Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EXCAVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Legacy Depleted Uranium (DU) Discovered on TTR Lakebed (subsurface)(DOE Occurrence Report Final Notification)

Soil from an excavated test was being surveyed and fresh DU fragments removed so the soil could be returned to the excavation hole. Sandia RCTs discovered two locations where highly oxidized DU was present just below the undisturbed lake bed surface. The oxidized DU was removed for disposal as radioactive waste. Approximately one cubic foot of oxidized DU mixed with soil was removed. Line Manager, Sr. Manager and Acting Director were all notified of this event.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Salt Repository Concept for CSNF in 21-PWR Size Canisters

The most straightforward concept for disposal of large, heavy packages containing commercial spent nuclear fuel (CSNF) in a repository in bedded salt, would be to emplace them directly on the floor in emplacement tunnels. In-tunnel axially aligned horizontal emplacement would minimize excavated volume and avoid drilling of large-diameter emplacement boreholes. A similar concept was proposed in Germany for direct disposal of POLLUX ® canisters. The repository would be constructed at a depth of 500 to 1,000 m for isolation from the surface, and for sufficient overburden stress to ensure creep reconsolidation of repository openings. It could entail modular panels of emplacement tunnels arranged on headings oriented in cardinal directions from a central core, to accommodate the estimated 140,000 MTU total U.S. CSNF inventory. To do so, the overall area of the repository layout would be approximately 20 km 2 . Many layouts are possible, but the approach should be modular, excavation should be deferred for as long as possible to avoid maintenance, and the emplacement areas should share support facilities and shafts. Vertical shafts would be used in accordance with mining practice in sedimentary basins. Large diameter shafts would be needed for ventilation exhaust and waste transport, with smaller shafts for waste salt removal, men & materials, and ventilation intake. The spacing between disposal tunnels as estimated from thermal modeling, seeks to limit the maximum average areal thermal load in the panels to 11 W/m 2 to control long-term heat buildup in the host rock. Peak salt temperature would occur within a few years and would be dominated by each waste package locally, simplifying thermal management. There would be some flexibility to decrease the package spacing or increase the emplacement thermal power limit Backfilling emplaced waste packages immediately with mine-run crushed salt would provide shielding and expedite reconsolidation. This arrangement would isolate adjacent waste packages from one another by the intervening backfill, especially after it reconsolidates and its properties approach those of intact salt. After the repository is fully loaded and the performance confirmation program is complete, activities to permanently close the repository would be initiated. During closure operations all openings in the host salt would be backfilled, then shafts would be sealed, and boreholes plugged. Plans for the Waste Isolation Pilot Plant (WIPP) show how sealing and plugging could be done. A monitoring program could continue for 50 years or longer after repository closure. With an emplacement thermal power limit of 10 kW per waste package, nearly all the CSNF that is projected to be produced by the current fleet of reactors in the U.S. could be emplaced over a period of approximately 50 years starting in calendar 2048. No barriers to implementation in a reasonable timeframe have been identified from this generic analysis. Engineering challenges include: 1) shaft construction; 2) a very-large capacity shaft hoist; 3) overpack design; 4) a transport-emplacement-vehicle (TEV) for transporting waste packages once they are underground and emplacing them remotely; and 5) remotely operated equipment for emplacing backfill. The method of shaft construction would depend on site-specific conditions, and could involve freezing the subsurface. A shaft hoist with payload capacity of 175 MT seems technically and economically feasible based on development work in Germany, and it would be the largest hoist of its kind. The function of disposal overpacks would be to provide reliable containment during repository operations, which could be accomplished using a corrosion allowance material such as a low-carbon steel. Development effort would be needed to determine overpack thickness (e.g., 7 to 20 cm) that can resist corrosion and loading from salt creep, to rovide containment throughout the repository operational period. The transport-emplacement vehicle (TEV) would be similar to previous concepts, particularly one option proposed for a Yucca Mountain repository. It would move over a rough salt floor on independently driven and steered wheels, and carry heavy shielding in addition to a waste package. By analogy to the safety case for the WIPP in New Mexico, human intrusion is likely to be the dominant mode of radionuclide release from the repository. Treatment of human intrusion for a CSNF repository in salt could depend on promulgation of site-specific changes in the regulations. Radionuclide release and migration would be quite limited for undisturbed conditions. There may be opportunities for improved understanding of salt performance with waste heating, based on future in situ testing in an underground salt research laboratory. This report also discusses a developing area of salt rock mechanics that involves low-stress, low strain-rate creep that might cause large, heavy waste packages to slowly sink. Site-specific sampling, testing, and modeling would be used to determine if the mechanism is important enough to merit consideration in design, or inclusion in performance assessment. Part of engineering design and postclosure safety assessment for a CSNF repository in salt would be to implement a methodology to show that the probability of a criticality event in the repository, when waste packages eventually breach and are flooded, is less than the probability screening threshold for performance assessment. In the methodology, a criticality analysis would be performed for waste packages in the repository, incorporating measures that could be introduced as needed to limit reactivity, for example using fuel selection and loading rules, and crediting the absorption of thermal neutrons by natural chlorine in the environment. A similar analysis has been underway for CSNF stored in dual-purpose canisters. Ideally the strategy would be developed prior to actually loading SNF assemblies into canisters used in waste packages for disposal.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Effective Access Monitoring at Geological Repositories

