Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Contamination Control Engineering”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Viral and bacterial community responses to stimulated Fe(III)–bioreduction during simulated subsurface bioremediation

The delivery of fermentable substrate(s) to subsurface environments stimulates Fe(III)–bioreduction and achieves detoxification of organic/inorganic contaminants. Although, much research has been conducted on the microbiology of such engineered systems at lab and field scales, little attention has been given to the phage–host interactions and virus community dynamics in these environments. The objective was to determine the responses of soil bacterial communities and viral assemblages to stimulated anaerobic Fe(III)–bioreduction following electron donor (e.g. acetate) addition. Microbial communities, including viral assemblages, were investigated after 60 days of Fe(III)–bioreduction in laboratory–scale columns continuously fed with acetate–amended artificial groundwater. Viral abundances were greatest in the influent section and decreased along the flow path. Acetate availability was important in influencing bacterial diversity, microbial interactions and viral abundance and community composition. The impact of acetate addition was most evident in the influent section of the columns. The increased relative abundance of Fe(III)–reducing bacteria coincided with an increase in viral abundance in areas of the columns exhibiting the most Fe(III) reduction. In conclusion, the genetic composition of viruses in these column sections also differed from the control column and distal sections of acetate–treated columns suggesting viral communities responded to biostimulated Fe(III)–bioreduction.

59 BASIC BIOLOGICAL SCIENCES↗

NASA Tech Briefs, April 2012

Topics include: Computational Ghost Imaging for Remote Sensing; Digital Architecture for a Trace Gas Sensor Platform; Dispersed Fringe Sensing Analysis - DFSA; Indium Tin Oxide Resistor-Based Nitric Oxide Microsensors; Gas Composition Sensing Using Carbon Nanotube Arrays; Sensor for Boundary Shear Stress in Fluid Flow; Model-Based Method for Sensor Validation; Qualification of Engineering Camera for Long-Duration Deep Space Missions; Remotely Powered Reconfigurable Receiver for Extreme Environment Sensing Platforms; Bump Bonding Using Metal-Coated Carbon Nanotubes; In Situ Mosaic Brightness Correction; Simplex GPS and InSAR Inversion Software; Virtual Machine Language 2.1; Multi-Scale Three-Dimensional Variational Data Assimilation System for Coastal Ocean Prediction; Pandora Operation and Analysis Software; Fabrication of a Cryogenic Bias Filter for Ultrasensitive Focal Plane; Processing of Nanosensors Using a Sacrificial Template Approach; High-Temperature Shape Memory Polymers; Modular Flooring System; Non-Toxic, Low-Freezing, Drop-In Replacement Heat Transfer Fluids; Materials That Enhance Efficiency and Radiation Resistance of Solar Cells; Low-Cost, Rugged High-Vacuum System; Static Gas-Charging Plug; Floating Oil-Spill Containment Device; Stemless Ball Valve; Improving Balance Function Using Low Levels of Electrical Stimulation of the Balance Organs; Oxygen-Methane Thruster; Lunar Navigation Determination System - LaNDS; Launch Method for Kites in Low-Wind or No-Wind Conditions; Supercritical CO2 Cleaning System for Planetary Protection and Contamination Control Applications; Design and Performance of a Wideband Radio Telescope; Finite Element Models for Electron Beam Freeform Fabrication Process Autonomous Information Unit for Fine-Grain Data Access Control and Information Protection in a Net-Centric System; Vehicle Detection for RCTA/ANS (Autonomous Navigation System); Image Mapping and Visual Attention on the Sensory Ego-Sphere; HyDE Framework for Stochastic and Hybrid Model-Based Diagnosis; and IMAGESEER - IMAGEs for Education and Research.

Source record↗

Electronics Upgrades to the Green is Clean Phoswich Detector Systems and Programmatic Implementation at LANL - Phase II Completion - 18403

