Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PNNL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

ROTOR: Research to Operations and Operations to Research

PNNL’s Research to Operations/Operations to Research (ROTOR) Program fosters a cybersecurity operations to researcher collaboration, identifying hard problems and challenges for cyber defenders and bringing researcher science disciplines to these challenges. ROTOR allows PNNL’s cyber defenders to better protect the laboratory but also fosters innovation and incubation of solutions for our sponsor missions across DOE, DOD, DHS and the intelligence community. Our sponsors and their missions are faced with many of the same cyber defense challenges that PNNL faces. By using our own laboratory security operations environment as an innovation generator and testing ground, allowing research to be tested and tried, our sponsors are directly benefitted. PNNL is in a unique position to combine our world class research organization with enterprise cybersecurity operations. ROTOR is taking advantage of this to bring PNNL cybersecurity research projects into an operational environment within PNNL’s Cyber Security Operations Center. With ROTOR, PNNL researchers gain the advantage of operational experience and expertise and have an avenue for showcasing research in an operational environment. This helps to advance PNNL research, prove operability of PNNL projects to its sponsors, and provide real-world insight to real-world problems for our cybersecurity research agenda. ROTOR is the conduit for PNNL cybersecurity research to find its way to operational use. PNNL researchers and engineers are informed by real-world operations and operations has access to current PNNL research and engineering capabilities. All of this leads to improved reputation for PNNL as a provider of national security solutions that are tried and tested. To date, ROTOR has collaborated with six projects, enabling each to conduct operational work within the CSOC.

97 MATHEMATICS AND COMPUTING↗

Metering Plan: Intelligent Operational Strategies Through Enhanced Metering Systems

The Sustainability Program at Pacific Northwest National Laboratory (PNNL) has adopted a “triple-bottom-line” approach of environmental stewardship, social responsibility, and economic prosperity to its operations. Metering at PNNL works in support of all three, specifically to measure and inform building energy use and greenhouse gas emissions and minimize water use. The foundation for metering at PNNL is a core goal set, which consists of four objectives: providing accurate data without interruption, analyzing data while it is still new, providing actionable recommendations to operations management, and ensuring PNNL’s compliance with contract metering requirements. These core objectives guide the decisions that we make during annual planning and as we operate throughout the year. This 2016 edition of the Metering Plan conveys the metering practices for and vision of the Sustainability Program. Changes in this plan from the 2015 edition include updated tables and an enhanced discussion on energy tracking systems used at PNNL. This plan also discusses updated benchmarking strategies using PNNL’s graphics and analytics tool, BuildingOS by Lucid Design Group. This plan presents our progress toward the metering goals shared by all federal agencies and highlights our successful completion of metering requirements. Currently, PNNL is fully compliant with the applicable legislative and Executive Order metering requirements. PNNL’s approach to the installation of new meters will be discussed. Perhaps most importantly, this plan details the analysis techniques utilized at PNNL that rely on the endless streams of data newly available as a result of increased meter deployment over the last several years. Previous Metering Plans have documented specific meter connection schemes as PNNL focused on deploying meters in a first step toward managing energy and water use. This plan serves not only to highlight PNNL’s successful completion of agency metering goals, but also can be used as a guideline for meter installation and data analysis.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Pacific Northwest National Laboratory Facility Radionuclide Emission Points and Sampling Systems

Battelle–Pacific Northwest Division operates numerous research and development laboratories in Washington State. The U.S. Department of Energy (DOE) contracts to Battelle at Richland facilities on both the DOE Hanford Site and the Pacific Northwest National Laboratory (PNNL) Richland campus. These facilities have the potential for radionuclide air emissions. The PNNL contract with DOE also includes operations at the PNNL-Sequim campus in Sequim, where there is also the potential for radionuclide air emissions. This document is a periodic update that describes current PNNL facility emission units and sampling systems. The National Emission Standard for Hazardous Air Pollutants (NESHAP [40 Code of Federal Regulations 61, Subpart H]) requires an assessment of all emission units that have the potential for radionuclide air emissions. Emission units are registered with the State of Washington. Potential emissions from emission units are assessed annually by PNNL staff. Sampling, monitoring, and other regulatory compliance requirements are designated based on the potential to-emit dose criteria, a graded approach to facility-identified potential impact categories, and regulatory requirements. The purpose of this document is to describe the facility radionuclide air emission sampling program and provide current and historical facility emission unit system performance, operation, and design information. For sampled emission units, the building, exhaust unit, control technologies, and sample extraction details are provided. Additionally, applicable configuration drawings, figures, and photographs are included. For non-sampled emission units, emission estimation and radionuclide source details are provided. Site-wide permits for the lowest potential impact category are described. Deregistered/transitioned emission unit details are also provided as necessary for at least 5 years post-closure/transition. Currently, five emission units are sampled continuously for particulate radionuclides at PNNL managed facilities on the PNNL-Richland campus (3 of the 5) and on the Hanford Site (2 of the 5). Four of these units have sampling systems that comply with the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1–2011 standard for sampling from stacks and ducts of nuclear facilities, and the fifth is grandfathered and compliant with the older ANSI N13.1–1969 standard. In addition, the PNNL-managed Hanford Site 325 Building EP 325-01-S stack is sampled continuously for emissions of tritium. No emissions sampling is required for the single licensed emission unit on the PNNL-Sequim campus.

