Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Launch operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Transition Marshall Space Flight Center Wind Profiler Splicing Algorithm to Launch Services Program Upper Winds Tool

NASAs LSP customers and the future SLS program rely on observations of upper-level winds for steering, loads, and trajectory calculations for the launch vehicles flight. On the day of launch, the 45th Weather Squadron (45 WS) Launch Weather Officers (LWOs) monitor the upper-level winds and provide forecasts to the launch team via the AMU-developed LSP Upper Winds tool for launches at Kennedy Space Center (KSC) and Cape Canaveral Air Force Station. This tool displays wind speed and direction profiles from rawinsondes released during launch operations, the 45th Space Wing 915-MHz Doppler Radar Wind Profilers (DRWPs) and KSC 50-MHz DRWP, and output from numerical weather prediction models.The goal of this task was to splice the wind speed and direction profiles from the 45th Space Wing (45 SW) 915-MHz Doppler radar Wind Profilers (DRWPs) and KSC 50-MHz DRWP at altitudes where the wind profiles overlap to create a smooth profile. In the first version of the LSP Upper Winds tool, the top of the 915-MHz DRWP wind profile and the bottom of the 50-MHz DRWP were not spliced, sometimes creating a discontinuity in the profile. The Marshall Space Flight Center (MSFC) Natural Environments Branch (NE) created algorithms to splice the wind profiles from the two sensors to generate an archive of vertically complete wind profiles for the SLS program. The AMU worked with MSFC NE personnel to implement these algorithms in the LSP Upper Winds tool to provide a continuous spliced wind profile.The AMU transitioned the MSFC NE algorithms to interpolate and fill data gaps in the data, implement a Gaussian weighting function to produce 50-m altitude intervals in each sensor, and splice the data together from both DRWPs. They did so by porting the MSFC NE code written with MATLAB software into Microsoft Excel Visual Basic for Applications (VBA). After testing the new algorithms in stand-alone VBA modules, the AMU replaced the existing VBA code in the LSP Upper Winds tool with the new algorithms. They then tested the code in the LSP Upper Winds tool with archived data. The tool will be delivered to the 45 WS after the 50-MHz DRWP upgrade is complete and the tool is tested with real-time data. The 50-MHz DRWP upgrade is expected to be finished in October 2014.

Space launch↗

Report from Mars - Mariner IV, 1964-1965

The successful mission of Mariner IV is a most gratifying conclusion to the first generation of lunar and planetary exploration, which has been based on lightweight automatic unmanned spacecraft in constant communication with Earth, designed for lunar impact or planetary encounter. The flight of this first Mars probe is noteworthy not only for the outstanding quantity and quality of scientific data but also as the verification of large and useful advances in a number of technological areas. The Mariner Mars Project of 1964-1965 was conducted for the National Aeronautics and Space Administration by the Jet Propulsion Laboratory; it was made possible by the valued assistance and support of many government agencies, scientific institutions, and industrial concerns. Among these are NASA's Lewis Research Center (Launch Vehicle Systems Manager) and their prime contractors, Lockheed Missiles and Space Corporation and General Dynamics/Convair; Goddard Space Flight Center (Launch Operations) and other agencies at Cape Kennedy; the agencies of the Australian, South African, and Spanish governments which operate overseas tracking stations; many hundreds of American industrial contractors and vendors; and a number of scientists in various fields of endeavor. The Project was established in late 1962 with the objective of conducting scientific observations near the planet Mars and returning the data to Earth for study and analysis; secondary objectives were to develop and study the equipment and techniques involved and to make certain scientific measurements of the interplanetary environment on the way to Mars. Successful accomplishment of these objectives under the severe constraints which were a part of the mission is a tribute to every single individual who shared in the preparation and execution of the Mariner Mars Project.

MARINER IV SPACE PROBE↗

Quick response targeting program

Computer program generates and verifies operational launch vehicle targeting presettings for lunar free-return missions and lunar landing missions. Program is applicable in astronomy and nuclear physics, and in areas where improved targeting techniques are valuable.

Bosley, J. T.↗

Space station MSFC-DPD-235/DR no. CM-04 interface and support requirements

The interface and support performance, design and confirmation requirements are defined for the modular space station and space shuttle programs. The requirements are treated as separate obligations against each modular program and are presented for the following: shuttle orbiter, shuttle booster, launch operations, mission operations, and the research applications module.

Source record↗

Mariner Mars 1971: Press kit

The news release describes the 1971 launches of Mariner 8 and 9 which were to be the first attempt by NASA to orbit another planet, Mars. Described are: (1) mission capsule; (2) planetary missions; (3) aiming zones; (4) the spacecraft; (5) scientific experiments to be performed; (6) Atlas Centaur launch vehicle; (7) launch operations; (8) tracking and data system and mission operations; and (9) Mariner Mars 71 team and subcontractors.

Mittauer, R. T.↗

Saturn 5 Launch Vehicle Flight Evaluation Report, AS-510, Apollo 15 Mission

A postflight analysis of the Apollo 15 flight is presented. The performance of the launch vehicle, spacecraft, and lunar roving vehicle are discussed. The objective of the evaluation is to acquire, reduce, analyze, and report on flight data to the extent required to assure future mission success and vehicle reliability. Actual flight problems are identified, their causes are determined, and recommendations are made for corrective actions. Summaries of launch operations and spacecraft performance are included. Significant events for all phases of the flight are tabulated.

Source record↗

Saturn 1B launch vehicle flight evaluation report, SA-206, Skylab-2

The performance evaluation of the SA-206 launch vehicle for the Skylab 2 launch is presented. Flight problems are identified, the causes are determined, and recommendations are made for appropriate corrective action. Summaries of launch operations and spacecraft performance are included. The significant events, failures, and anomalies are tabulated.

Source record↗

Saturn 1B launch vehicle flight evaluation report-SA-207: Skylab-3

The performance evaluation of the SA-207 launch vehicle for the Skylab 3 launch is presented. Flight problems are identified, the causes are determined, and recommendations are made for appropriate corrective action. Summaries of launch operations and spacecraft performance are included. The significant events, failures, and anomalies are tabulated.

Source record↗