Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Off gas”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Linear Temporal Stability Analysis of a Low-Density Round Gas Jet Injected into a High-Density Gas

It has been observed in previous experimental studies that round helium jets injected into air display a repetitive structure for a long distance, somewhat similar to the buoyancy-induced flickering observed in diffusion flames. In order to investigate the influence of gravity on the near-injector development of the flow, a linear temporal stability analysis of a round helium jet injected into air was performed. The flow was assumed to be isothermal and locally parallel; viscous and diffusive effects were ignored. The variables were represented as the sum of the mean value and a normal-mode small disturbance. An ordinary differential equation governing the amplitude of the pressure disturbance was derived. The velocity and density profiles in the shear layer, and the Froude number (signifying the effects of gravity) were the three important parameters in this equation. Together with the boundary conditions, an eigenvalue problem was formulated. Assuming that the velocity and density profiles in the shear layer to be represented by hyperbolic tangent functions, the eigenvalue problem was solved for various values of Froude number. The temporal growth rates and the phase velocity of the disturbances were obtained. The temporal growth rates of the disturbances increased as the Froude number was reduced (i.e. gravitational effects increased), indicating the destabilizing role played by gravity.

Lawson, Anthony L.↗

Hydrogen Enrichment for Solid Oxide Fuel Cell Gas Turbine (SOFC/GT) Hybrid Power Generation Systems Using Mechanical Gas Separation

This presentation, given at the 37 th annual Pittsburgh Coal Conference on September 8-11, 2020, includes information on the process, previous work, normal and oblique shocks model, diffuser design model, and calculation results (expansion, recompression with no losses, and recompression with mass depletion). Summary includes the concept of aerodynamic separation of water and carbon dioxide from a SYNGAS stream and that deposition was modeled by mass depletion from a compressible flow.

VanOsdol, John↗

3D-printed electrode, gas diffusion electrode (GDE) and gas diffusion layer (GDL) for fuel cell applications

An electrocatalytically active ink composition is used with an additive manufacturing process, such as 3D printing, to produce electrodes having consistent, adaptable, and high surface area structures. The electrocatalytically active ink composition includes a mixed powdered precursor and a polymer matrix. The mixed powdered precursor includes a carbon source, a dopant source, and/or a metal-containing catalyst. The material and electrochemical properties of the ink composition may facilitate 3D printing of electrochemically active electrodes for energy conversion and storage devices, and may allow fine-tuning of macro- and microstructures to develop electrodes having improved activity and efficiency.