54 ENVIRONMENTAL SCIENCES↗

FY07 Final Report for Calibration Systems

Remote infrared (IR) sensing provides a valuable method for detection and identification of materials associated with nuclear proliferation. Current challenges for remote sensors include minimizing the size, mass, and power requirements for cheaper, smaller, and more deployable instruments without affecting the measurement performance. One area that is often overlooked is sensor calibration design that is optimized to minimize the cost, size, weight, and power of the payload. Yet, an on-board calibration system is essential to account for changes in the detector response once the instrument has been removed from the laboratory. The Calibration Systems project at Pacific Northwest National Laboratory (PNNL) is aimed towards developing and demonstrating compact quantum cascade (QC) laser-based calibration systems for infrared sensor systems in order to provide both a spectral and radiometric calibration while minimizing the impact on the instrument payload. In FY05, PNNL demonstrated a multi-level radiance scheme that provides six radiance levels for an enhanced linearity check compared to the currently accepted two-point scheme. PNNL began testing the repeatability of this scheme using a cryogenically cooled, single-mode quantum cascade laser (QCL). A cyclic variation in the power was observed that was attributed to the thermal cycling of the laser's dewar. In FY06, PNNL continued testing this scheme and installed an auxiliary liquid nitrogen reservoir to limit the thermal cycling effects. Although better repeatability was achieved over a longer time period, power fluctuations were still observed due to the thermal cycling. Due to the limitations with the cryogenic system, PNNL began testing Fabry-Perot QCLs that operate continuous-wave (cw) or quasi-cw at room temperature (RT) in FY06. PNNL demonstrated a multi-level scheme that provides five radiance levels in 105 seconds with excellent repeatability. We have continued testing this repeatability in FY07. A burn-in effect appears in which the power increases over a certain time period. Repeatability better than 1%, however, is demonstrated for most of the radiance levels after this initial burn-in. In FY06, PNNL also began investigating a fiber-coupled RT QCL for a compact IR calibration source. PNNL demonstrated a uniform beam profile by measuring a time-averaged response and modulating the fiber optic with a motor to minimize the effects of speckle. In FY07, PNNL examined the power stability of fiber-coupled QCLs. Feedback appears to degrade the stability so that anti-reflective coatings for fibers may be essential. In FY07, PNNL continued to investigate the stability of room temperature QCLs as well as the measurement technique to provide a quantitative estimate for the measurement uncertainty. We designed and built a custom environmental enclosure to reduce the measurement uncertainty. After an initial burn-in, we have achieved uncertainties better than 0.1% for data collected over almost 100 hours of operation. We also built a bench-top system to demonstrate how the QC laser can be used to calibrate a microbolometer array and illustrated the importance of a multi-point calibration.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Economic Impact of Pacific Northwest National Laboratory on the State of Washington in Fiscal Year 2013

Pacific Northwest National Laboratory (PNNL) is a large economic entity, with $1.06 billion in annual funding, $936 million in total spending, and 4,344 employees in fiscal year (FY) 2013. Four thousand, one hundred and one (4,101) employees live in Washington State. The Laboratory directly and indirectly supports almost $1.31 billion in economic output, 6,802 jobs, and $514 million in Washington State wage income from current operations. The state also gains more than $1.21 billion in output, more than 6,400 jobs, and $459 million in income through closely related economic activities, such as visitors, health care spending, spending by resident retirees, and spinoff companies. PNNL affects Washington’s economy through commonly recognized economic channels, including spending on payrolls and other goods and services that support Laboratory operations. Less-commonly recognized channels also have their own impacts and include company-supported spending on health care for its staff members and retirees, spending of its resident retirees, Laboratory visitor spending, and the economic activities in a growing constellation of “spinoff” companies founded on PNNL research, technology, and managerial expertise. PNNL also has a significant impact on science and technology education and community nonprofit organizations. PNNL is an active participant in the future scientific enterprise in Washington with the state’s K-12 schools, colleges, and universities. The Laboratory sends staff members to the classroom and brings hundreds of students to the PNNL campus to help train the next generation of scientists, engineers, mathematicians, and technicians. This investment in human capital, though difficult to measure in terms of current dollars of economic output, is among the important lasting legacies of the Laboratory. Finally, PNNL contributes to the local community with millions of dollars’ worth of cash and in-kind corporate and staff contributions, all of which strengthen the economy. This report quantifies these effects, providing detailed information on PNNL’s revenues and expenditures, as well as the impacts of its activities on the rest of the Washington State economy. This report also describes the impacts of the four closely related activities: health care spending, spinoff companies with roots in PNNL, visitors to the Laboratory, and PNNL retirees.

