Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations coordination plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Greening the Grid: Integrating 175 Gigawatts of Renewable Energy into India's Electric Grid - A Detailed Look at the Southern Region

The higher-spatial-resolution model of 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. II - Regional Study' (the Regional Study), which better represents the impact of congestion on least-cost scheduling and dispatch, provides a deeper understanding of the relationship among renewable energy (RE) location, transmission, and system flexibility with regard to RE integration, compared to 'Greening the Grid: Pathways to Integrate 175 Gigawatts of Renewable Energy into India's Electric Grid, Vol. I - National Study.' The Regional Study validates the relative value of mitigation strategies demonstrated in the National Study - namely, coordinated operations among states reduce production costs, and reducing coal minimum generation levels reduces RE curtailment. Significantly, the Regional Study also highlights a potential barrier to realizing the value of these mitigation strategies: when locations of RE development are planned independently of state-level transmission, intrastate congestion can result in undesirable levels of RE curtailment. Therefore a key objective of this study is to illustrate to state-level power system planners and operators, in particular, how a higher-resolution model, inclusive of intrastate granularity, can be used as a planning tool for two primary purposes: to better anticipate, understand, and mitigate system constraints that could affect RE integration; and to provide a modeling framework that can be used as part of future transmission studies and planning efforts. The Regional Study is not intended to predict precisely how RE will affect state-level operations. There is considerable uncertainty regarding the locations of the RE development, as well as how contract terms can affect access to the inherent physical flexibility of the system. But the scenarios analyzed identify the types of issues that can arise under various RE and transmission expansion pathways. The model developed for this study provides a rigorous framework for future work and can be updated with the characteristics of new capacity as more information on the future power system is known.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Integrated Waste Feed Delivery Plan for the Direct Feed Low-Activity Waste Mission - 17160

In order to begin tank waste treatment and reduce the risk to the liquid waste cleanup mission, a plan to directly feed the Hanford Tank Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Vitrification Facility before other WTP facilities has been implemented. Implementation requires another facility, the Low-Activity Waste Pretreatment System (LAWPS), to generate LAW from tank waste supernatant, along with upgrades to the existing tank farm facilities to provide waste feed and receive process returns. The Integrated Waste Feed Delivery Plan (IWFDP) presents the strategy for reliably delivering compliant waste feed to the LAWPS and subsequently WTP to safely and efficiently accomplish the direct feed LAW (DFLAW) mission. Modifications to existing systems and installation of new systems will be coordinated to meet WTP startup, commissioning, and processing needs. The IWFDP presents the process approach, feed campaign plans, and a list of infrastructure projects required to upgrade the DST system in order to support DFLAW start-up and operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Microwave Soil Moisture Retrieval Under Trees

Soil moisture is recognized as an important component of the water, energy, and carbon cycles at the interface between the Earth's surface and atmosphere. Current baseline soil moisture retrieval algorithms for microwave space missions have been developed and validated only over grasslands, agricultural crops, and generally light to moderate vegetation. Tree areas have commonly been excluded from operational soil moisture retrieval plans due to the large expected impact of trees on masking the microwave response to the underlying soil moisture. Our understanding of the microwave properties of trees of various sizes and their effect on soil moisture retrieval algorithms at L band is presently limited, although research efforts are ongoing in Europe, the United States, and elsewhere to remedy this situation. As part of this research, a coordinated sequence of field measurements involving the ComRAD (for Combined Radar/Radiometer) active/passive microwave truck instrument system has been undertaken. Jointly developed and operated by NASA Goddard Space Flight Center and George Washington University, ComRAD consists of dual-polarized 1.4 GHz total-power radiometers (LH, LV) and a quad-polarized 1.25 GHz L band radar sharing a single parabolic dish antenna with a novel broadband stacked patch dual-polarized feed, a quad-polarized 4.75 GHz C band radar, and a single channel 10 GHz XHH radar. The instruments are deployed on a mobile truck with an 19-m hydraulic boom and share common control software; real-time calibrated signals, and the capability for automated data collection for unattended operation. Most microwave soil moisture retrieval algorithms developed for use at L band frequencies are based on the tau-omega model, a simplified zero-order radiative transfer approach where scattering is largely ignored and vegetation canopies are generally treated as a bulk attenuating layer. In this approach, vegetation effects are parameterized by tau and omega, the microwave vegetation opacity and single scattering albedo. One goal of our current research is to determine whether the tau-omega model can work for tree canopies given the increased scatter from trees compared to grasses and crops, and. if so, what are effective values for tau and omega for trees.

