Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Path Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Relevant Studies for NERC’s Analysis of EPA's Clean Power Plan 111 (d) Compliance

The purpose of this paper is to describe multiple studies of wind and solar integration that have found CO 2 reductions of approximately 30%. These studies can be viewed in several ways, including as viable paths to compliance with the EPA rule, alternative ''bookend cases'' to compare to compliance based largely on natural gas, or something in between. The studies in this paper represent a body of work that can help inform the public discussion surrounding the cost and reliability impacts of complying with the proposed EPA CPP.

17 WIND ENERGY↗

Actinide Studies with Ultracold Neutrons [Slides]

First characterization of UCN-induced fission: • Previously no fission data at these energies • Initial characterizations of UCN energy dependence, material thickness. First observation of sputtering from UCN-induced fission: • Proof of principle demonstrated • Analysis of sputtered rates, angular and size distribution underway. Future plans: • Determine absolute cross sections • Develop scheme for characterizing ejected material • Explore effect of material thickness, surface preparation in more detail • Develop path forward for plutonium and other actinides.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Fermilab: A plan for discovery

This Plan for Discovery describes Fermilab’s long-term scientific strategy. It evolved from the report of the Fermilab Steering Group, convened in 2007 to obtain input from a broad spectrum of U.S. particle and accelerator physics communities and to prepare a report that would provide input to Fermilab, the Particle Physics Project Prioritization Panel, the High Energy Physics Advisory Panel and the funding agencies as they considered options for new particle accelerators and detectors in the United States. A number of key events have occurred in particle physics over the last four years, including the successful startup of the Large Hadron Collider, the extension of the timeline for the International Linear Collider, and the end of Tevatron operations. These events have guided Fermilab in its implementation of the recommendations of the Steering Group and have led to the development of this Plan for Discovery. The plan is designed to maintain the nation’s leadership in particle physics and keep the laboratory and the United States on the path to discovery at the frontiers of particle physics.

99 GENERAL AND MISCELLANEOUS↗

Advanced Reactor Technology -- Regulatory Technology Development Plan (RTDP)

This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advanced Reactor Technologies - Regulatory Technology Development Plan (RTDP)

This DOE-NE Advanced Small Modular Reactor (AdvSMR) regulatory technology development plan (RTDP) will link critical DOE nuclear reactor technology development programs to important regulatory and policy-related issues likely to impact a “critical path” for establishing a viable commercial AdvSMR presence in the domestic energy market. Accordingly, the regulatory considerations that are set forth in the AdvSMR RTDP will not be limited to any one particular type or subset of advanced reactor technology(s) but rather broadly consider potential regulatory approaches and the licensing implications that accompany all DOE-sponsored research and technology development activity that deal with commercial non-light water reactors. However, it is also important to remember that certain “minimum” levels of design and safety approach knowledge concerning these technology(s) must be defined and available to an extent that supports appropriate pre-licensing regulatory analysis within the RTDP. Final resolution to advanced reactor licensing issues is most often predicated on the detailed design information and specific safety approach as documented in a facility license application and submitted for licensing review. Because the AdvSMR RTDP is focused on identifying and assessing the potential regulatory implications of DOE-sponsored reactor technology research very early in the pre-license application development phase, the information necessary to support a comprehensive regulatory analysis of a new reactor technology, and the resolution of resulting issues, will generally not be available. As such, the regulatory considerations documented in the RTDP should be considered an initial “first step” in the licensing process which will continue until a license is issued to build and operate the said nuclear facility. Because a facility license application relies heavily on the data and information generated by technology development studies, the anticipated regulatory importance of key DOE reactor research initiatives should be assessed early in the technology development process. Quality assurance requirements supportive of later licensing activities must also be attached to important research activities to ensure resulting data is usable in that context. Early regulatory analysis and licensing approach planning thus provides a significant benefit to the formulation of research plans and also enables the planning and development of a compatible AdvSMR licensing framework, should significant modification be required.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Storage Innovations 2030: Mapping a Path to $0.05/kWh

This is a presentation, where the team updates industry and DOE on progress made in the Storage Innovations 2030 initiative. The team also presents updates to the methodology, plans for the future, and revised results.