99 GENERAL AND MISCELLANEOUS↗

Electrochemical Acid Sequestration to Ease Ocean Acidification (EASE-OA) - CRADA 600 (Abstract)

The PNNL team will coordinate logistics involved with setting up the field trial on the PNNL Sequim campus in collaboration with Ebb Carbon. Facilities on the PNNL Sequim campus are capable of pumping raw or filtered seawater from Sequim Bay at a rate ~45,000 L hr -1 , which can accommodate the 4000 L hr -1 requirement of the 200 ton CO2 yr-1 Ebb Carbon marine carbon dioxide removal (mCDR) system. The primary tasks for the PNNL team are 1) laying out appropriate indoor and outdoor spaces for installing the Ebb Carbon’s mCDR system, 2) facilitating Ebb Carbon’s access to the PNNL’s seawater intake on the PNNL Sequim campus, 3) conducting mesocosm experiments within the PNNL Sequim campus laboratories to test how the brine and base discharged from the Ebb Carbon system affect marine life, and 4) facilitating Ebb Carbon access to the PNNL Sequim installation site and aiding in maintenance as needed. In addition to these tasks, the PNNL team will provide surface water quality data (e.g., salinity, temperature, pH, dissolved O2) from a monitoring station located on the pier to contextualize starting conditions of the seawater used in the mCDR process. Finally, the PNNL team will also consult with Ebb Carbon on strategies for improving overall system performance and next steps for further scaling and/or monitoring the effectiveness of the mCDR system.

54 ENVIRONMENTAL SCIENCES↗

Building Diagnostic Market Deployment (Final Report)

Operational faults are pervasive across the commercial buildings sector, wasting energy and increasing energy costs by up to about 30% (Mills 2009, Liu et al. 2003, Claridge et al. 2000, Katipamula and Brambley 2008, and Brambley and Katipamula 2009). Automated fault detection and diagnostic (AFDD) tools provide capabilities essential for detecting and correcting these problems and eliminating the associated energy waste and costs. The U.S. Department of Energy's (DOE) Building Technology Program (BTP) has previously invested in developing and testing of such diagnostic tools for whole-building (and major system) energy use, air handlers, chillers, cooling towers, chilled-water distribution systems, and boilers. These diagnostic processes can be used to make the commercial buildings more energy efficient. The work described in this report was done as part of a Cooperative Research and Development Agreement (CRADA) between the U.S. Department of Energy's Pacific Northwest National Laboratory (PNNL) and KGS Building LLC (KGS). PNNL and KGS both believe that the widespread adoption of AFDD tools will result in significant reduction to energy and peak energy consumption. The report provides an introduction and summary of the various tasks performed under the CRADA. The CRADA project had three major focus areas: (1) Technical Assistance for Whole Building Energy Diagnostician (WBE) Commercialization, (2) Market Transfer of the Outdoor Air/Economizer Diagnostician (OAE), and (3) Development and Deployment of Automated Diagnostics to Improve Large Commercial Building Operations. PNNL has previously developed two diagnostic tools: (1) whole building energy (WBE) diagnostician and (2) outdoor air/economizer (OAE) diagnostician. WBE diagnostician is currently licensed non-exclusively to one company. As part of this CRADA, PNNL developed implementation documentation and provided technical support to KGS to implement the tool into their software suite, Clockworks. PNNL also provided validation data sets and the WBE software tool to validate the KGS implementation. OAE diagnostician automatically detects and diagnoses problems with outdoor air ventilation and economizer operation for air handling units (AHUs) in commercial buildings using data available from building automation systems (BASs). As part of this CRADA, PNNL developed implementation documentation and provided technical support to KGS to implement the tool into their software suite. PNNL also provided validation data sets and the OAE software tool to validate the KGS implementation. Finally, as part of this CRADA project, PNNL developed new processes to automate parts of the re-tuning process and transfer those process to KGS for integration into their software product. The transfer of DOE-funded technologies will transform the commercial buildings sector by making buildings more energy efficient and also reducing the carbon footprint from the buildings. As part of the CRADA with PNNL, KGS implemented the whole building energy diagnostician, a portion of outdoor air economizer diagnostician and a number of measures that automate the identification of re-tuning measures.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - Second FY 2015 Quarterly Report

