Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Commercial Building”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

VIPER Rover: Flight Build and Environmental Test Status

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, Earth logistical requirements could be substantially reduced by “living off the land” with in-situ lunar resources. Local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. LCROSS, LRO and other missions have confirmed the presence of lunar volatiles resources in polar regions, so the next step is to understand the physical distribution of those resources, as well as the scientific basis for how water got there, and why it is still there. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss VIPER’s completion of the flight rover build, as well as current progress in environmental testing, preparedness for mission operations, and overall readying for launch integration with our CLPS partner. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model.

VIPER↗

Viper Rover: Flight Build and Environmental Test Status

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, Earth logistical requirements could be substantially reduced by “living off the land” with in-situ lunar resources. Local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. LCROSS, LRO and other missions have confirmed the presence of lunar volatiles resources in polar regions, so the next step is to understand the physical distribution of those resources, as well as the scientific basis for how water got there, and why it is still there. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss VIPER’s completion of the flight rover build, as well as current progress in environmental testing, preparedness for mission operations, and overall readying for launch integration with our CLPS partner. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model.

rover↗

VIPER Rover Flight Build and Environmental Test Status

The NASA Artemis Program plans to return humans to the Moon to stay. Extended human stays on the Moon will require substantial resources to sustain human presence, requiring continuous supplies delivered from the Earth. However, if some of the resources were indigenously available, Earth logistical requirements could be substantially reduced by “living off the land” with in-situ lunar resources. Local volatiles could be processed into propellants and human life-supporting needs, reducing risk of maintaining a permanent human presence on the Moon. LCROSS, LRO and other missions have confirmed the presence of lunar volatiles resources in polar regions, so the next step is to understand the physical distribution of those resources, as well as the scientific basis for how water got there, and why it is still there. The Volatiles Investigating Polar Exploration Resource (VIPER) is a surface mobility scientific platform, designed to spend ~100 days mapping and surveying four different Ice Stability Regions to understand the scientific nature and distribution of water and other volatiles. VIPER will also provide scientific mineralogical context of the lunar regolith, such as the presence of silicon and light metals in lunar regolith, providing a composite picture of resource availability and sustainment. This paper will discuss VIPER’s completion of the flight rover build, as well as current progress in environmental testing, preparedness for mission operations, and overall readying for launch integration with our CLPS partner. VIPER is managed within NASA’s Science Mission Directorate (SMD), utilizing the Commercial Lunar Payload Services (CLPS) lunar delivery model.

rover↗

NASA Delay Tolerant Networks: Operational, Evolving, an Ready for Expansion

The future of humanity’s presence beyond Earth depends on the successful commercialization of space. For commercialization to succeed, companies need cost-efficient architectures to support their business models and minimize risks for human capital, design, development, and operations. An ongoing challenge to any space enterprise is the reality that terrestrial network technologies are insufficient to provide reliable communications between assets in space. Whether you need to ensure your valuable data is safely transmitted to the ground or reliably delivered between platforms in orbit, ensuring data integrity over intermittent communication links is a necessity. Current solutions to space communications rely heavily on manual recording, storing, and retrieval of data from spacecraft. The current standard in space communication protocols, Consultative Committee for Space Data Systems (CCSDS) Space Packet standard, is reliant on inflexible network architectures based around mission-critical infrastructure to ensure data delivery. However, by automating the recording, storing, retrieval, and verification of data with Delay Tolerant Networks (DTN), the operator is freed from the dependence on manual data management and expensive mission critical infrastructure. NASA has been developing delay tolerant systems since the late 1990’s. Multiple DTN implementations have been established during that time, each suited to different use cases. Most notably, the DTN deployment for the International Space Station (ISS) includes demonstration of two DTN technologies: Interplanetary Overlay Network (ION) and Delay Tolerant Network Marshall Enterprise (DTNME). Beyond ISS, there are even more NASA DTN deployments being considered. Now that DTN implementations are maturing, it is appropriate to reflect upon these decades of work, review the integration and performance of the existing ISS deployment, and explore the future possibilities for DTN deployment industry-wide. The ISS DTN deployment is a complex architecture consisting of different DTN implementations for the onboard and ground network environments. The ION DTN implementation is being used in the on-board network. The Huntsville Operations Support Center (HOSC) DTN implementation, DTNME, is used by the ground network supporting ISS and will soon be a second onboard gateway too. The two implementations work cooperatively to provide high fidelity data services to flight operations users and payload developers across the globe. Though the two implementations yield a quality service, limitations are evident. Data rate, data storage, and device management are constrained by the services themselves and the complex nature of the deployment. Evolution of operations concepts will improve system capabilities and stability, but significant improvement will require additional development to the implementations themselves and to the overall deployment architecture. Taking advantage of the ongoing development and operation of the ISS DTN service will be central to the success of the future evolutions of NASA DTN deployments while demonstrating the benefits of DTN’s low-cost reliable data communication protocols for the growing commercial space industry. A broad effort on DTN integration and support is necessary to promote expansion beyond existing applications. NASA is developing several useful DTN implementations across a number of different systems: ION, DTNME, High-Rate DTN (HDTN), Bundle Protocol Library (BPLib), and others. To prevent fragmentation, DTN implementation teams need to communicate, collaborate, and integrate with one another to build a solid operational foundation for new DTN deployments. The establishment of a group that can assist new DTN users with understanding the purpose of each DTN implementation, provide best practices, and serve as a general knowledge base is paramount. Potential use of DTN on Gateway and other future NASA missions further drives the need for streamlined communication between DTN implementation teams. A well-integrated and highly engaged NASA DTN working group should help provide system architects the best DTN solutions for future commercial space efforts. This paper will first review the history of DTN implementations, explore the shortcoming of current space networking solutions given available limits in technology, and therefore establish the need for Delay Tolerant Networking in space communications. Secondly, the authors will explore NASA’s array of DTN implementations and highlight their usefulness to space applications. Thirdly, this paper will establish general DTN implementation distinguishing factors. Fourthly, the authors will discuss attempts to create a generic DTN comparison matrix, and the authors will review potential future topics in DTN innovation and collaboration, highlighting several key future efforts. Finally, this paper will describe how the institution of a NASA DTN Working Group will benefit DTN adoption across the governmental and commercial space sector. The goal of this paper is to encourage enthusiasm for DTN, share strategies for improving DTN on both current and future applications, promote the collaboration of DTN implementation groups within the international space operations community, and open the conversations about DTN, priorities, complexities, and innovation to the wider spaceflight industry.

