Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operations and Maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Hybrid Zircex Hydrochlorinator

This project was driven by the desire to create easier and faster ways to load Advanced Test Reactor (ATR) Fuel Elements into the Hybrid Zircex hydrochlorinator. The primary requirements for this project were to minimize the potential release of radioactive contamination, minimize maintenance operations to replace or remove the lid seal, and allow for remote usage. Three preliminary designs were made. These designs allow ATR fuel elements to be loaded into the hydrochlorinator more efficiently while fulfilling the requirements.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Life Cycle Assessment for Closed-Loop Pumped Hydropower Energy Storage in the United States

The federal government has initiated an aggressive set of policies to achieve a net-zero carbon emission goal for the electricity sector by 2050. As a result, rapid growth in deployment of renewable energy technologies is expected. Most commercially mature technologies are temporally variable and do not provide grid inertia, while renewable technologies with high projected deployment have intermittent generation methods. Energy storage technologies are needed to both dispatch power on-demand and help provide the needed grid inertia. Pumped storage hydro (PSH) is a well-established technology that has gained renewed interest in recent years offering energy-balancing, grid stability, control of electrical network frequency, and large-scale storage capacity. For widespread adoption of PSH, more information is needed regarding its current life cycle environmental impacts. The objective of this study is to perform a full life cycle assessment (LCA) of new closed-loop PSH in the U.S. The functional unit for this study is 1 kWh of electrical power delivered to the grid and the base case project lifetime is 80 years. The life cycle inventory for this project accounts for all material and energy flows associated with the green-field construction, operation, maintenance, and decommissioning of a closed-loop PSH plant in the U.S. Collected data represents a range of potential PSH specifications and geographic locations coming from all prospective closed-loop PSH installations in the U.S. with data available. In addition, existing PSH installations are used to provide assumptions for inventory inputs. Results presented will include the global warming potential (GWP IPCC 100a) and Energy Return on Investment (EROI) from our base case (average PSH installation) as well as from scenario analyses and model sensitivity. These results will be compared to the impacts from existing PSH sites and alternate storage technologies. Methods align with the assumptions and guidelines put in place by previous PSH LCAs to ensure an accurate comparison with the results from this report.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

WBS 1.2.3.405 - Life Cycle Assessment of Storage Technologies

Recent commitments by the Biden administration have established targets to achieve a net-zero energy system by 2050. Meeting these targets will spur a rapid transition to clean energy technologies and a commensurate need to develop and deploy energy storage technologies at scale. Pumped Storage Hydro (PSH) is expected to be part of this solution because its ability to provide grid flexibility and stability and enable the dispatching of disparate variable renewable energy technologies. Despite PSH being a mature technology with a history of deployment dating back several decades, there is very little information on the greenhouse gas (GHG) implications of PSH as compared to other storage technologies. The objective of this project is to perform a full lifecycle assessment (LCA) of new PSH projects in the U.S. This LCA includes all project phases (resource extraction, construction, operation, maintenance, end-of-life). The functional unit for this study is 1 kWh electricity delivered by system to grid substation connection point and the estimated lifetime for our base case is 80 years. Data used in this study are based on over 30 potential PSH projects that are in preliminary planning phases and are represent a wide range of potential closed-loop PSH systems in terms of location, technology, and capacity. The project approach, data sources, and modeling assumptions have been informed by a technical review committee of stakeholders that include experts from academia, national and international government, industry, and utilities. The GHGs and energy return on investment (EROI) from PSH will be compared to other storage technologies (e.g., stationary battery storage). Results from this project will improve the PSH community's understanding of the environmental impacts and sustainability of new PSH projects and how PSH compares to other storage technologies. The approach used in this project relies on open-source programming. The analysis framework (source code and data) and will be made publicly available at the end of the project. In addition to reporting results for the base case, we will perform rigorous sensitivity analysis to identify the major drivers, understand impacts of different configurations, and future energy markets. Results from this project will be published in a suitable journal.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗

Transferring Photovoltaic Lessons Learned to Concentrating Solar Power

This presentations outlines the following: 1) Points worth noting in the history of the PV industry, 2) PV benefits from standardization, 3) PV sharing reliability challenges since the 1975, 4) PV projects from an independent engineering (IE) perspective, 5) Site selection (what NOT to do), 6) PV Operations & Maintenance over time, 7) Soiling research (remove the silos), 8) Noting a few relevant PV IEC standards, and 9) PVfleets data sharing.