O'Neill, P.↗

Langley Research Center's Unitary Plan Wind Tunnel: Testing Capabilities and Recent Modernization Activities

Description, capabilities, initiatives, and utilization of the NASA Langley Research Center's Unitary Plan Wind Tunnel are presented. A brief overview of the facility's operational capabilities and testing techniques is provided. A recent Construction of Facilities (Car) project to improve facility productivity and efficiency through facility automation has been completed and is discussed. Several new and maturing thrusts are underway that include systematic efforts to provide credible assessment for data quality, modifications to the new automation control system for increased compatibility with the Modern Design of Experiments (MDOE) testing methodology, and process improvements for better test coordination, planning, and execution.

Micol, John R.↗

Langley Research Center's Unitary Plan Wind Tunnel: Testing Capabilities and Recent Modernization Activities

Description, capabilities, initiatives, and utilization of the NASA Langley Research Center's Unitary Plan Wind Tunnel are presented. A brief overview of the facility's operational capabilities and testing techniques is provided. A recent Construction of Facilities (CoF) project to improve facility productivity and efficiency through facility automation has been completed and is discussed. Several new and maturing thrusts are underway that include systematic efforts to provide credible assessment for data quality, modifications to the new automation control system for increased compatibility with the Modern Design Of Experiments (MDOE) testing methodology, and process improvements for better test coordination, planning, and execution.

Micol, John R.↗

Safeguards-by-Design:Guidance for High Temperature Gas Reactors (HTGRs) With Prismatic Fuel

Introduction and Purpose The following is a guidance document from a series prepared for the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA), under the Next Generation Safeguards Initiative (NGSI), to assist facility designers and operators in implementing international Safeguards-by-Design (SBD). SBD has two main objectives: (1) to avoid costly and time consuming redesign work or retrofits of new nuclear fuel cycle facilities and (2) to make the implementation of international safeguards more effective and efficient at such facilities. In the long term, the attainment of these goals would save industry and the International Atomic Energy Agency (IAEA) time, money, and resources and be mutually beneficial. This particular safeguards guidance document focuses on prismatic fuel high temperature gas reactors (HTGR). The purpose of the IAEA safeguards system is to provide credible assurance to the international community that nuclear material and other specified items are not diverted from peaceful nuclear uses. The safeguards system consists of the IAEA’s statutory authority to establish safeguards; safeguards rights and obligations in safeguards agreements and additional protocols; and technical measures implemented pursuant to those agreements. Of foremost importance is the international safeguards agreement between the country and the IAEA, concluded pursuant to the Treaty on the Non-Proliferation of Nuclear Weapons (NPT). According to a 1992 IAEA Board of Governors decision, countries must: notify the IAEA of a decision to construct a new nuclear facility as soon as such decision is taken; provide design information on such facilities as the designs develop; and provide detailed design information based on construction plans at least 180 days prior to the start of construction, and on "as-built" designs at least 180 days before the first receipt of nuclear material. Ultimately, the design information will be captured in an IAEA Design Information Questionnaire (DIQ), prepared by the facility operator, typically with the support of the facility designer. The IAEA will verify design information over the life of the project. This design information is an important IAEA safeguards tool. Since the main interlocutor with the IAEA in each country is the State Regulatory Authority/SSAC (or Regional Regulatory Authority, e.g. EURATOM), the responsibility for conveying this design information to the IAEA falls to the State Regulatory Authority/SSAC. For the nuclear industry to reap the benefits of SBD (i.e. avoid cost overruns and construction schedule slippages), nuclear facility designers and operators should work closely with the State Regulatory Authority and IAEA as soon as a decision is taken to build a new nuclear facility. Ideally, this interaction should begin during the conceptual design phase and continue throughout construction and start-up of a nuclear facility. Such early coordination and planning could influence decisions on the design of the nuclear material processing flow-sheet, material storage and handling arrangements, and facility layout (including safeguards equipment), etc.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

One System Integrated Project Team: Retrieval And Delivery Of The Hanford Tank Wastes For Vitrification In The Waste Treatment Plant