Los Alamos National Laboratory (LANL) radiological facilities produce low-density room trash that, in many cases, is not contaminated with radioactivity. It has been estimated that 50 to 90% of low-density room trash is free of radioactive contamination and eligible for inclusion in LANL's Green is Clean (GIC) program. The GIC program is a verification program for non-regulated waste from radiation controlled areas that has been actively segregated as nonradioactive through the use of the waste generator's acceptable knowledge. The GIC program has employed two large area Phoswich gamma ray detector systems (HERCULES and ZEUS) to verify that GIC candidate low-density waste contains no radioactivity above background. The large area (127 cm{sup 2}) Phoswich detectors consist of a thin NaI front crystal (3 mm thick) that is optically coupled to a thick CsI back crystal (50 mm thick). The scintillation properties of the two crystals are different enough to allow the system's electronic components to identify the origin of any pulse. The original systems utilize Nuclear Instrumentation Module (NIM) electronics to process the detector signals. The electronics currently in use by the systems are out of date and some components are no longer manufactured. In 2015, phase I upgrades to the GIC detector systems were completed. Phase I objectives included identifying more modern commercially available electronics that could replace the NIM electronics. A pulse shape discriminator (PSD) module, the Digital Gamma Finder (DGF) Pixie-4 made by XIA LLC, that fits in a compact National Instruments{sup TM} PXI chassis was identified to replace the majority of the original NIM bin electronics - a single Pixie-4 module replaces four NIM amplifiers and four NIM pulse shape analyzers (PSAs). Another phase I objective was to show that that new PSD could separate out the NaI and CsI detector signals in a manner equivalent to or better than the NIM electronics. Proof of concept was achieved in 2015 when a prototype upgrade system on ZEUS was built and tested and gating parameter settings were determined that successfully separated the NaI and CsI signals. Phase II required establishing a LabVIEW software interface with Pixie-4 electronics in lieu of the manufacturer provided Pixie-4 software called the Pixie Viewer. In addition, phase II included 1) final optimization of the gating parameters on the prototype Pixie-4 ZEUS system, 2) finalizing Requirements, Design and Test Plan documents, 3) LabVIEW software interface quality assurance (QA) testing, 4) setting up the HERCULES system with the Pixie-4 upgrade electronics, 5) check source and background calibration of both systems, 6) absolute efficiency determination on both systems and 7) procedure revisions and implementation of both systems into routine operations. In 2017 phase II was completed including the preparation of detailed Requirements, Design and Test Plan documents. The LabVIEW interface software that communicates and controls the Pixie-4 has been completed, merged with the preexisting LabVIEW operations software and fully tested. Gating parameter optimization, configuration of HERCULES with the Pixie-4 electronics, check source and background calibrations and absolute efficiency determinations have all been performed - quantitative results are presented in the full paper. For performance validation, comparison measurements of actual GIC bags on both the HERCULES system using the old NIM Bin electronics and the ZEUS system using the upgraded Pixie-4 electronics have been done and evaluated. Finally, procedure revisions and implementation of both systems into routine operations is currently in process and planned to be complete by the end of calendar year 2017. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from the Space Shuttle Engine Hydrogen Flow Control Valve Poppet Breakage

The Main Propulsion System (MPS) uses three Flow Control Valves (FCV) to modulate the flow of pressurant hydrogen gas from the Space Shuttle Main Engines (SSME) to the hydrogen External Tank (ET). This maintains pressure in the ullage volume as the liquid level drops, preserving ET structural integrity and assuring the engines receive a sufficient amount of head pressure. On Space Transportation System (STS)-126 (2009), with only a handful of International Space Station (ISS) assembly flights from the end of the Shuttle program, a portion of a single FCV?s poppet head broke off at about a minute and a half after liftoff. The risk of the poppet head failure is that the increased flow area through the FCV could result in excessive gaseous hydrogen flow back to the external tank, which could result in overboard venting of hydrogen ullage pressure. If the hydrogen venting were to occur in first stage (i.e., lower atmosphere), a flammability hazard exists that could lead to catastrophic loss of crew and vehicle. Other failure risks included particle impact damage to MPS downstream hardware. Although the FCV design had been plagued by contamination-related sluggish valve response problems prior to a redesign at STS-80 (1996), contamination was ruled out as the cause of the STS-126 failure. Employing a combination of enhanced hardware inspection and a better understanding of the consequences of a poppet failure, safe flight rationale for subsequent flights (STS-119 and later) was achieved. This paper deals with the technical lessons learned during the investigation and mitigation of this problem at a time when assembly flights were each in the critical path to Space Station success.

Martinez, Hugo E.↗

Overview and status of the Long-Baseline Neutrino Facility Far Site cryogenics system

The Sanford Underground Research Facility (SURF) will host the Far Detector of the Deep Underground Neutrino Experiment (DUNE), an international multi-kiloton Long-Baseline neutrino experiment that will be installed about one and a half kilometers underground in Lead, SD. Detectors will be located inside four cryostats filled with almost 70,000 metric tons of ultrapure liquid argon, with a level of impurities lower than 100 parts per trillion of oxygen equivalent contamination. The cryogenics infrastructure supporting this experiment is provided by the Long-Baseline Neutrino Facility (LBNF). This contribution presents modes of operation, layout, and main features of the LBNF Far Site cryogenic system, which is composed of three subsystems: Infrastructure, Proximity, and Internal cryogenics. The Infrastructure cryogenics supports the needs of the cryostat and Proximity cryogenics. It includes the equipment to receive the argon in liquid phase, vaporize it and transfer it underground as a gas, the nitrogen system (composed of the refrigeration system, liquid nitrogen buffer tanks and liquid and gaseous nitrogen distribution), liquid and gaseous argon distribution and process controls. The Proximity cryogenics receives fluids from the Infrastructure cryogenics and delivers them to the Internal cryogenics at the required temperature, pressure, purity and mass flow rate. It includes the argon condensers, liquid and gaseous argon purification and regeneration systems, nitrogen and argon phase separators, piping, valves, and instrumentation. The Internal cryogenics comprises the liquid and gaseous argon distribution inside the cryostats for the commissioning, cool down, fill, and steady state operations of the cryostats and detectors. An international engineering team is designing these systems and will manufacture, install, commission, and qualify them. This contribution describes the main features, performance, functional requirements, and modes of operation of the LBNF Far Site cryogenics system. It also presents the status of the design, along with present and future needs to support the DUNE experiment.