25 - ENERGY STORAGE↗

Initial Process and Expected Outcomes for Preliminary Identification of Routes to Yucca Mountain, Nevada

The Department of Energy's (DOE's) Office of Civilian Radioactive Waste Management (OCRWM) is responsible for developing and implementing a safe, secure and efficient transportation system to ship spent nuclear fuel (SNF) and high-level radioactive waste (HLW) from commercial and DOE sites to the proposed Yucca Mountain repository. The Office of Logistics Management (OLM) within OCRWM has begun to work with stakeholders to identify preliminary national suites of highway and rail routes that could be used for future shipments OLM is striving to develop a planning-basis set of routes that will support long-lead time logistical analyses (i.e., five or more years before shipment). The results will represent a starting point for discussions between DOE and corridor jurisdictions, and for shipping arrangements between DOE and carriers. This fulfills a recommendation of the National Academy of Sciences report on SNF and HLW transportation that 'DOE should identify and make public its suite of preferred highway and rail routes for transporting spent fuel and high level waste to a federal repository as soon as practicable to support State, Tribal and local planning, especially for emergency responder preparedness'. OLM encourages and supports participation of program stakeholders in a process to identify suites of national routes. The principal objective is to identify preliminary suites of national routes that reflect responsible consideration of the interests of a broad cross-section of stakeholders. This will facilitate transportation planning activities to help meet program goals, including providing an advanced planning framework for State and Tribal authorities; supporting a pilot program for providing funding under Section 180(c) of the Nuclear Waste Policy Act; allowing sufficient time for security and operational reviews in advance of shipments to Yucca Mountain; and supporting utility planning and readiness for transportation operations. Concepts for routing and routing criteria have been considered by several state regional groups supported by cooperative agreements with OLM. OCRWM is also working with other Federal agencies, transportation service providers and others involved in the transportation industry to ensure the criteria are consistent with operating practices and regulations. These coordination efforts will ensure the experience, knowledge, and expertise of those involved are considered in the process to identify the preliminary national suites of routes. This paper describes the current process and timeline for preliminary identification and analyses of routes. In conclusion: The path toward developing a safe, secure, and efficient transportation system for shipments of SNF and HLW to Yucca Mountain will require the participation of many interested parties. Real cooperative planning is sometimes challenging, and requires a commitment from all involved parties to act in good faith and to employ their best efforts in developing mutually beneficial solutions. Identifying routes to the proposed repository at Yucca Mountain, and engaging in planning and preparedness activities with affected jurisdictions and other stakeholders, will take time. OCRWM is committed to a cooperative approach that will ultimately enhance safety, security, efficiency and public confidence. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 114: Area 25 EMAD Facility Nevada National Security Site, Nevada

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 114, Area 25 EMAD Facility, identified in the Federal Facility Agreement and Consent Order (FFACO). CAU 114 comprises the following corrective action sites (CASs) located in Area 25 of the Nevada National Security Site: • 25-41-03, EMAD Facility (Building 3900) • 25-99-23, Manned Control Car (MCC) and Engine Installation Vehicle (EIV) • 25-33-05, Building 3901, Engine Transport System Maintenance Building (Train Shed) This plan provides the methodology for field activities needed to gather the necessary information for closing CAU 114. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of CAU 114 using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective actions for CAU 114. It is anticipated that the results of the field investigation and implementation of corrective actions will support a defensible recommendation that no further corrective action is necessary. The purpose of the corrective action investigation will be to document and verify the adequacy of existing information; to affirm the decision for either clean closure, closure in place, or no further action; and to provide sufficient data to implement the corrective action. The actual corrective action selected will be based on characterization activities implemented under this SAFER Plan. If specific conditions or findings fall outside the bounds of the conceptual site model, such as an unanticipated release, the Nevada Division of Environmental Protection (NDEP) will be consulted to determine the path forward before proceeding. Upon completion of SAFER activities, a closure report (CR) will be prepared and submitted to NDEP for review and approval. The schedule for completion of the CR will be established in consultation with NDEP.