Lee, Kwan-Soo↗

Findings on Subtask 3.1 - Bakken Rich Gas Enhanced Oil Recovery Project

Total in-place oil for the Bakken petroleum system (BPS) (which includes the Bakken and Three Forks Formations) has been estimated to be 600 billion barrels (bbl). However, BPS wells have decline rates as high as 85% over the first 3 years of their lives, and primary recovery factors typically range from 3% to 10% of original oil in place. Given the low initial recovery rates, even small incremental productivity improvements could dramatically increase technically recoverable oil in the BPS. One potential solution is enhanced oil recovery (EOR) using gas injection, such as carbon dioxide (CO2) or hydrocarbon (HC) gases. While commonly used in conventional reservoirs, CO2 EOR in unconventional tight oil reservoirs has been limited to pilot tests. EOR using rich gas (mixture of methane, ethane, and propane) has also been employed in numerous pilots in several unconventional plays and has recently been successfully applied in the Eagle Ford play. If successful, large-scale gas-based EOR in the BPS could dramatically increase oil productivity and recovery factors and extend the life of the play for decades. While CO2 may be a technically suitable working fluid for EOR in the BPS, supplies are limited and costs for using CO2 in EOR pilots are prohibitively high. Meanwhile, produced gas flaring has presented challenges for BPS operators in North Dakota. Analysis conducted by the North Dakota Pipeline Authority indicates that the current gas-gathering infrastructure in North Dakota is insufficient to accommodate all of the associated gas that is produced from the BPS. The geographically isolated location of North Dakota relative to large natural gas markets, combined with suppressed natural gas prices, has made it economically challenging for industry to invest capital in expanding gas-gathering infrastructure in the state. These circumstances led to a research program conducted by the Energy & Environmental Research Center (EERC) in partnership with Liberty Resources Management Company LLC (LR) to examine the potential to use rich gas injection for EOR and mitigate flaring. A rich gas EOR pilot test was designed and executed by LR at its Stomping Horse development area in Williams County, North Dakota. From July 2018 through May 2019, a total of 160 million standard cubic feet (MMscf) of rich produced gas was injected into the BPS using five different wells in a sequential injection strategy. LR’s Leon–Gohrick drill spacing unit (DSU) was used as the test site. Regulatory oversight was provided by the North Dakota Industrial Commission (NDIC). Technical support was provided by the EERC through a series of laboratory, modeling, and field-based activities, and additional post-pilot research activities incorporated learnings from the test, developed new laboratory data, improved fracture modeling methods, and developed machine learning and big data analytics. The results from the Stomping Horse rich gas EOR pilot activities indicate that developing an effective, economical EOR approach for the BPS will require more field tests. Another key lesson learned from the Stomping Horse tests is that detailed pre- and posttest data on reservoir conditions and fluids production are essential. Robust reservoir characterization provides information that is crucial to creating realistic geomodels and conducting valid dynamic simulations of potential EOR scenarios. A detailed understanding of the completions and production history of offset wells is also necessary for valid test result interpretations. This knowledge is essential to designing the operational parameters of injectivity tests and interpreting the results. A conformance control strategy is also essential to success. Laboratory-based examinations of rich gas interactions with reservoir fluids and rocks were conducted, with an emphasis on determining the ability to mobilize oil in the tight reservoir rocks and shales of the BPS. Injection fluid composition was shown to have a positive impact on reducing reservoir oil minimum miscibility pressure (MMP), reducing interfacial tension (IFT), and altering wettability. IFT and contact angle measurements demonstrated that wettability can be altered in the presence of rich gas, suggesting the potential to improve oil recovery. Iterative modeling of surface infrastructure and reservoir performance using data generated by the various project activities was conducted. A geologic model of the Stomping Horse area was built; history-matched oil, gas, and water production was used in simulations of various EOR scenarios. Early programmatic modeling results were used to support LR’s design and operation of the EOR pilot and to provide insight regarding optimization of future commercial-scale BPS EOR design and operations. Post-pilot modeling focused on alternative methods of understanding complex fracture networks and accelerating simulation time. These led to improved simulation run times and provide excellent history-matching results. Several of these iterative models were used as the bases for developing algorithms into machine learning and big data analytics. History matching in reservoir simulation is time-consuming and computer processing-intensive. Machine learning algorithms were created, and an automated history-matching tool was developed. A large set of synthetic reservoir simulations were created to generate well responses (oil, gas, and water production, well bottomhole pressure [BHP], and tracer or propane breakthrough) for a set of EOR operating parameters that included offset well status (open or closed), injectate (rich gas or propane), injection rate, and injection well BHP. A user interface was developed to provide real-time visualization. Machine learning-based models were developed to provide rapid forecasting of well performance given a set of user-defined EOR operating parameters. These predictive models allow the user to modify the offset well status, injection rate, and injection well BHP and rapidly forecast future production performance. The combination of real-time visualization tools with real-time forecasting tools provides a framework for real-time control—operational changes that the EOR site operator can enact (e.g., changing gas injection rates) to affect the observed performance and potentially improve the EOR outcome. There is great reason to be optimistic about the future of EOR in the Bakken. The results of the laboratory studies suggest significant potential for high rates of oil mobilization using produced field gas injection under the right conditions. The results of the lab studies, combined with rigorous statistical analysis of well production data and associated modeling efforts, confirm the notion that fluid mobility within the reservoir is controlled by fractures. As more knowledge is gained about the nature and distribution of fracture networks in the Bakken, the industry will be in a better position to predict and, ultimately, influence fluid mobility. New field tests are necessary to develop a more complete understanding of those conditions. Thoughtful and creatively engineered field tests within a well-characterized geologic setting will yield the fundamental knowledge needed to take Bakken oil production to the next level. This subtask was cofunded through the EERC–U.S. Department of Energy Joint Program on Research and Development for Fossil Energy-Related Resources Cooperative Agreement No. DE-FE0024233. Nonfederal funding was provided by the North Dakota Industrial Commission’s Oil and Gas Research Program and Computer Modelling Group.

