Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operating systems”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Earned Value Management Systems for Operations Activities

An earned value management system (EVMS), which monitors contractor performance, is a requirement for program and project management for all major acquisitions by the United States Federal Government with development effort: (i.e., an asset requiring management attention because of its importance to an agency’s mission; high development, operating, or maintenance costs; high risk and/or high return). As an area less explored in earned value management (EVM) practices, this paper will survey the application of an EVMS for operations activities defined as: (1) Non-capital asset activities that are projects (or project - like) with definable start and end dates, with discrete scopes of work, and measurable accomplishments; as well as (2) Routine or recurring facility or environmental operations. This paper will examine the use of an EVMS to evaluate performance of operations and maintenance activities required once construction of a capital asset is complete and being used as intended. Such activities include upgrades and maintenance in order for capital assets to meet their mission function over a life-cycle (through repair, replacement, etc.). This paper will provide background on this topic from the perspective of the Department of Energy (DOE) Environmental Management (EM) Program. In addition, it will provide material from a panel discussion provided by a group of experts from the October 2019 Office of Environmental Management Project Management Workshop, as well as material from subsequent research on this topic.

97 MATHEMATICS AND COMPUTING↗

System and operation for thermochemical renewable energy storage

Systems and methods for energy storage and energy recovery are provided. An electrical-to-electrical energy storage system includes a thermochemical energy storage device, a blower, a compressor, a turbine, and an electrical generator. The TCES device includes a vessel, a porous bed, and a heater. The porous bed is disposed within an interior volume of the vessel. The porous bed comprises a reactive material. The reactive material is configured to release oxygen upon being heated to a reduction temperature, and generate heat when exposed to oxygen. The heater is in thermal contact with the reactive material. The blower is configured to remove oxygen from the interior volume. The compressor is configured to flow oxygen into the interior volume. The turbine is configured to receive a heated, oxygen-depleted gas from the interior volume. The generator is configured to be powered by the turbine to generate electricity.

Klausner, James F.↗

Dynamic Line Rating Oncor Electric Delivery Smart Grid Program

Electric transmission lines are the lifeline of the electric utility industry, delivering its product from source to consumer. This critical infrastructure is often constrained such that there is inadequate capacity on existing transmission lines to efficiently deliver the power to meet demand in certain areas or to transport energy from high-generation areas to high-consumption regions. When this happens, the cost of the energy rises; more costly sources of power are used to meet the demand or the system operates less reliably. These economic impacts are known as congestion, and they can amount to substantial dollars for any time frame of reference: hour, day or year. There are several solutions to the transmission constraint problem, including: construction of new generation, construction of new transmission facilities, rebuilding and reconductoring of existing transmission assets, and Dynamic Line Rating (DLR). All of these options except DLR are capital intensive, have long lead times and often experience strong public and regulatory opposition. The Smart Grid Demonstration Program (SGDP) project co-funded by the Department of Energy (DOE) and Oncor Electric Delivery Company developed and deployed the most extensive and advanced DLR installation to demonstrate that DLR technology is capable of resolving many transmission capacity constraint problems with a system that is reliable, safe and very cost competitive. The SGDP DLR deployment is the first application of DLR technology to feed transmission line real-time dynamic ratings directly into the system operation’s State Estimator and load dispatch program, which optimizes the matching of generation with load demand on a security, reliability and economic basis. The integrated Dynamic Line Rating (iDLR)1 collects transmission line parameters at remote locations on the lines, calculates the real-time line rating based on the equivalent conductor temperature, ambient temperature and influence of wind and solar radiation on the stringing section, transmits the data to the Transmission Energy Management System, validates its integrity and passes it on to Oncor and ERCOT (Electric Reliability Council of Texas) respective system operations. The iDLR system is automatic and transparent to ERCOT System Operations, i.e., it operates in parallel with all other system status telemetry collected through Supervisory Control and Data Acquisition (SCADA) employed across the company.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Learning Koopman Operators for Systems with Isolated Critical Points