DTN↗

NASA Delay Tolerant Networks: Operational, Evolving, an Ready for Expansion

The future of humanity’s presence beyond Earth depends on the successful commercialization of space. For commercialization to succeed, companies need cost-efficient architectures to support their business models and minimize risks for human capital, design, development, and operations. An ongoing challenge to any space enterprise is the reality that terrestrial network technologies are insufficient to provide reliable communications between assets in space. Whether you need to ensure your valuable data is safely transmitted to the ground or reliably delivered between platforms in orbit, ensuring data integrity over intermittent communication links is a necessity. Current solutions to space communications rely heavily on manual recording, storing, and retrieval of data from spacecraft. The current standard in space communication protocols, Consultative Committee for Space Data Systems (CCSDS) Space Packet standard, is reliant on inflexible network architectures based around mission-critical infrastructure to ensure data delivery. However, by automating the recording, storing, retrieval, and verification of data with Delay Tolerant Networks (DTN), the operator is freed from the dependence on manual data management and expensive mission critical infrastructure. NASA has been developing delay tolerant systems since the late 1990’s. Multiple DTN implementations have been established during that time, each suited to different use cases. Most notably, the DTN deployment for the International Space Station (ISS) includes demonstration of two DTN technologies: Interplanetary Overlay Network (ION) and Delay Tolerant Network Marshall Enterprise (DTNME). Beyond ISS, there are even more NASA DTN deployments being considered. Now that DTN implementations are maturing, it is appropriate to reflect upon these decades of work, review the integration and performance of the existing ISS deployment, and explore the future possibilities for DTN deployment industry-wide. The ISS DTN deployment is a complex architecture consisting of different DTN implementations for the onboard and ground network environments. The ION DTN implementation is being used in the on-board network. The Huntsville Operations Support Center (HOSC) DTN implementation, DTNME, is used by the ground network supporting ISS and will soon be a second onboard gateway too. The two implementations work cooperatively to provide high fidelity data services to flight operations users and payload developers across the globe. Though the two implementations yield a quality service, limitations are evident. Data rate, data storage, and device management are constrained by the services themselves and the complex nature of the deployment. Evolution of operations concepts will improve system capabilities and stability, but significant improvement will require additional development to the implementations themselves and to the overall deployment architecture. Taking advantage of the ongoing development and operation of the ISS DTN service will be central to the success of the future evolutions of NASA DTN deployments while demonstrating the benefits of DTN’s low-cost reliable data communication protocols for the growing commercial space industry. A broad effort on DTN integration and support is necessary to promote expansion beyond existing applications. NASA is developing several useful DTN implementations across a number of different systems: ION, DTNME, High-Rate DTN (HDTN), Bundle Protocol Library (BPLib), and others. To prevent fragmentation, DTN implementation teams need to communicate, collaborate, and integrate with one another to build a solid operational foundation for new DTN deployments. The establishment of a group that can assist new DTN users with understanding the purpose of each DTN implementation, provide best practices, and serve as a general knowledge base is paramount. Potential use of DTN on Gateway and other future NASA missions further drives the need for streamlined communication between DTN implementation teams. A well-integrated and highly engaged NASA DTN working group should help provide system architects the best DTN solutions for future commercial space efforts. This paper will first review the history of DTN implementations, explore the shortcoming of current space networking solutions given available limits in technology, and therefore establish the need for Delay Tolerant Networking in space communications. Secondly, the authors will explore NASA’s array of DTN implementations and highlight their usefulness to space applications. Thirdly, this paper will establish general DTN implementation distinguishing factors. Fourthly, the authors will discuss attempts to create a generic DTN comparison matrix, and the authors will review potential future topics in DTN innovation and collaboration, highlighting several key future efforts. Finally, this paper will describe how the institution of a NASA DTN Working Group will benefit DTN adoption across the governmental and commercial space sector. The goal of this paper is to encourage enthusiasm for DTN, share strategies for improving DTN on both current and future applications, promote the collaboration of DTN implementation groups within the international space operations community, and open the conversations about DTN, priorities, complexities, and innovation to the wider spaceflight industry.