Access points at a deep, mined geological repository (GR) for the disposal of spent nuclear fuel (SNF) and other nuclear wastes present potential diversion paths for nuclear material. Because C/S measures are not likely to be used underground, access to a GR will require unprecedented reliance on C/S measures to maintain continuity of knowledge (CoK) on SNF buried underground. We develop a model GR based on common features of GR designs from national programs in order to develop and optimize C/S measures for GR access points that maximize confidence that CoK is maintained on SNF underground. Critical access points identified in this study are surface entrances to (1) the GR ramp (2) the excavation shaft, (3) the main elevator shaft, and (4) the ventilation shaft. The first three are considered critical detection points (DPs), whereas the fourth is considered a non-critical DP. The reason for the distinction is due to the different design capabilities of shaft components: the first three (ramp, excavation shaft, main elevator) are all capable of being used to move material from the underground to the surface, whereas the ventilation shaft is not. Such capabilities are verified during periodic design information verification (DIV) inspections.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reconstruction of the Room D, B, G, and Q Closure Histories at the Waste Isolation Pilot Plant

Experimental measurements of room closure in salt repositories are valuable for understanding the evolution of the underground and for validating geomechanical models. Room closure was measured during a number of experiments at the Waste Isolation Pilot Plant (WIPP) during the 1980's and 1990's. Most rooms were excavated using a multi-pass mining sequence, where each pass necessarily destroyed some of the mining sequence closure measurement points. These destroyed points were promptly reinstalled to capture the closure after the mining pass. After the room was complete, the mining sequence closure measurement stations were supplemented with remotely read closure measurement stations. Although many aspects of these experiments were thoroughly documented, the digital copies of the closure data were inadvertently destroyed, the non-trivial process of zeroing and shifting the raw closure measurements after each mining pass was not precisely described, the various closure measurements within a given room were not directly compared on the same plot, and the measurements were collected for several years longer than previously reported. Consequently, the hand-written mining sequence closure measurements for Rooms D, B, G, and Q were located in the WIPP archives, digitized, and reanalyzed for this report. The process of reconstructing the mining sequence closure histories was documented in detail and the raw data can be found in the appendices. Within the mid-section of a given room, the reconstructed closure histories were largely consistent with other mining sequence and remotely read closure histories, which builds confidence in the experiments and suggests that plane strain is an appropriate modeling assumption. The reconstructed closure histories were also reasonably consistent with previously published results, except in one notable case: the reconstructed Room Q closure histories 30 days after excavation were about 45 % less than the corresponding closures reported in Munson's 1997 capstone paper.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lawrence Livermore National Laboratory Experimental Test Site 300 (S300): S300 Roadway Improvements - 817 Complex Soil Sampling and Analysis Plan, Addendum 1 (June 2023)

The purpose of this addendum is to amend and update the S300 Roadway Improvements – 817 Complex [project] Soil Sampling and Analysis Plan (SAP) dated May 2023. Field activities to implement the SAP were completed in May 2023 except for SB-17. SB-17 is therefore included in this addendum. In addition, this addendum amends the SAP by covering an expanded scope of work and project limits. The project limits have been expanded to include areas around Building 818. Sampling at the expanded project area is addressed in this addendum by two additional borings for geotechnical and environmental analyses. The project area consists of the access gate and existing access roads for the Process Area complex. Excavation depths are anticipated to be no deeper than 5 feet from current grade. None of the proposed disturbance areas are within known areas of contamination or mapped controlled excavation area (LLNL 2008). Therefore, this addendum proposes a sampling spacing in the vicinity of Building 818 of about 172 feet (Tier 2) in accordance with the Soil Screening and Management Plan (LLNL 2022). The information contained in this addendum supersedes the May 2023 SAP. However, this addendum only addresses elements of the May 2023 SAP that were modified. Elements of the May 2023 SAP that have not been modified are relevant and will remain in effect.

