Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Human Engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

NASA's J-2X Engine Builds on the Apollo Program for Lunar Return Missions

In January 2006, NASA streamlined its U.S. Vision for Space Exploration hardware development approach for replacing the Space Shuttle after it is retired in 2010. The revised CLV upper stage will use the J-2X engine, a derivative of NASA s Apollo Program Saturn V s S-II and S-IVB main propulsion, which will also serve as the Earth Departure Stage (EDS) engine. This paper gives details of how the J- 2X engine effort mitigates risk by building on the Apollo Program and other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with first demonstration flight in 2010 and human test flights in 2012. It is well documented that propulsion is historically a high-risk area. NASA s risk reduction strategy for the J-2X engine design, development, test, and evaluation is to build upon heritage hardware and apply valuable experience gained from past development efforts. In addition, NASA and its industry partner, Rocketdyne, which originally built the J-2, have tapped into their extensive databases and are applying lessons conveyed firsthand by Apollo-era veterans of America s first round of Moon missions in the 1960s and 1970s. NASA s development approach for the J-2X engine includes early requirements definition and management; designing-in lessons learned from the 5-2 heritage programs; initiating long-lead procurement items before Preliminary Desi& Review; incorporating design features for anticipated EDS requirements; identifying facilities for sea-level and altitude testing; and starting ground support equipment and logistics planning at an early stage. Other risk reduction strategies include utilizing a proven gas generator cycle with recent development experience; utilizing existing turbomachinery ; applying current and recent main combustion chamber (Integrated Powerhead Demonstrator) and channel wall nozzle (COBRA) advances; and performing rigorous development, qualification, and certification testing of the engine system, with a philosophy of "test what you fly, and fly what you test". These and other active risk management strategies are in place to deliver the J-2X engine for LEO and lunar return missions as outlined in the U.S. Vision for Space Exploration.

Snoddy, Jimmy R.↗

A review of human-system interface design issues observed during analog-to-digital and digital-to-digital migrations in U.S. nuclear power plants - 312

The United States (U.S.) Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) program is developing a scientific basis through targeted research and development (R and D) to support the U.S. nuclear power plant (NPP) fleet in extending their existing licensing period and ensuring their long-term reliability, productivity, safety, and security. Over the last several years, human factors engineering (HFE) professionals at the Idaho National Laboratory (INL) have supported the LWRS Advanced Instrumentation, Information, and Control (II and C) System Technologies pathway across several U.S. commercial NPPs in analog-to-digital migrations (i.e., turbine control systems) and digital-to-digital migrations (i.e., Safety Parameter Display System). These efforts have included in-depth human factors evaluation of proposed human-system interface (HSI) design concepts against established U.S. Nuclear Regulatory Commission (NRC) design guidelines from NUREG-0700, Rev 2 to inform subsequent HSI design prior to transitioning into Verification and Validation. This paper discusses some of the overarching design issues observed from these past HFE evaluations. In addition, this work presents some observed challenges such as common tradeoffs utilities are likely to face when introducing new HSI technologies into NPP hybrid control rooms. The primary purpose of this work is to distill these observed design issues into general HSI design guidance that industry can use in early stages of HSI design. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Parametric identification of human operator models

The accurate and efficient identification of the human operator is still a need in human factors engineering especially concerning multivariable control. Control theoretic identification methods need to be tested with human operator models under realistic boundary conditons. The requirements and criteria for the use of parametric methods, selected models as well as the Maximum Likelihood Method and the Extended Kalman Filter are displayed. The experiments and results are comparatively discussed from the point of practical engineering.

Ninz, N. R.↗

A HUMAN FACTORS META MODEL FOR U.S. NUCLEAR POWER PLANT CONTROL ROOM MODERNIZATION

Over the last several years, the United States (U.S.) Department of Energy (DOE) has sponsored human factors research and development (R&D) and human factors engineering (HFE) activities through its Light Water Reactor Sustainability (LWRS) program to modernize the main control rooms (MCR) of commercial nuclear power plants (NPP). Idaho National Laboratory (INL), in partnership with numerous commercial nuclear utilities, has conducted some of this R&D to enable the life extension of NPPs (i.e., provide the technical basis for the long-term reliability, productivity, safety, and security of U.S. NPPs). From these activities performed to date, a human factors meta model for U.S. NPP control room modernization can now be formulated. This paper discusses this emergent HFE meta model for NPP control room modernization, with the goal of providing an integrated high level roadmap and guidance on how to perform human factors R&D and HFE for those in the U.S. nuclear industry that are engaging in the process of upgrading their MCRs.

