Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “LICENSES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Tritium Laboratory Karlsruhe: administrative and technical framework for isotope laboratory operation

Originally licensed in 1993 the Tritium Laboratory Karlsruhe (TLK) is a unique pilot scale isotope laboratory focused on tritium handling and processing to conduct a variety of scientific experiments and development tasks in view of future fusion power plants. TLK currently operates 15 glove boxes of 125 m{sup 3} total volume in an experimental hall measuring nearly 1500 m{sup 2}. The tritium infrastructure, comprising of the tritium storage system, the tritium transfer system and the isotope separation system, is integrated into TLK as a closed loop system to supply tritium to the experiments. Having a license for handling of up to 40 g of tritium and a closed tritium processing loop, TLK is a unique institute in non-military tritium research. In order to fulfil all requirements regarding the license, a framework of regulations is applied as a basis for the operation of TLK, as well as the setup of new experiments and the design of components. This paper will give an overview on the framework of operation in view of licensing issues, as well as administrative and technical regulations mandatory to legally and reliably operate an isotope laboratory of this scale.

07 ISOTOPE AND RADIATION SOURCES↗

Quality Assurance Protocol for AFCI Advanced Structural Materials Testing

The objective of this letter is to inform you of recent progress on the development of advanced structural materials in support of advanced fast reactors and AFCI. As you know, the alloy development effort has been initiated in recent months with the procurement of adequate quantities of the NF616 and HT-UPS alloys. As the test alloys become available in the coming days, mechanical testing, evaluation of optimizing treatments, and screening of environmental effects will be possible at a larger scale. It is therefore important to establish proper quality assurance protocols for this testing effort in a timely manner to ensure high technical quality throughout testing. A properly implemented quality assurance effort will also enable preliminary data taken in this effort to be qualified as NQA-1 during any subsequent licensing discussions for an advanced design or actual prototype. The objective of this report is to describe the quality assurance protocols that will be used for this effort. An essential first step in evaluating quality protocols is assessing the end use of the data. Currently, the advanced structural materials effort is part of a long-range, basic research and development effort and not, as yet, involved in licensing discussions for a specific reactor design. After consultation with Mark Vance (an ORNL QA expert) and based on the recently-issued AFCI QA requirements, the application of NQA-1 quality requirements will follow the guidance provided in Part IV, Subpart 4.2 of the NQA-1 standard (Guidance on Graded Application of QA for Nuclear-Related Research and Development). This guidance mandates the application of sound scientific methodology and a robust peer review process in all phases, allowing for the data to be qualified for use even if the programmatic mission changes to include licensing discussions of a specific design or prototype. ORNL has previously implemented a QA program dedicated to GNEP activities and based on an appropriately graded application of NQA-1 requirements at the site. The current program is being revised to incorporate changes imposed through the recently revised AFCI Technical Integration Office QA requirements. Testing conducted under the AFCI QA program for the advanced structural materials effort shall incorporate the following quality assurance expectations: (1) personnel are adequately trained to perform assigned work; (2) activities are controlled to ensure consistency of results; (3) records necessary to substantiate how the work was performed are maintained (dedicated laboratory notebooks will be used); (4) the pedigree and traceability of the various tested materials are maintained throughout the described processes using consistent sample numbering and adequate record keeping; (5) equipment with the potential to affect the quality of the planned work is calibrated and maintained in accordance with applicable operating requirements. In addition, all reporting or related dissemination by ORNL personnel of the results of the work described in this subcontract shall be conducted in accordance with the requirements described or referenced in the ORNL Standards Based Management System subject area entitled Scientific and Technical Information. Reporting or publications at other institutions will be conducted in accordance with the requirements of that institution. Successful implementation of these protocols will provide a sound basis for future decisions and research. In addition, these steps will also help ensure that results can also be applied to licensing discussions at a future date.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Prioritization and Implementation Plan for Collaborative Case Study on RPV Steels During Extended Service

