Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Digital Instrumentation and Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Additively Manufactured Strain Sensing for Nuclear Reactor Applications

Real-time monitoring of materials in harsh environments is a crucial technique towards reducing innovation time in nuclear systems. The successful measurement of real time, in-situ strain measurements during nuclear reactor operation requires innovative sensing solutions, including novel sensing strategies as well as advanced sensor design, manufacturing, and materials selection. In this paper, we will discuss two primary strategies for in-situ strain measurement strategies: additively manufactured (AM) capacitive strain gauges (CSGs) and digital image correlation (DIC). Current commercial strain gauges have limited applications in reactors due to the harsh operating conditions and non-trivial attachment strategies (i.e., welding, epoxy-adhesive) that can affect both the sensing performance and the underlying substrate under testing. AM CSGs are a viable solution as they have a low profile, low hysteresis, and wireless sensing integration capabilities that will enhance nuclear sensing technologies. In this work, the mechanical and thermal performance of the AM CSGs were tested up to 300 °C using ASTM standardized testing procedures to simulate the temperatures found in existing light water reactors. The AM CSGs had a similar performance across multiple samples which correlates to analytical models. This work leads towards the development of CSGs designed for higher temperatures and additional environmental factors found in Generation-IV reactors. Non-contact sensors, such as DIC, offer a less destructive way to measure deformation of materials when compared to alternative methods of in-situ strain determination, such as weldable strain gauges. However, DIC requires high contrast surfaces, which often relies on the implementation of artificial patterns. Using traditional splatter techniques to fabricate these patterns have limitations, including poor surface adhesion and reproducibility. In this work, AM fabrication techniques were implemented to avoid such limitations. Accordingly, aerosol jet printing (AJP) was used to print small scale periodic patterns of silver on stainless steel and aluminum tensile specimens. DIC was employed to monitor strain (up to 1100 µe) during temperature cycling from 23-600 °C. The results validated the use of AJP to better control pattern parameters for small fields of view applications at high temperatures.

36 MATERIALS SCIENCE↗

Computer Controlled Magnetotransport Setup for the Characterization of Semiconductor Thin Films

We have considered a computer controlled magnetotransport setup using LabWindows environment. It allows for measurements of resistivity, Hall resistance, carrier concentration and charge mobility in semiconductor thin films using a van der Pauw configuration. The setup features an electromagnet (B = 0.7 Tesla) a 80486-DX 33 computer with a National Instrument AT-MIO 16 AD/DA and a GPIB interface board. A Keithely 224 current source and a Keithley 196 digital voltmeter were also used in the setup. Plans for the addition of capabilities to allow for magnetic field sweeping and the performance of measurements as a function of temperature will be presented.

Ducoudray, G. O.↗

Instrumentation for airbreathing propulsion; Proceedings of the Symposium, U.S. Naval Postgraduate School, Monterey, Calif., September 19-21, 1972

New developments and refinements in measuring techniques used for both ground testing and in-flight control, diagnosis, and monitoring of airbreathing combustors are analyzed in a number of papers. Some of the techniques studied include the application of laser velocimeters for flow measurements; on-the-shaft data systems for rotating engine components; total pressure averaging in pulsating flows; fiber optic and laser digital pressure transducers; holography of nozzles, jets, and spraying systems; application of the Raman effect fo flowfield diagnostics; holography of JP-4 droplets and combusting boron particles; the use of a laser-powered optical proximity probe in advanced turbofan engine development; pyrometry for measurement of surface temperature distribution on a rotating turbine blade; an ultrasonic turbine inlet gas temperature sensor; automatic detection and suppression of inlet buzz; and electrostatic probes for sensing incipient engine failure. Individual items are announced in this issue.

Fuhs, A. E.↗

Ard [SWR-25-18]

A wind farm optimization suite for wind energy that is built for modular, gradient-enabled multi-disciplinary and multi-fidelity optimizations. Dig into wind farm design. An ard is a type of simple and lightweight plow, used through the single-digit centuries to prepare a farm for planting. The intent of Ard is to be a modular, full-stack multi-disciplinary optimization tool for wind farms. The problem with wind farms is that they are complicated, multi-disciplinary objects. They are aerodynamic machines, with complicated control systems, power electronic devices, social and political objects, and the core value (and cost) of complicated financial instruments. Moreover, the design of one of these aspects affects all the rest! Ard seeks to make plant-level design choices that can incorporate these different aspects and their interactions to make wind energy projects more successful.