bio-soiling↗

Updates and Lessons Learned from NuMI Beamline at Fermilab

The Neutrinos at the Main Injector (NuMI) beamline at Fermilab generates an intense muon neutrino beam for the NOvA (NuMI Off-axis $\nu_e$ Appearance) long-baseline neutrino experiment. Over the years, the NuMI beamline has been pivotal in advancing neutrino physics, providing invaluable data and insights. This proceeding paper discusses updates and the lessons learned from recent experiences during the beam operations, maintenance, and monitoring of the NuMI beamline. Key topics include the optimization of beam performance and challenges in maintaining beamline stability. The paper aims to share best practices and provide a road-map for future beamline projects, including the Long-Baseline Neutrino Facility (LBNF).

43 PARTICLE ACCELERATORS↗

The Myth of Fungible FTE: A Quantitative Assessment of Matrixed Resource Allocation

Matrix organizations allow scientific facilities to share specialized personnel across projects, operations, maintenance, and strategic initiatives. Nominal staffing allocations, however, may not capture the schedule consequences of fragmented individual commitments, limited access to specialist groups, and intermittent availability of key decision makers. We developed a stochas- tic, daily-time-step simulation of a hypothetical medium-sized accelerator-facility project com- prising sequential phases and parallel tasks. Each task requires role-specific work measured in FTE-days. Ordinary personnel may be unavailable because they contribute concurrently to other institutional activities, while designated key roles have independently specified daily un- availability probabilities. An organization-wide priority factor scales the number of people from each functional group who can effectively contribute to the project. It is interpreted as a composite proxy for project access and workforce fragmentation across competing commit- ments. We examined project completion time as a function of this factor and Project Lead unavailability using 100 Monte Carlo runs per condition. Increasing priority factor from 0.1 to 1.0 reduced median completion time from 1708.5 days (interquartile range 1681.5–1735.25) to 390 days (interquartile range 379–399). At priority factor = 0.1, increasing Project Lead unavailability from 0.5 to 0.9 increased median completion time from 1713.5 days (interquartile range 1691–1733.25) to 4,417 days (interquartile range 4271.75–4550.5). The model quantifies the commonly expected sensitivity of project schedules to fragmented resource commitments and limited coordination availability. Within this model, the results also indicate a possible threshold regime in which small increases in workforce availability yield only modest sched- ule improvements until sufficient capacity becomes accessible, after which project performance improves sharply. With further validation and calibration, this quantitative framework could support resource-allocation decisions during initial project planning and subsequent schedule rebaselining.

Bai, Mei [SLAC National Accelerator Laboratory (SL↗

Shuttle Flight Operations Contract Generator Maintenance Facility Land Use Control Implementation Plan (LUCIP)

This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Shuttle Flight Operations Contract Generator Maintenance Facility (SFOC; SWMU 081; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the SFOC, an institutional land use control (LUC) is necessary to prevent human health exposure to antimony-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.

Remediation↗

SSR APPLIED – Automated Power Plants: Intelligent, Efficient and Digitised (V.2)

This report describes work undertaken during the SSR APPLIED project. The focus of the project has been on the development of digital twins to de-risk licensing of improved operating and maintenance practices. The operation of a bespoke flowing separate effects molten salt loop at ANL, with realistic temperature gradients, will provide invaluable data for computer codes validation. Three digital twins of aspects of the SSR-W have been successfully developed using ANL expertise and software. These digital twins have demonstrated optimization of the fuel cycle, the ability to model transients using an integrated coupled neutronic – thermal-hydraulic model with a model of the fuel expansion feedback so important to the inherent safety of the SSR-W. Advanced machine learning techniques have been developed and demonstrated for optimization of heat exchanger operation and maintenance.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

A simulation program for the analysis of on-orbit Space Station maintenance and logistics operations

This paper describes the analysis approach adopted by NASA's Space Station Maintenance Planning and Analysis (MPA) Study and focuses on the development and use of a simulation program called Simulation of Manned Space System Logistics Support (SIMSYLS) for modeling the Space Station operations environment. The basic assumptions and groundrules used in the development of SIMSYLS are presented, including its capabilities, limitations and samples of analyses performed. Finally, a proposed simulation outgrowth entitled Space Applications System Simulation (SASS) is described. SIMSYLS will constitute the foundation for SASS which will provide a full system operational RAM analysis tool for Space Station and its logistics support environment.