Nuclear power currently provides a significant fraction of the United States non-carbon emitting power generation. In future years, nuclear power must continue to generate a significant portion of the nation's electricity to meet the growing electricity demand, clean energy goals, and ensure energy independence. New reactors will be an essential part of the expansion of nuclear power. However, given limits on new builds imposed by economics and industrial capacity, the extended service of the existing fleet will also be required. Ensuring public safety and environmental protection is a prerequisite to all nuclear power plant operating and licensing decisions at all stages of reactor life. This includes the original license period of 40 years, the first license extension to 60 years, and certainly for any consideration of life beyond 60 years. For extended operating periods, it must be shown that adequate aging management programs are present or planned and that appropriate safety margins exist throughout the subsequent license renewal periods. Materials degradation can impact reactor reliability, availability, and potentially, safe operation. Components within a reactor must tolerate the harsh environment of high temperature water, stress, vibration, and/or an intense neutron field. Degradation of materials in this environment can lead to reduced performance, and in some cases, sudden failure. Clearly, understanding materials degradation and accounting for the effects of a reactor environment in operating and regulatory limits is essential. The Light Water Reactor Sustainability (LWRS) Program is designed to support the long-term operation (LTO) of existing domestic nuclear power generation with targeted collaborative research programs into areas beyond current short-term optimization opportunities. Within the LWRS program, two pathways have been initiated to perform research essential to informing relicensing decisions. The Materials Aging and Degradation Pathway is designed to help develop the scientific basis for understanding and predicting long-term environmental degradation behavior of materials in nuclear power plants and to provide data and methods to assess performance of systems, structures, and components essential to safe and sustained operation. The Risk-Informed Safety Margins Characterization Pathway (RISMC) seeks to merge fundamental scientific understanding of critical phenomenological conditions and deterministic predictions of nuclear power plant performance with risk-informed characterization tools. This will provide an integrated characterization of public safety margins in an optimization of nuclear safety, plant performance, and long-term asset management. Clearly, these two pathways have many synergies in goals and outcomes. The data and mechanisms generated in the Materials Pathway may feed into and mold efforts within the RISMC Pathway. In addition, insights from the characterization tools developed in RISMC tasks may inform materials testing needs and experiments. To demonstrate this potentially powerful interaction, a joint case study has been proposed and initiated. This document describes the initial planning for a coordinated study between the Materials and the RISMC Pathways. A brief description of each Pathway is presented along with a more detailed description of the needs and requirements of this collaborative task. A list of criteria for any case-study candidate are then listed, along with the rationale for choosing pressurized thermal shock as the prime candidate an inter-pathway collaboration. A proposed timeline and organization of future interactions on this subject area is also presented.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

INVENTORY AND DESCRIPTION OF COMMERCIAL REACTOR FUELS WITHIN THE UNITED STATES

There are currently 104 nuclear reactors in 31 states, operated by 51 different utilities. Operation of these reactors generates used fuel assemblies that require storage prior to final disposition. The regulatory framework within the United States (U.S.) allows for the licensing of used nuclear fuel storage facilities for an initial licensing period of up to 40 years with potential for license extensions in 40 years increments. Extended storage, for periods of up to 300 years, is being considered within the U.S. Therefore, there is an emerging need to develop the technical bases to support the licensing for long-term storage. In support of the Research and Development (R&D) activities required to support the technical bases, a comprehensive assessment of the current inventory of used nuclear fuel based upon publicly available resources has been completed that includes the most current projections of used fuel discharges from operating reactors. Negotiations with the nuclear power industry are ongoing concerning the willingness of individual utilities to provide information and material needed to complete the R&D activities required to develop the technical bases for used fuel storage for up to 300 years. This report includes a status of negotiations between DOE and industry in these regards. These negotiations are expected to result in a framework for cooperation between the Department and industry in which industry will provide and specific information on used fuel inventory and the Department will compensate industry for the material required for Research and Development and Testing and Evaluation Facility activities.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Basin-Wide Approaches to Hydropower Relicensing: Case Studies and Considerations

