Light Water Reactor Sustainability Program: Use of Time Distributions to Predict Operator Procedure Performance in Dynamic Human Reliability Analysis

The Human Unimodel for Nuclear Technology to Enhance Reliability (HUNTER) framework affords software capable of conducting human reliability analysis (HRA) using a dynamic approach built around operating procedures (OPs) from nuclear power plants (NPPs). Previous HUNTER reports document the development of this software tool, the coupling of HUNTER to the simulator code, the collection of operator performance data by using simulators to calibrate HUNTER models, and linking HUNTER to probabilistic risk assessment (PRA) software. The present report largely addresses two topics. The first is a new function in HUNTER called the HUNTER Procedure Performance Predictor (P3). HUNTER P3 uses HUNTER’s built in Monte Carlo tools featuring human performance variability to identify potential error traps in procedures. The second topic is time distribution analysis to generate time inputs for dynamic HRA. The current analysis was performed to investigate time distributions for task primitives, which are the minimum task unit of analysis used in dynamic HRA modeling. Using the time distribution data, the elapsed time for human actions in an extended loss of AC power (ELAP) scenario is then investigated. Time data and prediction are essential for modeling procedure performance.

99 GENERAL AND MISCELLANEOUS↗

Port Impedance Measurement and Current Injection Response Analysis for PLCs

Programmable Logic Controllers (PLCs) are used to control devices throughout the power system since they have fast control capabilities and can utilize multiple types of communication interfaces. Therefore, studying and mitigating their vulnerabilities to electromagnetic pulse is important for the reliability of PLC operations. Here, in this paper, an effective impedance measurement scheme is proposed and demonstrated for three PLCs to estimate their susceptibility to an electromagnetic pulse. The equivalent non-uniform transmission line model is established to eliminate the impact of the fixture in the de-embedding process. Then different parameters of the impedance measurement setup are explored. Based on the measured impedance, the equivalent circuit is established to calculate the response of the device when subjected to the electromagnetic pulse. The voltage and current responses of different interfaces are compared utilizing the developed pulsed Current Injection (CI) method. Finally, the impedance measurement scheme is verified through testing using three measuring instruments. And the CI simulation experiments reveal the characteristics and susceptibilities of different PLCs interfaces, indicating that some protection measures are required for the reliable operation of the PLC.

42 ENGINEERING↗

Designing monitoring networks for local earthquakes

Abstract Seismic networks are essential for monitoring local earthquakes in connection to industrial activities, including wastewater injection and CO2 sequestration. Because these networks are typically deployed for short periods of time at specific sites, it is beneficial to develop best practices for efficient and effective installation and monitoring. Such standards are available for regional earthquake and microseismic monitoring, but not readily available for local scale (tens of kilometer scale) monitoring. Once the region of interest has been determined, the key parameters for establishing a network are available monitoring station locations, site noise, and site utility. Networks should be designed based on the project monitoring goals for earthquake magnitude and density. Herein, a network was established at the Patterson and Hartland Oil Fields in western Kansas in association with a US Department of Energy CarbonSAFE carbon capture and sequestration research project. We employed observations from an analog local network, the Wellington Earthquake Monitoring Network in south-central Kansas, to assess site noise and estimate earthquake detection thresholds for the Patterson and Hartland fields. Noise from oil production facilities was evaluated, concluding that oil lease sites are suitable for monitoring small local earthquakes (M1-M3). The network was designed to have a magnitude of completeness of M1 while using station locations on existing field operator leases. Fifteen months of continuous network operation demonstrates reliable and efficient local earthquake monitoring and provides best practices recommendations for similar operations.