The Koopman operator provides a way to transform a (potentially) nonlinear finite-dimensional dynamical system into an infinite-dimensional linear system by lifting the nonlinear state dynamics into a functional space of observables, where the dynamics are linear. Previous literature has claimed that it is not possible to represent nonlinear dynamics with multiple isolated critical points if the set of observables is finite and contains the state; more precisely, such a set cannot be invariant under the Koopman operator. In this paper, we investigate this claim in more detail and provide an analytical counterexample to disprove it. We also consider the convergence of discretetime Koopman approximation error to the continuous-time error: we show both how this convergence occurs in general and how it can fail for systems with multiple isolated critical points. In particular, discontinuities in Koopman observables at the boundaries of basins of attraction may cause the continuous-time error to diverge; the discretetime error also suffers from this as the sampling time step goes to zero.

Bakker, Craig KR↗

Multi-spool CO2 aircraft power system for operating multiple generators

A CO 2 bottoming cycle system includes a first compressor operatively connected to a first turbine through a first shaft. A first generator is operatively connected to the first shaft. A second compressor is fluidically connected to the first compressor. The second compressor is operatively connected to a second turbine through a second shaft. A second generator is operatively connected to the second shaft. The first turbine is fluidically connected to the second turbine.

Taylor, Stephen H.↗

Application of Banking Scoring and Rating for Coherent Risk Measures in Electricity Systems ABSCORES

This project developed a framework for asset and system risk management that can be incorporated into current electricity system operations to improve economic efficiency and establish an Electric Assets Risk Bureau. We leveraged scoring and ratings from banking and financial institutions alongside current optimization methods in dispatching power systems to help system operators and electricity markets schedule resources. This approach is based on the observation that there are major discrepancies between the power scheduled by a system operator and the actual power generated/consumed. These discrepancies—exacerbated by unplanned contingencies (e.g., natural disasters)—are caused by multiple factors, including the different financial, environmental and risk preferences of power producers, consumers, and aggregators. We developed a framework that counteracts two failures in electricity system operations: imperfect information and missing markets for products. The technical approach included five tasks. Tasks 1 and 2 supported the development of risk scores at the asset level with historical data collected for this project. Tasks 3, 4, and 5 incorporated scoring into decision-making at the system level. The proposed effort achieved PERFORM's Program Objectives because the proposed outputs and algorithms do not exist in the electricity industry and are an innovative approach to managing risk. Since the acknowledged need to better assess and act upon risk profiles for grid assets has not been met by the industry, this project will also impact ARPA-E's Mission Areas, including improving energy efficiency and giving the U.S. a technological lead in advanced energy technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ARM-Related Unmanned Aerial System (UAS) and Tethered Balloon System (TBS) Operational Requirements and Approval

This procedure addresses the requirements and process for obtaining approval for Unmanned Aerial System (UAS) and Tethered Balloon System (TBS) operations at DOE Office of Science (SC) Atmospheric Radiation Measurement user facility observatories (ARM sites), ARM-supported training flights, atmospheric instrument development flights, and campaigns at non-ARM sites. ARM sites include both ARM observatories and ARM mobile facility deployments. The protection of people, property, and the environment during UAS and TBS operations is the foundation of executing a successful mission using UAS or TBS. This procedure is designed to facilitate safe mission execution. It does not address obtaining approval for ARM-supported research, which is approved through the ARM Field Campaign (AFC) or Engineering Evaluation (EE) processes. Approval of UAS and TBS operations is a prerequisite for final approval of an AFC or EE by the Infrastructure Management Board (IMB) and may be conducted in parallel with preparation and submittal of the AFC or EE proposal to the IMB. This procedure addresses UAS and TBS requirements; mission planning; documentation; maintenance; risk assessment; airworthiness determination; operation approval; training and qualification requirements and responsibilities for UAS remote pilots; TBS operators; visual observers; maintenance technicians; and A&P mechanics. It also addresses the responsibilities of ARM site managers, the Office of Science Aviation Safety Manager, principal investigators, requesting organizations, and Range Safety Officers. This procedure is derived from DOE O 440.2C, Aviation Management and Safety, and Federal Aviation Administration (FAA) Regulations (FARs), 14 CFR 107, and 14 CFR 101. It contains two sections: Section 3.0 addresses UAS operations; Section 4.0 addresses TBS operations.