This report analyzes basin-wide approaches to the Federal Energy Regulatory Commission (FERC) relicensing process for non-federal hydropower projects. In the United States there are 1,044 active FERC-licensed hydroelectric projects with a total capacity of 56,103 MW. Of those FERC-licensed hydropower projects, 647 with a total capacity of 21,870 MW have license expiration dates from 2018-2037. FERC anticipates receiving a total of 1,012 hydropower filings for relicense through September 2032. Of those total filings, 551 are expected to be notices of intent for relicense and 461 are expected to be applications for a new license.The expected workload in conjunction with the time, cost, and complexity associated with issuing a single new license has led to initiatives that aim to increase the efficiency of the relicensing process. Federal and state regulators and licensees in states such as California, Maine, New York, and Wisconsin have begun to develop approaches to look at hydropower relicensing as part of a larger system - a river basin. Recognizing the number of hydropower projects within a shared waterway, these basin-wide approaches seek to coordinate different stages of the relicensing process for multiple projects at the same time.

13 HYDRO ENERGY↗

Radioactive Waste Disposal Strategies within the US Army Corps of Engineers FUSRAP - 18328

The U.S. Army Corps of Engineers' (USACE) highest priority is the protection of human health and the environment and public and worker safety during the cleanup, transportation, and disposal of Formerly Utilized Sites Remedial Action Program (FUSRAP) material. In addition to following all appropriate federal and state rules and regulations, the USACE has its own safety program that ensures that we are being protective. One aspect of the USACE FUSRAP is the radioactive waste disposal strategies that we must consider. The USACE will only dispose of FUSRAP material in a facility that is licenses/permitted to accept it. The estimated exposures to facility workers and members of the public from the permitted disposal of FUSRAP wastes is evaluated as part of this process. The USACE uses the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process to study and remediate FUSRAP sites. An evaluation is performed to decide whether it is best to manage the waste on-site or off-site and the requirements for disposal. The action selected must be protective of human health and the environment and must comply with regulations. When making the decision, there are several other factors taken into consideration including cost of the disposal and whether the public and state agencies support the action. Prior to determining disposal options, wastes must first be characterized. This involves an evaluation of both site history and analytical data. Determining the proper disposal requirements and subsequent disposal option involves: Characterizing the waste as stated above. This is important because there are several regulatory agencies which may oversee management of the waste. The US Nuclear Regulatory Commission, the US Environmental Protection Agency (US EPA), the US Department of Transportation, and state hazardous waste and/or radiation protection agencies may all have varying degrees of involvement. Identifying disposal requirements. Certain wastes must be disposed at licensed radioactive waste disposal facilities. Wastes containing US EPA regulated hazardous waste must be disposed at permitted hazardous waste disposal facilities. Certain wastes must be disposed at facilities licensed/permitted for both radioactive and hazardous waste. Some lower activity wastes may be accepted for disposal at other types of landfills. Considering acceptance criteria of the disposal facility. Radionuclides and/or hazardous constituents in the waste, as well as physical and chemical form of the waste, are evaluated to ensure they meet the acceptance criteria of the receiving facility's license and/or permit. If they don't, another disposal location must be used. Considering the accessibility and location of the disposal facility. Some facilities are able to accept shipments only by truck and others can accept material via railcar as well. The distance to a disposal facility impacts the risk of transportation accidents and efficient use of project resources such as the number of trucks required to perform the transportation. These factors are also important in evaluating whether material can be cost effectively shipped to a disposal facility. Evaluating the compliance status of the receiving facility. It is not assumed that just because a facility has a license or permit that it is acceptable for the USACE' waste. Prior to selecting a facility for disposal of FUSRAP waste, a site visit, audit and consultation with the US EPA is required to determine whether there are any known relevant violations at the facility. Facilities that have violations that negatively impact the USACE or US EPA approval of the facility are not used for disposal of FUSRAP waste. Once a facility is selected. The USACE procures contracts, or utilizes existing contracts, to facilitate the transportation and disposal action. Additionally, the USACE continues to consult with US EPA routinely to confirm the compliance status of the facility. Considering state acceptance of wastes to a facility. The USACE seeks to obtain written authorization from the facility state regulator indicating the action is compliant with existing licenses, permits, laws, and regulations. Each of these factors is considered by the USACE in selecting a FUSRAP disposal location. The goal is to provide safe, cost effective disposal which is protective of human health and the environment and which complies with all regulatory requirements. These steps all feed in to the disposal strategy consideration that USACE must go through for our FUSRAP waste streams. There are a number of challenges in the process to include In order to achieve the Congressional mandate of completing cleanup work under FUSRAP in a more cost effective, timely manner, while assuring protection of public health and safety. USACE must determine all disposal options that are available for the types of waste at each FUSRAP site. As a solution, completion of a disposal strategy document can help ensure this goal is met and will foster consistency across the FUSRAP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Implementation Plan for Qualification of Sodium-Cooled Fast Reactor Technology Information

