Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Finance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Texas Clean Energy Project: Decision Point Application, Section 2: Topical Report - Phase 1, February 2010-October 2013

Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the Project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) power plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO 2 ) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) that will be cleaned and further treated so that at least 90 percent of the overall carbon entering the IGCC facility will be captured. The clean syngas will then be divided into two highhydrogen (H 2 ) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO 2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the Project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and additional work required to complete the financing of the Project. In general, STCE completed project definition, a front-end, engineering and design study (FEED), applied for and received its Record of Decision (ROD) associated with the NEPA requirements summarized in a detailed Environmental Impact Statement. A topical report covering the results of the FEED is the subject of a separate report submitted to the DOE on January 26, 2012. References to the FEED report are contained herein. In August 2013, STCE executed fixed-price turnkey EPC contracts and previously, in December 2011 a long-term O&M agreement, with industry-leading contractors. Other work completed during Phase 1 includes execution of all commercial input and offtake agreements required for project financing. STCE negotiated long-term agreements for power, CO 2 and urea offtake. A contract for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine was executed, as well as necessary agreements (supplementing the tariff) with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site. STCE executed firm agreements for natural gas transportation with ONEOK for long-term water supply with a private landowner. In addition, STCE secured options for critical easements and rights-of-way, completed and updated a transmission study, executed an interconnection agreement and has agreed a target October 31, 2013 financial closing date with debt and conventional and tax equity.

Mattes, Karl↗

Texas Clean Energy Project: Topical Report, Phase 1 - February 2010-December 2012

Summit Texas Clean Energy, LLC (STCE) is developing the Texas Clean Energy Project (TCEP or the project) to be located near Penwell, Texas. The TCEP will include an Integrated Gasification Combined Cycle (IGCC) plant with a nameplate capacity of 400 megawatts electric (MWe), combined with the production of urea fertilizer and the capture, utilization and storage of carbon dioxide (CO 2 ) sold commercially for regional use in enhanced oil recovery (EOR) in the Permian Basin of west Texas. The TCEP will utilize coal gasification technology to convert Powder River Basin subbituminous coal delivered by rail from Wyoming into a synthetic gas (syngas) which will be cleaned and further treated so that at least 90 percent of the overall carbon entering the facility will be captured. The clean syngas will then be divided into two high-hydrogen (H 2 ) concentration streams, one of which will be combusted as a fuel in a combined cycle power block for power generation and the other converted into urea fertilizer for commercial sale. The captured CO 2 will be divided into two streams: one will be used in producing the urea fertilizer and the other will be compressed for transport by pipeline for offsite use in EOR and permanent underground sequestration. The TCEP was selected by the U.S. Department of Energy (DOE) Office of Fossil Energy (FE) for cost-shared co-funded financial assistance under Round 3 of its Clean Coal Power Initiative (CCPI). A portion of this financial assistance was budgeted and provided for initial development, permitting and design activities. STCE and the DOE executed a Cooperative Agreement dated January 29, 2010, which defined the objectives of the project for all phases. During Phase 1, STCE conducted and completed all objectives defined in the initial development, permitting and design portions of the Cooperative Agreement. This topical report summarizes all work associated with the project objectives, and additional work required to complete the financing of the project. In general, STCE completed project definition, a front-end, engineering and design study (FEED), applied for and received its Record of Decision (ROD) associated with the NEPA requirements summarized in a detailed Environmental Impact Statement. A topical report covering the results of the FEED is the subject of a separate report submitted to the DOE on January 26, 2012. References to the FEED report are contained herein. In December 2011, STCE executed fixed-price turnkey EPC contracts and a long-term O&M agreement with industry-leading contractors.. Other work completed during Phase 1 includes execution of all major commercial input and offtake agreements. STCE negotiated long-term agreements for power, CO 2 and urea offtake. A contract for the purchase of coal feedstock from Cloud Peak Energy’s Cordero Rojo mine was executed, as well as a memorandum of understanding with the Union Pacific Railroad (UPRR) for delivery of the coal to the TCEP site. An MOU for natural gas supply was completed with ONEOK, and a long-term water supply agreement was completed with a private landowner. In addition, STCE secured options for easements and rights-of-way, completed a transmission study, executed an interconnection agreement and devoted substantial effort to debt and conventional and tax equity structuring to position the Project for project financing, currently scheduled for closing on December 31, 2012.