99 GENERAL AND MISCELLANEOUS↗

A human factors meta model for U.S. nuclear power plant control room modernization - 350

Over the last several years, the United States (U.S.) Department of Energy (DOE) has sponsored human factors research and development (R and D) and human factors engineering (HFE) activities through its Light Water Reactor Sustainability (LWRS) program to modernize the main control rooms (MCR) of commercial nuclear power plants (NPP). Idaho National Laboratory (INL), in partnership with numerous commercial nuclear utilities, has conducted some of this R and D to enable the life extension of NPPs (i.e., provide the technical basis for the long-term reliability, productivity, safety, and security of U.S. NPPs). From these activities performed to date, a human factors meta model for U.S. NPP control room modernization can now be formulated. This paper discusses this emergent HFE meta model for NPP control room modernization, with the goal of providing an integrated high-level road map and guidance on how to perform human factors R and D and HFE for those in the U.S. nuclear industry engaged in the process of upgrading their MCRs. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Review of Reactor Facilities without Main Control Rooms

Small, advanced reactors may require few, if any, safety-related human actions (HAs) and fewer HAs to monitor and control the plant. In comparison to large light water reactors, these are significant changes that have implications for many aspects of an applicant's human factors engineering (HFE), including control room design, plant staffing, and the management of safety functions. To support the Nuclear Regulatory Commission's (NRC) ability to evaluate these changes, information needs to be developed addressing the characteristics and potential issues. The objectives of our research were to (1) identify when a traditional main control room (MCR) may not be necessary, (2) identify workplace design alternatives to traditional MCRs, and (3) develop guidance for reviewing an applicant's workplace designs with and without a MCR. We determined that the safety question isn't so much justifying why a design has no MCR, but rather verifying that important human actions can be accurately and reliably performed under a range of challenging conditions using the HSIs provided regardless of their location. We developed guidance to review alternatives to MCRs based on HFE analyses for determining workplace location and design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Early implementation of digital upgrades on simulators - 347

An important aspect of successful Nuclear Power Plant (NPP) digital control system upgrade projects is to upgrade the Operator Training Simulator (OTS) or a related Engineering Simulator (ES), prior to installation of the Distributed Control System (DCS) on the plant allowing for early testing of the digital controls/HMI and for early training of the plant operators while maintaining OTS configuration management (i.e. OTS in sync with the plant's current design). Experience has shown that early implementation of digital upgrades on the OTS and/or an ES can reduce plant startup duration (related to digital systems commissioning) and ensure operators are proficient with the new digital systems to ensure safe and reliable plant operation. Including simulators in the design process offers many benefits including early identification of design deficiencies, testing deficiency fixes, developing and validating plant procedures and supporting human factors engineering, to name a few. Implementing digital upgrades on the OTS is also a regulatory requirement driven by the ANSI/ANS-3.5-2009 standard (Nuclear Power Plant Simulators for Use in Operator Training and Examination) if the new DCS affects actions to be taken by the plant operator in the main control room. This paper presents the benefits of implementing digital upgrades on the OTS and/or ES prior to plant implementation. The various simulator implementation strategies (stimulation, emulation, simulation or a hybrid solution) and selection factors are discussed. The paper also covers four (4) case studies demonstrating how digital upgrades can be implemented on simulators. The first case study covers the implementation of a Siemens offgas Programmable Logic Controller (PLC) system on the Enrico Fermi OTS (Michigan). The second case study covers the implementation of a GE main generator excitation system on the Cernavoda OTS (Romania). The third case study covers the implementation of a Siemens main feedwater control system on the Callaway OTS and ES (Missouri). The final case study covers the implementation of the non-safety related and safety related DCS on the Nuclear New Build (NNB) Hongyanhe Phase I dual-purpose OTS/ES (China). (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Crew interface analysis: Selected articles on space human factors research, 1987 - 1991

As part of the Flight Crew Support Division at NASA, the Crew Interface Analysis Section is dedicated to the study of human factors in the manned space program. It assumes a specialized role that focuses on answering operational questions pertaining to NASA's Space Shuttle and Space Station Freedom Programs. One of the section's key contributions is to provide knowledge and information about human capabilities and limitations that promote optimal spacecraft and habitat design and use to enhance crew safety and productivity. The section provides human factors engineering for the ongoing missions as well as proposed missions that aim to put human settlements on the Moon and Mars. Research providing solutions to operational issues is the primary objective of the Crew Interface Analysis Section. The studies represent such subdisciplines as ergonomics, space habitability, man-computer interaction, and remote operator interaction.