This document identifies and discusses implementation elements that can be used to facilitate consistent and systematic evaluation processes relating to quality attributes of technical information (with focus on SFR technology) that will be used to support licensing of advanced reactor designs. Information may include, but is not limited to, design documents for SFRs, research-and-development (R&D) data and associated documents, test plans and associated protocols, operations and test data, international research data, technical reports, and information associated with past U.S. Nuclear Regulatory Commission (NRC) reviews of SFR designs. The approach for determining acceptability of test data, analysis, and/or other technical information is based on guidance provided in INL/EXT-15-35805, “Guidance on Evaluating Historic Technology Information for Use in Advanced Reactor Licensing.” The implementation plan can be adopted into a working procedure at each of the national laboratories performing data qualification, or by applicants seeking future license application for advanced reactor technology.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Structural and mechanistic insights into Mcm2-7 double-hexamer assembly and function

Eukaryotic cells license each DNA replication origin during G1 phase by assembling a prereplication complex that contains a Mcm2–7 (minichromosome maintenance proteins 2–7) double hexamer. During S phase, each Mcm2–7 hexamer forms the core of a replicative DNA helicase. However, the mechanisms of origin licensing and helicase activation are poorly understood. The helicase loaders ORC–Cdc6 function to recruit a single Cdt1–Mcm2–7 heptamer to replication origins prior to Cdt1 release and ORC–Cdc6–Mcm2–7 complex formation, but how the second Mcm2–7 hexamer is recruited to promote double-hexamer formation is not well understood. Here, structural evidence for intermediates consisting of an ORC–Cdc6–Mcm2–7 complex and an ORC–Cdc6–Mcm2–7–Mcm2–7 complex are reported, which together provide new insights into DNA licensing. Detailed structural analysis of the loaded Mcm2–7 double-hexamer complex demonstrates that the two hexamers are interlocked and misaligned along the DNA axis and lack ATP hydrolysis activity that is essential for DNA helicase activity. Moreover, we show that the head-to-head juxtaposition of the Mcm2–7 double hexamer generates a new protein interaction surface that creates a multisubunit-binding site for an S-phase protein kinase that is known to activate DNA replication. The data suggest how the double hexamer is assembled and how helicase activity is regulated during DNA licensing, with implications for cell cycle control of DNA replication and genome stability.

59 BASIC BIOLOGICAL SCIENCES↗

Python Codebase and Jupyter Notebooks - Applications of Machine Learning Techniques to Geothermal Play Fairway Analysis in the Great Basin Region, Nevada

Git archive containing Python modules and resources used to generate machine-learning models used in the "Applications of Machine Learning Techniques to Geothermal Play Fairway Analysis in the Great Basin Region, Nevada" project. This software is licensed as free to use, modify, and distribute with attribution. Full license details are included within the archive. See "documentation.zip" for setup instructions and file trees annotated with module descriptions.