04 OIL SHALES AND TAR SANDS↗

Integrated Optimization and Control of a Hybrid Gas Turbine/sCO 2 Power System

During phase-I, the project team led by Echogen Power Systems (EPS) had two primary objectives based on investigating the application of gas turbines with supercritical carbon dioxide (sCO 2 ) power cycles. The first objective was to improve the overall efficiency and performance of a hybrid gas turbine/sCO 2 power system through a joint optimization of the two subsystems (gas turbine and sCO 2 power cycle) using non-linear optimization techniques that simultaneously evaluate thermal performance of the combined cycle. The hybrid power system included several points of interaction, including (but not limited to) gas turbine exhaust, fuel heating, inlet chilling and turbine cooling. The second objective was to establish a baseline transient response model of the hybrid power system and a notional microgrid and begin steps to integrate the control systems of the three major elements (gas turbine, sCO 2 cycle and grid controller). The project team established a baseline performance for a combined cycle power plant using a production gas turbine and scaled sCO 2 power cycle only utilizing exhaust heat recovery. Echogen’s non-linear techno-economic optimization code was extended by adding gas turbine component models derived from a in-house developed gas turbine design code. With the two cycles coupled by the gas turbine exhaust, design parameters of both cycles were allowed to vary simultaneously to determine performance opportunity versus isolated designs. Returning to the baseline gas turbine/sCO 2 power cycle transient models: Echogen had in-house developed sCO 2 cycle transient model in GT-Suite system simulation software, and had partnered with Siemens Finspång for gas turbine transient model, and Siemens PTI group to provide micro-grid load profile as well as hybrid power cycle generated load (power and frequency) analysis. The transient model for the SGT-750 Siemens gas turbine was a “black-box” functional mock-up interface (FMI) model developed by Siemens Industrial Turbomachinery in Finspång, Sweden. The SGT-750 is a twin-shaft gas turbine that produces 40 MW electricity with an efficiency of about 40% at ISO conditions. At 100% gas turbine throttle (load), the SGT-750 has average exhaust conditions of 114.6 kg/s and 469.8°C. The transient model for sCO 2 power cycle was developed by Echogen in GT-SUITE 1D system simulation software platform. The basic CO 2 flow circuit has single-shaft turbomachinery with net 11.5 MW electrical power output at design conditions. The power turbine has a double-ended shaft with one end connected to synchronous generator through a fixed-ratio gearbox. The other end of power turbine is connected to the compressor through a continuously variable transmission. The major components of the sCO 2 power cycle modeled include air cooled condenser/cooler, CO 2 compressor, recuperator, two waste heat exchanger coils, power turbine, continuous variable transmission, gearbox and generator. Integration of SGT-750 transient model and sCO 2 power cycle transient model was done in Matlab Simulink. In the integrated model, the gas turbine and sCO 2 power cycle interacted at two points, first one being the gas turbine exhaust gas flow rate and temperature, which were inputs to sCO 2 power cycle model. The second point was the distribution of micro-grid load demand signal between the SGT-750 generator and sCO 2 cycle generator. For a given combined-cycle load demand, the gas turbine load demand was equal to the total demand minus the sCO 2 cycle power generated. In the present study the integrated model was simulated for two cases of grid load demand: (i) for a step change, both positive-step and negative-step, in grid load demand (ii) for a micro-grid load demand curve provided by Siemens PTI group. Finally, the time series plots representing load demand versus integrated system response were presented including the sCO 2 power cycle control system performance plots. The actual generated power and frequency of both the generators, gas turbine and sCO 2 power cycle, was supplied to Siemens PTI group for dynamic grid assessment, results of which are provided in appendices.

03 NATURAL GAS↗

The Hidden Flexibility of the Natural Gas Network for Electric Power Operations: A Case Study of a Near-Miss Winter Event

The U.S. power sector has become increasingly reliant on gas pipeline networks to deliver fuel to natural gas power plants. In addition to supplying relatively low-cost fuel, gas networks offer generators flexibility in their operations through the ability to deliver fuel when needed by using gas storage facilities or linepack if the gas network is at an operating point below its design capacity. However, disruptions or stress events on the gas network - like those occurring in the Northeast and Texas in recent years - can result in limitations on gas availability to generators at times when generation is in short supply. Here we examine a period of stress that occurred in the winter of 2022 in the Western United States. Using data on the region's natural gas pipeline network and electric generators, we build an integrated gas and electric model that closely replicates the actual dispatch of the period. We then evaluate the implications of removing flexibility employed by the gas network operator, which during that period curtailed scheduled gas deliveries to other parties to increase deliveries to natural gas power plants, which requested more gas than initially forecasted. We find that without the flexibility supplied by the gas network operator, there would have been curtailment of gas generation due to gas offtake constraints, requiring the power system operator to redispatch relying on more expensive generation or to potentially shed load. A sensitivity exploring a wind drought further exacerbates the strain, illustrating the potential challenge of managing gas and grid interactions as systems move to higher shares of variable renewable electricity. Based on this example, we discuss potential coordination strategies between the two system operators to ensure that the power system can successfully utilize and rely on the flexibility offered by natural gas networks.