43 PARTICLE ACCELERATORS↗

Preparing the FUSRAP Colonie Interim Storage Site for Transfer Back to the US Department of Energy Office of Legacy Management - 19215

The Formerly Utilized Sites Remedial Action Program (FUSRAP) Colonie Interim Storage Site was transferred from the US Department of Energy (US DOE) to the US Army Corps of Engineers (USACE) in 1997. The USACE initiated remediation efforts at the Site under FUSRAP. The Site was separated into three distinct operable units (OU) to more efficiently manage the remedial process: 1) Groundwater OU, 2) Main Site Soils OU, and 3) Vicinity Property OU. The USACE has completed remedial actions at each of these three OUs and has advanced the OU remedies at the Site to the long-term stewardship stage to be executed by the US DOE Office of Legacy Management (LM). The US DOE LM is the current real property owner of record of the Colonie Main Site. A summary of each OU and the activities needed to prepare for site transfer follows: OU 1 - USACE issued the Colonie Groundwater OU Record of Decision (ROD) (USACE 2010a) on April 9, 2010. The Groundwater ROD remedy is monitored natural attenuation (MNA) and long-term monitoring (LTM) of groundwater after source removal completion. Results of groundwater monitoring indicate reductions in concentrations of contaminants of concern (COC). Based on the marked progress to date, USACE has optimized the groundwater LTM program (USACE, 2014) by reducing the well network, sampling frequency, and analytical parameters, and by abandoning wells that are no longer needed. A Groundwater ROD Five-Year Review report was submitted to the New York State Department of Environmental Conservation (NYSDEC) for review in 2018. NYSDEC agreed that MNA is still an appropriate remedial method although it is progressing at a slower rate than predicted. OU 2 - From 1999 to 2007, USACE completed the large-scale removal of soil at the Main Site, which included the adjacent Town of Colonie Vicinity Property. Radioactively contaminated soil along with accessible metals-contaminated soil and soil containing volatile organic compounds (VOC) were removed during this effort. A total of 103,402 cubic meters (m{sup 3}) of soil was excavated and disposed offsite. On March 26, 2015, USACE signed the Main Site Soils OU ROD (USACE, 2015a). The ROD remedy included provisions for Land Use Controls (LUC) consisting of institutional controls (IC) through an Environmental Easement for management of three small and discrete inaccessible locations within three of the 27 Final Status Survey units of the Main Site. The Environmental Easement provides a means of protection based on both current and future land use by placing restrictions on soil excavation and reuse. The easement and a supporting Site Management Plan (SMP) will be finalized by LM in coordination with NYSDEC. OU 3 - the Vicinity Property OU ROD was signed on 20 September 2017. This ROD declared No Action (NA) for dust and No Further Action (NFA) for soil and other media for the Vicinity Properties. Prior to the ROD, USACE performed dust sampling and other characterization activities at representative commercial and residential Vicinity Property locations. These efforts were reported in the Colonie FUSRAP Site Vicinity Property Operable Unit Remedial Investigation Summary Report (USACE, 2016). A Site Closeout Report (SCOR) was issued to NYSDEC and approved in 2018. The approval of this report starts the transfer process back to the LM. Ongoing and future transfer activities include records retention and management, preparation and filing of real estate records, physical site management (fencing, landscape maintenance, well abandonment) and coordination with state regulators and LM staff. This presentation is intended to make all stakeholders aware of the necessary steps for site transfer from the USACE back to the LM. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shuttle measured contaminant environment and modeling for payloads. Preliminary assessment of the space telescope environment in the shuttle bay

A baseline gaseous and particulate environment of the Shuttle bay was developed based on the various measurements which were made during the first four flights of the Shuttle. The environment is described by the time dependent pressure, density, scattered molecular fluxes, the column densities and including the transient effects of water dumps, engine firings and opening and closing of the bay doors. The particulate conditions in the ambient and on surfaces were predicted as a function of the mission time based on the available data. This basic Shuttle environment when combined with the outgassing and the particulate contributions of the payloads, can provide a description of the environment of a payload in the Shuttle bay. As an example of this application, the environment of the Space Telescope in the bay, which may be representative of the environment of several payloads, was derived. Among the many findings obtained in the process of modeling the environment, one is that the payloads environment in the bay is not substantially different or more objectionable than the self-generated environment of a large payload or spacecraft. It is, however, more severe during ground facilities operations, the first 15 to 20 hours of the flight, during and for a short period after ater was dumped overboard, and the reaction control engines are being fired.