Bagian, Tandi↗

Cross-cultural issues in CRM training

The author presents six stages of intercultural awareness and relates them to cockpit resource management training. A case study examines cultural differences between South American and United States flight crews and the problems that can occur when pilots minimize differences. Differences in leadership styles are highlighted and strategies for training South American pilots are provided.

NASA Discipline Space Human Factors↗

Automation-induced monitoring inefficiency: role of display location

Operators can be poor monitors of automation if they are engaged concurrently in other tasks. However, in previous studies of this phenomenon the automated task was always presented in the periphery, away from the primary manual tasks that were centrally displayed. In this study we examined whether centrally locating an automated task would boost monitoring performance during a flight-simulation task consisting of system monitoring, tracking and fuel resource management sub-tasks. Twelve nonpilot subjects were required to perform the tracking and fuel management tasks manually while watching the automated system monitoring task for occasional failures. The automation reliability was constant at 87.5% for six subjects and variable (alternating between 87.5% and 56.25%) for the other six subjects. Each subject completed four 30 min sessions over a period of 2 days. In each automation reliability condition the automation routine was disabled for the last 20 min of the fourth session in order to simulate catastrophic automation failure (0 % reliability). Monitoring for automation failure was inefficient when automation reliability was constant but not when it varied over time, replicating previous results. Furthermore, there was no evidence of resource or speed accuracy trade-off between tasks. Thus, automation-induced failures of monitoring cannot be prevented by centrally locating the automated task.

Automation↗

Motion sickness and proprioceptive aftereffects following virtual environment exposure

To study the potential aftereffects of virtual environments (VE), tests of visually guided behavior and felt limb position (pointing with eyes open and closed) along with self-reports of motion sickness-like discomfort were administered before and after 30 min exposure of 34 subjects. When post- discomfort was compared to a pre-baseline, the participants reported more sickness afterward (p < 0.03). The change in felt limb position resulted in subjects pointing higher (p < 0.038) and slightly to the left, although the latter difference was not statistically significant (p = 0.08). When findings from a second study using a different VE system were compared, they essentially replicated the results of the first study with higher sickness afterward (p < 0.001) and post- pointing errors were also up (p < 0.001) and to the left (p < 0.001). While alternative explanations (e.g. learning, fatigue, boredom, habituation, etc.) of these outcomes cannot be ruled out, the consistency of the post- effects on felt limb position changes in the two VE implies that these recalibrations may linger once interaction with the VE has concluded, rendering users potentially physiologically maladapted for the real world when they return. This suggests there may be safety concerns following VE exposures until pre-exposure functioning has been regained. The results of this study emphasize the need for developing and using objective measures of post-VE exposure aftereffects in order to systematically determine under what conditions these effects may occur.

NASA Discipline Neuroscience↗

Human Research Program: Space Human Factors and Habitability Element

The three project areas of the Space Human Factors and Habitability Element work together to achieve a working and living environment that will keep crews healthy, safe, and productive throughout all missions -- from Earth orbit to Mars expeditions. The Advanced Environmental Health (AEH) Project develops and evaluates advanced habitability systems and establishes requirements and health standards for exploration missions. The Space Human Factors Engineering (SHFE) Project s goal is to ensure a safe and productive environment for humans in space. With missions using new technologies at an ever-increasing rate, it is imperative that these advances enhance crew performance without increasing stress or risk. The ultimate goal of Advanced Food Technology (AFT) Project is to develop and deliver technologies for human centered spacecraft that will support crews on missions to the moon, Mars, and beyond.