Mattes, Karl↗

West Virginia Full-Scale Solar Energy Team Growing the Mountain State Energy Economy by Reaching our Full Solar Potential

The WV Team will design and demonstrate a complete set of systems and processes for automating the identification of residential and light commercial solar opportunities, evaluating project finance options, securing permits and arranging for interconnections to the utility grid. These operations will be supported by the predictive qualification and feasibility of residential and light commercial solar energy opportunities in WV based on the current solar LCOE and potential state-wide policy initiatives. Through the WV Department of Commerce and its Division of Energy, the WV Team will coordinate with all 55 county development authorities in West Virginia, as well as a number of local and municipal authorities responsible for zoning and building code ordinances to support and implement a statewide, integrated set of regulations and administrative services. Additionally the WV Team will work with the State administration and legislature to develop incentives that will promote the financing of residential and light commercial solar projects.

14 SOLAR ENERGY↗

2018 Research Highlight in Manufacturing: Global Value Chain and Manufacturing Analysis on Geothermal Power Plant Turbines

Currently, geothermal project developers customize the size of the power plant to fit the resource being developed. The turbine is designed and sized to optimize efficiency and resource utilization for electricity production; most often, other power plant components are then chosen to complement the turbine design. These custom turbine designs demand one-off manufacturing processes, which result in higher manufacturing setup costs, longer lead-times, and higher capital costs overall in comparison to larger-volume line manufacturing processes. In contrast, turbines produced in standard increments, manufactured in larger volumes, could result in lower costs per turbine. In this study, we developed a manufacturing cost model to identify requirements for equipment, facilities, raw materials, and labor. Then we used discounted cash flow (DCF) analysis to calculate the minimum sustainable price (MSP). We analyzed three different cases 1) 1 MWe geothermal ORC turboexpander 2) 5 MWe ORC turboexpander and 3) 20 MWe geothermal steam turbine, and calculated the cost of manufacturing the major components, such as the impellers/blades, shaft/rotor, nozzles, inlet guide lanes, disks, and casings. The results showed that MSP could highly vary between 893 $/kW and 30 $/kW based on turbine size, standardization and volume of manufacturing. The analysis also showed that the economy of scale applies both to the size of the turbine and the number manufactured in a single run. As an example, the unit price of a 5 MW standard design turbine could be 150 $/W cheaper than the custom design. Sensitivity analysis indicated that these savings come largely from reduced labor costs for design and engineering and manufacturing setup. In addition to manufacturing cost savings, there is a delivery time saving up to 10 months, which could have a positive effect to construction financing operation time. Another advantage of these standard turbines is their adaptability to different geothermal systems by operating at off-design conditions. We also modeled off-design turbine efficiencies within the commercially-favorable operating range of a standard ORC compared to custom-designed ORC equipment. Than we used these performance calculations and power output capacities in a discounted cash flow (DCF) analysis of plant operations and financing, thereby creating representative techno economic models of a total geothermal power plant. I this scope we used NREL's System Advisor model (SAM) and performed DCF analysis of standard and custom design turbines using results from IPSEpro over range of temperatures of interest. In this scope 63 different off-design cases were analyzed. This helped us to answer the question; 'Can today`s capital cost savings compensate the future revenue losses due to lower electricity generation?' The results showed that, the net capital cost savings for the modeled 5 MW case study may reach up to +$1,298,672. Also, the difference between NPV of standard design and custom design turbine could reach up to +$733,940. To sum up, when all the things mentioned above are taken into consideration, it can be said that, the standard turbines are competitive over a wide range of temperatures and flow rates and the give positive NPV differences for certain cases near their design point.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Applying Value at Risk Analysis towards Energy Efficiency Investments