Brown, Stephen↗

Puget Sound Tidal Energy In-Water Testing and Development Project (Final Technical Report)

Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step toward potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.

16 TIDAL AND WAVE POWER↗

Environmental Effects of Sediment Transport Alteration and Impacts on Protected Species: Edgartown Tidal Energy Project

The Islands of Martha's Vineyard and Nantucket are separated from the Massachusetts mainland by Vineyard and Nantucket Sounds; water between the two islands flows through Muskeget Channel. The towns of Edgartown (on Martha's Vineyard) and Nantucket recognize that they are vulnerable to power supply interruptions due to their position at the end of the power grid, and due to sea level rise and other consequences of climate change. The tidal energy flowing through Muskeget Channel has been identified by the Electric Power Research Institute as the strongest tidal resource in Massachusetts waters. The Town of Edgartown proposes to develop an initial 5 MW (nameplate) tidal energy project in Muskeget Channel. The project will consist of 14 tidal turbines with 13 providing electricity to Edgartown and one operated by the University of Massachusetts at Dartmouth for research and development. Each turbine will be 90 feet long and 50 feet high. The electricity will be brought to shore by a submarine cable buried 8 feet below the seabed surface which will landfall in Edgartown either on Chappaquiddack or at Katama. Muskeget Channel is located between Martha's Vineyard and Nantucket. Its depth ranges between 40 and 160 feet in the deepest portion. It has strong currents where water is transferred between Nantucket Sound and the Atlantic Ocean continental shelf to the south. This makes it a treacherous passage for navigation. Current users of the channel are commercial and recreational fishing, and cruising boats. The US Coast Guard has indicated that the largest vessel passing through the channel is a commercial scallop dragger with a draft of about 10 feet. The tidal resource in the channel has been measured by the University of Massachusetts-Dartmouth and the peak velocity flow is approximately 5 knots. The technology proposed is the helical Gorlov-type turbine positioned with a horizontal axis that is positively buoyant in the water column and held down by anchors. This is the same technology proposed by Ocean Renewable Power Company in the Western Passage and Cobscook Bay near Eastport Maine. The blades rotate in two directions capturing the tides energy both during flood and ebb tides. The turbines will be anchored to the bottom and suspended in the water column. Initial depth of the turbines is expected to be about 25 feet below the surface to avoid impacting navigation while also capturing the strongest currents. The Town of Edgartown was initially granted a Preliminary Permit by the Federal Energy Regulatory Commission (FERC) on March 1, 2008, and has recently received a second permit valid through August 2014. The Preliminary Permit gives Edgartown the exclusive right to apply for a power generation license for power generated from the hydrokinetic energy in the water flowing in this area. Edgartown filed a Draft Pilot License Application with FERC on February 1, 2010 and an Expanded Environmental Notification Form with the Massachusetts Environmental Policy Act (MEPA) Office at the same time. It expects to file a Final License Application in late 2013. Harris Miller Miller & Hanson (HMMH) of Burlington Massachusetts is acting as the Project Manager for the Town of Edgartown and collaborating with other partners of the project including the University of Massachusetts - Dartmouth's Marine Renewable Energy Center and the Massachusetts Clean Energy Center. HMMH was awarded a grant under the Department of Energy's Advanced Water Program to conduct marine science and hydrokinetic site-specific environmental studies for projects actively seeking a FERC License. HMMH, on behalf of the Town, is managing this comprehensive study of the marine environment in Muskeget Channel and potential impacts of the tidal project on indicator species and habitats. The University of Massachusetts School of Marine Science and Technology (SMAST) conducted oceanographic studies of tidal currents, tide level, benthic habitat, and potential for biofouling and foundation scouring. Woods Hole Oceanographic Institution, cooperating with SMAST, developed an oceanographic model to predict changes in sediment transport as a result of the proposed tidal energy project. Provincetown Center for Coastal Studies prepared background material on protected species - including whales, seals, and sea turtles - in the project area and implemented an initial tagging program to record location specific information on seals and sea turtles. HMMH communicated research plans and findings with local stakeholder groups, state and federal resource agency staff, and the ocean power industry. The information is being used to prepare environmental permit applications and obtain approvals for project construction.