Russo, Dane M.↗

DEMONSTRATION OF A MULTI-STAGE TESTING AND EVALUATION APPROACH FOR A SAFETY-RELATED DIGITAL UPGRADE AT A NUCLEAR POWER PLANT

There is an imminent need for existing United States nuclear power plants to reduce their operating and maintenance costs to remain economically viable. Digital technology provides significant opportunity for the existing nuclear power plant fleet to transform that way in which work is accomplished to reduce costs and allow the fleet to remain economically competitive. However, a careful understanding of the human-technology integration is needed to ensure the continued safe and reliable operation of these existing plants with new digital capabilities. This work presents interim findings in applying human factors engineering to a safety-significant digital upgrade for a United States nuclear power plant, following the new Alternative Review Process in the recently revised Digital Instrumentation and Control Interim Staff Guidance Licensing Process, Revision 2. The interim results described in this work provides an industry perspective, based on ongoing work, to recent work published from Vazquez, Green, and Desaulniers (2022).

99 GENERAL AND MISCELLANEOUS↗

Ergonomic Safety and Health Activities to Support Commercial Nuclear Power Plant Control Room Modernization in the United States

Affordable, abundant, and reliable electricity generation is essential to fueling a nation’s robust and globally competitive economy. In the United States (U.S.), commercial nuclear power plants (NPPs) account for approximately 19% of reliable and cost-competitive baseload electricity generation. Other technologies that reduce reliance on fossil fuels and provide baseload electricity cost-competitively at a national scale are still under development. Thus, without suitable replacements for nuclear power, the generating capacity of nuclear energy in the U.S. must be continued through the safe and efficient operation of commercial NPPs. The U.S. De-partment of Energy’s (DOE) Light Water Reactor Sustainability (LWRS) research and development (R&D) program provides the technical bases for the long-term, safe, and economical operation of NPPs. One area in the LWRS program is the Plant Modernization pathway, which includes human factors R&D, human factors engineering (HFE), and ergonomics to enable the modernization of the instrumentation and control (I&C) technologies in NPP main control rooms (MCRs). DOE researchers, including ergonomics specialists at Idaho National Laboratory (INL) have collaborated with nu-merous commercial NPP utilities over the last few years on control room modernization. This paper summarizes recent ergonomics safety and health R&D and HFE performed in collaboration with a U.S. commercial utility to modernize their NPP MCRs.

99 GENERAL AND MISCELLANEOUS↗

Integrated emergency control board including design extended conditions for Krsko NPP - 297

In the aim of implementing post-Fukushima safety measures, Krsko Nuclear Power Plant is developing a Safety Upgrade Program. Krsko NPP is upgrading the remote shutdown capabilities and implementing ways to prevent and mitigate the consequences of potential Severe Accidents. This modification enhances remote shutdown capabilities of the plant to prevent potential severe accidents and improve the ways to mitigate their consequences. Within the set of plant design modifications, addressed the design, construction, and commissioning, of a new Emergency Control Room (EMCB. Tecnatom is the responsible of the design modification of the plant together with Idom, that participates with Tecnatom in the project as a joint venture, who provides a new set of field instrumentation, including its design and the corresponding wiring. EMCB integrates Human- System Interface throughout centralizing capabilities to safety shutdown and cooldown the plant as well as to control the new Design Extension Systems. The process relies on a Human Factors Engineering (HFE) analysis applying a specific methodology based on NUREG-0711 . Tecnatom has developed a specific HFE Program Management Plan to proceed with the analysis in a documented, traceable and reliable way. HFE activities ends with an Integrated System Validation in the actual full scope simulator involving MCR crews. This paper describes different phases of the project, the integrated schedule between HFE and I and C activities, benefits of upgrading main and emergency control rooms beyond design bases and addresses Tecnatom lessons learned obtained during the project execution. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Development of Human and Technology Integration Guidance for Work Optimization and Effective Use of Information

