Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “NEVADA”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Calendar Year 2017 Underground Test Area Annual Sampling Report Nevada National Security Site, Nevada, Revision 1

This report presents the analytical data for the 2017 calendar year (CY) (January 1 through December 31, 2017) and an evaluation of the data to ensure that the Sampling Plan’s objectives are achieved. Data from samples collected in 2016 that were not reported in the UGTA CY 2016 Annual Sampling Analysis Report (DOE/EMNV, 2018b) are presented in Appendix D.

54 ENVIRONMENTAL SCIENCES↗

Report of the Peer Review Panel for the Rainier Mesa/Shoshone Mountain Flow and Transport Model, Nevada National Security Site, Nevada, Revision 0

The stated purpose of the peer review is to determine whether the model, results, interpretations, and documentation are consistent with the requirements of the FFACO Alternative Modeling Strategy and Decision Process for closure of the CAU. The Peer Review Panel was asked to explicitly answer six questions that provide an overview to its conclusions and recommendations. These six questions and the panel’s responses are presented in the next section of this review report. The Peer Review Panel was asked to present and summarize its primary findings by answering six key peer review questions. These questions are as follows: 1.Is the implementation of the AMS technically and regulatorily sound and defensible? 2.Have conceptual models and/or alternatives for groundwater flow and radionuclide transport in the RM/SM system, permissible based upon available data and observations, been identified to support analyses of radionuclide migration away from the testing areas toward potential receptors? 3.Based on available data that include “maximum transport” and “minimum transport,” do the forecasts represent a range of plausible scenarios and address assumptions for parameters that are most sensitive for saturated zone flow and transport? 4.Can radionuclide transport forecasts be used as an aid in evaluating potential exposure pathways, as intended by the AMS? 5.Has the extent of contamination been bounded such that a regulatory decision can be made regarding CAU closure that is protective of human health and the environment? 6.Has anything that influences the protection of human health and the environment been missed?

54 ENVIRONMENTAL SCIENCES↗

FY 2017 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy Standard Disposal Authorization Statement and Tank Closure Documentation (DOE-STD-5002-2017) requires preparation of an Annual Summary Report comparing low-level radioactive waste disposal facilities operations with the Disposal Authorization Statement (DAS) and its supporting technical documents including the performance assessment (PA) and the composite analysis (CA). The fiscal year (FY) 2017 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) was prepared by reviewing planned and discovered changes, waste receipts, monitoring results, research and development (R&D) results, and the status of DAS conditions and issues to assess the validity of the DASs, PAs, and CAs.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

E Tunnel Wastewater Disposal System Quarterly Monitoring Report and Annual Summary Report Nevada National Security Site, Nevada, Water Pollution Control Permit NEV 96021: Fourth Quarter and Calendar Year 2018

This annual report includes the results of the ETOS sample collection and analysis of the effluent water from the ETOS. The effluent sample was collected on October 9, 2018. Sampling activities were performed in accordance with the requirements of WPC Permit NEV 96021, Revision 1, which is effective October 1, 2013. Although the stated end date of the WPC permit is September 3 O, 2018, the NDEP, in a letter dated September 21, 2018, provided guidance that indicated the WPC Permit NEV 96021, Revision 1, is in effect until NOEP notifies NNSA/NFO otherwise.