54 ENVIRONMENTAL SCIENCES↗

Thermal hydraulic analysis of the AFIP-7 irradiation test in the Advanced test Reactor – Model correlation and performance evaluation

We report as a system level code, RELAP5 is widely used in the nuclear field for the reactor hydraulic analysis. In the component/experimental level, it is frequently employed as well. This paper demonstrates that the RELAP5 flow simulation of the AFIP-7 irradiation experiment which has a complicated 3D geometry/flow path deviates by ~28% from the flow evaluation through a computational fluid dynamics (CFD) simulation, which has been validated against a flow test performed at Oregon State University. Thermal safety compliance analysis of an experiment planned to be irradiated in the Advanced Test Reactor is usually performed using the finite element analysis code, Abaqus. This research reveals the disadvantages of the Abaqus simulation in the flow instability and departure from nucleate boiling evaluations via a conjugate heat transfer analysis of the AFIP-7 irradiation experiment. As a result, a detailed CFD simulation is suggested for irradiation experiments with complicated flow paths, rather than a simplified RELAP5 simulation or hand calculations. The validated simulation approach will be integrated with the Boehmite correlations to investigate the oxide growth prediction on the fuel cladding in Part II of this research.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Future long-baseline neutrino oscillations: View from Europe

Since about a decade the european physics community interested in neutrino and neutrino-astrophysics develops a plan to conceive the next generation large underground neutrino observatory. Recently, the LAGUNA-LBNO collaboration made the outcome of the FP7 design study public which shows a clear path for the realization of such experiment. In this paper the LAGUNA and LAGUNA-LBNO Design studies, resulting in a proposal for the LBNO experiment, will be discussed. The author will focus on the long baseline neutrino oscillation search, especially on the potential to discover the neutrino mass ordering and the search for CP violation in the lepton sector.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Measurements of isocenter path characteristics of the gantry rotation axis with a smartphone application

Purpose: For stereotactic radiosurgery, the AAPM Report No. 54 [AAPM Task Group 42 (AAPM, 1995)] requires the overall stability of the isocenter (couch, gantry, and collimator) to be within a 1 mm radius. In reality, a rotating system has no rigid axis and thus no isocenter point which is fixed in space. As a consequence, the isocenter concept is reviewed here. It is the aim to develop a measurement method following the revised definitions. Methods: The mechanical isocenter is defined here by the point which rotates on the shortest path in the room coordinate system. The path is labeled as “isocenter path.” Its center of gravity is assumed to be the mechanical isocenter. Following this definition, an image-based and radiation-free measurement method was developed. Multiple marker pairs in a plane perpendicular to the assumed gantry rotation axis of a linear accelerator are imaged with a smartphone application from several rotation angles. Each marker pair represents an independent measuring system. The room coordinates of the isocenter path and the mechanical isocenter are calculated based on the marker coordinates. The presented measurement method is by this means strictly focused on the mechanical isocenter. Results: The measurement result is available virtually immediately following completion of measurement. When 12 independent measurement systems are evaluated, the standard deviations of the isocenter path points and mechanical isocenter coordinates are 0.02 and 0.002 mm, respectively. Conclusions: The measurement is highly accurate, time efficient, and simple to adapt. It is therefore suitable for regular checks of the mechanical isocenter characteristics of the gantry and collimator rotation axis. When the isocenter path is reproducible and its extent is in the range of the needed geometrical accuracy, it should be taken into account in the planning process. This is especially true for stereotactic treatments and radiosurgery.

60 APPLIED LIFE SCIENCES↗

SDSS-V Algorithms: Fast, Collision-free Trajectory Planning for Heavily Overlapping Robotic Fiber Positioners