Scialdone, J. J.↗

MH-1A Sturgis Decommissioning and Dismantlement - 20281

The U.S. Army Corps of Engineers (USACE) with its prime contractor, Aptim Federal Services, LLC (APTIM), recycled 5,260 metric tons (11.6 million pounds) of material from Sturgis Barge (Sturgis) during the Decommissioning and Dismantlement of the MH-1A nuclear power reactor. The overall objective of the project was to reduce residual radioactivity associated with MH-1A to levels that permitted release of Sturgis for dismantlement and termination of the Army Reactor Office permit. By effectively applying waste hierarchy's three Rs - reduce, reuse and recycle - the Sturgis project not only minimized the amount of waste that required disposal at landfills, but also reduced the potential for long-term environmental liability emanating from these landfills. The project team completed the physical decommissioning efforts in June 2018 in Galveston, TX. In September 2018, radiological surveys were completed to demonstrate the vessel could be released for shipbreaking. Sturgis was towed from Galveston, TX to Brownsville, TX in late September 2018. Shipbreaking, dismantlement and recycling efforts began in early October 2018 and were completed on 15 March 2019. As part of the decommissioning effort in Galveston, the team shipped 69 shipments (860 metric tons) of low-level radioactive waste and radioactive components to the Waste Control Specialist (WCS) facility in Andrews TX for disposal. Certain radioactive components had to be transferred to the Department of Energy prior to placing the materials into the Federal Waste Facility located within WCS. However, most of the radioactive waste was characterized, profiled, approved and managed under the WCS permitted radioactive waste exemption process authorized and implemented by the Texas Commission on Environmental Quality (TCEQ) and the Radioactive Materials Division. This allows LLRW and LLMW to be shipped as regulated waste and then upon receipt at WCS through satisfying the relevant waste acceptance criteria the waste is exempted and placed into the WCS RCRA permitted cell. An additional 35 shipments (544 metric ton) of contaminated hazardous waste water were transported to U.S. Ecology in Robstown, TX for treatment/disposal. An additional 36 shipments (500 metric tons) of non-hazardous wastewater was sent to Republic Waste Services' facility in Fresno, TX. The disposal of these materials required close coordination with State of Texas regulators. During decommissioning, the project team recycled approximately 270 metric tons (600,000 pounds) of lead and steel. As part of the dismantlement in Brownsville, TX the team recycled approximately 5,000 metric tons (11 million pounds) of ferrous and non-ferrous material, limiting our disposal requirements to about 180 metric tons (400,000 pounds) of material (<4% from entire shipbreaking activity). Although the primary hazard being mitigated by this project was radiological, recycling was always a priority for the project. The team strived to achieve sustainability goals as we implemented this one of a kind project. Scrap metal recycling has a large positive impact on the environment and can also favorably impact project disposal costs. Steel is among the most recycled material in the world. Nearly 40% of the world's steel production is made from scrap. Recycling steel also requires 75% less energy than producing it from raw materials. By using recycled steel rather than virgin materials, 2.33 kg of carbon emissions are eliminated per kg of steel [1]. The project recycled more than 4,500 metric tons (10 million pounds) of steel, which eliminated about 10,400 metric tons (23 million pounds) of CO{sub 2}. By implementing a recycling initiative for the Sturgis project, the team was able to realize cost avoidance for disposal of scrap, cost savings from the metals recycled, plus the project provided benefits to the environment through our recycling efforts. Once the dismantlement was complete, the team prepared a detailed decommissioning closure report, which allowed for the termination of the Army Reactor Decommissioning Permit. While it not only reduced any potential long-term environmental liability, this project to decommission and dismantle a floating nuclear power plant is truly unprecedented - it is a prime example of the USACE mission which is: 'Engineering solutions for the Nation's toughest challenges'. This unique, one of a kind, historical power plant was never designed to be taken apart, and the available information about its construction was lacking in many details. The hazards that required mitigation dictated a painstaking and deliberate process in order to avoid any release to the environment and the community, and to protect the health and safety of the workers involved while keeping the waste hierarchy's three R's - reduce, reuse and recycle at the forefront. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Molten Salt Reactor Experiment (MSRE) Lay-Up - 19187