54 ENVIRONMENTAL SCIENCES↗

Fiscal Year 2018 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy Standard Disposal Authorization Statement and Tank Closure Documentation (DOE-STD-5002-2017) requires preparation of an Annual Summary Report comparing low-level radioactive waste disposal facilities operations with the Disposal Authorization Statement (DAS) and its supporting technical documents including the performance assessment (PA) and the composite analysis (CA). The fiscal year (FY) 2018 Annual Summary Report for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) was prepared by reviewing planned and discovered changes, waste receipts, monitoring results, research and development (R&D) results, and the status of DAS conditions and issues to assess the validity of the DASs, PAs, and CAs. The Area 3 RWMS was placed in stand-by in 2006 and remained inactive in FY 2018. Resumption of waste disposal operations is planned for FY 2019. No proposed actions, new information, or discoveries affecting the Area 3 RWMS were identified in FY 2018. No significant changes have occurred since preparation of the most recent special analysis, which indicates a continuing reasonable expectation of meeting the PA performance objectives and measures, and the CA dose constraint in DOE O 435.1, “Radioactive Waste Management.” No changes were made to documents supporting the Radioactive Waste Management Basis (RWMB) including the PA, CA, DAS, waste acceptance criteria (WAC), closure plan, monitoring plan, or maintenance plan. Monitoring results for the most recent year with available data, calendar year (CY) 2017, indicate no changes to long-term trends and no results inconsistent with expected performance. R&D results for the Area 3 RWMS Drainage Lysimeter Facility continue to be consistent with the conceptual site model (CSM). All Area 3 RWMS DAS conditions and secondary issues were closed in 2002. The Area 5 RWMS continued disposal operations within the Northern Expansion Area in FY 2018. Eighty-six changes involving proposed actions, new information, or discoveries affecting the Area 5 RWMS PA and CA were screened during FY 2018 in the Unreviewed disposal question (UDQ) process. Twenty-two changes required UDQ evaluations and two changes resulted in unreviewed composite analysis question evaluations. None of the proposed actions, new information, or discoveries had significant impacts on the PAs or CAs. All of the planned changes were implemented. No special analyses were performed, and no changes were made to documents supporting the RWMB including the PA, CA, DAS, WAC, closure plan, monitoring plan, or maintenance plan. Planning continued and construction commenced on development of the Western Expansion Area within the Radioactive Waste Management Complex. All Area 5 RWMS DAS conditions and secondary issues were closed in 2002. The cumulative effects of changes occurring since preparation of the Area 5 RWMS PA and CA were assessed with the current baseline PA/CA model. Model results indicate that there is a reasonable expectation that the PA performance objectives and measures, and the CA dose constraint in DOE O 435.1, “Radioactive Waste Management,” can be met. No PA or CA mean result exceeds 50% of its performance objective. Monitoring results and R&D results continue to be consistent with the CSM. Monitoring results for CY 2017 indicate no changes to long-term trends and no results inconsistent with expected performance. R&D results for the Area 5 RWMS Weighing Lysimeter Facility continue to be consistent with the CSM. The FY 2018 review of Area 3 RWMS and Area 5 RWMS disposal operations supports the following conclusions: The Area 3 and Area 5 RWMS PA and associated CA assumptions and conclusions remain valid based on consideration of all changes identified or planned; The reasonable expectation that the Area 3 and Area 5 RWMSs will meet the performance objectives identified in DOE O 435.1, “Radioactive Waste Management”, remains valid; and The DAS, based on interpretation of the data collected, monitoring results, and other information, continues to be adequate.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

RCRA Permit for a Hazardous Waste Management Facility Permit Number NEV HW0101, Annual Summary/Waste Minimization Report, Calendar Year 2015, Nevada National Security Site, Nevada

This report summarizes the EPA identification number of each generator from which the Permittee received a waste stream, a description and quantity of each waste stream in tons and cubic feet received at the facility, the method of treatment, storage, and/or disposal for each waste stream, a description of the waste minimization efforts undertaken, a description of the changes in volume and toxicity of waste actually received, any unusual occurrences, and the results of tank integrity assessments. This Annual Summary/Waste Minimization Report is prepared in accordance with Section 2.13.5 of Permit Number NEV HW0101.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CY2019 Annual Closure Monitoring Report for Corrective Action Unit 98, Frenchman Flat, Underground Test Area, Nevada National Security Site, Nevada (January 2019–December 2019), Revision 1