54 ENVIRONMENTAL SCIENCES↗

Brine Availability Test in Salt (BATS) FY24 Update

This report summarizes fiscal year 2024 (FY24) activities centered around a series of field tests in bedded salt at the Waste Isolation Pilot Plant (WIPP) funded by the Office of Spent Fuel and Waste Science and Technology in the Spent Fuel and Waste Disposition (SFWD) program of the US Department of Energy’s Office of Nuclear Energy (DOE-NE). High-level Purpose of Experiments: The Brine Availability Test in Salt (BATS) field tests are revealing both brine occurrence (i.e., where, and how much) and brine migration (i.e., how easily it moves) in the excavation damaged zone (EDZ). This understanding is foundational to develop a safety case for a future heat-generating waste repository in salt, and to starting up a generic repository program in salt to buy down risk. BATS seeks to predict how much brine can flow into both ambient and heated excavations (e.g., boreholes or rooms) in salt. This work is educating and empowering new repository scientists on two fronts: “design and execution of field tests” and “prediction and modeling of coupled processes.” DOE-NE capabilities in salt have grown and been tested through international modeling and benchmarking exercises (e.g., DECOVALEX, RANGERS, KOMPASS, and MEASURES; see Mills et al., 2024). The hands-on expertise we are building is a necessary step towards large-scale disposal demonstrations and eventual implementation.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DECOVALEX-2023: Task C Final Report

The Full-scale Emplacement (FE) heater experiment at the Mont Terri Underground Rock Laboratory (URL) was designed and conducted by Nagra to replicate an emplacement tunnel of Nagra’s reference repository design at 1:1 scale. Alongside testing the technical feasibility of constructing disposal tunnels, emplacing waste containers in the tunnels and then backfilling them, the main goals of the FE experiment are (1) to obtain a better understanding of the coupled effects of induced thermo-hydro-mechanical (THM) processes that may occur and (2) to validate existing coupled THM models (Müller et al., 2017). A key aspect of ensuring safety for repositories located in low-permeability rock involves minimizing any damage to the rock itself, thereby preserving its integrity and promoting a stable environment Amongst a number of processes that could damage the rock is the increase in pore pressure due to thermal loading caused by heat emitted from the waste. To reduce the potential damage of the rock, it is important to analyse the evolution of heat over time due to the heat load of the containers and assess possible consequences by coupled THM models. The aim of Task C of DECOVALEX-2023 was to build 3D numerical models of the FE experiment, focussing in particular on the heating induced pore pressure change in the Opalinus Clay. Data from a large number of sensors were available from the FE experiment for model comparison. These sensors measured temperature and relative humidity in the bentonite around the heaters, and temperature, pressure and displacement/strain in the surrounding Opalinus clay. Data were available from the start of excavation (April 2012) up to August 2020 for most sensors (more than 5 years from the start of heating in December 2014). To fulfil the overall aim of the task, the work was broken down into a number of steps, starting with simpler models to build confidence in each team’s approach and then moving to more complex models that better represent the FE experiment. Step 0 consisted of 2D benchmark models, gradually increasing the number of processes that are represented from thermal (T) only models in Step 0a, to coupled thermal hydraulic (TH) models in Step 0b with a representation of changing porosity, to coupled thermo-hydro-mechanical (THM) models in Step 0c, where porosity changes are calculated by the mechanical model. A detailed specification of processes, parameters, initial and boundary conditions was provided for this step, with the ambition that all teams would work towards close agreement in their model results, thus building confidence in the model implementations. vi It was not straightforward to achieve agreement between the teams, so additional steps (Step 0b2, 0b3, 0c2, 0c3) were added along with derivation of some analytical solutions against which the models could be compared. The reasons for the differences between teams were investigated and found to be caused primarily by different conceptual model assumptions (including temperature dependence of the thermal expansion of water), different model formulations (including porosity evolution) and differences in modelled domain sizes, boundary conditions and grid discretisation. This demonstrates that comparisons between multiple modelling teams and/or comparison with analytical results and experimental data are highly beneficial in providing an indication of uncertainty in model predictions. At the conclusion of Step 0, almost all teams had achieved a close agreement in model results and those that had not achieved an agreement knew the reason for this. Step 1 moved from 2D models to 3D models of the FE experiment without adding technical features like shotcrete or EDZ, and only considering the heating phase. Initially the 3D model was tightly specified to continue to build confidence in the model implementations (Step 1a). The results of Step 1a were compared to the data from the FE-experiment without the teams seeing the data. The teams were then provided with a sub-set of the data from the FE-experiment and invited to consider how best to use the large dataset for model comparison (Step 1b). Teams were then asked to use the data provided to calibrate their models, only changing material property values rather than adding features or processes to their models (Step 1c). In Step 1, teams were asked to only model the heating phase of the experiment, so pressure in the Opalinus Clay was reported as change in pressure since the initial conditions were specified rather than modelled. The change from 2D to 3D models was accompanied by an increase in the dispersion of results between the teams. Some of this was resolved during the task, but some remained and is potentially due to model discretisation. Calibration of parameters was useful in improving the fit of the models to the data but the remaining differences indicated that the models were missing features or processes. In Step 2, the teams were asked to update their models with additional features and processes as well as calibrating parameters to try and improve the fit of the models to the data. Teams were encouraged to represent ventilation of the open FE tunnel prior to backfilling with heaters and bentonite and in Step 2, the absolute pressure in the Opalinus Clay was compared between the teams. Teams took different approaches, but there was consideration of adding shotcrete and an EDZ into the model, representing stress change during excavation and different approaches to modelling ventilation of the FE tunnel. Overall, the documented results showed a very good agreement for temperature. The results for porewater pressure evolution showed a significant improvement for most teams compared to Step 1c with a good agreement to the measurements for several teams whereas some teams overpredicted the pressure increase and others overpredicted the drainage effect especially for the sensors close to the heater. Step 3 was an opportunity for teams to use the models developed in Step 1 and Step 2 to make predictions about the temperature and pressure changes that will be expected at the FE experiment over the next few years in light of the planned changes in thermal output of the heaters.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