Value at Risk (VaR) is a measure of risk for potential losses within a portfolio of investments. Investments in energy efficiency in a manufacturing environment compete in terms of payback period, ease of investment, and transaction costs with other investments (production, safety, engineering, etc.). Because manufacturers have limited amounts of capital to allocate, investments in productivity tend to be prioritized over energy efficiency projects that offer similar paybacks. Value at Risk (VaR) can be used to quantify how risk-weighted expenditures change over time. Energy efficiency investments are often believed to offer relatively stable payoffs compared to changes in production and other assets, particularly when evaluated using methodologies such as simple payback. Incorporating methodologies such as VaR can provide a stronger business case for energy efficiency investments by quantifying value beyond what is captured in other Return on Investment calculations.In this paper we outline a methodology for applying VaR in the context of the variety of investments made by manufacturing organizations. Additionally, we profile the stability of energy efficiency (EE) and renewable energy (RE) investments compared to other types of investments made in manufacturing. By applying VaR to these investments, energy managers can better translate the financial benefits of energy-related capital projects in a way that is more compelling to Corporate Finance and Treasury departments. This common language also allows Corporate Finance and Treasury departments to support large, strategic deployments of capital for such projects based on a targeted objective – the management of financial risk for the organization’s shareholders.

Levine, Eli↗

Cost-Saving Strategies to Improve County Economic and Energy Resilience: A Resilient Counties Forum - Cultivating and Protecting Energy Assests Panel

The Resilient Counties Forum is a FREE opportunity for county leaders to gain a better understanding of how they can help meet county disaster management, energy cultivation and protection, resource recycling and infrastructure financing goals. At the Forum, county leaders and the private sector will discuss successful resilience strategies, and create action plans for how county leaders might address certain issues in their counties. The morning session will include presentations featuring county examples of best practices in the following topic areas: Managing Disasters, Cultivating and Protecting Energy Assets, Infrastructure Financing and Resource Recycling.

14 SOLAR ENERGY↗

Bringing Solar Energy to Low- and Moderate-Income Communities

The U.S. solar photovoltaics (PV) industry has taken off over the past decade, but without deliberate action low- and moderate-income communities could be left behind. Key recommendations for policymakers and funders in the renewable energy and community development fields that emerged from this process include the following: • Help to capitalize and support community-based lenders to provide flexible, low-cost, and long- term financing to mission-driven solar projects— including providing guarantees or other forms of credit enhancement. • Provide a grant-in-lieu-of-credits option for the Investment Tax Credit as was done during the last recession. • Develop pools of government and philanthropic support that can complement financing from community-based lenders to complete the capi- tal stack for mission-driven projects, as well as to support education and technical assistance to both consumers and potential project sponsors. • Create a national Renewable Energy Credits pro- gram that includes social equity targets to provide a baseline of support for clean energy generation. • Change utility regulations to remove barriers to low-income solar projects, provide greater certainty for developers, and measure progress toward equity in renewable energy policy implementation.

14 SOLAR ENERGY↗

Bio-project “derisking” through development of systematic methodologies and frameworks for risk assessment