The One System Integrated Project Team (IPT) was formed in late 2011 as a way for improving the efficiency of delivery and treatment of highly radioactive waste stored in underground tanks at the U.S. Department of Energy's (DOE's) 586-square-mile Hanford Site in southeastern Washington State. The purpose of the One System IPT is to improve coordination and integration between the Hanford's Waste Treatment Plant (WTP) contractor and the Tank Operations Contractor (TOC). The vision statement is: One System is a WTP and TOC safety conscious team that, through integrated management and implementation of risk-informed decision and mission-based solutions, will enable the earliest start of safe and efficient treatment of Hanford's tank waste, to protect the Columbia River, environment and public. The IPT is a formal collaboration between Bechtel National, Inc. (BNI), which manages design and construction of the WTP for the U.S. Department of Energy's Office of River Protection (DOEORP), and Washington River Protection Solutions (WRPS), which manages the TOC for ORP. More than fifty-six (56) million gallons of highly radioactive liquid waste are stored in one hundred seventy-seven (177) aging, underground tanks. Most of Hanford's waste tanks - one hundred forty-nine (149) of them - are of an old single-shell tank (SST) design built between 1944 and 1964. More than sixty (60) of these tanks have leaked in the past, releasing an estimated one million gallons of waste into the soil and threatening the nearby Columbia River. There are another twenty-eight (28) new double-shelled tanks (DSTs), built from 1968 to 1986, that provide greater protection to the environment. In 1989, DOE, the U.S. Environmental Protection Agency (EPA), and the Washington State Department of Ecology (Ecology) signed a landmark agreement that required Hanford to comply with federal and state environmental standards. It also paved the way for agreements that set deadlines for retrieving the tank wastes and for building and operating the WTP. The tank wastes are the result of Hanford's nearly fifty (50) years of plutonium production. In the intervening years, waste characteristics have been increasingly better understood. However, waste characteristics that are uncertain and will remain as such represent a significant technical challenge in terms of retrieval, transport, and treatment, as well as for design and construction ofWTP. What also is clear is that the longer the waste remains in the tanks, the greater the risk to the environment and the people of the Pacific Northwest. The goal of both projects - tank operations and waste treatment - is to diminish the risks posed by the waste in the tanks at the earliest possible date. About two hundred (200) WTP and TOC employees comprise the IPT. Individual work groups within One System include Technical, Project Integration & Controls, Front-End Design & Project Definition, Commissioning, Nuclear Safety & Engineering Systems Integration, and Environmental Safety and Health and Quality Assurance (ESH&QA). Additional functions and team members will be added as the WTP approaches the operational phase. The team has undertaken several initiatives since its formation to collaborate on issues: (1) alternate scenarios for delivery of wastes from the tank farms to WTP; (2) improvements in managing Interface Control Documents; (3) coordination on various technical issues, including the Defense Nuclear Facilities Nuclear Safety Board's Recommendation 2010-2; (4) deployment of the SmartPlant Foundation-configuration Management System; and (5) preparation of the joint contract deliverable of the Operational Readiness Support Plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Canadian Nuclear Laboratories Waste Management: Challenges and the Integrated Waste Strategy - 19160

Canadian Nuclear Laboratories (CNL) currently faces various waste management challenges and CNL's Integrated Waste Strategy is adapting to manage them. As Canada's premier nuclear science and technology organization, CNL is a global leader in developing peaceful and innovative applications from nuclear technology through its expertise in the scientific field, including physics, metallurgy, chemistry, biology and engineering. As demands change, CNL is shifting its focus to alpha therapies for cancer treatments and sustainable energy solutions. The next decade will see CNL decommission the sites it manages across Canada, whilst transforming Chalk River Laboratories (CRL) into a new, world-class facility which will have the capability to demonstrate the commercial viability of advanced reactor designs including Small Modular Reactors (SMRs). This is being enabled through an accelerated decommissioning program for all CNL operated sites, while renovating CRL, which includes revitalizing essential site infrastructure, and investment in new, world-class science facilities in a modern campus environment. With decommissioning and revitalization occurring simultaneously, the long-term strategy and vision for CNL presents some unique challenges to waste management. Therefore, integrated, collaborative and coordinated waste management is a vital component to ensuring a successful future. The Integrated Waste Strategy coordinates, and provides alignment of, waste management across CNL and: - Includes all CNL operated (Atomic Energy of Canada Limited (AECL) owned) sites; - Considers all CNL managed waste (including radioactive and non-radioactive operational, decommissioning, legacy and historic waste) for the planned lifetime of the sites; - Defines waste routes using a life cycle approach (from the generation of waste to final disposal) A baseline Integrated Waste Strategy and associated action plan to mitigate identified gaps and issues have been produced. A program of work is underway to close those gaps identified in a consistent, transparent, prioritized and justified manner. One of the key challenges is to ensure that waste management planning is completed effectively and in a timely manner. This will enable the provision of suitable and sufficient waste capability to meet CNL's long-term strategy. The Integrated Waste Strategy has been developed and maintained through engagement at all levels across CNL, ensuring buy-in of proposed solutions. Key process stakeholders include generators of CNL managed waste to ensure integrated consideration of legacy, current and future waste generation; waste management personnel to identify requirements, including processing, storage, transport and disposal; AECL as the client and waste liability owner; and the public to ensure they understand the 'big picture' regarding waste strategy. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Cost of Floating Offshore Wind Energy in California Between 2019 and 2032