E-Area Low-Level Waste Facility Inadvertent Human Intruder Limits and Doses in Support of the PA2022

This report documents the inadvertent human intruder (IHI) analysis for the E-Area Low-Level Waste Facility (ELLWF) at the Savannah River Site (SRS), near Aiken, South Carolina. This analysis supports the revised ELLWF Performance Assessment (PA), complying with the Department of Energy standard for operation of low-level waste disposal facilities (USDOE, 2017). The ELLWF is an operating waste disposal facility and is scheduled to continue accepting waste to 2065. One task of the revised PA is to establish waste inventory limits for the various disposal units at ELLWF. This is done by modeling future contaminant release and transport through applicable pathways to human receptors, comparing predicted doses per disposed curie with applicable performance measures, to obtain inventory limits which will assure that doses to receptors do not exceed performance measures. This report documents results of modeling future doses to one class of receptor, the inadvertent human intruder. It is assumed that after site closure, public knowledge of the site is lost, and IHIs will engage in activities on the ELLWF that will disrupt the closure cap, causing dose to the IHI. Following USDOE (2017), six different stylized exposure scenarios are considered, simulating activities by an IHI which could result in a radiological dose. The six scenarios are: • Acute – Basement Construction: IHI constructs a basement and encounters waste during excavation which is inadvertently mixed with clean soil and diluted. • Acute – Well Drilling: IHI drills a water well through waste and is exposed to drill cuttings mixed with clean soil that are brought to the surface. • Acute – Discovery: IHI begins constructing a basement but stops when encountering the riprap in the final closure cap and is exposed to photon radiation from unexcavated material residing in the undisturbed waste zone. • Chronic – Agriculture: Resident IHI is exposed to waste that was excavated for basement construction and mixed with native soil in the intruder’s vegetable garden. • Chronic – Post-Drilling: Resident IHI is exposed to waste from drill cuttings mixed with native soil and scattered in the garden area. • Chronic – Residential: Resident IHI is exposed to external radiation while in home located above waste with shielding provided by the concrete basement floor and any soil or engineered material remaining between the basement and waste. Dose calculations are performed using the SRNL Dose Toolkit (Aleman, 2023), following the approach of Smith et al (2019). Calculations are performed separately for 27 of the 33 disposal units (DUs) at ELLWF and are radionuclide specific. The results of the IHI analysis include: • Dose Factors: mrem per disposed curie (acute) and mrem/yr per disposed curie (chronic) for each parent radionuclide, for each DU. • Inventory Limits: in curies, for each parent radionuclide, for each DU. • Estimated Dose to IHI: mrem (acute) and mrem/yr (chronic), for each DU, given its projected closure inventory without inventory biases applied. Most DU-specific IHI inventory limits are in the range of 10 3 to 10 7 curies per nuclide. The lowest inventory limits are associated with gamma-emitters such as Sn-126, Ra-226, Th-232, and Cm-248. Radionuclides with short half-lives such as Pu-241, and nuclides which are pure beta emitters or which decay by electron capture, such as Ni-59 and Ni-63, have the highest limits. For the 27 evaluated DUs, predicted IHI doses are shown in Table ES-1. The maximum acute dose is 1.18 mrem, at ST23, much less than the DOE performance measure of 500 mrem (USDOE, 2017). The highest chronic dose is 37.2 mrem/yr at ST02, below the DOE performance measure of 100 mrem/yr. Also shown are estimated inventory sums of fractions (SOFs) at closure in 2065, for groundwater (GW) and IHI pathways. For each DU, the inventory is constrained by the GW pathway. For most DUs, the IHI SOFs are approximately 1000 times lower than the GW SOF values, and the IHI pathway does not drive risk for any disposal unit.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Multi-Product Coal Utilization By-Product Processing Plant