Robotic fiber positioner (RFP) arrays are becoming heavily adopted in wide-field massively multiplexed spectroscopic survey instruments. RFP arrays decrease nightly operational overheads through rapid reconfiguration between fields and exposures. In comparison to similar instruments, SDSS-V has selected a very dense RFP packing scheme where any point in a field is typically accessible to three or more robots. This design provides flexibility in target assignment. However, the task of collisionless trajectory planning is especially challenging. We present two multiagent distributed control strategies that are highly efficient and computationally inexpensive for determining collision-free paths for RFPs in heavily overlapping workspaces. We demonstrate that a reconfiguration path between two arbitrary robot configurations can be efficiently found if a “folded” state, in which all robot arms are retracted and aligned in a lattice-like orientation, is inserted between the initial and final states. Although developed for SDSS-V, the approach we describe is generic and thus applicable to a wide range of RFP designs and layouts. Robotic fiber positioner technology continues to advance rapidly, and in the near future ultra-densely packed RFP designs may be feasible. Our algorithms are especially capable in routing paths in very crowded environments, where we see efficient results even in regimes significantly more crowded than the SDSS-V RFP design.

42 ENGINEERING↗

A Multi-Criteria Approach to Camera Motion Design for Volume Data Animation

We present an integrated camera motion design and path generation system for building volume data animations. Creating animations is an essential task in presenting complex scientific visualizations. Existing visualization systems use an established animation function based on keyframes selected by the user. This approach is limited in providing the optimal in-between views of the data. Alternatively, computer graphics and virtual reality camera motion planning is frequently focused on collision free movement in a virtual walkthrough. For semi-transparent, fuzzy, or blobby volume data the collision free objective becomes insufficient. Here, we provide a set of essential criteria focused on computing camera paths to establish effective animations of volume data. Our dynamic multi-criteria solver coupled with a force-directed routing algorithm enables rapid generation of camera paths. Once users review the resulting animation and evaluate the camera motion, they are able to determine how each criterion impacts path generation. In this paper, we demonstrate how incorporating this animation approach with an interactive volume visualization system reduces the effort in creating context-aware and coherent animations. This frees the user to focus on visualization tasks with the objective of gaining additional insight from the volume data.

42 ENGINEERING↗

SU-E-T-05: A 2D EPID Transit Dosimetry Model Based On An Empirical Quadratic Formalism

Purpose: To describe a 2D electronic portal imaging device (EPID) transit dosimetry model, based on an empirical quadratic formalism, that can predict either EPID or in-phantom dose distribution for comparisons with EPID captured image or treatment planning system (TPS) dose respectively. Methods: A quadratic equation can be used to relate the reduction in intensity of an exit beam to the equivalent path length of the attenuator. The calibration involved deriving coefficients from a set of dose planes measured for homogeneous phantoms with known thicknesses under reference conditions. In this study, calibration dose planes were measured with EPID and ionisation chamber (IC) in water for the same reference beam (6MV, 100mu, 20×20cm{sup 2}) and set of thicknesses (0–30cm). Since the same calibration conditions were used, the EPID and IC measurements can be related through the quadratic equation. Consequently, EPID transit dose can be predicted from TPS exported dose planes and in-phantom dose can be predicted using EPID distribution captured during treatment as an input. The model was tested with 4 open fields, 6 wedge fields, and 7 IMRT fields on homogeneous and heterogeneous phantoms. Comparisons were done using 2D absolute gamma (3%/3mm) and results were validated against measurements with a commercial 2D array device. Results: The gamma pass rates for comparisons between EPID measured and predicted ranged from 93.6% to 100.0% for all fields and phantoms tested. Results from this study agreed with 2D array measurements to within 3.1%. Meanwhile, comparisons in-phantom between TPS computed and predicted ranged from 91.6% to 100.0%. Validation with 2D array device was not possible for inphantom comparisons. Conclusion: A 2D EPID transit dosimetry model for treatment verification was described and proven to be accurate. The model has the advantage of being generic and allows comparisons at the EPID plane as well as multiple planes in-phantom.