During the second quarter of FY 2015, the following technical progress has been made toward project milestones: 1) Autodesk reviewed 3D fiber orientation distribution (FOD) comparisons and provided support on improving accuracy. 2) Autodesk reviewed fiber length distribution (FLD) data comparisons and provided suggestions, assisted PNNL in FOD and FLD parameter settings optimization, and advised PNNL on appropriate through thickness thermal conductivity for improved frozen layer effect on FOD predictions. Autodesk also participated in project review meetings including preparations and discussions towards passing the go/no-go decision point. 3) Autodesk implemented an improved FOD inlet profile specification method through the part thickness for 3D meshes and provided an updated ASMI research version to PNNL. 4) The University of Illinois (Prof. C.L. Tucker) provided Autodesk with ideas to improve fiber orientation modeling 5) Purdue University re-measured fiber orientation for the fast-fill 50wt% LCF/PA66 edge-gated plaque, and delivered the fiber orientation data for this plaque at the selected locations (named A, B, and C, Figure 1) to PNNL. Purdue also re-measured fiber orientation for locations A on the fast-fill 30wt% LCF/PP and 50wt% LCF/PA66 center-gated plaques, which exhibited anomalous fiber orientation behavior. 6) Purdue University conducted fiber length measurements and delivered the length data to PNNL for the purge materials (slow-fill 30wt% LCF/PP and 30wt% LCF/PA66 purge materials) and PlastiComp plaques selected on the go/no-go list for fiber length model validation (i.e., slow-fill edge-gated 30wt% LCF/PP and 30wt% LCF/PA66 plaques, Locations A, B, and C). 7) PNNL developed a method to recover intact carbon fibers from LCF/PA66 materials. Isolated fibers were shipped to Purdue for length distribution analysis. 8) PNNL completed ASMI mid-plane analyses for all the PlastiComp plaques defined on the go/no-go list for fiber orientation (FO) model validation and compared the predicted fiber orientations with the measured data provided by Purdue at Locations A, B, and C on these plaques. The 15% accuracy criterion based on evaluation of tensile and bending stiffness was used to assess the accuracy in fiber orientation predictions. 9) PNNL completed ASMI mid-plane analyses for all the PlastiComp plaques defined on the go/no-go list for fiber length distribution (FLD) model validation and compared the predicted length distributions with the measured data provided by Purdue at Locations A, B, and C on these plaques. The 15% accuracy criterion based on evaluation of tensile and bending stiffness was used to assess the accuracy in fiber orientation predictions. 10) PNNL tested the new ASMI version received from Autodesk in March 2015, examined and discussed 3D fiber orientation predictions for PlastiComp plaques. 11) PlastiComp, Inc. (PlastiComp), Toyota Research Institute North America (Toyota) and Magna Exteriors and Interiors Corporation (Magna) participated in discussions with team members on the go/no-go plan. Toyota continued the discussion with Magna on tool modification for molding the complex part in order to achieve the target fiber length in the part.

42 ENGINEERING↗

Sequim Campus Master Plan

Based in Richland, Washington, Pacific Northwest National Laboratory (PNNL) is one of ten U.S. Department of Energy (DOE) Office of Science (SC) national laboratories. PNNL is DOE’s premier chemistry, earth sciences, and data analytics laboratory, delivering vital mission impacts in energy resiliency and national security. PNNL has 19 core capabilities, each a powerful combination of world-class staff, state-of-the- art equipment, and mission-ready facilities. These capabilities represent a collective set of skills and a body of world-leading scientific and engineering work that provides exceptional value and mission delivery to DOE, the National Nuclear Security Administration (NNSA), the U.S. Department of Homeland Security (DHS), and other federal agencies and industry through strategic partnership projects on a not-to-interfere basis. Currently operated by Battelle Memorial Institute, PNNL occupies more than 2.3 million gross square feet (GSF) of buildings and employs approximately 4,700 staff members. PNNL has implemented a rolling 10-year campus strategy, initiated in fiscal year 2013, designed to deliver the foundation for the multidisciplinary science and engineering expertise, equipment, instrumentation, facilities, and infrastructure required to continue providing exceptional value and mission delivery. This strategy is incorporated into PNNL’s annual Laboratory Plan, which serves as DOE-SC’s equivalent of the Five- Year Site Plan required by DOE Order 430.1C Chg. 1, Real Property Asset Management. The PNNL Sequim Campus is located in Clallam County, just outside of Sequim, Washington. PNNL Sequim builds upon a rich history of research related to marine and coastal resources, environmental chemistry, water resources modeling, ecotoxicology, biotechnology, and national security. Facilities at the PNNL Sequim Campus were designed to take advantage of two unique locational assets: the pristine coastal ocean water in Sequim Bay and the region’s exceptionally clean air. Research facilities on the waterfront are supplied with up to 200 gallons per minute (gpm) of seawater and/or groundwater that enables research on aquatic systems ranging from fully seawater to fresh water, with an onsite water treatment system that removes all biological and hazardous chemical residues prior to discharge. Multiple large seawater tanks outside the waterfront laboratories, along with a boat ramp, pier, and floating dock, enable lab-to-field research. The uplands facility takes advantage of the amazing air quality and is built and operated to enable ultratrace chemical/radiological analytical chemistry. This combination of capabilities is not available at any other marine laboratory in the nation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