Furlong, Kelly L.↗

High Resolution Doppler Imager FY 2001,2002,2003 Operations and Algorithm Maintenance

During the performance period of this grant HRDI (High Resolution Doppler Imager) operations remained nominal. The instrument has suffered no loss of scientific capability and operates whenever sufficient power is available. Generally, there are approximately 5-7 days per month when the power level is too low to permit observations. The daily latitude coverage for HRDI measurements in the mesosphere, lower thermosphere (MLT) region are shown.It shows that during the time of this grant, HRDI operations collected data at a rate comparable to that achieved during the UARS (Upper Atmosphere Research Satellite) prime mission (1991 -1995). Data collection emphasized MLT wind to support the validation efforts of the TIDI instrument on TIMED, therefore fulfilling one of the primary objectives of this phase of the UARS mission. Skinner et al., (2003) present a summary of the instrument performance during this period.

Skinner, Wilbert↗

Preliminary maintenance experience for DSS 13 unattended operations demonstration

The maintenance data base collected for 15 weeks of recent unattended and automated operation of DSS 13 is summarized. During this period, DSS 13 was receiving spacecraft telemetry while being controlled remotely from JPL in Pasadena. Corrective and preventive maintenance manhours are reported by subsystem for DSS 13 including the equipment added for the automation demonstration. The corrective and preventive maintenance weekly manhours at DSS 13 averaged 22 and 40, respectively. The antenna hydraulic and electronic systems accounted for about half of the preventive and corrective maintenance manhours for a comparable attended DSN station, DSS 11.

Remer, D. S.↗

AOI 3 Life Modelling of Critical Steam Cycle Components in Coal-Fueled Power Plants

Microstructural damage accumulation models have been used to produce calibrated life estimation models for a DR22/P22 steel wye-block welds, and a Jethete stainless steel turbine blade (bucket). The calibrated life estimation models will aid the power plant operator in determining optimal maintenance and operation schedules based upon historical operational data as well as current, or future operation schemes. The impact of this project will enable existing coal-fueled power plants to operate safely for longer periods of time and at higher efficiencies, thereby reducing the economic and environmental impact of the existing coal power plant fleet. Testing, characterization, and modelling indicates that the operating life of P22 pipelines and their welds are dominated by fatigue damage mechanisms. Specifically, fatigue is of no concern in these materials when operating under realistic conditions manifesting in the main steam piping of coal-fueled power plants. However, if a low-temperature overload ever occurs during operation, fatigue will manifest as a damage mechanism of interest. Primary impact provided by the completion of this work is in the manifestation of a detailed ABAQUS solid model providing accurate boundary conditions to enable the prediction of operational stresses and strains. The completed plant solid model, in conjunction with the calibrated fatigue and creep life models provide definitive confirmation that creep is the dominant damage mechanism during operational conditions. Jethete life modelling has been completed by the manifestation of a material-specific, and temperature-specific, Kitagowa diagram. The Kitagowa diagram provides maintenance and operation decision making with scientifically-based go/no-go support based upon the crack-like features that have been identified by use of inspection.

01 COAL, LIGNITE, AND PEAT↗

NIMBUS-7 ERB DELMAT operators guide and maintenance manual

Described in detail are the ERB DELMAT algorithms used to correct the wide field-of-view channels (11, 12, 13 and 14) radiometer data. The computer software and the required operational environment are also delineated. The information and procedures required to maintain the DELMAT program are also described.

Penn, L. M.↗

Hazard and Operability Analysis for Operating, Refueling, and Maintenance of Fuel Cell Electric Buses

​​Since hydrogen vehicles can be implemented in heavy-duty transportation applications such as buses, it is important to understand safety hazards and risks of hydrogen fuel cell electric bus (FCEB) and refueling technology. We conducted a hazard and operability analysis for FCEB operation/driving, refueling, and maintenance/inspection. We identified failure modes and consequences and defined a qualitative risk metric as the product of the likelihood of a failure and the severity of the worst-ca

08 HYDROGEN↗

Predictive-Maintenance Practices: For Operational Safety of Battery Energy Storage Systems

Changes in the Demand Profile and a growing role for renewable and distributed generation are leading to rapid evolution in the electric grid. These changes are beginning to considerably strain the transmission and distribution infrastructure. Utilities are increasingly recognizing that the integration of energy storage in the grid infrastructure will help manage intermittency and improve grid reliability. This recognition, coupled with the proliferation of state-level renewable portfolio standards and rapidly declining lithium-ion (Li-ion) battery costs, has led to a surge in the deployment of battery energy storage systems (BESSs). Additionally, although BESSs represented less than 1% of grid-scale energy storage in the United States in 2019, they are the preferred technology to meet growing demand because they are modular, scalable, and easy to deploy across diverse use cases and geographic locations.