Frontin, Cory [National Renewable Energy Laborator↗

NASA/Princeton digital avionics flight test facility

This paper describes a general-aviation digital avionics flight-test facility being jointly developed by the Flight Dynamics Laboratory of Princeton University and NASA/Langley Research Center. This facility consists of the Princeton avionics research aircraft (ARA) and NASA/Langley's digital avionics research (DARE) system. The ARA is a fully instrumented five-degree-of-freedom fly-by-wire aircraft. The DARE system contains a state-of-the-art flight computer system and receiving equipment that permits use of the NASA/Wallops Flight Center's position-tracking ground-based display-generation and ground-to-air digital-data-link equipment. The DARE/ARA system will be used for flight evaluation of advanced control, guidance, and display concepts developed as part of NASA/Langley Research Center's general aviation terminal area operations program.

Downing, D. R.↗

Synchronous Boxcar Averager

Digital electronic filtering system produces series of moving-average samples of fluctuating signal in manner resulting in removal of undesired periodic signal component of known frequency. Filter designed to pass steady or slowly varying components of fluctuating pressure, flow, pump speed, and pump torque in slurry-pumping system. Concept useful for monitoring or control in variety of applications including machinery, power supplies, and scientific instrumentation.

Rogers, Thomas W.↗

Unified Instrumentation: Examining the Simultaneous Application of Advanced Measurement Techniques for Increased Wind Tunnel Testing Capability

A Unified Instrumentation Test examining the combined application of Pressure Sensitive Paint, Projection Moire Interferometry, Digital Particle Image Velocimetry, Doppler Global Velocimetry, and Acoustic Microphone Array has been conducted at the NASA Langley Research Center. The fundamental purposes of conducting the test were to: (a) identify and solve compatibility issues among the techniques that would inhibit their simultaneous application in a wind tunnel, and (b) demonstrate that simultaneous use of advanced instrumentation techniques is feasible for increasing tunnel efficiency and identifying control surface actuation / aerodynamic reaction phenomena. This paper provides summary descriptions of each measurement technique used during the Unified Instrumentation Test, their implementation for testing in a unified fashion, and example results identifying areas of instrument compatibility and incompatibility. Conclusions are drawn regarding the conditions under which the measurement techniques can be operated simultaneously on a non-interference basis. Finally, areas requiring improvement for successfully applying unified instrumentation in future wind tunnel tests are addressed.

Fleming, Gary A.↗

Very High-Speed Digital Video Capability for In-Flight Use

digital video camera system has been qualified for use in flight on the NASA supersonic F-15B Research Testbed aircraft. This system is capable of very-high-speed color digital imaging at flight speeds up to Mach 2. The components of this system have been ruggedized and shock-mounted in the aircraft to survive the severe pressure, temperature, and vibration of the flight environment. The system includes two synchronized camera subsystems installed in fuselage-mounted camera pods (see Figure 1). Each camera subsystem comprises a camera controller/recorder unit and a camera head. The two camera subsystems are synchronized by use of an MHub(TradeMark) synchronization unit. Each camera subsystem is capable of recording at a rate up to 10,000 pictures per second (pps). A state-of-the-art complementary metal oxide/semiconductor (CMOS) sensor in the camera head has a maximum resolution of 1,280 1,024 pixels at 1,000 pps. Exposure times of the electronic shutter of the camera range from 1/200,000 of a second to full open. The recorded images are captured in a dynamic random-access memory (DRAM) and can be downloaded directly to a personal computer or saved on a compact flash memory card. In addition to the high-rate recording of images, the system can display images in real time at 30 pps. Inter Range Instrumentation Group (IRIG) time code can be inserted into the individual camera controllers or into the M-Hub unit. The video data could also be used to obtain quantitative, three-dimensional trajectory information. The first use of this system was in support of the Space Shuttle Return to Flight effort. Data were needed to help in understanding how thermally insulating foam is shed from a space shuttle external fuel tank during launch. The cameras captured images of simulated external tank debris ejected from a fixture mounted under the centerline of the F-15B aircraft. Digital video was obtained at subsonic and supersonic flight conditions, including speeds up to Mach 2 and altitudes up to 50,000 ft (15.24 km). The digital video was used to determine the structural survivability of the debris in a real flight environment and quantify the aerodynamic trajectories of the debris.