unmanned aerial systems, tethered balloon systems,↗

Coordinated operation of electricity and natural gas systems from day-ahead to real-time markets

Power systems worldwide are becoming more reliant on energy from natural gas, wind, and solar, posing possible reliability and coordination challenges from the tighter coupling of these infrastructure systems. This paper proposes a framework for the market-based coordination of electricity and natural gas system operations. The proposed framework includes a power system model that accounts for flexibility in the commitment of power plants with short start-up and shut-down times, coupled with a dynamic gas model that simulates when gas cannot be delivered to generators. The capabilities of the framework are illustrated using real-world electric power and gas systems, including scenarios around wind and solar penetrations and the analysis of time-variant, “shaped flow” gas nominations. Our results indicate that coordination between power and gas systems improves total gas delivery and reduces out-of-merit order dispatch in the electricity system, and that shaped flows may reduce unserved gas in systems with high penetrations of wind and solar. Coordination can have mixed effects on carbon-dioxide emissions, with emissions increasing with coordination for current systems during high load weeks but decreasing for systems with high renewable penetrations, particularly during periods of high variability.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Robust and resilient coordination of feeders with uncertain distributed energy resources: from real-time control to long-term planning

To enable flexible demand and ensure reliable and economical operation of distribution systems, we present a novel hierarchical scheme that actively coordinates responsive behind-the-meter grid resources, including distributed energy resources (DERs), to reliably manage each unbalanced distribution feeder and exploits the available flexibility to economically optimize the entire network. Each layer of the scheme employs advanced optimization methods at different timescales to ensure that the system operates within both grid and device limits. The hierarchy is validated in a large-scale realistic simulation based on data from the industry. Simulation results show that coordination of flexibility improves both system reliability and economics, and enables greater penetration of solar PV. Discussion is also provided on the practical viability of the required communications and controls to implement the presented scheme within a large DSO.

14 SOLAR ENERGY↗

Cyber-Physical Dynamic System (CPDS) Modeling for Frequency Regulation and AGC Services of Distributed Energy Resources

The substantial integration of renewable energy brings significant challenges to balance the system in real time because of the variability and intermittency of renewable power. For the reliable system operation, the frequency regulation service is used to stabilize the system frequency through automatically balancing the system generation and load. On one hand, with the substantially increasing deployment of renewable energy in electricity system, the requirement of frequency regulation (FR) services increases significantly. On the other hand, the current main resource of FR services, the controllable conventional generation, is continuously decreasing in the system generation mix. This means that in the future high renewable penetration power system, additional and alternative reliable FR services providers such as distributed energy storage (DES) resources should be explored. Although the capability of utility-scale energy storage to provide FR services has been demonstrated, the integrated control and dynamic modeling of distributed energy resource (DER) providing frequency regulation grid services has been rarely explored. There are several challenges to adopt DERs to provide reliable grid services as illustrated in FERC 755. First, the distributed installation of DES requires a comprehensive cyber-physical dynamic system (CPDS) modeling to fully consider the impacts of the communication latency variability on its real time FR provision capability. Unlike the conventional generators, there are two-layer communication between DERs and system operators which increase the communication delay. Second, unlike the conventional generators whose dynamic models have been comprehensively studied, the difference among individual DER components' power-dynamic characteristic brings challenges in the accurate dynamic AGC modeling of its power-frequency relationship. Third, the temporal dependent state of charge uncertainty of DERs challenges DERs' power and frequency regulation capacities scheduling in the look-ahead generation scheduling. Therefore, the aggregator should optimize the frequency regulation provision from individual DER in real time. To overcome these challenges, this project proposes a cyber-physical dynamic system (CPDS) model to handle the uncertainty of DERs two-layer communication latency and power dynamics. The variability of DERs' communication delay and dynamic constraints will be comprehensively modeled. The DERs' AGC model with communication delay is designed to validate DESs' frequency regulation services. Like current performance-based frequency regulation evaluation, the delivery of DERs' frequency regulation will be assessed through post-analysis of the actual AGC response with respect to the AGC control signal from system operators. Consequently, the reliability improvement with DERs providing reliable frequency regulation services can be evaluated from a comprehensive perspective considering all the dynamics of communication and power.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Statistical Characterization of Solar Photovoltaic Power Variability at Small Timescales: Preprint