58 GEOSCIENCES↗

Informing Plant Asset Reliability and Availability Through AI-Driven Analysis of Operator Logs

The availability and reliability of nuclear power plant (NPP) structures, systems, and components (SSCs) are critical parameters for NPP safety. Tracking these parameters is necessary but costly and labor-intensive, requiring the collection and evaluation of SSC event data such as shutdowns, startups, and failures. To show how these events are needed for the parameters an example is given: one measure of reliability is based on the number of equipment failure events and the number of run hours (i.e., the time from a startup event to a shutdown event). Here, this work investigates using artificial intelligence (AI) to mine NPP operator log entry texts for SSC event data. Four AI approaches were explored for identifying these events, including natural language processing (NLP) methods, generative AI, generative AI combined with NLP, and topic modeling. A key challenge addressed with all four approaches is the brevity of operator log entries. Among these four a neural network–based NLP method was shown to be the most promising for this application, achieving F1 scores of 86.0% for shutdowns, 92.2% for startups, and 80.4% for failures on a subject-matter-expert-curated dataset from NPP operator logs, compared to a baseline of 66.6% for a random classifier. This shows that NLP methods can perform better than generative AI. Additionally, the NLP methods combined with generative AI were shown to perform better than generative AI alone. Generative AI was most successful at providing the background information for the NLP methods to use. This work demonstrates the potential to use AI to automate parameter collection from NPP operator log entries and other records.

97 - MATHEMATICS AND COMPUTING↗

Reliability of Digital Communications in Nuclear Facilities and Operations

A comprehensive evaluation of methods to compare the reliability of wired and wireless digital communication networks for use in nuclear power plants. The study underscores the critical role of communication reliability in ensuring operational safety in nuclear power plants. Key objectives include developing a methodology to assess communication technologies’ reliability, particularly for comparing wireless and wired networks, for nuclear facility applications. The framework focuses on technology-agnostic evaluations and emphasizes the importance of reliability metrics spanning safety, security, and monitoring functions. The framework emphasizes that the key performance indicators are application dependent and provides a hierarchy of different network types that will have different reliability requirements. The report considers both existing plants and advanced reactors, including small modular reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Commercial building loads providing ancillary services In PJM

The adoption of low carbon energy technologies such as variable renewable energy and electric vehicles, coupled with the efficacy of energy efficiency to reduce traditional base load has increased the uncertainty inherent in the net load shape. Handling this variability with slower, traditional resources leads to inefficient system dispatch, and in some cases may compromise reliability. Grid operators are looking to future energy technologies, such as automated demand response (DR), to provide capacity-based reliability services as the need for these services increase. While DR resources are expected to have the flexibility characteristics operators are looking for, demonstrations are necessary to build confidence in their capabilities. Additionally, building owners are uncertain of the monetary value and operational burden of providing these services. To address this, the present study demonstrates the ability of demand response resources providing two ancillary services in the PJM territory, synchronous reserve and regulation, using an OpenADR 2.0b signaling architecture. The loads under control include HVAC and lighting at a big box retail store and variable frequency fan loads. The study examines performance characteristics of the resource: the speed of response, communications latencies in the architecture, and accuracy of response. It also examines the frequency and duration of events and the value in the marketplace which can be used to examine if the opportunity is sufficient to entice building owners to participate.

MacDonald, Jason↗

Machine Learning in Power System Operations: Training Data

Reliability and stability of the electric grid today has depended upon operations of the grid which include the protective relay. Today, the electricity sector faces new challenges with the shift of generation resource characteristics away from the traditional “big iron” generation to inverter-based resources (IBR) which shift the physics and assumption used in grid operation and protection. These changing conditions represent new challenges for protective relays (identification of faults) and increased challenges for protection engineers (correct settings and configuration, reduction of mis-operations), both issues recognized in research and industry. Finding new approaches to reduce mis-operations in relaying and new approaches to fault identification is critical to grid operations. Using today’s modern technology of embedded systems, edge computing, machine learning (ML), and communications we can help address challenges and augment and improve on existing power system operations methodologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Implementation and Operation of Power Flow Control Solutions for Transmission Systems

