enabling Corporate Sourcing of Renewable Energy Internationally: A 21st Century Power Partnership Report

This paper explores the policy and regulatory enabling environment for corporate sourcing of renewables. The paper has been developed in support of the Corporate Sourcing of Renewables Campaign, which was launched at the Clean Energy Ministerial (CEM) meeting in June 2016. Through the campaign, a subset of CEM member governments is collaborating with corporate and nongovernmental organization partners to facilitate increased corporate procurement of renewables and pursue supportive policies for corporate procurement. This paper finds that policy certainty is essential to creating vibrant markets for renewable energy. While policymakers may need to adjust policy mechanisms over time as markets go through different stages of maturity, they must also consider the economic decisions that end-users make in evaluating projects. Policy interaction is also important to consider because buyers seek assurances that their investments in renewables have impact and wish to make clear claims about their renewable energy purchases.

21st Century Power Partnership↗

U.S. Renewables Portfolio Standards: 2017 Annual Status Report

Berkeley Lab’s annual status report on U.S. renewables portfolio standards (RPS) provides an overview of key trends associated with U.S. state RPS policies. The report, published in slide-deck form, describes recent legislative revisions, key policy design features, compliance with interim targets, past and projected impacts on renewables development, and compliance costs. The 2017 edition of the report presents historical data through year-end 2016 and projections through 2030. Key trends from this edition of the report include the following: -Evolution of state RPS programs: Significant RPS-related policy revisions since the start of 2016 include increased RPS targets in DC, MD, MI, NY, RI, and OR; requirements for new wind and solar projects and other major reforms to the RPS procurement process in IL; and a new offshore wind carve-out and solar procurement program in MA. -Historical impacts on renewables development: Roughly half of all growth in U.S. renewable electricity (RE) generation and capacity since 2000 is associated with state RPS requirements. Nationally, the role of RPS policies has diminished over time, representing 44% of all U.S. RE capacity additions in 2016. However, within particular regions, RPS policies continue to play a central role in supporting RE growth, constituting 70-90% of 2016 RE capacity additions in the West, Mid-Atlantic, and Northeast. -Future RPS demand and incremental needs: Meeting RPS demand growth will require roughly a 50% increase in U.S. RE generation by 2030, equating to 55 GW of new RE capacity. To meet future RPS demand, total U.S. RE generation will need to reach 13% of electricity sales by 2030 (compared to 10% today), though other drivers will also continue to influence RE growth. -RPS target achievement to-date: States have generally met their interim RPS targets in recent years, with only a few exceptions reflecting unique state-specific policy designs. -REC pricing trends: Prices for renewable energy certificates (RECs) used to meet general RPS obligations fell in most markets in 2016, as surplus RPS supplies emerged in many regions. Price trends for solar RECs were more varied, with a particularly pronounced drop in MD. -RPS compliance costs and cost caps: RPS compliance costs totaled $3.0 billion in 2015 (the most-recent year for which relatively complete data are available), which equates to 1.6% of average retail electricity bills in RPS states. Though total U.S. RPS compliance costs rose from 2014, future cost growth in most RPS states will be capped by cost containment mechanisms.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Assessment of commercially available energy-efficient room air conditioners including models with low global warming potential (GWP) refrigerants

Improving the energy efficiency of room air conditioners (RACs) while transitioning to low global-warming-potential (GWP) refrigerants will be a critical step toward reducing the energy, peak load, and emissions impacts of RACs while keeping costs low. Previous research quantified the benefits of leapfrogging to high efficiency in tandem with the transition to low-GWP refrigerants for RACs (Shah et al., 2015) and identified opportunities for initial action to coordinate energy efficiency with refrigerant transition in economies constituting about 65% of the global RAC market (Shah et al., 2017). This report describes further research performed to identify the best-performing (i.e., most efficient and low-GWP-refrigerant using) RACs on the market, to support an understanding of the best available technology (BAT). Understanding BAT can help support market-transformation programs for high-efficiency and low-GWP equipment such as minimum energy performance standards (MEPS), labeling, procurement, and incentive programs. We studied RACs available in six economies—China, Europe, India, Japan, South Korea, and the United States—that together account for about 70% of global RAC demand, as well as other emerging economies. The following are our key findings: • Highly efficient RACs using low-GWP refrigerants, e.g., HFC-32 (R-32) and HC-290 (R-290), are commercially available today at prices comparable to similar RACs using high-GWP HCFC-22 (R-22) or HFC-410A (R-410A). • High efficiency is typically a feature of high-end products. However, highly efficient, cost-competitive (less than 1,000 or 1,500 U.S. dollars in retail price, depending on size) RACs are available. • Where R-22 is being phased out, high GWP R-410A still dominates RAC sales in most mature markets except Japan, where R-32 dominates. • In all of the economies studied except Japan, only a few models are energy efficient and use low-GWP refrigerants. For example, in Europe, India, and Indonesia, the highest-efficiency RAC models employ the low-GWP refrigerants R-32 or R-290. • RACs are available in most regions and worldwide that surpass the highest efficiency levels recognized by labeling programs. • Fixed-speed RACs using high-GWP and ozone-depleting R-22 refrigerant still dominate the market in many emerging economies. There is significant scope to improve RAC efficiency and transition to low-GWP refrigerants using commercially available technology and to design market-transformation programs for high-efficiency, low-GWP equipment including standards, labeling, procurement, and incentive programs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