Corda, Stephen↗

Valve Health Monitoring System Utilizing Smart Instrumentation

The valve monitoring system is a stand alone unit with network capabilities for integration into a higher level health management system. The system is designed for aiding in failure predictions of high-geared ball valves and linearly actuated valves. It performs data tracking and archiving for identifying degraded performance. The data collection types are cryogenic cycles, total cycles, inlet temperature, body temperature torsional strain, linear bonnet strain, preload position, total travel and total directional changes. Events are recorded and time stamped in accordance with the IRIG B True Time. The monitoring system is designed for use in a Class 1 Division II explosive environment. The basic configuration consists of several instrumentation sensor units and a base station. The sensor units are self contained microprocessor controlled and remotely mountable in three by three by two inches. Each unit is potted in a fire retardant substance without any cavities and limited to low operating power for maintaining safe operation in a hydrogen environment. The units are temperature monitored to safeguard against operation outside temperature limitations. Each contains 902-928 MHz band digital transmitters which meet Federal Communication Commission's requirements and are limited to a 35 foot transmission radius for preserving data security. The base-station controller correlates data from the sensor units and generates data event logs on a compact flash memory module for database uploading. The entries are also broadcast over an Ethernet network. Nitrogen purged National Electrical Manufactures Association (NEMA) Class 4 enclosures are used to house the base-station

Jensen, Scott L.↗

In-Flight Operation of the Dawn Ion Propulsion System - The First Nine Months

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta-V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion engine design is based on the design validated on NASA's Deep Space 1 mission. However, because of the very substantial (11 km/s) delta-V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are also based on the DS1 design. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft prior to the initiation of long-term thrusting for the heliocentric transfer to Vesta. The IPS hardware, consisting of three ion thrusters and TGAs, two PPUs and DCIUs, xenon feed system, and spacecraft control software, was investigated extensively. Thrust measurements, roll torque measurements, pointing capabilities, control characteristics, and thermal behavior of the spacecraft and IPS were carefully evaluated. The Dawn IPS fully met all its initial checkout performance objectives. Deterministic thrusting for cruise began on December 17, 2007. Over the subsequent approximately 330 days the IPS will be operated virtually continuously at full power thrusting (approximately 91 mN) leading to a Mars flyby in February 2009. The encounter with Mars provides a gravity assist for a plane change and is the only source of post-launch delta-V apart from the IPS. Following the Mars gravity assist IPS will be operated for approximately one year at full power and for 1.3 years at throttled power levels leading to rendezvous with Vesta in August of 2011. Following nine months of orbital operations with IPS providing the propulsion needed for orbit capture, science orbit transfer and orbit maintenance and Vesta escape, Dawn will transit to Ceres with an expected arrival date of February 2015. As of June 16, 2008 the ion thrusters on Dawn have operated for close to 3,846 hours and have delivered nearly 1 km/s of delta-V to the spacecraft. Dawn IPS operation has been almost flawless during the initial checkout and six months of cruise. This paper provides an overview of Dawn's mission objectives, mission and system design, and the results of the post-launch Dawn IPS mission operations through June 2008

Garner, Charles E.↗

Best Practices for Measuring the Modulation Transfer Function of Video Endoscopes