UCOR, an AECOM-led partnership with Jacobs, manages the cleanup of the 2,200-acre East Tennessee Technology Park for its client, the U.S. Department of Energy (DOE), in Oak Ridge, Tennessee. The site was contaminated with radioactive, hazardous and industrial wastes generated by more than 40 years of national defense and energy missions. 2019 is the 50. anniversary of the shutdown of the Molten Salt Reactor Experiment (MSRE). MSRE ran a brief four years in the 1960's but earned an enduring legacy as an innovative reactor technology concept which has enjoyed a renewal of global interest in the past several years. In 2018, it was given elevated status among advanced reactor programs within DoE's Nuclear Energy office. The MSRE was a graphite-moderated, liquid fueled reactor that operated from June 1965 through December 1969. Although it was shut down nearly 50 years ago, certain systems within the reactor have continued to operate to maintain the facility in a safe and stable condition until it can be demolished as part of the comprehensive cleanup of the Oak Ridge Reservation. These systems are composed of a complex network of pipes, valves, gauges and associated equipment that control air filtration and pressure buildup resulting from fluorine gas generated through radiolysis of the fluoride salt which once fueled the reactor. In 2016, an MSRE Engineering Evaluation Team was chartered to assess current facility conditions and develop recommendations to maintain the facility in a safe state until deactivation and demolition commences. Plans are now underway to 'lay up' the MSRE facility until deactivation and demolition can occur. The proposed MSRE Facility Layup will minimize maintenance costs, reduce personnel risk of injury and exposure, provide reliable electric service to the facility and require zero personnel occupancy at MSRE. In the proposed layup approach a new source of electrical power to required loads will be routed through the facility, and new gas processing and ventilation systems will be installed that will be optimized for safe processing of the constituent hazardous gasses that exist in the legacy vessels at MSRE. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Soil Sampling Results for Closure of a Portion of Solid Waste Management Unit #16

The U.S. Department of Energy/National Nuclear Security Administration (DOE/ NNSA) and National Technology & Engineering Solutions of Sandia, LLC (NTESS), the management and operating contractor for Sandia National Laboratories/California (SNL/CA), has prepared this soil sampling results report for closure of a portion of Solid Waste Management Unit (SWMU) #16. The entire network of SNL/CA sanitary sewer lines, including building laterals, was identified as SWMU #16 under a Resource Conservation and Recovery Act (RCRA) Facility Assessment conducted for SNL/CA in April 1991 (DOE 1992). Along with the previous SWMU #16 investigation results (SNL/CA 2019), the results of this investigation are intended to support closure decisions by the San Francisco Bay Regional Water Quality Control Board (RWQCB), as discussed below. SNL/CA personnel completed upgrading its sanitary sewer discharge network in 2019. These upgrades included installing new sections of underground lines and decommissioning certain sections of the old piping system by capping in place. To date, several sections of the sewer line have been abandoned-in-place by capping as new sewer lines were installed or flow was rerouted to other existing lines. To formally close these abandoned sections of the sewer line, the RWQCB required that SNL/CA personnel collect soil samples to be analyzed for contaminants potentially released from the sewer lines. SNL/CA personnel hired Weiss Associates (Weiss) of Emeryville, California to prepare a sampling and analysis plan, implement the sampling plan and report the results of the investigation under Purchase Order #2166257. The Sampling and Analysis Plan for Partial Closure of Solid Waste Management Unit #16 (SAP) was submitted to the RWQCB on August 14, 2020 by Weiss on behalf of SNL/CA. The RWQCB approved the SAP on September 30, 2020 after Weiss updated the method detection limit and reporting limits for total polychlorinated biphenyls (PCBs) and individual aroclors. Soil sampling was conducted in accordance with the SAP except that fewer locations were sampled due to site constraints, as discussed below. This report presents the results of the sampling effort and documents all associated field activities including borehole clearing, soil sample collection, storage and transportation to the analytical laboratories, borehole backfilling and surface restoration, and storage of investigation-derived waste (IDW) for future profiling and disposal by SNL/CA waste management personnel.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DOE Grand Junction Office Marks 75 Years of Contribution to the Nation's Defense Program - 18380