NA-42 TI Shared Software Component Library FY2011 Final Report

The NA-42 TI program initiated an effort in FY2010 to standardize its software development efforts with the long term goal of migrating toward a software management approach that will allow for the sharing and reuse of code developed within the TI program, improve integration, ensure a level of software documentation, and reduce development costs. The Pacific Northwest National Laboratory (PNNL) has been tasked with two activities that support this mission. PNNL has been tasked with the identification, selection, and implementation of a Shared Software Component Library. The intent of the library is to provide a common repository that is accessible by all authorized NA-42 software development teams. The repository facilitates software reuse through a searchable and easy to use web based interface. As software is submitted to the repository, the component registration process captures meta-data and provides version control for compiled libraries, documentation, and source code. This meta-data is then available for retrieval and review as part of library search results. In FY2010, PNNL and staff from the Remote Sensing Laboratory (RSL) teamed up to develop a software application with the goal of replacing the aging Aerial Measuring System (AMS). The application under development includes an Advanced Visualization and Integration of Data (AVID) framework and associated AMS modules. Throughout development, PNNL and RSL have utilized a common AMS code repository for collaborative code development. The AMS repository is hosted by PNNL, is restricted to the project development team, is accessed via two different geographic locations and continues to be used. The knowledge gained from the collaboration and hosting of this repository in conjunction with PNNL software development and systems engineering capabilities were used in the selection of a package to be used in the implementation of the software component library on behalf of NA-42 TI. The second task managed by PNNL is the development and continued maintenance of the NA-42 TI Software Development Questionnaire. This questionnaire is intended to help software development teams working under NA-42 TI in documenting their development activities. When sufficiently completed, the questionnaire illustrates that the software development activities recorded incorporate significant aspects of the software engineering lifecycle. The questionnaire template is updated as comments are received from NA-42 and/or its development teams and revised versions distributed to those using the questionnaire. PNNL also maintains a list of questionnaire recipients. The blank questionnaire template, the AVID and AMS software being developed, and the completed AVID AMS specific questionnaire are being used as the initial content to be established in the TI Component Library. This report summarizes the approach taken to identify requirements, search for and evaluate technologies, and the approach taken for installation of the software needed to host the component library. Additionally, it defines the process by which users request access for the contribution and retrieval of library content.

99 GENERAL AND MISCELLANEOUS↗

2010 Ecological Survey of the Pacific Northwest National Laboratory Site

The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL Site comply with applicable laws, policies, and DOE orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL Site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL Site is described in Larson and Downs (2009). There are currently two facilities on the PNNL Site: the William R. Wiley Environmental Molecular Sciences Laboratory (EMSL), and the recently completed Physical Sciences Facility (PSF). This report describes the results of the annual survey of the biological resources found on the undeveloped portions of the PNNL Site in 2010. A brief description of the methods PNNL ecologists used to conduct the surveys and the results of the surveys are presented. Actions taken to fully delineate noxious weed populations discovered in 2009 and efforts in 2010 to control those weeds also are described. Appendix A provides a list of plant and animal species identified on the PNNL Site.

54 ENVIRONMENTAL SCIENCES↗

2011 Annual Ecological Survey: Pacific Northwest National Laboratory Site

The U.S. Department of Energy (DOE) Pacific Northwest Site Office (PNSO) oversees and manages the DOE contract for the Pacific Northwest National Laboratory (PNNL), a DOE Office of Science multi-program laboratory located in Richland, Washington. PNSO is responsible for ensuring that all activities conducted on the PNNL site comply with applicable laws, policies, and DOE Orders. The DOE Pacific Northwest Site Office Cultural and Biological Resources Management Plan (DOE/PNSO 2008) addresses the requirement for annual surveys and monitoring for species of concern and to identify and map invasive species. In addition to the requirement for an annual survey, proposed project activities must be reviewed to assess any potential environmental consequences of conducting the project. The assessment process requires a thorough understanding of the resources present, the potential impacts of a proposed action to those resources, and the ultimate consequences of those actions. The PNNL site is situated on the southeastern corner of the DOE Hanford Site, located at the north end of the city of Richland in south-central Washington. The site is bordered on the east by the Columbia River, on the west by Stevens Drive, and on the north by the Hanford Site 300 Area (Figure 1). The environmental setting of the PNNL site is described in Larson and Downs (2009). There are currently two facilities on the PNNL site: the William R. Wiley Environmental Molecular Sciences Laboratory and the Physical Sciences Facility. This report describes the annual survey of biological resources found on the undeveloped upland portions of the PNNL site. The annual survey is comprised of a series of individual field surveys conducted on various days in late May and throughout June 2011. A brief description of the methods PNNL ecologists used to conduct the baseline surveys and a summary of the results of the surveys are presented. Appendix A provides a list of plant and animal species identified in the upland areas of the PNNL site in 2011. Efforts in 2011 to control noxious weed populations (comprising plant species designated as Class B noxious weeds by the Washington State Noxious Weed Control Board) discovered in 2009 and initially treated with herbicides in 2010 are described in Appendix B.

