Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Constraint programming”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Galileo probe battery program - An historical overview

The Galileo Probe mission to Jupiter required the selection of a battery module design that exceeded the known state of the art in 1977. The choice of the lithium-sulfur dioxide system, a technology then under development for nonaerospace applications necessitated an extensive cell and module development program that ultimately resulted in a space-qualified product that satisfies the severe constraints and requirements of the Galileo mission. The development program drew on the data base and experience then available from other government-sponsored lithium-sulfur dioxide programs and is an example of multiapplication synergism that can be derived from industry and government cooperation.

Krause, S. J.↗

Optimal Network-Topology Design

Candidate network designs tested for acceptability and cost. Optimal Network Topology Design computer program developed as part of study on topology design and analysis of performance of Space Station Information System (SSIS) network. Uses efficient algorithm to generate candidate network designs consisting of subsets of set of all network components, in increasing order of total costs and checks each design to see whether it forms acceptable network. Technique gives true cost-optimal network and particularly useful when network has many constraints and not too many components. Program written in PASCAL.

Li, Victor O. K.↗

Bootstrap and amplitudes: a hike in the landscape of quantum field theory

This article is an introduction to two currently very active research programs, the Conformal Bootstrap and Scattering Amplitudes. Rather than attempting full surveys, the emphasis is on common ideas and methods shared by these two seemingly very different programs. In both fields, mathematical and physical constraints are placed directly on the physical observables in order to explore the landscape of possible consistent quantum field theories. We give explicit examples from both programs: the reader can expect to encounter boiling water, ferromagnets, pion scattering, and emergent symmetries on this journey into the landscape of local relativistic quantum field theories. Here, the first part is written for a general physics audience. The second part includes further details, including a new on-shell bottom-up reconstruction of the CP 1 model with the Fubini-Study metric arising from re-summation of the n-point interaction terms derived from amplitudes.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Optimizing airport runway improvement program - A dynamic programming approach

In order to reduce the air traffic delay in the terminal area, an immediate remedy is to increase airport capacity by an expansion of the existing runway system. The runway expansion program is often limited by budgetary constraints; the expensive facilities for a long-term improvement cannot be built at once. When a runway improvement strategy is being considered for a longer planning horizon, the investiment decision depends upon the interrelations of its composite periods. The problem, therefore, is to determine how time factor and investment decisions interact to yield an optimal improvement scheme that meets demand at a minimum cost. With this objective in mind, a dynamic programming methodology is employed to determine the optimal planning scheme. Also, an example runway improvement problem is tested to illustrate how a dynamic programming model is practical in actual application.

Yu, J. C.↗

Candidate Core Designs for the Transformational Challenge Reactor

Early cycle activities under the Transformational Challenge Reactor (TCR) program focused on analyzing and maturing four reactor core design concepts: two fast-spectrum systems and two thermal-spectrum systems. A rapid, iterative approach has been implemented through which designs can be modified and analyzed and subcomponents can be manufactured in parallel over time frames of weeks rather than months or years. To meet key program initiatives (e.g., timeline, material use), several constraints—including fissile material availability (less than 250 kg of HALEU), component availabilities, materials compatibility, and additive manufacturing capabilities—were factored into the design effort, yielding small (less than one cubic meter in volume) cores with near-term viability. The fast-spectrum designs did not meet the fissile material constraint, so the thermal-spectrum systems became the primary design focus. Since significant progress has been made on advanced moderator materials (YH x ) under the TCR program, gas-cooled thermal-spectrum systems using less than 250 kg of HALEU that occupy less than 1 m 3 are now feasible. The designs for two of these systems have been evolved and matured. In both thermal-spectrum design concepts, bidirectional coolant flow is used. Coolant flows down through YH x moderator elements and is reversed in a bottom manifold and core support structure, and then flows up though or around the fuel elements. The main difference between the two thermal-spectrum design concepts is the fuel elements—one uses traditional UO 2 ceramic fuel, and the other uses UN-bearing TRISO fuel particles embedded inside a SiC matrix. Finally, core neutronics and thermal performance for these systems are assessed and summarized herein.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Identification and Analysis of National Airspace System Resource Constraints

This analysis is the deliverable for the Airspace Systems Program, Systems Analysis Integration and Evaluation Project Milestone for the Systems and Portfolio Analysis (SPA) focus area SPA.4.06 Identification and Analysis of National Airspace System (NAS) Resource Constraints and Mitigation Strategies. "Identify choke points in the current and future NAS. Choke points refer to any areas in the en route, terminal, oceanic, airport, and surface operations that constrain actual demand in current and projected future operations. Use the Common Scenarios based on Transportation Systems Analysis Model (TSAM) projections of future demand developed under SPA.4.04 Tools, Methods and Scenarios Development. Analyze causes, including operational and physical constraints." The NASA analysis is complementary to a NASA Research Announcement (NRA) "Development of Tools and Analysis to Evaluate Choke Points in the National Airspace System" Contract # NNA3AB95C awarded to Logistics Management Institute, Sept 2013.