The overall objective of this project is to design, construct, and operate an ash beneficiation facility that will generate several products from coal combustion ash stored in a utility ash pond. The site selected is LG&E's Ghent Station located in Carroll County, Kentucky. The specific site under consideration is the lower ash pond at Ghent, a closed landfill encompassing over 100 acres. Coring activities revealed that the pond contains over 7 million tons of ash, including over 1.5 million tons of coarse carbon and 1.8 million tons of fine (<10 {micro}m) glassy pozzolanic material. These potential products are primarily concentrated in the lower end of the pond adjacent to the outlet. A representative bulk sample was excavated for conducting laboratory-scale process testing while a composite 150 ton sample was also excavated for demonstration-scale testing at the Ghent site. A mobile demonstration plant with a design feed rate of 2.5 tph was constructed and hauled to the Ghent site to evaluate unit processes (i.e. primary classification, froth flotation, spiral concentration, secondary classification, etc.) on a continuous basis to determine appropriate scale-up data. Unit processes were configured into four different flowsheets and operated at a feed rate of 2.5 tph to verify continuous operating performance and generate bulk (1 to 2 tons) products for product testing. Cementitious products were evaluated for performance in mortar and concrete as well as cement manufacture process addition. All relevant data from the four flowsheets was compiled to compare product yields and quality while preliminary flowsheet designs were generated to determine throughputs, equipment size specifications and capital cost summaries. A detailed market study was completed to evaluate the potential markets for cementitious products. Results of the study revealed that the Ghent local fly ash market is currently oversupplied by more than 500,000 tpy and distant markets (i.e. Florida) are oversupplied as well. While the total US demand for ultrafine pozzolan is currently equal to demand, there is no reason to expect a significant increase in demand. Despite the technical merits identified in the pilot plant work with regard to beneficiating the entire pond ash stream, market developments in the Ohio River Valley area during 2006-2007 were not conducive to demonstrating the project at the scale proposed in the Cooperative Agreement. As a result, Cemex withdrew from the project in 2006 citing unfavorable local market conditions in the foreseeable future at the demonstration site. During the Budget Period 1 extensions provided by the DOE, CAER has contacted several other companies, including cement producers and ash marketing concerns for private cost share. Based on the prevailing demand-supply situation, these companies had expressed interest only in limited product lines, rather than the entire ash beneficiation product stream. Although CAER had generated interest in the technology, a financial commitment to proceed to Budget Period 2 could not be obtained from private companies. Furthermore, the prospects of any decisions being reached within a reasonable time frame were dim. Thus, CAER concurred with the DOE to conclude the project at the end of Budget Period 1, March 31, 2007. The activities presented in this report were carried out during the Cooperative Agreement period 08 November 2004 through 31 March 2007.

01 COAL, LIGNITE, AND PEAT↗

Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 134: Aboveground Storage Tanks, Nevada Test Site, Nevada

This Streamlined Approach for Environmental Restoration (SAFER) Plan identifies the activities required for the closure of Corrective Action Unit (CAU) 134, Aboveground Storage Tanks. CAU 134 is currently listed in Appendix III of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996; as amended February 2008) and consists of four Corrective Action Sites (CASs) located in Areas 3, 15, and 29 of the Nevada Test Site (NTS) (Figure 1): (1) CAS 03-01-03, Aboveground Storage Tank; (2) CAS 03-01-04, Tank; (3) CAS 15-01-05, Aboveground Storage Tank; and (4) CAS 29-01-01, Hydrocarbon Stain. CAS 03-01-03 consists of a mud tank that is located at the intersection of the 3-07 and the 3-12 Roads in Area 3 of the NTS. The tank and its contents are uncontaminated and will be dispositioned in accordance with applicable federal, state, and local regulations. This CAS will be closed by taking no further action. CAS 03-01-04 consists of a potable water tank that is located at the Core Complex in Area 3 of the NTS. The tank will be closed by taking no further action. CAS 15-01-05 consists of an aboveground storage tank (AST) and associated impacted soil, if any. This CAS is located on a steep slope near the Climax Mine in Area 15 of the NTS. The AST is empty and will be dispositioned in accordance with applicable federal, state, and local regulations. Soil below the AST will be sampled to identify whether it has been impacted by chemicals at concentrations exceeding the action levels. It appears that the tank is not at its original location. Soil will also be sampled at the original tank location, if it can be found. If soil at either location has been impacted at concentrations that exceed the action levels, then the extent of contamination will be identified and a use restriction (UR) will be implemented. The site may be clean closed if contamination is less than one cubic yard in extent and can be readily excavated. If action levels are not exceeded, then no further action is required. CAS 29-01-01 consists of soil that has been impacted by a release or operations from an active diesel AST that fuels the generator at the Shoshone Receiver Site in Area 29 of the NTS. Soil below the AST will be sampled to identify whether it has been impacted at concentrations exceeding the action levels. If it is, then the extent of contamination will be identified and a UR will be implemented. The site may be clean closed if contamination is less than one cubic yard in extent, can be readily excavated, and it is determined that clean closure is feasible based upon site conditions. If action levels are not exceeded, then no further action is required. Based on review of the preliminary assessment information for CAU 134 and recent site inspections, there is sufficient process knowledge to close CAU 134 using the SAFER process.