03 NATURAL GAS↗

Techno-Economic Analysis of Greenfield Geothermal Hybrid Power Plants using a Solar or Natural Gas Steam Topping Cycle

The relatively low generation costs associated with wind, solar photovoltaic (PV), and natural-gas power plants make it challenging for geothermal power plants to produce and sell the power that has the reliability and sustainability characteristics that are greatly needed in U.S. power markets. This is especially true for geothermal resources with low-to-medium temperatures, which results in relatively low-thermal efficiency and generation costs that are higher than those for wind, solar PV, and natural gas. This analysis evaluates solar thermal- and natural-gas combustion waste heat recovery-based topping cycle hybridization of geothermal binary power plants. This approach provides several benefits that may allow geothermal power plants to generate power at more competitive costs. First, the addition of solar thermal energy or natural-gas combustion waste heat input to a geothermal power plant provides additional heat input that can be converted to electrical power. Second, the temperature level of the heat obtained from concentrating solar collectors or natural-gas combustion exhaust is higher than that of geothermal heat, which provides opportunities for improving the efficiency of the conversion of thermal energy to electrical power. Third, the ease with which solar thermal systems integrate with energy storage and the flexibility of natural gas means power generation can occur during peak demand periods. The hybrid cycles are compared to equivalently sized, co-located, independent geothermal, concentrating solar, and/or natural-gas power plants. The hybrid cycle tends to produce slightly more power than the standalone plants combined. However, the hybrid plant Levelized Cost of Energy (LCOE) is slightly higher than the LCOE of the combined standalone power plants for each of the case study locations investigated. Using the steam-topping cycle, organic Rankine cycle (ORC)-bottoming cycle hybrid plant design to combine a solar thermal resource and low- temperature geothermal resource (<120 degrees C) leads to a hybrid plant with a lower LCOE than a standalone geothermal-only system. Thus, hybrid plants may enable the economic development of geothermal resources in locations with low geothermal resource temperatures. However, in areas with higher geothermal resource temperatures (>120 degrees C), the geothermal-only plant has a lower LCOE than the hybrid cycle and thus could be developed without the need for solar heat addition. iv A geothermal-natural-gas reciprocating engine hybrid plant was evaluated for an Elk Hills, California case study location. The Elk Hills case study analysis indicates that when the natural-gas engine operates for more than 12 hours per day the hybrid plant can produce power at an LCOE lower than a standalone geothermal plant, and comparable to that of the standalone natural-gas reciprocating engine, while also reducing the carbon intensity of the power generated relative to the standalone natural-gas engine. This may represent a scenario in which the hybrid plant provides an opportunity for the deployment of a low-temperature geothermal resource that otherwise may have an LCOE too high to develop and operate as a standalone resource, while also reducing the carbon intensity of natural-gas generation sources. A "triple-hybrid" plant that combines natural gas, solar thermal, thermal energy storage, and geothermal was also investigated. A natural-gas combustion turbine (NGCT) is added to the geothermal-solar hybrid such that the hot exhaust gas from the gas turbine provides an alternative source of heat to the steam turbine of the hybrid cycle. Analysis results suggest that the triple-hybrid plant has a significantly higher energy generation and revenue than a standalone NGCT or the original geothermal-solar hybrid. The triple-hybrid design benefits most from using a smaller solar field so that the solar energy can be dispatched at the most valuable times available. The triple-hybrid plant also has a lower LCOE than the standalone NGCT. The triple-hybrid plant was evaluated making simple assumptions about the dispatch profile of the gas cycle, and more nuanced and realistic dispatching schedules should be analyzed in future work.