Endoscopes are crucial for assisting in surgery and disease diagnosis, including the early detection of cancer. The effective use of endoscopes relies on their optical performance, which can be characterized with a series of metrics such as resolution, vital for revealing anatomical details. The modulation transfer function (MTF) is a key metric for evaluating endoscope resolution. However, the 2020 version of the ISO 8600-5 standard, while introducing an endoscope MTF measurement method, lacks empirical validation and excludes opto-electronic video endoscopes, the largest family of endoscopes. Measuring the MTF of video endoscopes requires tailored standards that address their unique characteristics. This paper aims to expand the scope of ISO 8600-5:2020 to include video endoscopes, by optimizing the MTF test method and addressing parameters affecting measurement accuracy. We studied the effects of intensity and uniformity of image luminance, chart modulation compensation, linearity of image digital values, auto gain control, image enhancement, image compression and the region of interest dimensions on images of slanted-edge test charts, and thus the MTF based on these images. By analyzing these effects, we provided recommendations for setting and controlling these factors to obtain accurate MTF curves. Our goal is to enhance the standard’s relevance and effectiveness for measuring the MTF of a broader range of endoscopic devices, with potential applications in the MTF measurement of other digital imaging devices.

47 OTHER INSTRUMENTATION↗

A Timer for Synchronous Digital Systems

The Real-Time Interferometer Control Systems Testbed (RICST) timing board is a VersaModule Eurocard (VME)-based board that can generate up to 16 simultaneous, phase-locked timing signals at a rate defined by the user. It can also generate all seven VME interrupt requests (IRQs). The RICST timing board is suitable mainly for robotic, aerospace, and real-time applications. Several circuit boards on the market are capable of generating periodic IRQs. Most are associated with Global Positioning System (GPS) receivers and Inter Range Instrumentation Group (IRIG) time-code generators, whereas this board uses either an internal VME clock or an externally generated clock signal to synchronize multiple components of the system. The primary advantage of this board is that there is no discernible jitter in the output clock waveforms because the signals are divided down from a high-frequency clock signal instead of being phase-locked from a lower frequency. The primary disadvantage to this board, relative to other periodic-IRQ-generating boards, is that it is more difficult to synchronize the system to wall clock time.

McKenney, Elizabeth↗

The LSST Camera (LSSTCam)

The LSST Camera is the sole instrument for the NSF-DOE Vera C. Rubin Observatory and consists of a 3.2 gigapixel focal plane mosaic with in-vacuum controllers, dedicated guider and wavefront CCDs, a three-element corrector whose largest lens is 1.55m in diameter, six optical interference filters covering a 320-1050nm band pass with an out-of-plane filter exchange mechanism, and camera slow control and data acquisition systems capable of digitizing each image in 2 seconds.

79 ASTRONOMY AND ASTROPHYSICS↗

Precision pointing control for an orbital earth observing system

The design concept developed for the pointing system of the high-resolution imaging spectrometer (HIRIS) which will be flown on one of NASA's earth observing system platforms is presented. The instrument is an F/5.4-aperture spectrometer with a focal length of 1222 mm, and it uses a precision two-axis gimballed mirror pointing system to image and track targets. Pointing accuracy of better than 585 arcsec (peak-to-peak), and pointing jitter of less than 2.65 arcsec in 33 ms are ensured through the use of gimbal position and basebody rate sensors. A state-space controller implemented with a digital computer is used to provide a position loop bandwidth of 1 Hz and a rate loop bandwidth of 7 Hz. An overview of the system design and flight hardware is given, the development of the controller architecture is addressed, and a simulation assessment of the pointing system that takes into consideration issues such as nonlinear effects, sensor noise, and noncollocated sensors and actuators in a flexible structure is discussed.

Robeck, Linda S.↗

In-Flight Operation of the Dawn Ion Propulsion System: Status at One Year from the Vesta Rendezvous

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) developed at the Jet Propulsion Laboratory which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer among Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer among Ceres science orbits. The Dawn ion thruster [I thought we only called it a thruster. Both terms are used in the paper, but I think a replacement of every occurrence of "engine" with "thruster" would be clearer.] design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. Since resumption of cruise to Vesta IPS has been operated at throttled power levels, most of the time at full power, and with a duty cycle of approximately 93%, leading to an arrival at Vesta in July of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through one year from the spacecraft's rendezvous with Vesta.