On July 26, 2016, the former US Department of Energy (DOE) Grand Junction Office was listed on the National Register of Historic Places in recognition of its important, historic roles in the Manhattan Project and the Cold War. The work done from Grand Junction, Colorado, was an important component of the nation's defense program; however, because of the classified nature of the work, little of this history was originally available to the public. In 1943, the privately-owned site that later became the Grand Junction Office was purchased by the US government for the Colorado Area Office for the US Army Corps of Engineers Manhattan Engineer District (MED). The Colorado Area Office's mission was to procure and process uranium as part of a nationwide effort to build an atomic bomb. This race to build a bomb ahead of Nazi Germany became known as the Manhattan Project. Approximately 14% of the uranium obtained for the Manhattan Project was from Colorado Plateau ore-the largest source of domestic uranium ore known at the time. Uranium extracted from vanadium mill tailings was concentrated into uranium oxide, or 'yellowcake,' and shipped by rail to a facility in Tonawanda, New York, for further refinement. At the conclusion of World War II, the military MED mission ended, and the Grand Junction site became the principal US Atomic Energy Commission (AEC) office for acquiring and exploring for domestic uranium. The Colorado Raw Materials Office's primary objective was to increase the stockpile of fissionable material as rapidly as possible. To do that, AEC incentivized private industry and invited individual prospectors to locate uranium ores on public lands of the Colorado Plateau. Seemingly overnight, the small city of Grand Junction was transformed into a booming, modern metropolis and the national center of uranium exploration. Program operations in Grand Junction later included those of the National Uranium Resource Evaluation (NURE) program, the Uranium Mill Tailings Radiation Control Act (UMTRCA), vicinity properties cleanup, decontamination and decommissioning, and long-term surveillance and maintenance of legacy sites. In 2001, DOE transferred most of the original Grand Junction 55.7-acre site to the Riverview Technology Corporation, a business-development nonprofit sponsored by Mesa County and the City of Grand Junction. The US Department of Energy Office of Legacy Management continues to operate from leased facilities onsite. The Office of Legacy Management will host the 2018 Long-Term Stewardship Conference in Grand Junction on August 20-23. Conference attendees are invited to participate in a special 75. anniversary celebration at the Grand Junction Office where they will have the opportunity to learn more about the office's historic past, its ongoing and expanding work, and its goals of informing future generations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Comparative Performance of Two Ventilation Strategies in a Hot-Humid Climate

In fiscal year 2013, Pacific Northwest National Laboratory (PNNL), Florida Solar Energy Center (FSEC), and Florida Home Energy and Resources Organization (Florida HERO) began a collaborative effort to evaluate the impact of ventilation rate on interior comfort conditions, space-conditioning energy use, and indoor air contaminant concentrations. Relevant parameters were measured in 10 homes in Gainesville, Florida, along with corresponding outdoor conditions, to characterize the impact of differing ventilation rates. This report provides information about the data collection method and results from more than 1 year of data collection during a period from summer 2013 through summer 2014. Indoor air quality was sampled in three discrete periods with the first occurring in August/September 2013, the second occurring in March/April 2014, and the third occurring in August 2014.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Unraveling Anion-Specific Inhibition and Structural Modulation of Gibbsite Crystallization: Implications for Aluminum Mobility in Natural and Engineered Systems

Gibbsite (α-Al(OH) 3 , sometimes designated as γ-Al(OH) 3 ) plays a crucial role in the chemistry of aluminum in the environment and industry, yet its crystallization behavior under multianionic conditions is not well understood. Here, in this study, we investigate how six common anions─fluoride (F – ), chloride (Cl – ), bromide (Br – ), nitrate (NO 3 – ), sulfate (SO 4 2– ), and phosphate (PO 4 3– )─influence the mineralization, structure, and morphology of gibbsite at room temperature. The results show that PO 4 3– , SO 4 2– , and F – strongly inhibit gibbsite formation, stabilizing amorphous or alternative crystalline phases such as nordstrandite and cryolite. On the contrary, Cl – , Br – , and NO 3 – allow partial to complete crystallization of gibbsite without significant morphological changes. Solid-state 27 Al magic angle spinning nuclear magnetic resonance provides crucial insight into aluminum coordination environments in both crystalline and amorphous phases, distinguishing between octahedral, pentahedral, and tetrahedral Al species. The density functional theory calculations reveal a direct correlation between the Al–X bond strength and the inhibition of crystallization, following the order: PO 4 3– > SO 4 2– > F – > NO 3 – > Cl – > Br – . These findings offer molecular-scale insights into anion-specific effects on aluminum hydroxide nucleation and transformation, improving the understanding of gibbsite formation and aluminum cycling in soils, phosphate retention, contaminant immobilization, and waste treatment strategies in nuclear and industrial settings. These insights can also guide the controlled synthesis of aluminum hydroxide materials with tailored crystallinity and morphology via liquid-assisted methods.