Integrating large amounts of variable and uncertain solar photovoltaic power into the electricity grid is a growing concern for power system operators in a number of different regions. Power system operators typically accommodate variability, whether from load, wind, or solar, by carrying reserves that can quickly change their output to match the changes in the solar resource. At timescales in the seconds-to-minutes range, this is known as regulation reserve. Previous studies have shown that increasing the geographic diversity of solar resources can reduce the short term-variability of the power output. As the price of solar has decreased, the emergence of very large PV plants (greater than 10 MW) has become more common. These plants present an interesting case because they are large enough to exhibit some spatial smoothing by themselves. This work examines the variability of solar PV output among different arrays in a large ({approx}50 MW) PV plant in the western United States, including the correlation in power output changes between different arrays, as well as the aggregated plant output, at timescales ranging from one second to five minutes.

14 SOLAR ENERGY↗

Deliverable Flexible Ramping Products Considering Spatiotemporal Correlation of Wind Generation and Demand Uncertainties

Flexible ramping products (FRPs) have been implemented by several independent system operators (ISOs) to procure adequate flexible resources. Currently, system operators estimate the system level ramping requirements ignoring the spatiotemporal correlations among various uncertainty sources. This leads to overestimates/underestimates of ramping requirements. In addition, the explicit FRPs model considers only the generation ramping limitation. Other security constraints, such as the transmission limits, are not considered, which leads to deliverability issues of FRPs. To deal with these shortcomings of current FRPs models, this paper proposes a deliverable FRPs based on a distributionally-robust chance constrained multi-interval optimal power flow (DRCC-MIOPF) considering the spatiotemporal correlation of wind power and demand uncertainties endogenously. Furthermore, an asymmetrical affine policy (AAP) is proposed to leverage generation flexibility and mitigate the uncertainty in different directions. The pricing mechanism of the FRPs is proposed using a novel uncertainty-contained locational marginal price (U_LMP) which is derived from the proposed AAP-DRCC-MIOPF model. New components representing the price of FRPs are added into the traditional LMP formulation. Finally, the PJM 5-bus, IEEE 39-bus and IEEE 118-bus systems case studies validate the proposed FRPs approach. The payment of uncertain demand and wind power on FRPs are analyzed.

electricity market↗

Thermal Energy Distribution System (TEDS) Operating Modes and Control Strategies

A Thermal Energy Delivery System was constructed at the Idaho National Laboratory for demonstrating distribution of thermal energy to and from co-located systems sited in the INL Dynamic Energy Transport and Integration Laboratory (DETAIL). DETAIL includes a flow loop simulating a pressurized water reactor, a high-temperature steam electrolysis unit and a thermal energy storage system. This report discusses the various operating modes and control strategies for enabling simultaneous, flexible and efficient transfer of heat from thermal energy sources to end users.

25 ENERGY STORAGE↗

A Fast and Accurate Transient Stability Assessment Method Based on Deep Learning: WECC Case Study

Transient stability is one of the critical aspects of power system stability assessment. The increasing integration of inverter-based resources and the retirement of conventional synchronous generators result in the decreasing system inertia and growing complexity of system operating conditions. Using a few selected typical operating conditions cannot guarantee system transient stability in all operating conditions, and the time-domain simulation of all operating conditions requires tremendous time and is often infeasible. This paper proposes a more efficient transient stability assessment method based on deep learning. The binary search method is used to determine the critical clearing time (CCT) in creating training databased by time-domain simulation. This method is fast and accurate with 1 ms resolution. The buses whose CCTs are lower than 200 ms are considered critical buses. Buses close to each other are grouped based on their mutual admittance matrix to reduce the search space of the critical buses. This paper also proposes the generator feature normalization based on the physical model. Case study on the reduced 240-bus WECC system model demonstrates that the proposed method can predict CCT accurately and efficiently.