Garner, Charles E.↗

In-Flight Operation of the Dawn Ion Propulsion System Through Start of the Vesta Cruise Phase

The Dawn mission, part of NASA's Discovery Program, has as its goal the scientific exploration of the two most massive main-belt asteroids, Vesta and Ceres. The Dawn spacecraft was launched from Cape Canaveral Air Force Station on September 27, 2007 on a Delta-II 7925H-9.5 (Delta-II Heavy) rocket that placed the 1218 kg spacecraft into an Earth-escape trajectory. On-board the spacecraft is an ion propulsion system (IPS) which will provide most of the delta V needed for heliocentric transfer to Vesta, orbit capture at Vesta, transfer to Vesta science orbits, departure and escape from Vesta, heliocentric transfer to Ceres, orbit capture at Ceres, and transfer to Ceres science orbits. The Dawn ion design is based on the design validated on NASA's Deep Space 1 (DS1) mission. However, because of the very substantial (11 km/s) delta V requirements for this mission Dawn requires two engines to complete its mission objectives. The power processor units (PPU), digital control and interface units (DCIU) slice boards and the xenon control assembly (XCA) are derivatives of the components used on DS1. The DCIUs and thrust gimbal assemblies (TGA) were developed at the Jet Propulsion Laboratory. The spacecraft was provided by Orbital Sciences Corporation, Sterling, Virginia, and the mission is managed by and operated from the Jet Propulsion Laboratory. Dawn partnered with Germany, Italy and Los Alamos National Laboratory for the science instruments. The mission is led by the principal investigator, Dr. Christopher Russell, from the University of California, Los Angeles. The first 80 days after launch were dedicated to the initial checkout of the spacecraft followed by cruise to Mars. Cruise thrusting leading to a Mars gravity assist began on December 17, 2007 and was successfully concluded as planned on October 31, 2008. During this time period the Dawn IPS was operated mostly at full power for approximately 6500 hours, consumed 71.7 kg of xenon and delivered approximately 1.8 km/s of delta V to the spacecraft. The thrusting to Mars was followed by a coasting period of approximately 3.5 months that included a Mars flyby in February of 2009. The Mars flyby provided a gravity assist (MGA) for a plane change and approximately 1 km/s of heliocentric energy increase and is the only part of the mission following launch in which a needed velocity change is not accomplished by the IPS. During the coast period IPS was operated for a trajectory correction maneuver and for engineering tests but was not operated for primary propulsion. Closest approach to Mars occurred as planned on February 17, 2009 and was followed by another coasting period of just under 4 months in duration. During this last coasting phase IPS was operated only for routine maintenance activities and for system engineering tests. Deterministic thrusting for heliocentric transfer to Vesta resumed on June 8, 2009. IPS will be operated for over two years at throttled power levels leading to arrival at Vesta in September of 2011 and arrival at Ceres in February 2015. This paper provides an overview of Dawn's mission objectives and the results of Dawn IPS mission operations through the start of deterministic thrusting to Vesta.

Garner, Charles E.↗

Using Qualified On-Site Nuclear Power Plant Simulators in Human Factors Validations of Control Room Upgrades

Existing commercial nuclear power plants (NPPs) are valuable assets in the infrastructure portfolio of the United States (U.S.) because they safely and reliably generate about 1/5th of all the electricity used. The instrumentation and control (I&C) systems in commercial NPPs are the ‘eyes and ears' of the operator, allowing operators to maintain situation awareness, thereby allowing the plant to operate safely and efficiently for all phases of operation. Because the I&C systems in NPPs are still mostly based on analog technologies, which are reliable but not especially cost-effective, upgrading the existing I&C in com-mercial NPPs to new digital I&C is very important. Furthermore, simulators and simulation are critical human factors engineering tools for this I&C modernization work. NPP control room simulators are essential test beds to simulate normal, abnormal, and emergency operations that allow human factors researchers to safely and realistically evaluate early design phase prototypes of the upgraded digital I&C, and validate final as-built digital I&C systems that have been modernized deployed in NPPs. This paper describes research performed using qualified on-site NPP simulators to perform human factors validations of digital I&C control room upgrades.

99 GENERAL AND MISCELLANEOUS↗