25 ENERGY STORAGE↗

Status Report on Regulatory Criteria Applicable to the Use of Artificial Intelligence (AI) and Machine Learning (ML)

Although the interest in the use of artificial intelligence (AI) and machine learning (ML) in nuclear energy is increasing rapidly, at present their implementation is limited. This rapid increase in interest is not surprising considering that implementing AI and ML technology would allow for continuous monitoring, facilitate the implementation of predictive maintenance with optimized staffing plans, enable automation and autonomy opportunities that could drastically reduce fixed operation and maintenance costs, and provide training for operations and maintenance. Other industries are using AI for construction, and in the nuclear arena AI could provide great benefit in decommissioning activities. The ability of AI and ML to operate in real time vastly increases their potential impact. Before AI can be used in design, operations, or as a regulatory tool, the specifics on the regulations applicable to the use of AI for nuclear power applications need to be established. The difficulty is that the specific use cases will dictate the applicability of regulations. For example, even within the application domain associated with operations, the regulations might vary if the AI is used to create a virtual reference for plant operations or is used for training, optimization of maintenance intervals, prioritization of maintenance activities, etc. Different still is if the AI is to be used for design or setting technical specifications, which will introduce additional requirements. US Nuclear Regulatory Commission (NRC) licensing reviews are based on an applicant’s design meeting its performance assessment based on (1) safety goals and objectives, (2) deterministic and/or probabilistic analysis of accident scenarios, and (3) quantitative assessment of design alternatives against the safety goals and objectives using accepted engineering tools, methodologies, and performance criteria. The current regulatory framework does not explicitly address AI or autonomous control. However, as implementing AI technology will require the use of a digital platform, it must meet the requirements of an instrumentation and control (I&C) system. The regulatory requirements for AI, which will be incorporated into the I&C system, will be very dependent on how it is used (i.e., its functionality, safety classification, etc.). The licensing process is primarily risk-based with the identification of components and systems as nonsafety, important to safety, or safety related. A risk-informed approach allows further gradation of components and systems based on risk metrics such as core damage frequency or large early release fractions. Thus, the use cases and the risk categorization of impacted systems and components will determine the regulatory requirements. Regardless of how AI is used it presents new opportunities for risk-informing operating, maintenance, and regulatory decisions. Trustworthiness, transparency, and the ability to validate and verify the results will be paramount in showing that the systems and plant still meet their performance requirements. This report describes the results of research to identify regulatory implications of AI technologies and their uses. Specifically, this report reviews current regulatory guidance relevant to the application of AI for design (including design changes or new designs including advanced reactors), construction, operations, training, maintenance, research, testing, and as a regulatory tool. AI can be automated at different levels from purely informative purposes to autonomous controls. The focus of this review included determination of constraints on the application of AI technology, identification of any regulatory gaps or uncertainties, and clarification of anticipated technical basis information likely to be important for regulatory acceptance of these technologies. Currently, any use of AI at nuclear power plants is focused on nonsafety-related applications. The NRC and other regulatory bodies are evaluating providing guidance to address gaps rather than create new regulations to address the use of AI and ML. This approach seems to be the best to encourage AI development without adding regulatory uncertainty.

97 MATHEMATICS AND COMPUTING↗

Evaluation of Component Reliability in Photovoltaic Systems using Field Failure Statistics

Ongoing operations and maintenance (O&M) are needed to ensure photovoltaic (PV) systems continue to operate and meet production targets over the lifecycle of the system. Although average costs to operate and maintain PV systems have been decreasing over time, reported costs can vary significantly at the plant level. Estimating O&M costs accurately is important for informing financial planning and tracking activities, and subsequently lowering the levelized cost of electricity (LCOE) of PV systems. This report describes a methodology for improving O&M planning estimates by using empirically-derived failure statistics to capture component reliability in the field. The report also summarizes failure patterns observed for specific PV components and local environmental conditions observed in Sandia's PV Reliability, Operations & Maintenance (PVROM) database, a collection of field records across 800+ systems in the U.S. Where system-specific or fleet-specific data are lacking, PVROM-derived failure distribution values can be used to inform cost modeling and other reliability analyses to evaluate opportunities for performance improvements.

14 SOLAR ENERGY↗