critical clearing time↗

Operation of a High Renewable Penetrated Power System With CSP Plants: A Look-Ahead Stochastic Unit Commitment Model

The integration of variable renewable energy (VRE) generation, i.e., wind power and solar photovoltaic, brings significant uncertainty for the power system operation. Different with VRE techniques, concentrating solar power (CSP) is an appealing renewable generation technology due to its dispatch ability through the use of thermal energy storage and is thus expected to play a significant role in high renewable energy penetrated power systems. In this paper, we propose a look-ahead stochastic unit commitment model to operate power systems with CSP under high renewable energy penetration. It has a three-stage structure. The first stage optimizes the operational decisions in a day-ahead framework based on forecasts; the second stage minimizes the expected generation cost for possible realizations in the real time; and the third stage accounts for look-ahead operation in future operating days. This paper has a dual purpose: first, exploring how CSP plants operate in high renewable penetrated power systems; and second, analyzing the benefits of CSP in accommodating VRE generation. A case study on a modified IEEE RTS-79 system with actual solar and wind power data is provided to validate the proposed method.

14 SOLAR ENERGY↗

Power Sector Resilience Planning Guidebook: A Self-Guided Reference for Practitioners

The provision of reliable, secure, and affordable electricity is essential to power economic growth and development. The power system is at risk from an array of natural, human-caused, and technological threats, which can cause everything from power interruption to chronic undersupply of energy. It is critical for policymakers, planners, and system operators to safeguard their power systems from these threats by proactively planning for future needs and investing in resilient power systems. This guidebook is a reference for power sector resilience planning that introduces policymakers, power sector investors, planners, system operators, and other energy-sector stakeholders to the key concepts and steps involved in power sector resilience planning. Users can then apply this knowledge in the development of strategic, country-specific processes and identify actions that increase power sector resilience. This guidebook can be used as a stand-alone resource or shared with participants at stakeholder workshops to facilitate discussions and complete key steps of a resilience planning process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Smart Infrared Inspection System Field Operational Test (Final Report)

The Smart InfraRed Inspection System (SIRIS) is a tool designed to assist inspectors in determining which vehicles passing through the SIRIS system are in need of further inspection by measuring the thermal data from the wheel components. As a vehicle enters the system, infrared cameras on the road measure temperatures of the brakes, tires, and wheel bearings on both wheel ends of commercial motor vehicles (CMVs) in motion. This thermal data is then presented to enforcement personal inside of the inspection station on a user friendly interface. Vehicles that are suspected to have a violation are automatically alerted to the enforcement staff. The main goal of the SIRIS field operational test (FOT) was to collect data to evaluate the performance of the prototype system and determine the viability of such a system being used for commercial motor vehicle enforcement. From March 2010 to September 2010, ORNL facilitated the SIRIS FOT at the Greene County Inspection Station (IS) in Greeneville, Tennessee. During the course of the FOT, 413 CMVs were given a North American Standard (NAS) Level-1 inspection. Of those 413 CMVs, 384 were subjected to a SIRIS screening. A total of 36 (9.38%) of the vehicles were flagged by SIRIS as having one or more thermal issues; with brakes issues making up 33 (91.67%) of those. Of the 36 vehicles flagged as having thermal issues, 31 (86.11%) were found to have a violation and 30 (83.33%) of those vehicles were placed out-of-service (OOS). Overall the enforcement personnel who have used SIRIS for screening purposes have had positive feedback on the potential of SIRIS. With improvements in detection algorithms and stability, the system will be beneficial to the CMV enforcement community and increase overall trooper productivity by accurately identifying a higher percentage of CMVs to be placed OOS with minimal error. No future evaluation of SIRIS has been deemed necessary and specifications for a production system will soon be drafted.

brake system↗