16 TIDAL AND WAVE POWER↗

TidGen Power System Commercialization Project

ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement for the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric Company on January 1, 2013 for up to 5 megawatts at a price of $215/MWh, escalating at 2.0% per year.

16 TIDAL AND WAVE POWER↗

2013 Annual Site Inspection and Monitoring Report for Uranium Mill Tailings Radiation Control Act Title II Disposal Sites

This report, in fulfillment of a license requirement, presents the results of long-term surveillance and maintenance activities conducted by the U.S. Department of Energy (DOE) Office of Legacy Management in 2013 at six uranium mill tailings disposal sites reclaimed under Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978. These activities verified that the UMTRCA Title II disposal sites remain in compliance with license requirements. DOE manages six UMTRCA Title II disposal sites under a general license granted by the U.S. Nuclear Regulatory Commission (NRC) established at Title 10 Code of Federal Regulations Part 40.28. Reclamation and site transition activities continue at other sites, and DOE ultimately expects to manage approximately 27 Title II disposal sites. Long-term surveillance and maintenance activities and services for these disposal sites include inspecting and maintaining the sites; monitoring environmental media and institutional controls; conducting any necessary corrective action; and performing administrative, records, stakeholder services, and other regulatory functions. Annual site inspections and monitoring are conducted in accordance with site-specific long-term surveillance plans (LTSPs) and procedures established by DOE to comply with license requirements. Each site inspection is performed to verify the integrity of visible features at the site; to identify changes or new conditions that may affect the long-term performance of the site; and to determine the need, if any, for maintenance, follow-up inspections, or corrective action. LTSPs and site compliance reports are available online at http://www.lm.doe.gov

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Regulatory Technology Development Plan Sodium Fast Reactor. Mechanistic Source Term Development

Construction and operation of a nuclear power installation in the U.S. requires licensing by the U.S. Nuclear Regulatory Commission (NRC). A vital part of this licensing process and integrated safety assessment entails the analysis of a source term (or source terms) that represents the release of radionuclides during normal operation and accident sequences. Historically, nuclear plant source term analyses have utilized deterministic, bounding assessments of the radionuclides released to the environment. Significant advancements in technical capabilities and the knowledge state have enabled the development of more realistic analyses such that a mechanistic source term (MST) assessment is now expected to be a requirement of advanced reactor licensing. This report focuses on the state of development of an MST for a sodium fast reactor (SFR), with the intent of aiding in the process of MST definition by qualitatively identifying and characterizing the major sources and transport processes of radionuclides. Due to common design characteristics among current U.S. SFR vendor designs, a metal-fuel, pool-type SFR has been selected as the reference design for this work, with all phenomenological discussions geared toward this specific reactor configuration. This works also aims to identify the key gaps and uncertainties in the current knowledge state that must be addressed for SFR MST development. It is anticipated that this knowledge state assessment can enable the coordination of technology and analysis tool development discussions such that any knowledge gaps may be addressed. Sources of radionuclides considered in this report include releases originating both in-vessel and ex-vessel, including in-core fuel, primary sodium and cover gas cleanup systems, and spent fuel movement and handling. Transport phenomena affecting various release groups are identified and qualitatively discussed, including fuel pin and primary coolant retention, and behavior in the cover gas and containment. Radionuclides released from a primary sodium fire are also considered as potential sources. Any available experimental data and pertinent results relevant to the aforementioned phenomena are discussed, and operating incidents at domestically operated facilities are also examined. Considering the extensive range of phenomena affecting the release of radionuclides, the existing state of knowledge generally appears to be substantial, and may be sufficient in most areas. For core damage accidents, high retention rates should be expected within the fuel matrix and primary sodium coolant for all radionuclides other than the noble gases. These factors greatly reduce the magnitude of possible radionuclide release to the environment. Several possible gaps within the knowledgebase were identified during this effort. First, there are uncertainties with regard to radionuclide release from metal fuel in the molten state. Another knowledge gap appears in the available thermodynamic data regarding the behavior of lanthanides and actinides in liquid sodium. While not necessarily a phenomenological knowledge gap, a determination of the data requirements for MST development should be formally made prior to the expenditure of significant future research efforts. That is, if additional experimentation is performed in support of MST development, it is important to identify the proper quality assurance requirements for licensing