54 ENVIRONMENTAL SCIENCES↗

Corrective Action Plan for Corrective Action Unit 563: Septic Systems, Nevada Test Site, Nevada

This Corrective Action Plan (CAP) has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order. CAU 563 consists of four Corrective Action Sites (CASs) located in Areas 3 and 12 of the Nevada Test Site. CAU 563 consists of the following CASs: CAS 03-04-02, Area 3 Subdock Septic Tank CAS 03-59-05, Area 3 Subdock Cesspool CAS 12-59-01, Drilling/Welding Shop Septic Tanks CAS 12-60-01, Drilling/Welding Shop Outfalls Site characterization activities were performed in 2007, and the results are presented in Appendix A of the CAU 563 Corrective Action Decision Document. The scope of work required to implement the recommended closure alternatives is summarized below. CAS 03-04-02, Area 3 Subdock Septic Tank, contains no contaminants of concern (COCs) above action levels. No further action is required for this site; however, as a best management practice (BMP), all aboveground features (e.g., riser pipes and bumper posts) will be removed, the septic tank will be removed, and all open pipe ends will be sealed with grout. CAS 03-59-05, Area 3 Subdock Cesspool, contains no COCs above action levels. No further action is required for this site; however, as a BMP, all aboveground features (e.g., riser pipes and bumper posts) will be removed, the cesspool will be abandoned by filling it with sand or native soil, and all open pipe ends will be sealed with grout. CAS 12-59-01, Drilling/Welding Shop Septic Tanks, will be clean closed by excavating approximately 4 cubic yards (yd3) of arsenic- and chromium-impacted soil. In addition, as a BMP, the liquid in the South Tank will be removed, the North Tank will be removed or filled with grout and left in place, the South Tank will be filled with grout and left in place, all open pipe ends will be sealed with grout or similar material, approximately 10 yd3 of chlordane-impacted soil will be excavated, and debris within the CAS boundary will be removed. CAS 12-60-01, Drilling/Welding Shop Outfalls, contains no COCs above action levels. No further action is required for this site; however, as a BMP, three drain pipe openings will be sealed with grout.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Management Waste Management Facility Waste Lot Profile for the K-770 Scrap Yard Soils and Miscellaneous Debris, East Tennessee Technology Park, Oak Ridge, Tennessee - EMWMF Waste Lot 4.12

Waste Lot 4.12 consists of approximately 17,500 yd{sup 3} of low-level, radioactively contaminated soil, concrete, and incidental metal and debris generated from remedial actions at the K-770 Scrap Metal Yard and Contaminated Debris Site (the K-770 Scrap Yard) at the East Tennessee Technology Park (ETTP). The excavated soil will be transported by dump truck to the Environmental Management Waste Management Facility (EMWMF). This profile provides project-specific information to demonstrate compliance with Attainment Plan for Risk/Toxicity-based Waste Acceptance Criteria at the Oak Ridge Reservation, Oak Ridge, Tennessee (DOE 2001). The K-770 Scrap Yard is an approximately 36-acre storage area located southwest of the main portion of ETTP, outside the security perimeter fence in the Powerhouse Area adjacent to the Clinch River. The K-770 area was used to store radioactively contaminated or suspected contaminated materials during and previous to the K-25 Site cascade upgrading program. The waste storage facility began operation in the 1960s and is estimated to at one time contain in excess of 40,000 tons of low-level, radioactively contaminated scrap metal. Scrap metal was taken to the site when it was found to contain alpha or beta/gamma activity on the surface or if the scrap metal originated from a process building. The segregated metal debris was removed from the site as part of the K-770 Scrap Removal Action (RA) Project that was completed in fiscal year (FY) 2007 by Bechtel Jacobs Company LLC (BJC). An area of approximately 10 acres is located in EUs 29 and 31 where the scrap was originally located in the 100-year floodplain. In the process of moving the materials around and establishing segregated waste piles above the 100-year floodplain, the footprint of the site was expanded by 10-15 acres in EUs 30 and 32. The area in EUs 29 and 31 that was cleared of metallic debris in the floodplain was sown with grass. The areas in EUs 30 and 32 have some scattered vegetation but are generally open and accessible. With limited exception, all materials contained in the scrap yard have been removed and disposed at the EMWMF. Soils that underlay the original waste storage area in EUs 29 and 31 as well as soils that underlay the scrap piles in EUs 30 and 32 show substantially elevated radioactivity. In addition to soils present at the site, remaining portions of foundations/floor slabs for Bldgs. K-725, K-726, and K-736 as well as the unnamed pad at the northeast corner of the site constructed to support the sort and segregation operations at the K-770 Scrap Removal Project in 2006 and several other small, unnamed concrete pads are included in this waste lot. While many of these foundations/floor slabs will be removed because they are contaminated, some of the smaller unamed concrete pads will be removed in order to access contaminated soils that are around and under the pads and regrade the site. Appendix E contains a map showing the areas of soil and concrete pads that are expected to be excavated. Soils in the areas indicated on this map will be removed to approximately one foot below the surface. (This corresponds to the soil interval sampled and analyzed to characterize this waste lot.) Contaminants present in the soils are directly derived from metallic debris and rubbish handled by the waste storage operations, are concentrated in the top few inches, and include the predominant constituents of concern associated with the metallic waste already disposed at EMWMF. Additionally, some residual metallic debris remains embedded in the shallow soils that underlay the former debris piles. This residual metallic debris is eligible for disposal in the EMWMF WAC criteria as defined in Waste Profile for: Disposal of the Scrap Removal Project Waste Lot 65.1 East Tennessee Technology Park, Oak Ridge, Tennessee (BJC 2004a). This waste, however, has been included in Waste Lot 4.12 to conform to the more rigorous profiling requirements currently contained in Waste Acceptance Criteria Attainment Team Project Execution Plan Environmental Management Waste Management Facility, Oak Ridge Reservation, Tennessee (BJC 2008a). It comprises approximately 5% of the total mass of material that will be generated under this RA. Incidental amounts of wood and other debris items and secondary waste generated during the RA are also included in this waste lot.