California’s energy planning is centered around meeting the emissions reduction and renewable energy requirements of Senate Bill 350 by 2030. However, state power system planning is expected to eventually address California’s requirement to achieve 100% of total retail electricity sales from renewable energy and zero-carbon resources by 2045, as mandated by Senate Bill 100. To comply with these directives, California needs to investigate the further development of energy efficiency, storage, and a diverse range of renewable energy, zero-carbon emission, and transmission resources, including offshore wind. Wind resources off the coast of California have the potential to generate a significant portion of the state’s electric energy as it moves toward a zero-carbon economy and can help diversify its energy mix. Floating offshore wind technology, which is suitable for the deep waters along the California coast, is currently in a precommercial phase, with approximately 84 megawatts (MW) installed worldwide at the end of 2019. Globally there are over 7,000 MW in planning and permitting phases of development, with the first commercial-scale projects expected to be operational in 2024. This study provides site-specific cost and performance data for floating offshore wind to inform California’s long-term energy planning. The identification of new resources to meet California’s policy goals at least cost is part of the Integrated Resource Planning (IRP) process, which is coordinated by the California Public Utilities Commission (CPUC). In 2019–2020 IRP modeling, offshore wind was included for the first time as a candidate resource in some sensitivity cases (CPUC 2019). The data and information presented in this report can be used to update offshore wind inputs in future IRP cycles. The authors conducted a geospatial cost analysis over portions of the offshore wind resource area of California. The analyzed spatial domain includes sites with a mean wind speed of at least 7 meters per second and water depths between 40 meters (m) and 1,300 m. Costs and energy production vary across this analysis domain. We calculated these parameters on a grid layout with over 750 sites, with each site representing a 1,000-MW commercial offshore wind power plant. Levelized cost of energy (LCOE) was calculated at each site over the analysis domain. The resulting variation in LCOE across the analysis domain is illustrated through heat maps in this report. Five study areas were selected within the analysis domain where more detailed cost analysis was conducted and cost parameters, such as annual energy production, capital cost expenditures (CapEx), operational cost expenditures (OpEx), and net capacity factors are reported. These five study areas include Morro Bay, Diablo Canyon, Humboldt, Cape Mendocino and Del Norte.

17 WIND ENERGY↗

Lunar Surface Concept of Operations for the Global Exploration Roadmap Lunar Surface Exploration Scenario

The International Space Exploration Coordination Group (ISECG) is a voluntary, non-binding coordination forum of 26 space agencies. Building on the 2018 Global Exploration Roadmap (GER) and on growing global interest in space exploration, ISECG’s GER Supplement (Aug 2020) captures the latest developments in lunar exploration planning in an updated Lunar Surface Exploration Scenario. The updated Lunar Surface Exploration Scenario describes a phased approach to implementing infrastructure and exploration on the lunar surface to meet the goals and objectives defined by the ISECG. The updated scenario starts with Boots on the Moon, where space agencies focus on sending humans to the Moon beginning in 2024 and robotic exploration missions to support the 2024 goal and later phases. Next is Phase 2, Lunar Exploration—Expanding and Building, with an emphasis on completion of the proposed lunar surface objectives by exploring the lunar surface diversely and ultimately settling at the most beneficial site. Initial focus is on lunar surface exploration objectives pertaining to human landing and ascent, logistic cargo landers, and long-range traverses. The later focus is on lunar surface exploration objectives pertaining to long duration habitation, crew health and performance, and in-situ resource utilisation (ISRU). The third phase, Sustained Lunar Opportunities, envisages laying the foundation for a sustained and vibrant lunar presence in the coming decades through partnerships with international governments, academia and industry. During this phase, governments would shift their investment focus to further expand the frontier, including Mars exploration missions. This paper will describe the concept of operations by phase that supported the development of the updated scenario, along with refinements to those concepts of operations since the release of the updated scenario. By phase, the paper will describe the scenario, give an overview of the applicable architecture elements, identify functional requirements/needs of those elements, and include a discussion of nominal operations and contingency scenarios.