Power-flow controls (PFCs) technologies provide a suite of alternatives to more-efficiently direct the flow of power on the grid, improving flexibility and enabling the grid to be more responsive and resilient. PFCs can be used in many cases to mitigate overloads and consequently defer the installation of grid-expansion projects. They can also be suitable options in situations where new transmission lines cannot be built because of environmental constraints, land use, or other types of restrictions. Other uses include mitigation of loop or unintended flows, forcing of contractual or scheduled flows, reduction of congestion, and mitigation solutions during large maintenance or construction projects. While many studies have demonstrated the potential economic benefits of PFC for different types of applications, the implementation implications of using multiple PFCs for system operation and reliability have not been analyzed in detail. The lack of information and practical experience on these aspects hinders adoption of this technology. One use case would be that multiple PFCs are required to coordinate congestion management. In such cases, multiple PFCs are deployed in a meshed power system to control power flows across a wide area. The challenges are associated with PFC interaction—namely, the self and mutual power-flow sensitivity of each PFC, which must be accounted for in the calculation of the respective operating setpoints. This report analyzes implementation and operation that must be considered in evaluating transmission solutions using PFCs. The report first analyzes attributes with which PFC-based solutions should comply, based on the objective and characteristics of each particular use case. It then describes different approaches for coordinated control of multiple PFC devices for different applications, including options to avoid adverse interactions and reduce risks due to inappropriate coordination. Control and operation are illustrated through case studies performed on both generic and actual power system models. This report provides insights for transmission planners and operation engineers about the implementation of PFC-based transmission solutions; consequently, it will help them make informed decisions about the adoption of the technology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Evolution of the high-power spallation neutron mercury target at the SNS

The Spallation Neutron Source (SNS) began operation in 2006 and first operated at its full 1.4 MW power in 2013. Targets, which receive the pulsed proton beam, were a limiting factor for reliable full power operation for several years. Reaching reliable target operation at 1.4 MW required not only changes to the target design but also support and coordination across the entire SNS enterprise. The history and some key lessons learned are presented.

Winder, Drew E↗

Optimal Complementarity Analysis of Potential Floating Solar Co-Located With Existing Hydropower Assets Across the Contiguous United States

The U.S. is expected to double its rate of renewable capacity from 2024 to 2030. However, the stochastic nature of renewable energy poses challenges to the operation and reliability of our power grid. The combined generation from renewable energy sources, with dispatchable sources (such as hydropower) operating as a hybrid energy plant, could mitigate this variability. In this paper, the complementarity analysis of selected U.S. reservoirs with existing hydropower assets (EHAs) and potential floating photovoltaics (FPVs) is conducted for the continuous U.S. (CONUS). The optimal FPV capacity for each site is determined by minimizing the variability of the combined output, while adhering to the FPV potential. Our results indicate that over 50% of the analyzed reservoirs achieve a stability coefficient exceeding 0.5, leading to a less-variable output after optimization. Finally, we analyze the complementary hydro-FPV hybrid reservoirs by considering both the Pearson correlation coefficient and the stability coefficient on daily, monthly, and yearly scales. Summaries are included of locations of theoretical FPVs co-located with hydropower plants that exhibit high complementarity based on the selected metrics.

13 - HYDRO ENERGY↗

Multi-level optimization with the koopman operator for data-driven, domain-aware, and dynamic system security

Cyber-Physical Systems (CPSs) like the power grid are critically important but also increasingly vulnerable; ensuring reliable system operation in the face of disruptions is becoming more and more challenging. Multi-Level Optimization (MLO) is a powerful way to model adversarial interactions, which naturally makes it applicable to studying CPS security. However, MLO typically does not address underlying system dynamics, and incorporating nonlinear dynamics is generally infeasible. In this paper, we show how to combine MLO with the Koopman Operator (KO) to remedy this. The KO maps nonlinear dynamics to a lifted space in which those dynamics are linear, thus making it ideal for use with MLO. Moreover, the structure of the KO also provides convenient ways to incorporate domain knowledge into the data-driven process of learning the KO representation of a given system. Here we then demonstrate the use of MLO-KO on a small example problem taken from the power grid domain, discuss the scalability and computational cost of MLO-KO, and identify future research directions for this work.