54 ENVIRONMENTAL SCIENCES↗

Co-Design of a Fully Electric Hybrid Hydraulic-Electric Architecture (FE-HHEA) for Off-Road Mobile Machines

Off-road mobile machines, such as excavators and wheel-loaders, are typically actuated by hydraulics using internal combustion engines as their power sources. There is a trend towards fully electrifying these machines and improving their efficiencies due to environmental regulations and concerns. In this paper, a control co-design methodology is used to design a Fully Electrified Hybrid Hydraulic-Electric Architecture (FE-HHEA) for an excavator that drastically reduces energy consumption and minimizes the sizes of costly electric components. By optimizing both control operation and the physical design, the co-design methodology takes into account the interaction between these two aspects. The design methodology also illustrates how the system architecture evolves from the previously developed IC engine powered HHEA with the engine replaced by an electric motor to a seemingly very different architecture with fewer components. The optimized system reduces energy consumption by 71% over the baseline system and uses electrical components that are 1/3 the size of an alternate fully electric architecture.

33 ADVANCED PROPULSION SYSTEMS↗

Using Fission-Track Radiography Coupled with Scanning Electron Microscopy for Efficient Identification of Solid-Phase Uranium Mineralogy at a Former Uranium Pilot Mill (Grand Junction, Colorado)

At a former uranium pilot mill in Grand Junction, Colorado, mine tailings and some subpile sediments were excavated to various depths to meet surface radiological standards, but residual solid-phase uranium below these excavation depths still occurs at concentrations above background. The combination of fission-track radiography and scanning electron microscope energy-dispersive X-ray spectroscopy (SEM-EDS) provides a uniquely efficient and quantitative way of determining mineralogic associations of uranium that can influence uranium mobility. After the creation of sample thin sections, a mica sheet is placed on those thin sections and irradiated in a nuclear research reactor. Decay of the irradiated uranium creates fission tracks that can be viewed with a microscope. The fission-track radiography images indicate thin section sample areas with elevated uranium that are focus areas for SEM-EDS work. EDS spectra provide quantitative elemental data that indicate the mineralogy of individual grains or grain coatings associated with the fission-track identification of elevated uranium. For the site in this study, the results indicated that uranium occurred (1) with coatings of aluminum–silicon (Al/Si) gel and gypsum, (2) dispersed in the unsaturated zone associated with evaporite-type salts, and (3) sorbed onto organic carbon. The Al/Si gel likely formed when low-pH waters were precipitated during calcite buffering, which in turn retained or precipitated trace amounts of Fe, As, U, V, Ca, and S. Understanding these mechanisms can help guide future laboratory and field-scale efforts in determining long-term uranium release rates to groundwater.

58 GEOSCIENCES↗

Nitrogen control of 13 C enrichment in heterotrophic organs relative to leaves in a landscape-building desert plant species

A longstanding puzzle in isotope studies of C 3 plant species is that heterotrophic plant organs (e.g., stems, roots, seeds, and fruits) tend to be enriched in 13 C compared to the autotrophic organ (leaves) that provides them with photosynthate. Our inability to explain this puzzle suggests key deficiencies in understanding post-photosynthetic metabolic processes. It also limits the effectiveness of applications of stable carbon isotope analyses in a variety of scientific disciplines ranging from plant physiology to global carbon cycle studies. To gain insight into this puzzle, we excavated whole plant architectures of Nitraria tangutorum Bobrov, a C 3 species that has an exceptional capability of fixing sands and building sand dunes, in two deserts in northwestern China. We systematically and simultaneously measured carbon isotope ratios and nitrogen and phosphorous contents of different parts of the excavated plants. We also determined the seasonal variations in leaf carbon isotope ratios on nearby intact plants of N. tangutorum . We found, for the first time, that higher nitrogen contents in heterotrophic organs were significantly correlated with increased heterotrophic 13 C enrichment compared to leaves. However, phosphorous contents had no effect on the enrichment. In addition, new leaves had carbon isotope ratios similar to roots but were progressively depleted in 13 C as they matured. We concluded that a nitrogen-mediated process, hypothesized to be the refixation of respiratory CO 2 by phosphoenolpyruvate (PEP) carboxylase, was responsible for the differences in 13 C enrichment among different heterotrophic organs, while processes such as fractionating foliar metabolism and preferentially loading into phloem of 13 C-enriched sugars may contribute to the overall autotrophic–heterotrophic difference in carbon isotope compositions.