Anions effect↗

Reactive Distillation and Air Stripping Processes for Water Recycling and Trace Contaminant Control

Reactive distillation designs are considered to reduce the presence of volatile organic compounds in the purified water. Reactive distillation integrates a reactor with a distillation column. A review of the literature in this field has revealed a variety of functional reactive columns in industry. Wastewater may be purified by a combination of a reactor and a distiller (e.g., the EWRS or VPCAR concepts) or, in principle, through a design which integrates the reactor with the distiller. A review of the literature in reactive distillation has identified some different designs in such combinations of reactor and distiller. An evaluation of reactive distillation and reactive air stripping is presented with regards to the reduction of volatile organic compounds in the contaminated water and air. Among the methods presented, an architecture is presented for the evaluation of the simultaneous oxidation of organics in air and water. These and other designs are presented in light of potential improvements in power consumptions and air and water purities for architectures which include catalytic activity integrated into the water processor. In particular, catalytic oxidation of organics may be useful as a tool to remove contaminants that more traditional distillation and/or air stripping columns may not remove. A review of the current leading edge at the commercial level and at the research frontier in catalytically active materials is presented. Themes and directions from the engineering developments in catalyst design are presented conceptually in light of developments in the nanoscale chemistry of a variety of catalyst materials.

Boul, Peter J.↗

Oil and Natural Gas Development near and beneath Uranium Tailings Cells and Other Remediated Sites - 20358

DOE LM is responsible for maintaining remedies at more than 50 remediated sites that require active long-term surveillance and maintenance (LTS and M). Institutional controls (ICs) were established to limit human and environmental exposures to residual contamination by controlling land use, restricting access to potential hazards, and making the public aware of potential dangers from the residual contamination. ICs for each site were developed based on current and foreseeable conditions; however, these controls should evolve to mitigate potential human health and other environmental risks from unanticipated changes in activities or site conditions. Activities conducted beyond the DOE long-term care boundaries by non-DOE parties may impact the effectiveness of ICs or even the long-term stability of disposal cells and groundwater remedies. Several sites that LM manages or that will transfer to LM for LTS and M are in active oil and gas production basins. The sites are associated with uranium ore milling or nuclear test sites and have been remediated or are in the process of remediation and have no ongoing DOE mission. Particularly since 2005, hydraulic fracturing ('fracking') combined with directional drilling has dramatically increased oil and natural gas (oil/gas) production in the United States, now making it the number one hydrocarbon-producing country. Fracking has allowed production from shale and other rocks of low natural permeability that were historically not considered viable oil/gas resources. Also, because wellbores can now be drilled as many as 5 kilometers or more horizontally, hydrocarbons can be recovered from zones without having access to the surface above them. Drilling activity near Rulison, Colorado, the location of an underground nuclear detonation managed by LM, has raised public concerns that remnant radioactivity in the detonation zone could migrate to producing wells and enter the natural gas distribution system. At sites like the Falls City, Texas, Disposal site, transitioned to LM with a split estate, increased production in the region has resulted in wellbores beneath the long-term care boundary of the site. While the DOE license for Falls City was approved by the NRC in 1997 without the acquisition of the subsurface rights, NRC has raised concerns on whether this activity impacts the integrity of the cell and/or groundwater remedies. In Wyoming, LM is anticipating receiving the license for the Bear Creek site and manages the Spook site, both locations of uranium mill tailings disposal cells. These Wyoming sites are in an active region of major oil and gas development. This change in surrounding land use will require LM to work collaboratively with NRC to address these concerns. At several DOE sites radioactive waste, and often intermixed nonradioactive constituents, is permanently isolated in engineered disposal cells. At other sites, residual contamination can be present in groundwater, blast cavities, and infinite amounts within soil. Areas targeted for oil and gas development at the Texas and Wyoming sites range from depths of 2440 to 3350 meters (8000-11000 feet) below ground surface. When most site remedies were designed, oil and gas development was not considered to be an issue within the site boundary. With the more recent uses of directional drilling, fracking, and associated wastewater injections, the evaluative criteria for incoming sites and ICs for managing long-term protectiveness and regulatory compliance are changing. Although DOE surface ownership was previously thought to be a robust IC to prevent surface and subsurface development, particularly at disposal sites, that may no longer be the case. Whereas the subsurface development at Texas and Wyoming sites is currently occurring at thousands of meters beneath the surface, shallower and direct onsite development would be more of a concern for LM. The energy introduced when a well is hydraulically fractured causes microseismic events (magnitude -2 to 1.0) as the fractures propagate but does not directly cause seismic events (earthquakes) of sufficient magnitude to damage surface structures. Additionally, the extent of the hydraulic fractures is limited to the targeted depths, which are far below the surface. However, earthquakes of sufficient magnitude to damage surface structures have been attributed to the injection of wastewater into disposal wells. States that have experienced these effects have enacted regulations that limit the rate and pressures that wastewater can be injected into disposal wells. Items LM may consider are the need for monitoring the volume of water injected into nearby disposal wells and possibly installing seismic stations at sites most susceptible to damage. While the need to demonstrate that no impact from oil and gas extraction activities on a site groundwater remedy or disposal cells will vary from site to site, LM is assessing risk criteria for this activity. Though LM has not experienced an issue yet at a uranium tailings disposal site, it cannot assume that there will be none, and must address NRC concerns. LM is building on past experiences at other sites and beginning to form new processes with the hope that these concepts can be applied for other future sites. (authors)