Markus Landgraf↗

NASA Strategy for Technology Development

At the National Aeronautics and Space Administration (NASA), foresight is a coordinated, iterative, and continual process for making informed decisions. NASA faces diverse and relatively unique challenges and opportunities as the leading U.S. agency for aeronautics development, cutting-edge scientific discovery, and human space exploration. To address these challenges and leverage opportunities, NASA uses foresight to strategically plan technology development across four mission directorates: Aeronautics Research Mission Directorate, Space Technology Mission Directorate, Science Mission Directorate, and Human Exploration and Operations Mission Directorate (recently separated into the new Exploration Systems Development Mission Directorate and Space Operations Mission Directorate). The mission directorates leverage a broad community of experts and partners to incorporate technology foresight into mission and program planning. Through this process NASA realizes tangible benefits to the agency’s science, technology, and exploration programs. As an independent office, NASA’s Office of Technology, Policy, and Strategy (OTPS) provides strategic advice, supported by independent assessments and rigorous analysis, to inform NASA senior leadership on key areas to align mission and agency-level activities. OTPS serves as a trusted authority to inform technology strategy at the agency to enable future missions. Specifically, OTPS coordinates and uses inputs from a broad community of experts, both internal and external to NASA, to inform decision making for technology plans, investments, and partnerships. OTPS develops and maintains the NASA Technology Taxonomy to standardize communication across the agency’s diverse technology portfolio and the related Strategic Technology Investment Plan that integrates priorities and informs technology investment. Through these efforts, OTPS has refined elements of foresight-informed strategic planning that may be applicable to other technology-driven industries where foresight is essential for resilience. This chapter describes the processes of foresight for technology development at NASA and provides insight into the value the agency derives from these processes. The chapter further describes the role of OTPS as an independent advisory office that supports NASA’s efforts to capitalize on foresight and strategic technology planning. We present these examples with consideration for how organizations in defense, security, and other technology-driven industries can operationalize foresight in their own strategic technology development.

Erica Rodgers↗

Planning and Operations in Electricity Markets Under System Transformation

United States electricity markets, planning mechanisms, and operational procedures are currently evolving in concert with three key trends. First, a range of new resources—solar, wind, energy storage, hybrid co-located storage, and distributed energy—are coming online and require new solutions to ensure they are efficiently integrated into existing systems. Second, consumers now face more opportunities to participate in markets by providing demand response and engaging in two-way interactions with the grid. Third, there is an increasing need for enhanced coordination between generation and transmission planning as well as across transmission and distribution systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The origin and evolution of the coordinated data analysis workshop process

During the planning stage for the International Magnetospheric Study (IMS), it was stressed that coordinated observations among various satellites and among satellite, ground-based, balloon, and rocket (GBR) experiments were essential in obtaining the required observational data base. In the course of operating the Satellite Situation Center (SSC), it was found to be desirable to assemble a problem-oriented digital data base, consisting of a large number of physical parameters obtained from satellite and GBR sensors, in a computer system which would permit a large number of scientists to manipulate, display, discuss, study and analyze the data together in a coordinated manner. It was felt that such a process might shorten the time required to gain full scientific understanding of the observations. This approach was called the Coordinated Data Analysis Workshop (CDAW) process. Attention is given to the preliminary concept, the the initial implementation of the CDAW process, and aspects of subsequent evolution.

Vette, J. I.↗

The JPL telerobotic Manipulator Control and Mechanization (MCM) subsystem

The Manipulator Control and Mechanization (MCM) subsystem of the telerobot system provides the real-time control of the robot manipulators in autonomous and teleoperated modes and real time input/output for a variety of sensors and actuators. Substantial hardware and software are included in this subsystem which interfaces in the hierarchy of the telerobot system with the other subsystems. The other subsystems are: run time control, task planning and reasoning, sensing and perception, and operator control subsystem. The architecture of the MCM subsystem, its capabilities, and details of various hardware and software elements are described. Important improvements in the MCM subsystem over the first version are: dual arm coordinated trajectory generation and control, addition of integrated teleoperation, shared control capability, replacement of the ultimate controllers with motor controllers, and substantial increase in real time processing capability.