One of the primary hindrances to producing a viable, sustainable domestic biomass industry for renewable biofuels, bio-products and bio-power is the lack of understanding and quantification of the risks associated with both the biomass supply chain and preprocessing and conversion technologies. Currently a consistent method for assessing, comparing, and quantifying risks in biomass supply chains does not exist, creating a major investment barrier to bioenergy projects in the U.S. The lack of a standardized approach has resulted in bioenergy stakeholders independently using inconsistent approaches and evaluation criteria, leading to unreliable and incomparable assessments of risks and financing barriers to bio-project development. Along with the challenges of inconsistent risk assessment for supply chain risk, technology specific risks based on variability in biomass properties are not fully understood and can pose significant unforeseen challenges for bioenergy projects. In many cases these properties have not yet been identified and the impacts on the proposed technology and products unquantified. This is particularly challenging for emerging preprocessing and conversion technologies. Without a firm understanding of the preprocessing/conversion technology-specific critical properties, the risk of a proposed bio-project cannot be fully evaluated. To address inconsistent risk evaluation in the biomass supply chain supporting project financing, a Biomass Supply Chain Risk Standards (BSCRS) framework was developed. The BSCRS framework includes a comprehensive list of known and perceived risks (Risk Indicators) to the supply chain developed through 100’s of interviews with bioenergy industry experts spanning from feedstock growers and suppliers to representatives from the financial sector. These risks have been organized into a manageable hierarchy of Risk Categories and Risk Factors that can be practically assessed. This BSCRS framework also provides mitigation strategies for multiple Risk Indicators from best available industry practices and research findings. Additionally, a risk quantification methodology for each Risk Factor, Risk Category, and the bio-project as a whole was developed to enable capital markets to assess feedstock risk more efficiently and more accurately. Multiple case studies representing existing bio-projects have been used to evaluate and verify the BSCRS framework and scoring methodology. To address technological risk along with the supply chain risk captured in the developed BSCRS framework, this work also focuses on development of a systematic criticality assessment tool using well-accepted, quantitative risk analysis methods to evaluate bioenergy feedstock critical properties impacting system unit operations. The proposed Failure Mode and Effect Analysis (FMEA) approach uses a team of subject area experts (SAEs) for each targeted unit operation within a system. Collectively, the team will develop and use a quantitative scoring system to assess the material attributes, process parameters, and quality attributes for key unit operations that have already been identified. The FMEA process generates Risk Priority Numbers (RPNs) for the various failures and predominant causes for each material/process unit/product combination resulting in a semi-quantitative, standardized methodology for assessing technological risk and biomass properties contributing to that risk.

09 BIOMASS FUELS↗

FY 2022 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Birth of a Data Center

Since 2005, Research and Education Campus serves as the gateway to INL University Boulevard Consolidates scientific studies, increased interaction and educational opportunities Teams with local commercial developers, the State of Idaho, and Idaho universities Developed University Boulevard 7 major R&D Leased facilities (388,000 sq. ft.) $122M capital value of leased property Some facilities are at and others forecasted to exceed capacity within 2-3 years as mission growth continues DOE awarded the INL contract to BEA, Feb. 2005. Purpose; transform two uniquely different National Laboratories into the newly formed Idaho National Laboratory Become the pre-eminent, internationally recognized nuclear energy research, development and demonstration laboratory within 10 years. Aggressively streamline, upgrade and plan for new infrastructure INL Infrastructure Transformation Plan, Sept 2005, an overall roadmap for transforming INL to meet the new vision. Key goal; procure 400,000 sq ft of new facility space DOE-NE approved Mission Need document for consolidating the INL Research and Education Campus (REC), Dec. 2005; add or replace 200,000 to 500,000 sq ft of professional scientific space, existing facilities were fair to poor condition. Master Campus Plan requirements document and Environmental Assessment approved January and March 2007 respectively. Defined campus location and REC boundaries. INL and DOE-ID decided, in 2007, to suspend quest for third-party financing, because unlikely to succeed. The strategy was; Keep original target of 200,000 to 500,000 sq ft new space Consolidate existing scattered leases Pursue developer-financed facilities in smaller incremental sizes All leased general purpose buildings;No DOE capital investments (except for utility corridor), developed by others (local developers, State, University, private funding), no government land involved INL-funded tenant improvements