54 ENVIRONMENTAL SCIENCES↗

Economic Impact of Pacific Northwest National Laboratory on the State of Washington in Fiscal Year 2014

PNNL is a large economic entity with a total of 4,308 employees, $939 million (M) in total funding, and $1.02 billion (B) in total spending during FY 2014. The number of employees that live in Washington State is 4,026 or 93 percent of the Laboratory staff. he Laboratory directly and indirectly supported $1.45 billion in economic output, 6,832 jobs, and $517 million in Washington State wage income from current operations. The state also gained more than $1.19 billion in output, over 6,200 jobs, and $444 million in income through closely related economic activities such as visitors, health care spending, spending by resident retirees, and spinoff companies. PNNL affects Washington’s economy through commonly recognized economic channels, including spending on payrolls and other goods and services that support Laboratory operations. Less commonly recognized channels also have their own impacts and include company-supported spending on health care for its staff members and retirees, spending of its resident retirees, Laboratory visitor spending, and the economic activities in a growing constellation of “spinoff” companies founded on PNNL research, technology, and managerial expertise. PNNL also has a significant impact on science and technology education and community not-for-profit organizations. PNNL is an active participant in the future scientific enterprise in Washington with the state’s K-12 schools, colleges, and universities. The Laboratory sends staff members to the classroom and brings hundreds of students to the PNNL campus to help train the next generation of scientists, engineers, mathematicians, and technicians. This investment in human capital, though difficult to measure in terms of current dollars of economic output, is among the important lasting legacies of the Laboratory. Finally, PNNL contributes to the local community with millions of dollars’ worth of cash and in-kind corporate and staff contributions, all of which strengthen the economy. The purpose of this report is to quantify these effects, providing detailed information on PNNL’s revenues and expenditures, as well as the impacts of its activities on the rest of the Washington State economy.

99 GENERAL AND MISCELLANEOUS↗

Extended Bandwidth Spread Spectrum Time Domain Reflectometry Cable Test for Thermal Aging, Low Resistance Fault, and Water Detection

In 2022, researchers at Pacific Northwest National Laboratory (PNNL) used the Accelerated and Real-Time Environmental Nodal Assessment (ARENA) cable and motor test bed to characterize spread spectrum time domain reflectometry (SSTDR) and compare the responses of an SSTDR instrument to those of a frequency domain reflectometry (FDR) instrument. Results showed both techniques could detect and locate cable anomalies such as phase-to-phase low resistance and shorts, thermal insulation damage, mechanical insulation damage, and the presence or absence of water in some conditions. The SSTDR tests used a commercial instrument provided by LiveWire Innovations Inc. This commercial instrument performed tests at 6, 12, 24, and 48 MHz bandwidth. The results of these tests were compared to FDR tests where bandwidths could be extended up to 1.3 GHz, although the best responses for cable tests were from 100 to 500 MHz. Lower bandwidth signals can propagate better along the cable while higher bandwidths have higher resolution for impedance change reflections allowing more precise indication of location and separation of anomalies. The 2022 research found that FDR responses were clearer than SSTDR and speculated that a higher bandwidth SSTDR could more successfully detect and locate cable anomalies. One advantage of the SSTDR system investigated was that it was designed for energized online use up to 1,000 volts, which may be a significant advantage for nuclear power plant use. The LiveWire SSTDR instrument is an established product in the rail and aircraft industry and updating the SSTDR hardware parameters is difficult to justify without more conclusive testing. Therefore, a software adjustable laboratory SSTDR instrument was developed by PNNL and was used to test extended bandwidth SSTDR cable tests. Within the ARENA test bed, 42 cable conditions were tested with the PNNL SSTDR, FDR, and the LiveWire SSTDR—each operating at four different bandwidths. Observations and conclusions regarding the relative performance of the three instruments over different bandwidths are note below. Responses of the PNNL SSTDR (at 50 MHz) and the LiveWire SSTDR (at 48 MHz) were similar. The PNNL SSTDR higher frequency bandwidths behaved as expected showing sharper peaks and higher noise. This validated the PNNL SSTDR as a reasonable implementation of the SSTDR technology. Lower bandwidth SSTDR responses (particularly 6 and 12 MHz) may have increased value for use within longer cables but were not particularly effective at identifying anomalous cable behavior in the 100 ft cables tested here. The higher bandwidths of the PNNL SSTDR (50, 100, 200, and 400 MHz) did not provide substantially clearer cable reflectometry responses, but having the higher frequency responses available did add to the cable test evaluation. Strong responses to shorts and low impedance faults between phases were particularly evident in the higher bandwidth PNNL SSTDR and the FDR data. Measurements were repeatable, with similar responses obtained from a thermally aged cable for tests taken a month apart. Signal noise was affected in the unshielded cable by the local in-tray cable arrangement including proximity to metal edges and rungs of the cable tray. Foam isolation of the cable from the tray metal reduced in both FDR and SSTDR responses. Cable condition monitoring in nuclear power plants will likely benefit from both more informative off-line testing methods and from the development of on-line methods for continuous monitoring of cables in use. The LWRS-funded ARENA test bed was a valuable resource for this development and direct comparison of nuclear electrical cable condition monitoring technologies. Test results are targeted to guide industry advancement of testing and monitoring tools for cable aging management.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Agilent CRADA (Abstract)