Three types of monitoring are performed for CAU 98: water quality, water level, and institutional control. These are monitored to determine whether the URs remain protective of human health and the environment, and to ensure that the regulatory boundary objectives are being met. Monitoring data will be used in the future, once multiple years of data are available, to evaluate consistency with the groundwater flow and contaminant transport models because the contaminant boundaries calculated with the models are the primary basis of the UR boundaries. Six wells were sampled for water-quality monitoring in 2019. Contaminants of concern were detected only in the two source/plume wells already known to contain contamination as a result of a radionuclide migration experiment. Tritium concentrations in both of these wells, RNM-2S and UE-5n, remain above the Safe Drinking Water Act maximum contaminant level of 20,000 picocuries per liter but declined in 2019 as compared to measurements in 2018. All other contaminants of concern are below the minimum detection level plus analytical error. The water-level monitoring network includes 16 wells. Depth to water measured in 2019 is generally consistent with recent measurements for all wells. Many wells continue to exhibit a long-term downward trend in water level, though changes from 2018 to 2019 are minimal. The sharp 2016 decline in water level in Well ER-5-3-2 remains unexplained, with the lower level persisting through 2019. Rising water-level trends continue to be observed in Well ER-5-3 deep piezometer and former water supply Well WW-5A. Water supply Well WW-5B experienced a rise in water level as a result of an absence of pumping in the first part of the year (due to a mechanical problem), whereas water levels declined in WW-4 and WW-4A in response to greater pumping in 2019. Institutional control monitoring confirmed the URs are recorded in U.S. Department of Energy and U.S. Air Force land management systems, and that no activities within Frenchman Flat basin are occurring that could potentially affect the contaminant boundaries. Survey of groundwater resources in basins surrounding Frenchman Flat similarly identify no current or pending development that would indicate the need to increase monitoring activities or would otherwise cause concern for the closure decision. The URs continue to prevent exposure of the public, workers, and the environment to contaminants of concern by preventing use of potentially contaminated groundwater.

54 ENVIRONMENTAL SCIENCES↗

Underground Test Area (UGTA) Corrective Action Unit 97: Yucca Flat/Climax Mine, Nevada National Security Site, Nevada (Closure Report)

This CR describes the selected corrective action to be implemented during closure to protect human health and the environment from groundwater impacted by the underground nuclear testing within the YF/CM CAU. The purpose of the CR is to describe the selected corrective action. Summarize previous activities and conclusions that support CAU closure. Present final contaminant boundaries, use restriction (UR) boundaries, and regulatory boundaries. Provide an implementation plan for long-term monitoring and well network maintenance and identify the approaches and policies for institutional controls.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada (CY2020)

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 associated with the following closed corrective action units (CAUs): 1) CAU 90, Area 2 Bitcutter Containment. 2) CAU 91, Area 3 U-3fi Injection Well. 3) CAU 92, Area 6 Decon Pond Facility. 4)CAU 110, Area 3 WMD U-3ax/bl Crater. 5) CAU 111, Area 5 WMD Retired Mixed Waste Pits. 6) CAU 112, Area 23 Hazardous Waste Trenches. The locations of the sites are shown in Figure ES-1. This report covers calendar year 2020. The post-closure requirements for these sites are described in RCRA Permit NEV HW0101 and are summarized in each CAU-specific section of this report. The results of the inspections, a summary of maintenance activities, and an evaluation of monitoring data are presented in this report.

54 ENVIRONMENTAL SCIENCES↗

Calendar Year 2020 Underground Test Area Annual Sampling Report Nevada National Security Site, Nevada (Rev. 1)

This CY 2020 annual sampling report presents the background of the FFACO and Sampling Plan implementation, sampling and analysis methods, sampling results, quality assurance and quality control, regulatory requirements, and analytical data for the CY 2020. Appendix A presents data from samples collected in CY 2020 from the YF/CM CAU and the RM/SM CAU. This sampling was conducted in support of the Sampling Plan at these CAUs prior to approval of the final CRs. Appendix B presents the well completion diagrams for the wells sampled in CY 2020. Appendix C presents data from samples collected in CY 2019. These results were not reported in the previous sampling report because they were not available from the specialized laboratories at the time of the report’s publication.

54 ENVIRONMENTAL SCIENCES↗

Post-Closure Report for Closed Resource Conservation and Recovery Act Corrective Action Units, Nevada National Security Site, Nevada For Calendar Year 2022

This report serves as the combined annual report for post-closure activities in compliance with the requirements listed in Resource Conservation and Recovery Act (RCRA) Permit Number NEV HW0101 (Rev. 6) associated with the following closed corrective action units (CAUs): CAU 90, Area 2 Bitcutter Containment; CAU 91, Area 3 U-3fi Injection Well; CAU 92, Area 6 Decon Pond Facility; CAU 110, Area 3 WMD U-3ax/bl Crater; CAU 111, Area 5 WMD Retired Mixed Waste Pits; CAU 112, Area 23 Hazardous Waste Trenches. All post-closure inspections and evaluations were performed in accordance with requirements set out in RCRA Permit NEV HW0101, Rev. 6.

54 ENVIRONMENTAL SCIENCES↗