54 ENVIRONMENTAL SCIENCES↗

The interaction between nitrogen and phosphorous is a strong predictor of intra-plant variation in nitrogen isotope composition in a desert species

Understanding intra-plant variations in δ 15 N is essential for fully utilizing the potential of δ 15 N as an integrator of the terrestrial nitrogen (N) cycle and as an indicator of the relative limitation of N and phosphorous (P) on plant growth. Studying such variations can also yield insights into N metabolism by plant as a whole or by specific organs. However, few researchers have systematically evaluated intra-plant variations in δ 15 N and their relationships with organ nutrient contents. We excavated whole plant architectures of Nitraria tangutorum Bobrov, a C 3 species of vital regional ecological importance, in two deserts in northwestern China. We systematically and simultaneously measured N isotope ratios and N and P contents of different parts of the excavated plants. We found that intra-plant variations in δ 15 N of N. tangutorum were positively correlated with corresponding organ N and P contents. However, it was the N × P interaction, not N and P individually or their linear combination, that was the strongest predictor of intra-plant δ 15 N. Additionally, we showed that root δ 15 N increased with depth into soil, a pattern similar to profiles of soil δ 15 N reported by previous studies in different ecosystems. We hypothesized that the strong positive intra-plant δ 15 N–N and P relationships are caused by three processes acting in conjunction: (1) N and P content-driven fractionating exchanges of ammonia between leaves and the atmosphere (volatilization) during photorespiration, (2) resorption and remobilization of N and P from senescing leaves, and (3) mixture of the re-translocated foliar N and P with existing pools in stems and roots. To test our hypothesis, future studies should investigate plant N volatilization and associated isotope fractionation and intra-plant variations in δ 15 N in different species across ecosystems and climates.

59 BASIC BIOLOGICAL SCIENCES↗

Nitrogen control of 13 C enrichment in heterotrophic organs relative to leaves in a landscape-building desert plant species

A longstanding puzzle in isotope studies of C 3 plant species is that heterotrophic plant organs (e.g., stems, roots, seeds, and fruits) tend to be enriched in 13 C compared to the autotrophic organ (leaves) that provides them with photosynthate. Our inability to explain this puzzle suggests key deficiencies in understanding post-photosynthetic metabolic processes. It also limits the effectiveness of applications of stable carbon isotope analyses in a variety of scientific disciplines ranging from plant physiology to global carbon cycle studies. To gain insight into this puzzle, we excavated whole plant architectures of Nitraria tangutorum Bobrov, a C 3 species that has an exceptional capability of fixing sands and building sand dunes, in two deserts in northwestern China. We systematically and simultaneously measured carbon isotope ratios and nitrogen and phosphorous contents of different parts of the excavated plants. We also determined the seasonal variations in leaf carbon isotope ratios on nearby intact plants of N. tangutorum . We found, for the first time, that higher nitrogen contents in heterotrophic organs were significantly correlated with increased heterotrophic 13 C enrichment compared to leaves. However, phosphorous contents had no effect on the enrichment. In addition, new leaves had carbon isotope ratios similar to roots but were progressively depleted in 13 C as they matured. We concluded that a nitrogen-mediated process, probably the refixation of respiratory CO 2 by phosphoenolpyruvate (PEP) carboxylase, was responsible for the differences in 13 C enrichment among different heterotrophic organs while processes within leaves or during phloem loading may contribute to the overall autotrophic – heterotrophic difference in carbon isotope compositions.

59 BASIC BIOLOGICAL SCIENCES↗

Smooth plains and continuous deposits of craters and basins

Apollo 16 photographic data are analyzed which suggest that smooth plains are related in origin to large primary cratering events, and that the plains material is mainly the ejecta of local and regional primary impact craters with only minor contributions from distant craters and basins. This material, then, has been emplaced in its present location by secondaries of distant craters and directly by primary craters near the site. Calculations indicate that the material excavated from large primary craters typically excavates much larger amounts of material from local terrain when it impacts in the secondary crater field. There is a correlation between the extent of development of smooth plains inside large high-land craters and the erosional state of the crater rims and walls. It is incorrect to consider the continuous deposits to be solely basin ejecta.

Oberbeck, V. R.↗