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NRC Regulatory History of Non-Light Water Reactors (1950-2019)

This report describes the U.S. Nuclear Regulatory Commission’s (NRC’s) history with the licensing of non-light water reactors (LWRs). The focus is on regulatory policy and licensing issues that have arisen in the past so that NRC staff will be in a better position to deal with these matters in the future. It is not an objective to discuss in any detail the technology of non-LWR designs. Documenting the historical policy issues and licensing approaches is particularly important to NRC staff unfamiliar with non-LWRs and is an important incentive for the report. Hence, the report is written as a tutorial rather than as an historical archive. The subject is approached chronologically going from the early days of the Atomic Energy Commission to the formation of the NRC, then into the era when the regulatory structure newly developed for LWRs provided guidance for other types of reactors, and then into the era when policy was made specifically for advanced reactors including non-LWRs. This background provides the transition to current planning for future non-LWR licensing and policy.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Integrated Risk Assessment Process for Digital Instrumentation and Control Upgrades of Nuclear Power Plants

Most of the existing nuclear power plants (NPPs) in the world rely on traditional analog instrumentation and control (I&C) systems for monitoring, control, and protection functions. With the industrial base largely moving to digital systems, the operation and maintenance of plants involves managing issues including lack of needed analog spare parts, increasing maintenance costs, and the loss of vendor support. Compared with existing analog I&C systems, digital I&C systems have significant functional advantages, such as reliable system performance in terms of accuracy and computational capability, high data handling and storage capabilities to fully measure and display operating conditions, and improved capabilities (e.g., fault tolerance, self-testing, signal validation, process system diagnostics). Therefore, the U.S. nuclear power industry has initiated the replacement of existing, aging analog systems with digital I&C technology, and is developing new designs for advanced plants using digital systems in integrated control rooms to provide modern control and protection systems. However, the qualification of digital I&C systems remains a challenge, especially the issue of software common cause failure (CCF), which has been difficult to address. A CCF is the malfunction of two or more plant components or functions due to a single failure source. CCFs have the potential to generate unanalyzed events or sequences that may not be bounded by previous plant accident analyses, therefore, to challenge the plant safety. Existing analyses on CCF in I&C systems are mainly focusing on hardware failures. With the application and upgrades of new digital I&C systems, software CCFs due to design flaws have become a potential threat to plant safety considering most redundancy designs are using the similar digital platforms or software in the operating and application systems. With complex multi-layer redundancy designs to meet the single failure criterion, these I&C safety systems are of a particular concern in the U.S. Nuclear Regulatory Commission (NRC) licensing procedures. Therefore, there is a need to develop an integrated risk assessment strategy with digital CCF and plant transient responses considered to assure the long-term safety and reliability of vital digital systems and reduce uncertainties in costs, time, and support integration of digital systems in the plant. The overall goal of this project is to deliver a strong technical basis to support effective, licensable, and secure digital I&C technologies for the digital upgrades to existing NPPs. To deal with the expensive licensing justifications from regulatory insights, this technical basis is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed-up industry advances by: (1) defining an integrated risk-informed analysis process for digital I&C upgrades including hazard analysis, reliability analysis, and consequence analysis; (2) applying systematic and risk-informed tools to address CCFs and quantify responding failure probabilities for digital I&C technologies; (3) evaluating the impact of digital failures at the individual level, system level, and plant level; and (4) providing insights and suggestions on designs to manage the risks, thus to support the development, licensing, and deployment of advanced digital I&C technologies on NPPs. Upgrading digital I&C (safety and non-safety related) systems in existing NPPs within a cost-effective and regulatory acceptable way offers the foremost means of performance improvements and cost-reductions for existing NPPs. One key outcome of this project is to perform plant-specific risk assessment to provide a sustainable scientific support for enabling industry to balance the digital-related risks, costs, reliability, and safety.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Cost-Disruptive, Low Impact, Modular Form Factor Low-Head Hyropower System