Hayati, Samad↗

Scheduling and Separating Departures Crossing Arrival Flows in Shared Airspace

Flight efficiency and reduction of flight delays are among the primary goals of NextGen. In this paper, we propose a concept of shared airspace where departures fly across arrival flows, provided gaps are available in these flows. We have explored solutions to separate departures temporally from arrival traffic and pre-arranged procedures to support controllers' decisions. We conducted a Human-in-the-Loop simulation and assessed the efficiency and safety of 96 departures from the San Jose airport (SJC) climbing across the arrival airspace of the Oakland and San Francisco arrival flows. In our simulation, the SJC tower had a tool to schedule departures to fly across predicted gaps in the arrival flow. When departures were mistimed and separation could not be ensured, a safe but less efficient route was provided to the departures to fly under the arrival flows. A coordination using a point-out procedure allowed the arrival controller to control the SJC departures right after takeoff. We manipulated the accuracy of departure time (accurate vs. inaccurate) as well as which sector took control of the departures after takeoff (departure vs. arrival sector) in a 2x2 full factorial plan. Results show that coordination time decreased and climb efficiency increased when the arrival sector controlled the aircraft right after takeoff. Also, climb efficiency increased when the departure times were more accurate. Coordination was shown to be a critical component of tactical operations in shared airspace. Although workload, coordination, and safety were judged by controllers as acceptable in the simulation, it appears that in the field, controllers would need improved tools and coordination procedures to support this procedure.

shared airspace↗

Monitoring, Reporting, and Verification (MRV) Plan - Meeting EPA Guidelines for GHGRP and Subpart RR

The Midwest Regional Carbon Sequestration Partnership (MRCSP) was founded in 2003 as part of the U.S. Department of Energy’s (DOE’s) Regional Carbon Sequestration Partnership initiative. Since its founding, MRCSP has made significant strides toward making CCUS a viable option for states in the region. The public/private consortium, funded through the DOE Regional Carbon Sequestration Initiative, brings together nearly 40 industry partners and 10 states. Battelle, as the project lead, oversees research, development and operations and coordinates activities among the partners. The incremental, phased approach has built a valuable knowledge base for the industry and paved the way for commercial-scale adoption of CCUS technologies. From 2008 to 2020, MRCSP Phase III focused on the development of large-scale injection projects. This report is part of a series of reports prepared under the Midwestern Regional Carbon Sequestration Partnership (MRCSP) Phase III (Development Phase). These reports summarize and detail the findings of the work conducted under the Phase III project. This report summarizes the steps for successfully submitting a Monitoring, Reporting and Verification (MRV) plan to the U.S. Environmental Protection Agency (EPA). This work used the lessons learned from various MRCSP tasks to demonstrate the geologic understanding of the reefs in Northern Niagaran Pinnacle Reef Trend (NNPRT), successful monitoring and accounting methodologies, understanding of potential risks and leakage pathways, and mass balance of CO2 baseline and net storage. The plan encompasses ten reefs and provides a reporting plan for future reef development.

01 COAL, LIGNITE, AND PEAT↗

Interactive orbital proximity operations planning system instruction and training guide

This guide instructs users in the operation of a Proximity Operations Planning System. This system uses an interactive graphical method for planning fuel-efficient rendezvous trajectories in the multi-spacecraft environment of the space station and allows the operator to compose a multi-burn transfer trajectory between orbit initial chaser and target trajectories. The available task time (window) of the mission is predetermined and the maneuver is subject to various operational constraints, such as departure, arrival, spatial, plume impingement, and en route passage constraints. The maneuvers are described in terms of the relative motion experienced in a space station centered coordinate system. Both in-orbital plane as well as out-of-orbital plane maneuvering is considered. A number of visual optimization aids are used for assisting the operator in reaching fuel-efficient solutions. These optimization aids are based on the Primer Vector theory. The visual feedback of trajectory shapes, operational constraints, and optimization functions, provided by user-transparent and continuously active background computations, allows the operator to make fast, iterative design changes that rapidly converge to fuel-efficient solutions. The planning tool is an example of operator-assisted optimization of nonlinear cost functions.

Grunwald, Arthur J.↗

MSL relay coordination and tactical planning in the era of InSight, MAVEN, and TGO

This study examines an approach for optimizing the scheduling of regular relay communications between the Mars Science Laboratory (MSL) rover and the non-sun-synchronous Mars orbiters MAVEN and TGO as well as the impacts of the approaching InSight landing on MSL relay and tactical planning. Rover operations require knowledge of recently executed activities, termed decisional data, in order to inform tactical activity planning. As a result, timely and routine data return is critical for nominal rover operations. Mars orbiters are used as relay assets to achieve such timeliness.

Thomas, Steven↗