15 GEOTHERMAL ENERGY↗

Organic Iodide Sorption from Dilute Gas Streams

Reprocessing used nuclear fuel releases volatile radionuclides, including 129 iodine (I), into the off-gas of a processing plant. Volatile radioiodine could be present in several forms, depending on the chemistry of the process used and the off-gas stream. Inorganic I 2 is expected to be the predominant I species in the dissolver off-gas (DOG), with minor organic iodides present. The bulk of the I is expected to volatilize into the DOG in parts-per-million-level (ppm) concentrations. In contrast, in the vessel off-gas (VOG), most of the volatile I is expected to be found as organic iodides, such as CH 3 I, C 4 H 9 I, and C 12 H 25 I. These species are expected to be present in parts-per-billion-level (ppb) concentrations but require abatement, even at low expected concentrations, to meet regulatory emissions limits in the United States. Historically, studies of I abatement by Ag-functionalized sorbents have focused on inorganic I in the DOG, but in the last few years, more research attention has been given to organic iodides, especially longer chain species, such as C 4 H 9 I, and C 12 H 25 I. This report has three main goals: (1) to present new data generated at Oak Ridge National Laboratory (ORNL) in FY21 on the sorption behavior of organic iodides on AgZ, (2) to summarize and synthesize organic iodide data produced by ORNL and Idaho National Laboratory (INL) over the last 4 years to answer questions on organic iodides behavior outlined in the 2018 joint test plan (Jubin et al. 2018), and (3) to propose a VOG abatement system design that can provide the capture efficiencies required to meet I emission limits. The 2021 ORNL experimental campaign tested the effects of organic iodide speciation and concentration in the off-gas, superficial velocity of the off-gas, and effects of aging on AgZ sorbent capacity. These studies found that the sorption rate of organic iodides by AgZ depends on the hydrocarbon chain length and the concentration in the off-gas. Higher molecular weight organic iodides adsorb to AgZ more slowly than I. At a concentration of 50 ppm concentration in the off-gas, CH 3 I loads 8% slower, C 4 H 9 I loads 20% slower, and C 12 H 25 I loads 40% slower than I. The lowest concentration loading rates calculated were in 5 ppm organic iodide gas streams in which AgZ gained on average 0.14 mg I/g sorbent/hour in the bench scale test system. Thus, longer sorbent beds might be needed to accommodate slower loading rates onto AgZ in lower concentration gas streams. Although sorption rate varies as a function of hydrocarbon chain length, the saturation concentration of the sorbent for these I-bearing species does not vary. Aging AgZ in a humid air stream for 9 months drops the overall sorbent capacity by ~35% for CH 3 I, ~50% for C 4 H 9 I, and ~40% for C 12 H 25 I. This results in a saturation capacity between 35 and 70 mg I/g sorbent for the aged AgZ. In conjunction with recent data produced by INL, these data are used to estimate the mass transfer zone (MTZ) and decontamination factor (DF) for sorbent beds of AgZ. Sorption tests performed with iodide gas concentrations of about 1 ppm and higher at a superficial gas velocity of 10 m/min, indicate that MTZ depths for these conditions tend to range between about 8-20 cm. Tests performed at lower concentrations between 50-90 ppb and at gas superficial velocities of 1, 10, and 20 m/min indicate that the MTZ depth increases with increasing superficial gas velocity. The 20 m/min test indicates that the MTZ for those conditions was at least 22 cm, and doubling the superficial gas velocity from 10 to 20 m/min could roughly double or triple the MTZ depth. Doubling and tripling the bounding MTZ depth of 20 cm for the body of MTZ estimates made at with 10 m/min superficial velocity would extend the MTZ for a superficial velocity of 20 m/min to 40-60 cm. This bounding limit applies to all of the organic iodides that have been tested. These results also indicate that the sorption rate-limiting step is not sensitive to the superficial gas velocity; otherwise the MTZ depth would not have increased approximately in proportion to the increase in the gas superficial velocity. This further suggests that the rate limiting step is not associated with mass transfer of the sorbate to the sorbent surface, or mass transfer of the reaction byproducts from the sorbent surface, but is associated with sorption or chemical reactions on the sorbent surface or in sorbent pores. Deep bed testing at INL has established DFs of >2,000 for I, CH 3 I, and C 4 H 9 I under a range of conditions (Soelberg et al. 2021, Bruffey et al. 2019). DF does not seem to be affected by the concentration of the organic iodide in the gas stream over the range of 1 to 50 ppm. Thus, if the MTZ is accommodated in sorbent bed design for the DOG and VOG, then regulatory DFs will be met. To meet the third objective outlined in this report, these experimental data were used to update an engineering evaluation of the VOG first completed in 2016. The updated VOG design can be found in an accompanying document (Welty et al., 2021; INL- LTD-21-64587). This report finds that the VOG will decrease in both size and complexity, relative to previous designs, and will still meet regulatory requirements for all iodine forms.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Heuristic based analytics for gas leak source identification

Heuristic-based techniques for gas leak source identification are provided. In one aspect, a method for identifying a location of a gas leak source includes: obtaining gas sensor data and wind data synchronously from a gas leak detection system having a network of interconnected motes comprising gas sensors and wind sensors, with the gas sensors arranged around possible gas leak sources in a given area of interest; identifying the location of the gas leak source using the gas sensor data and wind data; and determining a magnitude of gas leak from the gas leak source using the location of the gas leak source and a distance d between the location of the gas leak source and a select one of the gas sensors from which the gas sensor data was obtained. A gas leak detection system is also provided.

03 NATURAL GAS↗