The CRADA between Agilent Technologies Inc. and Battelle will focus on five software components as listed below: Prototype 4D Feature Finding functionality with a particular focus on recovering low level features and extending the bottom end dynamic range of IM-MS technology. Compare and contrast developments to current 4D Feature Finding capabilities. Highlight important algorithmic aspects employed. Implement the PNNL saturation correction algorithm. Agilent will give PNNL the needed data file access API and assistance in understanding it implementation and any needed instrumental aspects. Supported high resolution products to include Agilent’s TOF, QTOF and IM-QTOF mass spectrometers. PNNL will then work with Agilent to benchmark performance. Implementation of the PNNL Hadamard de-multiplexing algorithm. Agilent will give provide PNNL the needed date file access API access and as needed assistance in understanding the current Agilent multiplexed IM offering. PNNL will then work with Agilent on benchmark performance. Add ion mobility collision cross sections to existing and new metabolomic libraries for data analysis with Agilent’s informatics program MPP/ID Browser. PNNL will work with Agilent to create a software pipeline that takes data from chemical and metabolic standards and properly formats it for inclusion in MPP accessible libraries, using the collision cross section as a new separation dimension. Improvements of MPP multidimensional matching to identify metabolomic features using multiple characteristics beyond retention time and accurate mass. Most significantly matching will include analyte collision cross section with proposed support for sample fraction or RapidFire cartridge and fragmentation spectra. PNNL will work with Agilent to modify and improve the current MPP analysis pipeline to allow for creating, aligning, and identifying MS features defined by accurate mass, collision cross section and chromatographic retention time. As additional criteria such as fraction or RapidFire cartridge type are supported in the identification process, then they also will become part of the automation workflow. This includes the automation of said system to work with command line program (i.e. not a GUI) sufficient for programmatic execution in a pipeline.

97 MATHEMATICS AND COMPUTING↗

Lead Slowing-Down Spectrometry Time Spectral Analysis for Spent Fuel Assay: FY11 Status Report

Developing a method for the accurate, direct, and independent assay of the fissile isotopes in bulk materials (such as used fuel) from next-generation domestic nuclear fuel cycles is a goal of the Office of Nuclear Energy, Fuel Cycle R&D, Material Protection and Control Technology (MPACT) Campaign. To meet this goal, MPACT supports a multi-institutional collaboration, of which PNNL is a part, to study the feasibility of Lead Slowing Down Spectroscopy (LSDS). This technique is an active nondestructive assay method that has the potential to provide independent, direct measurement of Pu and U isotopic masses in used fuel with an uncertainty considerably lower than the approximately 10% typical of today's confirmatory assay methods. This document is a progress report for FY2011 PNNL analysis and algorithm development. Progress made by PNNL in FY2011 continues to indicate the promise of LSDS analysis and algorithms applied to used fuel. PNNL developed an empirical model based on calibration of the LSDS to responses generated from well-characterized used fuel. The empirical model, which accounts for self-shielding effects using empirical basis vectors calculated from the singular value decomposition (SVD) of a matrix containing the true self-shielding functions of the used fuel assembly models. The potential for the direct and independent assay of the sum of the masses of 239Pu and 241Pu to within approximately 3% over a wide used fuel parameter space was demonstrated. Also, in FY2011, PNNL continued to develop an analytical model. Such efforts included the addition of six more non-fissile absorbers in the analytical shielding function and the non-uniformity of the neutron flux across the LSDS assay chamber. A hybrid analytical-empirical approach was developed to determine the mass of total Pu (sum of the masses of 239Pu, 240Pu, and 241Pu), which is an important quantity in safeguards. Results using this hybrid method were of approximately the same accuracy as the pure empirical approach. In addition, total Pu with much better accuracy with the hybrid approach than the pure analytical approach. In FY2012, PNNL will continue efforts to optimize its empirical model and minimize its reliance on calibration data. In addition, PNNL will continue to develop an analytical model, considering effects such as neutron-scattering in the fuel and cladding, as well as neutrons streaming through gaps between fuel pins in the fuel assembly.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY 2014 First Quarterly Report