Smith, Jeremy C.↗

The application of VLB interferometry to earth measurements

Results of a four-phase development of capability in very long-baseline interferometry (VLBI) at the Smithsonian Astrophysical Observatory (SAO) are summarized. The objectives of the VLBI program at SAO are to: (1) develop the capability to collect, process, and analyze VLBI data; (2) determine experimentally the accuracy now attainable with VLBI and, within the constraints imposed by this accuracy, initiate a program of VLBI observations for geophysical applications; (3) identify all significant error sources and devise means for eliminating or correcting these errors; and (4) develop a long range plan for applying VLBI techniques to a program of earth physics measurements.

Michelini, R. D.↗

NASA Space Rocket Logistics Challenges

The Space Launch System (SLS) is the new NASA heavy lift launch vehicle and is scheduled for its first mission in 2017. The goal of the first mission, which will be uncrewed, is to demonstrate the integrated system performance of the SLS rocket and spacecraft before a crewed flight in 2021. SLS has many of the same logistics challenges as any other large scale program. Common logistics concerns for SLS include integration of discreet programs geographically separated, multiple prime contractors with distinct and different goals, schedule pressures and funding constraints. However, SLS also faces unique challenges. The new program is a confluence of new hardware and heritage, with heritage hardware constituting seventy-five percent of the program. This unique approach to design makes logistics concerns such as commonality especially problematic. Additionally, a very low manifest rate of one flight every four years makes logistics comparatively expensive. That, along with the SLS architecture being developed using a block upgrade evolutionary approach, exacerbates long-range planning for supportability considerations. These common and unique logistics challenges must be clearly identified and tackled to allow SLS to have a successful program. This paper will address the common and unique challenges facing the SLS programs, along with the analysis and decisions the NASA Logistics engineers are making to mitigate the threats posed by each.

Neeley, James R.↗

NASA Space Flight Vehicle Fault Isolation Challenges

The Space Launch System (SLS) is the new NASA heavy lift launch vehicle and is scheduled for its first mission in 2017. The goal of the first mission, which will be uncrewed, is to demonstrate the integrated system performance of the SLS rocket and spacecraft before a crewed flight in 2021. SLS has many of the same logistics challenges as any other large scale program. Common logistics concerns for SLS include integration of discrete programs geographically separated, multiple prime contractors with distinct and different goals, schedule pressures and funding constraints. However, SLS also faces unique challenges. The new program is a confluence of new hardware and heritage, with heritage hardware constituting seventy-five percent of the program. This unique approach to design makes logistics concerns such as testability of the integrated flight vehicle especially problematic. The cost of fully automated diagnostics can be completely justified for a large fleet, but not so for a single flight vehicle. Fault detection is mandatory to assure the vehicle is capable of a safe launch, but fault isolation is another issue. SLS has considered various methods for fault isolation which can provide a reasonable balance between adequacy, timeliness and cost. This paper will address the analyses and decisions the NASA Logistics engineers are making to mitigate risk while providing a reasonable testability solution for fault isolation.

Bramon, Christopher↗

Commercial Space Research: Entering a New Stage

The Space Act which established NASA included direction that NASA is to foster to the maximum extent possible the commercial use of space. In order to achieve this, NASA began establishing in 1985, Commercial Space Centers (CSCs). These centers are a consortium of industry, academia, and government. Primarily university based, the CSCs are chartered to partner with industry to help companies learn how using space can improve their bottom line. Responsibility for the Commercial Space Centers rests with the Space Product Development Office at Marshall Space Flight Center. Since the program was established in 1985, SPD has sponsored nearly 180 commercial microgravity research payloads on 30 Shuttle missions. The vast majority of these missions were on the order of 6 days. Most companies have only had on average three flight opportunities to advance their product development efforts. From the product development standpoint of an individual company only three weeks of microgravity time have been obtained to date. Of key importance to a company is the fact that this time has not been continuous. Anywhere from one to three years elapses between flights. Despite these flight constraints, the companies in the SPD program have made considerable progress. For example, over the course of the program through 1999, industry has invested over half a billion dollars in cash and in-kind. Over a dozen new product lines are in development by the industrial partners of the Commercial Space Centers. Now the companies partnered with the SPD program have a new opportunity in the International Space Station. The long duration capability provided by the Station will provide double the amount of per company average microgravity time in just the first increment. Current planning through planning increment 5 shows that commercial investment in space research should now be positioned for greater returns.