04 OIL SHALES AND TAR SANDS↗

First scientific application of the membrane cryostat technology

We report on the design, fabrication, performance and commissioning of the first membrane cryostat to be used for scientific application. The Long Baseline Neutrino Experiment (LBNE) has designed and fabricated a membrane cryostat prototype in collaboration with IHI Corporation (IHI). Original goals of the prototype are: to demonstrate the membrane cryostat technology in terms of thermal performance, feasibility for liquid argon, and leak tightness; to demonstrate that we can remove all the impurities from the vessel and achieve the purity requirements in a membrane cryostat without evacuation and using only a controlled gaseous argon purge; to demonstrate that we can achieve and maintain the purity requirements of the liquid argon during filling, purification, and maintenance mode using mole sieve and copper filters from the Liquid Argon Purity Demonstrator (LAPD) R and D project. The purity requirements of a large liquid argon detector such as LBNE are contaminants below 200 parts per trillion oxygen equivalent. This paper gives the requirements, design, construction, and performance of the LBNE membrane cryostat prototype, with experience and results important to the development of the LBNE detector.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Light Microscopy Module Imaging Tested and Demonstrated

The Fluids Integrated Rack (FIR), a facility-class payload, and the Light Microscopy Module (LMM), a subrack payload, are integrated research facilities that will fly in the U.S. Laboratory module, Destiny, aboard the International Space Station. Both facilities are being engineered, designed, and developed at the NASA Glenn Research Center by Northrop Grumman Information Technology. The FIR is a modular, multiuser scientific research facility that is one of two racks that make up the Fluids and Combustion Facility (the other being the Combustion Integrated Rack). The FIR has a large volume dedicated for experimental hardware; easily reconfigurable diagnostics, power, and data systems that allow for unique experiment configurations; and customizable software. The FIR will also provide imagers, light sources, power management and control, command and data handling for facility and experiment hardware, and data processing and storage. The first payload in the FIR will be the LMM. The LMM integrated with the FIR is a remotely controllable, automated, on-orbit microscope subrack facility, with key diagnostic capabilities for meeting science requirements--including video microscopy to observe microscopic phenonema and dynamic interactions, interferometry to make thin-film measurements with nanometer resolution, laser tweezers to manipulate micrometer-sized particles, confocal microscopy to provide enhanced three-dimensional visualization of structures, and spectrophotometry to measure the photonic properties of materials. Vibration disturbances were identified early in the LMM development phase as a high risk for contaminating the science microgravity environment. An integrated FIR-LMM test was conducted in Glenn's Acoustics Test Laboratory to assess mechanical sources of vibration and their impact to microscopic imaging. The primary purpose of the test was to characterize the LMM response at the sample location, the x-y stage within the microscope, to vibration emissions from the FIR and LMM support structures.

Gati, Frank↗

Methylmercury sorption onto engineered materials

Four commercially available sorbents (BioChar (BC), ThiolSAMMS® (TS), SediMite (SM), and Organoclay™ PM-199 (OC-199)) were tested for their ability to sorb methylmercury (MeHg) and MeHg complexed with dissolved organic matter (DOM). Testing sorption behavior with DOM is more representative of the environmental conditions and mercury speciation expected during in-situ remediation efforts. Isotherms were fit using a robust, iterative re-weighting scheme. This fitting method improves upon the traditionally used indirect sorption method by removing the dependence between aqueous and solid phase concentrations in isotherm fitting. Developed isotherms reflect that without DOM, BC, TS, and SM adsorbed similar amounts of MeHg while OC-199 sorbed substantially less MeHg. Below an equilibrium concentration of 5.6 ng L -1 BC was the best performing sorbent, between 5.6 and 20. ng L -1 SM sorbed the most MeHg, and above an equilibrium concentration of 20.9 ng L -1 TS outperformed the other sorbents. BC and OC-199 showed indication of MeHg sorption saturation over the tested concentration range of 3.5–680 ng L -1 . With DOM, SM outperformed the other sorbents at equilibrium concentrations less than 0.98 ng L -1 and TS was the superior MeHg:DOM sorbent at higher concentrations. MeHg:DOM sorption was controlled by DOM-sorbent interactions. DOM decreased MeHg sorption onto BC and SM whereas TS exhibited similar sorption with and without DOM. OC-199 had slightly higher MeHg uptake with DOM. East Fork Poplar Creek (EFPC), an industrially Hg contaminated site, was used as a case study example to build a relationship between aqueous and fish MeHg concentrations and subsequently compare the cost of sorbent materials required to meet regulatory objectives. For this case study, SM provided the most cost-effective sorbent option for in-situ remediation efforts to reduce aqueous MeHg concentrations.

36 MATERIALS SCIENCE↗