42 ENGINEERING↗

Optimal Operation for Resilient and Economic Modes in an Islanded Alaskan Grid

Legacy energy management systems for distribution system or microgrids are typically driven by economics. During extreme events, resiliency can be defined as ability of the system to keep supplying critical loads. Resilient operation during extreme events (e.g. avalanche in Alaska) may require decision variables to be different and conflicting with economic operation. Operational objectives are driven by a complex consideration of the economic, reliable and resilient operation of the system: economic and reliable in normal operating state and resilient during extreme events. Challenge is to move between economic and resilient operation in optimal manner and setting up problem formulation and constraints specially with Distributed Energy Resources (DERs). In this paper, we focus on striking a balance between optimal economic and resilient operation using novel formulation and developed tool called Resiliency Enabled Energy System Operation Toolbox (RE-ESOT). Simulation results are provided for a real islanded grid in Alaska with battery energy systems.

50 EE - Wind and Water Power Program - Water (EE-4↗

Safety-Related Instrumentation and Control Pilot Upgrade (Initial Scoping Phase Implementation Report)

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP), NISP-EN-04, Standard Digital Engineering Process (SDEP), and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrade.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Safety-Related Instrumentation & Control Pilot Upgrade Initiation Phase Implementation Report

This research report (1) describes the process followed and products developed during the SR I&C Pilot Project Initial Scoping Phase, and (2) captures lessons learned. Exelon Generation and LWRS collaborated to develop a Digital Transformation Strategy as part of a larger Advanced Concept of Operations. The proposed SR I&C Pilot Upgrade provides a foundation stone for this Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant Total Cost of Ownership (TCO). Initial Scoping Phase activities for this Pilot Project have been performed in accordance with industry processes that have been adapted to better support digital upgrades. These processes include IP-ENG-001, Standard Design Process (SDP) [Reference 2], NISP-EN-04, Standard Digital Engineering Process (SDEP) [Reference 3], and Electric Power Research Institute (EPRI) Report 3002011816, Digital Engineering Guide (DEG). Completing Initial Scoping Phase Engineering and Operations, Licensing, and Project Management Activities was necessary to sufficiently bound the scope, schedule, and estimated cost of the Project to enable utility management to authorize moving into the Conceptual Design Phase. A significant finding of the Business Case Analysis (BCA) methodology developed and applied as part of this effort was that the growth rate of material costs for sustaining the operation of obsolete SR I&C equipment is accelerating. This directly contributed to the Project Economic Analysis created to justify continuing the Project. Project Initial Scoping Phase lessons learned have also been captured to assist the larger industry in understanding the Digital Transformation Strategy and SR I&C Pilot Project Initial Scoping Phase efforts. This is in keeping with the public/private partnership that has been established between the Department of Energy (DOE) and Exelon for this effort with engagement from the NRC. By addressing first-of-a-kind (FOAK) risks and capturing lessons learned, the SR I&C Pilot Upgrade Project addresses technical, regulatory, and business risks to enable subsequent implementers of similar upgrades.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Foundations for the Future Power System: Inverter-Based Resource Interconnection Standards

As power systems evolve to become reliant on solar, wind, batteries, and other inverter-based resources (IBRs), it is essential that those resources meet certain minimum performance and capability criteria designed to ensure the power system operates stably and reliably. Because those criteria, as enshrined in interconnection standards, take years to develop and are very long lived, they need to account for not only the present state of the power system but also its expected future state over the lifetime of the power plants to which they will apply. In addition, they need to be specific enough to ensure reliability without over specifying and, thereby, impeding innovation. Because power systems are shifting rapidly from a state where IBRs make up a small to medium portion of generation to one where the generation will, at times, come predominantly from IBRs, interconnection standards are especially challenging to develop today. Good interconnection standards can make the power system more reliable and less costly to operate, whereas poorly designed standards can lead to major problems, like the famous German 50.2-Hz problem, which introduced a risk of losing many gigawatts of solar on a frequency excursion and resulted in many IBRs being retrofitted at great cost to mitigate a major system reliability risk. Readying the power system by specifying forward-looking technical minimum functional capabilities for IBRs can be an effective approach to avoid future retrofits.