The CRADA between PNNL, Autodesk, Toyota and Magna has been effective since October 28th, 2013. The whole team including CRADA and subcontract partners kicked off the project technically on November 1st, 2013. This report describes work performed during the first quarter of FY 2014. The following technical progresses have been made toward project milestones: 1) The project kickoff meeting was organized at PlastiComp, Inc. in Winona on November 13th, 2013 involving all the project partners. During this meeting the research plan and Gantt chart were discussed and refined. The coordination of the research activities among the partners was also discussed to ensure that the deliverables and timeline will be met. 2) Autodesk delivered a research version of ASMI to PNNL for process modeling using this tool under the project. PNNL installed this research version on a PNNL computer and tested it. Currently, PNNL is using ASMI to prepare the models for PlastiComp plaques. 3) PlastiComp has compounded long carbon-fiber reinforced polypropylene and polyamide 6,6 compounds for rheological and thermal characterization tests by the Autodesk laboratories in Melbourne, Australia. 4) Initial mold flow analysis was carried out by PlastiComp to confirm that the 3D complex part selected by Toyota as a representative automotive part is moldable. 5) Toyota, Magna, PlastiComp and PNNL finalized the planning for molding the Toyota 3D complex part. 6) Purdue University worked with PNNL to update and specify the test matrix for characterization of fiber length/orientation. 7) Purdue University developed tools to automate the data collection and analysis of fiber length and orientation measurements. 8) Purdue University designed and specified equipment to replace the need for equipment using the technology established by the University of Leeds at General Motors.

42 ENGINEERING↗

Predictive Engineering Tools for Injection-Molded Long-Carbon-Fiber Thermoplastic Composites - FY 2015 First Quarterly Report

During the first quarter of FY 2015, the following technical progress has been made toward project milestones: 1) Autodesk delivered a new research version of ASMI to PNNL. This version includes the improved 3D fiber orientation solver, and the reduced order model (ROM) for fiber length distribution using the proper orthogonal decomposition (POD) implemented in the mid-plane, dual-domain and 3D solvers. 2) Autodesk coordinated a conference paper with PNNL reporting ASMI mid-plane fiber orientation predictions compared with the measured data for two PlastiComp plaques. This paper was accepted for presentation at the 2015 Society for Plastics Engineers (SPE) ANTEC conference. 3) The University of Illinois (Prof. Tucker) assisted team members from Purdue with fiber orientation measurement techniques, including interpretation of off-axis cross sections. 4) The University of Illinois assisted Autodesk team members with software implementation of the POD approach for fiber length modeling, and with fiber orientation modeling. 5) The University of Illinois co-authored in the SPE ANTEC paper, participated with the team in discussions of plaque data and model results, and participated in the definition of go/no-go experiments and data. 6) Purdue University (Purdue) conducted fiber orientation measurements for 3 PlastiComp plaques: fast-fill 30wt% LCF/PP center-gated, fast-fill 50wt% LCF/PA66 edge-gated and fast-fill 50wt% LCF/PA66 center-gated plaques, and delivered the fiber orientation data for these plaques at the selected locations (named A, B, and C) to PNNL. However, the data for the fast-fill 50wt% LCF/PA66 edge-gated plaque exhibited unusual variations and could not be used for the model validation. Purdue will re-measure fiber orientation for this plaque. 7) Based on discussions with the University of Illinois Purdue explained the ambiguity in the measurements of the fiber orientation components. 8) PNNL discussed with team members to establish a go/no-go decision plan for the project and submitted the established plan to DOE. 9) PNNL performed ASMI mid-plane analyses for the fast-fill center-gated 30wt% LCF/PP and 50wt% LCF/PA66 plaques and compared the predicted fiber orientations with the measured data provided by Purdue at Locations A, B, and C on these plaques. 10) Based on discussions with the University of Illinois and Autodesk, PNNL proposed a procedure to adjust fiber orientation data for Location A of the center-gated plaques so that the data can be expressed and interpreted in the flow/cross-flow direction coordinate system. 11) PNNL tested the new ASMI version received from Autodesk, examined and discussed 3D fiber orientation predictions for PlastiComp plaques. 12) PlastiComp, Inc. (PlastiComp), Toyota Research Institute North America (Toyota) and Magna Exteriors and Interiors Corp. (Magna) participated in discussions with team members on the go/no-go plan and the issues related to fiber length measurements. Toyota continued the discussion with Magna on tool modification for molding the complex part in order to achieve the target fiber length in the part.

42 ENGINEERING↗