Littoral Power Systems, Inc. (LPS) is writing a new story when it comes to turning the natural power of water into electricity. h-Modulor™ is a new way of designing and building hydropower plants that addresses the crucial issues of cost, environmental impact and regulatory time frames. For decades hydropower developers, owners and operators have struggled to build new or expanded facilities that didn’t cost so much, were friendlier to the environment and didn’t take so much time to license or build. The problem is particularly acute in smaller installations. The burdensome regulatory pathway for projects under 10MW in capacity have eased the licensing requirements for small hydro projects. But in small projects are still very hard, because capital costs are a much larger percentage of the generation revenues than they are in large facilities. There is an acute need for a cost effective solution. Understanding this need and opportunity, LPS conceived a new type of hydropower equipment – a kit of standard, pre-fabricated modular parts for dam safety, power generation, spill control and other hydropower facility functions to be used to build and operate a hydro plant at substantially lower costs than are currently achievable. This system of prefabricated parts also showed promise to reduce environmental impacts, reduce engineering time involved in the licensing process, and possibly provide a new way for regulators to think about licensing that could lead to reduced regulatory timeframes. Because of this invention’s compelling and intriguing promise the Department of Energy’s (DOE) Water Power Technology Office (WPTO) awarded funding to LPS through the Office of Energy Efficiency and Renewable Energy (EERE) to develop this new type of hydropower equipment to meet a levelized cost of energy (LCOE) goal and analyze it for dam safety. LPS teamed with professional engineers, PhDs, and geotechnical consultants from GZA GeoEnvironental, Inc. (GZA), Alden Research Laboratory (Alden), University of Massachusetts – Dartmouth (UMass-D), the National Renewable Energy Laboratory (NREL) and AECOM. In collaboration with the engineers and managers at the WPTO and EERE they matured the concepts through substantial design shifts. The project exceeded the original goals and delivered designs beyond the proof-of-concept stage backed up by thorough professional engineering analysis of stability, seepage, and structural integrity. A full-scale section with seals successfully retained water in full-head leakage tests. Construction plans and professional engineering cost estimates indicated an LCOE half of the original LCOE goal. A system of these modules is now on track to be used in a 4.5 MW commercial installation.

13 HYDRO ENERGY↗

Probabilistic Risk Assessment of a Light Water Reactor Coupled with a High Temperature Electrolysis Hydrogen Production Plant

Two generic probabilistic risk assessments (PRA) for the addition of a heat extraction system (HES) addition to a light water reactor (LWR) are performed, one for a pressurized water reactor (PWR) and one for a boiling water reactor (BWR). The results investigate the applicability of the potential licensing approaches which do not require a full U.S. Nuclear Regulatory Commission (NRC) licensing review. The PRAs are generic, and some assumptions are made. Many conservative assumptions from a the preliminary PWR PRA report were eliminated using design data for both the HES and the high temperature electrolysis facility (HTEF). The results of the PRA indicate that the 10 CFR 50.59 licensing approach is justified due to the minimal increase in initiating event frequencies for all DBAs, none exceeding 5.6%. The PRA results for CDF and LERF support the use of RG 1.174 as further risk information that supports a change without a full LAR. Further insights provided through hazard analysis and sensitivity studies confirm with high confidence that the safety case for licensing an HES addition and a HTEF sited at 1.0 km from the NPP is strong and that the placement of a HTEF at 0.5 km is a viable case. Site specific information can alter these conclusions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