99 GENERAL AND MISCELLANEOUS↗

Extracting value from coal mine methane

Emerging US policy to regulate greenhouse gas (GHG) emissions through a cap-and-trade program presents mine managers with a new opportunity to explore and develop methane utilization or abatement projects that generate value from the anodization of carbon offset credits. In addition, the rising focus on US energy security and domestic energy supply is promoting mine managers and engineers to give further consideration to the importance of their methane gas by-products. The market through which coal mine methane offset projects can be developed and carbon offset credits monetized is quickly maturing. While many methane utilization projects have previously been uneconomical, the carbon offset credit market provides a new set of financing tools for mine engineers to capitalize these projects today. Currently , there are two certification programs that have approved project protocols for CMM projects. The Voluntary Carbon Standard (VCS) offers a methodology approved under the Clean Development Mechanism, the international compliance based offset market under the Kyoto Protocol. The VCS protocol is applicable to projects that combust ventilation air methane (VAM) and methane extracted from pre-and post-mine drainage systems. The Chicago Climate Exchange (CCX), which operates a voluntary yet binding cap-and-trade market, also has an approved protocol for CMM projects. CCX's protocol can be applied to projects combusting VAM, and methane extracted from pre-and-post-mine drainage systems, as well as abandoned mines. The article describes two case studies - Developing a gob gas utilization project financed by carbon offset credits and First VAM oxidation system to be commissioned at an operating mine in the US. 1 tab., 4 photos.

01 COAL, LIGNITE, AND PEAT↗

French Atomic Energy Commission Decommissioning Programme and Feedback Experience - 12230

Since the French Atomic and Alternatives Energy Commission (CEA) was founded in 1945 to carry out research programmes on use of nuclear, and its application France has set up and run various types of installations: research or prototypes reactors, process study or examination laboratories, pilot installations, accelerators, nuclear power plants and processing facilities. Some of these are currently being dismantled or must be dismantled soon so that the DEN, the Nuclear Energy Division, can construct new equipment and thus have available a range of R and D facilities in line with the issues of the nuclear industry of the future. Since the 1960's and 1970's in all its centres, the CEA has acquired experience and know-how through dismantling various nuclear facilities. The dismantling techniques are nowadays operational, even if sometimes certain specific developments are necessary to reduce the cost of operations. Thanks to availability of techniques and guarantees of dismantling programme financing now from two dedicated funds, close to euro 15,000 M for the next thirty years, for current or projected dismantling operations, the CEA's Nuclear Energy Division has been able to develop, when necessary, its immediate dismantling strategy. Currently, nearly thirty facilities are being dismantled by the CEA's Nuclear Energy Division operational units with industrial partners. Thus the next decade will see completion of the dismantling and radioactive clean-up of the Grenoble site and of the facilities on the Fontenay-aux-Roses site. By 2016, the dismantling of the UP1 plant at Marcoule, the largest dismantling work in France, will be well advanced, with all the process equipment dismantled. After an overview of the French regulatory framework, the paper will describe the DD and R (Decontamination Decommissioning and Remediation) strategy, programme and feedback experience inside the CEA's Nuclear Energy Division. A special feature of dismantling operations at the CEA comes from the diversity of facilities to be dismantled, which are predominantly research facilities and therefore have no series advantage. There is tremendous operating feedback, however. For more than twenty years in all its centres, the CEA has acquired experience and know-how through dismantling research reactors or critical models and laboratories or plants. The dismantling techniques are nowadays operational, even if sometimes certain specific developments are necessary to reduce the cost of operations. Thanks to availability of techniques and guarantees of dismantling programme financing from two dedicated funds, close to euro 15,000 Millions for the next thirty years, for current or projected dismantling operations, the Nuclear Energy Division has been able to develop, when necessary, its immediate dismantling strategy. Currently, nearly thirty facilities are being dismantled by the CEA's Nuclear Energy Division operational units with industrial partners. Thus the next decade will see completion of the dismantling and radioactive clean-up of the Grenoble site and of the facilities on the Fontenay-aux-Roses site. By 2020, the dismantling of the UP1 plant at Marcoule, one of the largest dismantling works in the world, will be well advanced, with all the process equipment dismantled. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY 2023 Idaho National Laboratory Site Sustainability Plan