60 APPLIED LIFE SCIENCES↗

Broad Scope Analysis of the MOX Fuel Fabrication Facility and Disposition of Plutonium

The Plutonium Management and Disposition Agreement (PMDA), signed into effect in 2000, between the United States and Russia, was made in a post-Cold War effort to dispose of military-useable material, a combined 68 metric tons of weapon-grade plutonium. The United States has been pursuing a disposition path through conversion to MOX fuel for use in current commercial nuclear reactors. The Savannah River Site’s (SRS) MOX Fuel Fabrication Facility (MFFF, the MOX facility) began construction in 2007 with intent to uphold the United States’ half of the agreement. In the FY2017 budget, the Obama administration proposed a termination of the MFFF after lack of sufficient funding to the project, which caused paralyzing delays and drastically inflated costs for completion. Prolonged construction, piled costs, and divergent policies between shifting administrations have resulted in turmoil between the United States and Russia, culminating with the proposed abandonment of the MOX disposition path and being used as a justification by Russia to withdraw from the agreement until the United States is able to identify a clear plan, fulfilling the requirements set forth by the PMDA. The leading expedient to replace MOX fuel is the dilute and dispose method, which leaves uncertainty for the SRS MFFF and places reliance on New Mexico’s Waste Isolation Pilot Plant (WIPP) to legally accommodate the additional and unaccounted waste. If the current capacity of WIPP proves insufficient, construction of a new repository for transuranic waste would only incur additional costs and regulatory burdens, along with extreme schedule delays. Future proposed adaptations of the SRS MFFF include pit production, which would require complex and costly alterations to be operational at the current site. Restrictions from Congress, such as mandating the proposed solution to abandoning MFFF must equal half of the costs required for completing the facility, have fueled severely underestimated quotations of these alternatives. The increasing pressure from both Russia and South Carolina government officials to make a decision could result in the pursuit of another doomed project, leaving the United States with even further sunk costs and strained international relations. This paper will summarize the involved history of the MFFF, explicate the recourses to salvage the facility for pit production, and provide postulation on the dilute and dispose method.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

SU-E-J-222: Feasibility Study of MRI-Only Proton Therapy Planning

Purpose: To assess the dosimetric equivalence of MRI based proton planning vs. single energy x-ray CT. Methods: 8 glioblastoma patients were imaged with CT and MRI after surgical resection. T1-weighted 3DMPRAGE was used to delineate the GTV, which was subsequently rigidly registered to the CT volume. A pseudoCT was generated from the aligned MRI by combining segmentation and atlas-based approaches. The spatial resolution both for pseudo- and real CT was 0.6×0.6×2.5mm. Three orthogonal proton beams were simulated on the pseudoCT. Two co-planar beams were set on the axial plane. The third one was planned parallel to the cranio-caudal (CC) direction. Each beam was set to cover the GTV at 98% of the nominal dose (18Gy). The proton plan was copied and transferred to the real CT, including aperture/compensator geometry. Dose comparison between pseudoCT and CT plan was performed beam-by-beam by quantifying the range shift of dose profile on each slice of the GTV. The GTV’s V{sub 98} was computed for the CT. Results: For beams in axial plane the median absolute value of the range shift was 0.3mm, with 0.9mm and 1.4mm as 95th percentile and maximum, respectively. Worst scenarios were found for the CC beam, where we measured 1.1mm (median), 2.7mm (95thpercentile) and 5mm (maximum). Regardless the direction, beams passing through the surgical site, where metal (Titanium MRI-compatible) staples were present, were mostly affected by range shift. GTV’s V{sub 98} for CT was not lower than 99.3%. Conclusion: The study showed the clinical feasibility of an MRI-alone proton plan. Advantages include the possibility to rely on better soft tissue contrast for target and organs at risk delineation without the need of further CT scan and image registration. Additional investigation is required in presence of metal implants along the beam path and to account for partial volume effects due to slice thickness.

60 APPLIED LIFE SCIENCES↗

A Framework to Assess Advanced Reactor Spent Fuel Management Facility Deployment

Previous planning and prioritization for LWR SNF management investigated the risks and uncertainties of deploying facilities such as consolidated interim storage [1, 2, 3, 4]. As part of that work, activities and milestones were collected into success precedence diagrams that charted a path to achieving facility deployment [1]. In that framework, activities are any research, development, design, or decision required to achieve an intermediate goal; milestones are activity endpoints and mark the completion of deliverables. Milestones can be thought of as achievements required to reach the final goal of facility deployment; activities are the means by which milestones are accomplished. In planning, activities and milestones are compiled into comprehensive flow charts that visualize the steps necessary for deployment. This framework has been used to quantify risks, timelines, and costs of deploying SNF management facilities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