data models↗

Quench Behavior of 18-mm-Period, 1.1-m-Long Nb 3 Sn Undulator Magnets

A novel Nb 3 Sn-based superconducting undulator (SCU) was developed and integrated into the Advanced Photon Source (APS) at Argonne National Laboratory. The SCU achieved user operation within an accelerator environment. Compared to its Nb-Ti counterpart, the Nb 3 Sn SCU operates at substantially higher currents. Thus, a detailed experimental evaluation of the SCU magnets’ performance was necessary under both “wet” and indirectly cooled conditions to ensure its reliability during operation. Here our study indicated that the cooling method has a noticeable influence on the magnet's behavior. Specifically, energy dissipation in the magnets during quenches was observed to be greater under indirect cooling than with “wet” cooling. This investigation provided insights into the safe operational limits. Guided by these insights the more challenging high-current tests were successfully carried out at the end of the user phase. The SCU achieved the design undulator field of 1.17 T at 820 A and 4.2 K, with a magnetic gap of 9.5 mm and a period of 18 mm. Actual performance exceeded the specifications, reaching 850 A.

43 PARTICLE ACCELERATORS↗

Polarity effects on wake–up behavior of Al 0.94 B 0.06 N ferroelectrics

Wurtzite ferroelectric materials are promising candidates for energy-efficient memory technologies, particularly for applications requiring high operating temperatures. Asymmetric wake-up behaviors, in which the polarization reversal depends both on polarity and cycle number for the first few dozen cycles, must be better understood for reliable device operation. Here, the detailed analysis of the asymmetric wake-up behavior of thin film Al 0.94 B 0.06 N was performed combining time-resolved switching measurements with Rayleigh analysis, piezoelectric measurements, and etching experiments of progressively switched samples. Furthermore, the analysis shows that the gradual opening of the polarization hysteresis loops associated with wake-up is driven by a gradual increase in the domain-wall density and/or domain-wall mobility with electric field cycle to the polarity opposite to the growth polarity. The insights of this discovery will help to guide interface and polarity design in the eventual deployment of reliable devices based on these materials.

36 MATERIALS SCIENCE↗

Geologic Seawater Air Conditioning (GeoSWAC) System: Resource Assessment and Techno-Economic Evaluation in Puerto Rico

Puerto Rico's hot, humid climate drives a high and persistent demand for cooling, straining an aging and fuel-dependent energy grid while increasing peak electricity loads. Much of this challenge stems from inefficient air-conditioning systems operating in buildings without passive cooling design, making cooling both costly and vulnerable to disruption - especially during hurricanes. To address these issues, researchers evaluated a new alternative called Geologic Seawater Air Conditioning (GeoSWAC), which uses inland wells connected to naturally cold, deep seawater. By avoiding long offshore pipelines and energy-intensive refrigeration cycles, GeoSWAC can cut electricity use by 75-90%, reduce environmental impacts, and operate more reliably during power outages. A case study at the University of Puerto Rico's Rio Piedras campus found that GeoSWAC could deliver significantly lower levelized costs of cooling, reduced operational expenses, and improved water conservation compared to the campus's existing chilled-water plant. The system offers key advantages - including access to a constant cold heat sink, low pumping requirements, and enhanced resilience - for coastal regions such as Puerto Rico, the broader Caribbean, and Florida. However, its effectiveness depends heavily on site-specific geological conditions, such as subsurface connectivity and aquifer characteristics, which require detailed investigation. Future research should refine hydrogeological models, conduct performance and economic analyses, and address regulatory and permitting frameworks to support broader adoption of this promising technology.

24 POWER TRANSMISSION AND DISTRIBUTION↗