Nall, Mark E.↗

A parallel trajectory optimization tool for aerospace plane guidance

A parallel trajectory optimization algorithm is being developed. One possible mission is to provide real-time, on-line guidance for the National Aerospace Plane. The algorithm solves a discrete-time problem via the augmented Lagrangian nonlinear programming algorithm. The algorithm exploits the dynamic programming structure of the problem to achieve parallelism in calculating cost functions, gradients, constraints, Jacobians, Hessian approximations, search directions, and merit functions. Special additions to the augmented Lagrangian algorithm achieve robust convergence, achieve (almost) superlinear local convergence, and deal with constraint curvature efficiency. The algorithm can handle control and state inequality constraints such as angle-of-attack and dynamic pressure constraints. Portions of the algorithm have been tested. The nonlinear programming core algorithm performs well on a variety of static test problems and on an orbit transfer problem. The parallel search direction algorithm can reduce wall clock time by a factor of 10 for this part of the computation task.

Psiaki, Mark L.↗

Magnetically Actuated Propellant Orientation, Controlling Fluids in a Low-Gravity Environment

Cryogenic fluid management (CFM) is a technology area common to virtually every space transportation propulsion concept envisioned. Storage, supply, transfer and handling of sub-critical cryogenic fluids are basic capabilities that have long been needed by multiple programs and the need is expected to continue in the future. The use of magnetic fields provides another method, which could replace or augment current/traditional approaches, potentially simplifying vehicle operational constraints. The magnetically actuated propellant orientation (MAPO) program effort focused on the use of magnetic fields to control fluid motion as it relates to positioning (i.e. orientation and acquisition) of a paramagnetic substance such as LO2. Current CFM state- of-the-art systems used to control and acquire propellant in low gravity environments rely on liquid surface tension devices which employ vanes, fine screen mesh channels and baskets. These devices trap and direct propellant to areas where it's needed and have been used routinely with storable (non-cryogenic) propellants. However, almost no data exists r,egarding their operation in cryogenics and the use of such devices confronts designers with a multitude of significant technology issues. Typical problems include a sensitivity to screen dry out (due to thermal loads and pressurant gas) and momentary adverse accelerations (generated from either internal or external sources). Any of these problems can potentially cause the acquisition systems to ingest or develop vapor and fail. The use of lightweight high field strength magnets may offer a valuable means of augmenting traditional systems potentially mitigating or at least easing operational requirements. Two potential uses of magnetic fields include: 1) strategically positioning magnets to keep vent ports clear of liquid (enabling low G vented fill operations), and 2) placing magnets in the center or around the walls of the tank to create an insulating vapor pocket (between the liquid and the tank wall) which could effectively lower heat transfer to the liquid (enabling increased storage time).

Martin, James J.↗

Formulations and Valid Inequalities for Optimal Black Start Allocation in Power Systems

The restoration of a power system after a blackout starts around units with enhanced technical capabilities, referred to as black start units (BSUs). We examine the planning problem of optimally allocating these units on the grid subject to a budget constraint. We present a mixed integer programming model based on current literature in power systems. Binary variables are associated with the allocation of BSUs and with the energization state of buses, branches, and generators of the power system over a time horizon. We extract a substructure of the feasible region which imposes the requirement that each island that appears during the restoration process must have at least one operational generator. We discuss three equivalent reformulations for this requirement. We introduce a family of exponentially many, polynomially separable, valid inequalities to strengthen the formulation. Under simplifying assumptions, we show that the convex hull of the feasible region is a full-dimensional polyhedron, and prove that some of the constraints we introduced are facet-defining. We perform experiments to examine the difference in strength between the formulations as well as the computational times to solve the problem to near optimality for synthetic instances of the IEEE-39, IEEE-118, Illinois-200, WECC-225, IEEE-300, South Carolina-500, and Texas-2000 power systems. We illustrate a use case of the model. We conclude by suggesting extensions of the current work for future research.