The mission of the Department of Energy (DOE) is to ensure America’s security and prosperity by addressing its energy, environmental and nuclear challenges through transformative science and technology solutions. This FY 2022 Idaho National Laboratory Site Sustainability Plan (SSP) was developed to enable and sustain Idaho National Laboratory’s (INL’s) mission to discover, demonstrate, and secure innovative nuclear solutions, clean energy options, and critical infrastructure. DOE Order 436.1, “Departmental Sustainability,” provides requirements and assigns responsibilities for managing sustainability within DOE to ensure that DOE missions are carried out in a sustainable manner, to institute wholesale cultural change to factor sustainability into all DOE decisions, and to ensure DOE achieves sustainability goals. DOE Order 436.1 also requires DOE sites to commit appropriate personnel resources, establish a financing plan that prioritizes the use of life-cycle cost effective private-sector financing, optimize the application of appropriations and budgeted funds, and establish specific performance measures and deliverables designed to achieve the listed requirements. The SSP was developed according to the narrative requirements from the “FY 2022 DOE Site Sustainability Plan Guidance” document issued in September 2021. The SSP contains strategies and activities that will lead to continual energy, water, and waste reductions that move the INL site toward meeting DOE sustainability goals and requirements. The SSP summarizes energy and available fuel use reporting requirements and references criteria for instituting sustainable design. SSP requirements are integrated into each INL site contractor’s Integrated Safety Management System and Environmental Management System (EMS). Finally, the Sustainability Program directives, based on this SSP, are integrated into INL/LTD-21-62463, Annual Laboratory Plan 2021, and operations and acquisition systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Benchmarking Non-Hardware Balance-of-System (Soft) Costs for U.S. Photovoltaic Systems, Using a Bottom-Up Approach and Installer Survey – Second Edition

This report presents results from the second U.S. Department of Energy (DOE) sponsored, bottom-up data-collection and analysis of non-hardware balance-of-system costs -- often referred to as 'business process' or 'soft' costs -- for U.S. residential and commercial photovoltaic (PV) systems. In service to DOE's SunShot Initiative, annual expenditure and labor-hour-productivity data are analyzed to benchmark 2012 soft costs related to (1) customer acquisition and system design (2) permitting, inspection, and interconnection (PII). We also include an in-depth analysis of costs related to financing, overhead, and profit. Soft costs are both a major challenge and a major opportunity for reducing PV system prices and stimulating SunShot-level PV deployment in the United States. The data and analysis in this series of benchmarking reports are a step toward the more detailed understanding of PV soft costs required to track and accelerate these price reductions.

14 SOLAR ENERGY↗

Feasibility Study of Economics and Performance of Solar Photovoltaics at the Stringfellow Superfund Site in Riverside, California

This report presents the results of an assessment of the technical and economic feasibility of deploying a photovoltaics (PV) system on the Stringfellow Superfund Site in Riverside, California. The site was assessed for possible PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics of the potential systems were analyzed using an electricrate of $0.13/kWh and incentives offered by Southern California Edison under the California Solar Initiative. According to the assessment, a government-owned, ground-mounted PV system represents a technically and economically feasible option. The report recommends financing options that could assist in the implementation of such a system.

14 SOLAR ENERGY↗

Solar Technical Assistance Team (STAT) (Fact Sheet)

The Solar Technical Assistance Team (STAT) is a team of solar technology and deployment experts who ensure that the best information on policies, regulations, financing and other issues is getting into the hands of state government decision makers at the time they need it. The goal of the team is to provide timely, unbiased expertise to assist key policy makers and regulators in making informeddecisions.

14 SOLAR ENERGY↗

Feasibility Study of Economics and Performance of Solar Photovoltaics in the Commonwealth of Puerto Rico

This report presents the results of an assessment of the technical and economic feasibility of deploying a photovoltaics (PV) system on brownfield sites in the Commonwealth of Puerto Rico. All of the assessed sites are landfills. The sites were assessed for possible PV installations. The cost, performance, and site impacts of different PV options were estimated. The economics of the potentialsystems were analyzed using an electric rate of $0.119/kWh and incentives offered by Puerto Rico and by the serving utility, PREPA. According to the site production calculations, the most cost-effective system in terms of return on investment is the thin-film fixed-tilt technology. The report recommends financing options that could assist in the implementation of such a system.

14 SOLAR ENERGY↗