Existing nuclear power contributes to roughly 20% of the total electricity generation, and consistently provides the highest capacity factor of any other electricity generating resource in the United States. Despite these advantages, the existing nuclear power plant fleet in the United States has been enduring significant challenges in providing electricity in a cost-competitive manner, which has ultimately threatened the long-term economic viability of these plants. A major contributor to these increased operating and maintenance costs has been the continued reliance of a large workforce who perform their work under an operating model that has largely remained unchanged since the commissioning of these nuclear power plants. Unfortunately, while this operating model has provided safe and reliable electricity, other industries have already began transforming their workforce through the use of advanced digital technology and automation that has reduced their operating and maintenance cost significantly. In order for the United States nuclear industry to remain economically viable, a similar transformation must be considered in which digital technologies and automation capabilities are brought in to support key plant functions across all work functions across plant operation, maintenance, and support. To effectively integrate digital technology and automation in the existing nuclear power plant operating model, a multidisciplinary approach is needed that addresses technological and sociotechnical (i.e., human and technology integration) considerations. This report describes an extension to the human and technology integration methodology, herein referred to as Human Integration and Technology Task Force for Work Management Optimization (HITT), to support the safe, reliable, and efficient use of proposed innovations with the intended users in their intended environment to perform their intended tasks. By effectively incorporating human and technology integration into a plant modernization effort by using HITT, we believe that a utility can significantly improve work performance and overall workforce quality of life. For instance, if HITT is performed to optimize work management, scheduling performance and scope stability can be improved by up to 10%. HITT enables these benefits through developing a rich understanding of the work being performed, the utility’s vision, and the opportunities that provide greatest value to optimize performance through a 10-step process illustrated below as a quick guide. The quick guide contains links in the righthand side of each step that allows for navigation to the detailed section (Section 4) of HITT in this technical report.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The human factors verification at plant startup for the AP1000 Plant - 173

The Human Factors (HF) verification at plant startup is the final HF assessment for the AP1000{sup R} HF program and is performed using the as-built plant design. This HF verification has been implemented for the China AP1000 Standard Plant. The scope and objectives of the HF verification at plant startup met the requirements for Verification and Validation (V and V) as described in NUREG-0711, 'Human Factors Engineering Program Review Model'. The majority of the verifications have been completed. Overall, the results confirmed the adequacy of the China AP1000 Standard Plant operating procedures and operator training. A number of design issues were identified and were categorized as safety issues, operability and maintainability issues or minor issues. These issues are being addressed and tracked as site test deficiencies. Based on the current results, it can be concluded that the China AP1000 Standard Plant is safe, operable and maintainable, pending completion of the outstanding verifications and resolution of the identified issues. This paper will describe the overall strategy and discuss the lessons learned in respect to providing HF support to the startup activities for the AP1000 plant. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Planning for Plume Diagnostics for Ground Testing of J-2X Engines at the SSC

John C. Stennis Space Center (SSC) is the premier test facility for liquid rocket engine development and certification for the National Aeronautics and Space Administration (NASA). Therefore, it is no surprise that the SSC will play the most prominent role in the engine development testing and certification for the J-2X engine. The Pratt & Whitney Rocketdyne J-2X engine has been selected by the Constellation Program to power the Ares I Upper Stage Element and the Ares V Earth Departure Stage in NASA s strategy of risk mitigation for hardware development by building on the Apollo program and other lessons learned to deliver a human-rated engine that is on an aggressive development schedule, with first demonstration flight in 2010 and human test flights in 2012. Accordingly, J-2X engine design, development, test, and evaluation is to build upon heritage hardware and apply valuable experience gained from past development and testing efforts. In order to leverage SSC s successful and innovative expertise in the plume diagnostics for the space shuttle main engine (SSME) health monitoring,1-10 this paper will present a blueprint for plume diagnostics for various proposed ground testing activities for J-2X at SSC. Complete description of the SSC s test facilities, supporting infrastructure, and test facilities is available in Ref. 11. The A-1 Test Stand is currently being prepared for testing the J-2X engine at sea level conditions. The A-2 Test Stand is currently being used for testing the SSME and may also be used for testing the J-2X engine at sea level conditions in the future. Very recently, ground-breaking ceremony for the new A-3 rocket engine test stand took place at SSC on August 23, 2007. A-3 is the first large - scale test stand to be built at the SSC since the A and B stands were constructed in the 1960s. The A-3 Test Stand will be used for testing J-2X engines under vacuum conditions simulating high altitude operation at approximately 30,480 m (100,000 ft). To achieve the simulated altitude environment, chemical steam generators using isopropyl alcohol, LOX, and RELEASED - Printed documents may be obsolete; validate prior to use. water would run for the duration of the test and would generate approximately 2096 Kg/s of steam to reduce pressure in the test cell and downstream of the engine. The testing at the A-3 Test Stand is projected to begin in late 2010, meanwhile the J-2X component testing on A-1 is scheduled to begin later this year.

SaintCyr, William W.↗