Black Start Allocation↗

Knowledge based tools for Hubble Space Telescope planning and scheduling: Constraints and strategies

The Hubble Space Telescope (HST) presents an especially challenging scheduling problem since a year's observing program encompasses tens of thousands of exposures facing numerous coupled constraints. Recent progress in the development of planning and scheduling tools is discussed which augment the existing HST ground system. General methods for representing activities, constraints, and constraint satisfaction, and time segmentation were implemented in a scheduling testbed. The testbed permits planners to evaluate optimal scheduling time intervals, calculate resource usage, and to generate long and medium range plans. Graphical displays of activities, constraints, and plans are an important feature of the system. High-level scheduling strategies using rule based and neural net approaches were implemented.

Miller, Glenn↗

SU-F-BRD-08: Guaranteed Epsilon-Optimal Treatment Plans with Minimum Number of Beams for SBRT Using RayStation

Purpose: To efficiently find quality-guaranteed treatment plans with the minimum number of beams for stereotactic body radiation therapy using RayStation. Methods: For a pre-specified pool of candidate beams we use RayStation (a treatment planning software for clinical use) to identify the deliverable plan which uses all the beams with the minimum dose to organs at risk (OARs) and dose to the tumor and other structures in specified ranges. Then use the dose matrix information for the generated apertures from RayStation to solve a linear program to find the ideal plan with the same objective and constraints allowing use of all beams. Finally we solve a mixed integer programming formulation of the beam angle optimization problem (BAO) with the objective of minimizing the number of beams while remaining in a predetermined epsilon-optimality of the ideal plan with respect to the dose to OARs. Since the treatment plan optimization is a multicriteria optimization problem, the planner can exploit the multicriteria optimization capability of RayStation to navigate the ideal dose distribution Pareto surface and select a plan of desired target coverage versus OARs sparing, and then use the proposed technique to reduce the number of beams while guaranteeing quality. For the numerical experiments two liver cases and one lung case with 33 non-coplanar beams are considered. Results: The ideal plan uses an impractically large number of beams. The proposed technique reduces the number of beams to the range of practical application (5 to 9 beams) while remaining in the epsilon-optimal range of 1% to 5% optimality gap. Conclusion: The proposed method can be integrated into a general algorithm for fast navigation of the ideal dose distribution Pareto surface and finding the treatment plan with the minimum number of beams, which corresponds to the delivery time, in epsilon-optimality range of the desired ideal plan. The project was supported by the Federal Share of program income earned by Massachusetts General Hospital on C06 CA059267, Proton Therapy Research and Treatment Center and partially by RaySearch Laboratories.

60 APPLIED LIFE SCIENCES↗

Testing the Exploration ConOps (ExCon) Mockup Suit in Lunar Analog Environments in 2022

Understanding how to effectively train for Extravehicular Activities (EVAs) for Artemis missions is critical. Developing high-fidelity simulation environments is important for Artemis mission preparation. Because the actual Lunar exploration environment cannot be fully replicated on Earth, it is paramount to determine where and how to properly train the Artemis team. The overall focus for this test series was developing the capability to perform Artemis simulated EVAs in high-fidelity, full-scale environments. This test series was broken into three distinct tests titled after the EVA & Human Surface Mobility (HSM) Program (EHP) integrated test team: Joint EVA & HSM Test Team (JETT). The test locations are planned to serve as Artemis training sites and were selected because of their relevance to the expected Artemis Lunar terrain. JETT1 was conducted near Kilbourne Hole by El Paso, Texas and focused on hardware development and checkout. JETT2 was conducted in the Icelandic Highlands and began the transition towards EVA concept of operations (con-ops), risks and technology. JETT3 was conducted near SP Crater by Flagstaff, Arizona and focused on simulating the Artemis III mission including a Houston based Flight Control Team (FCT) and a Science Mission Directorate (SMD) science team. All three JETT tests utilized the Exploration Concept of Operations (ExCon) mockup space suit. The ExCon mockup suit is a lightweight, unpressurized Exploration Extravehicular Mobility Unit (xEMU) simulator. While it cannot replicate the feel of working within a pressurized suit, it does introduce similar volume constraints and some of the mobility programing to simulate the user experience in the xEMU. Overall, the JETT testing was able to create a simulated Lunar EVA and have two subjects perform full scale operations in line with Artemis III mission expectations. Future work is planned to continue to improve the simulation quality of Lunar EVA simulations.

spacesuit↗