DTN↗

Some aspects of robotics calibration, design and control

The main objective is to introduce techniques in the areas of testing and calibration, design, and control of robotic systems. A statistical technique is described that analyzes a robot's performance and provides quantitative three-dimensional evaluation of its repeatability, accuracy, and linearity. Based on this analysis, a corrective action should be taken to compensate for any existing errors and enhance the robot's overall accuracy and performance. A comparison between robotics simulation software packages that were commercially available (SILMA, IGRIP) and that of Kennedy Space Center (ROBSIM) is also included. These computer codes simulate the kinematics and dynamics patterns of various robot arm geometries to help the design engineer in sizing and building the robot manipulator and control system. A brief discussion on an adaptive control algorithm is provided.

Tawfik, Hazem↗

Dual-Input AND Gate From Single-Channel Thin-Film FET

A regio-regular poly(3-hexylthiophene) (RRP3HT) thin-film transistor having a split-gate architecture has been fabricated on a doped silicon/silicon nitride substrate and characterized. RRP3HT is a semiconducting polymer that has a carrier mobility and on/off ratio when used in a field effect transistor (FET) configuration. This commercially available polymer is very soluble in common organic solvents and is easily processed to form uniform thin films. The most important polymer-based device fabricated and studied is the FET, since it forms the building block in logic circuits and switches for active matrix (light-emitting-diode) (LED) displays, smart cards, and radio frequency identification (RFID) cards.

Miranda, F. A.↗

Microhard MHX 2420 Orbital Performance Evaluation Using RT Logic T400CS

A major upfront cost of building low cost Nanosatellites is the communications sub-system. Most radios built for space missions cost over $4,000 per unit. This exceeds many budgets. One possible cost effective solution is the Microhard MHX2420, a commercial off-the-shelf transceiver with a unit cost under $1000. This paper aims to support the Nanosatellite community seeking an inexpensive radio by characterizing Microhard's performance envelope. Though not intended for space operations, the ability to test edge cases and increase average data transfer speeds through optimization positions this radio as a solution for Nanosatellite communications by expanding usage to include more missions. The second objective of this paper is to test and verify the optimal radio settings for the most common cases to improve downlinking. All tests were conducted with the aid of the RT Logic T400CS, a hardware-in-the-loop channel simulator designed to emulate real-world radio frequency (RF) link effects. This study provides recommended settings to optimize the downlink speed as well as the environmental parameters that cause the link to fail.

Microhard MHX 2420↗

Simulated Tiltrotor Aircraft Operation in Close Proximity to a Building in Wind and Ground-Effect Conditions

A mid-fidelity computational fluid dynamics tool called RotCFD specifically developed to aid in rotorcraft studies has been applied to the study of wake interactions of civiltiltrotor aircraft in the immediate vicinity of buildings, in- and out-of-ground-effect, with and without winds, consistent with notional tiltrotor operations from urban vertiports. Such civil tiltrotor operations from urban vertiports could potentially enable city-center-to-city center commercial transport. However, in order to one day realize such civil tiltrotor operations, though, it is necessary to better understand the wake interaction and interactional aerodynamic operating environment of urban vertiports. In the early 2000s, a series of 7-by-10 Ft. wind tunnel tests were conducted at NASA Ames Research Center that began to explore some of these civil tiltrotor and vertiport wake interactioninteractional aerodynamics issues. This study seeks to validate computation fluid dynamic predictions against these early wind tunnel experimental results and, thereby, continue exploration of this important research area.

Rotorcraft↗

Developing Expert Teams with a Strong Safety Culture

Would you like to lead a world renowned team that draws out all the talents and expertise of its members and consistently out performs all others in the industry? Ever wonder why so many organizations fail to truly learn from past mistakes only to repeat the same ones at a later date? Are you a program/project manager or team member in a high-risk organization where the decisions made often carry the highest of consequences? Leadership, communication, team building, critical decision-making and continuous team improvement skills and behaviors are mere talking points without the attitudes, commitment and strategies necessary to make them the very fabric of a team. Developing Expert Teams with a Strong Safety Culture, will provide you with proven knowledge and strategies to take your team soaring to heights you may have not thought possible. A myriad of teams have applied these strategies and techniques within their organization team environments: military and commercial aviation, astronaut flight crews, Shuttle flight controllers, members of the Space Shuttle Program Mission Management Team, air traffic controllers, nuclear power control teams, surgical teams, and the fire service report having spectacular success. Many industry leaders are beginning to realize that although the circumstances and environments of these teams may differ greatly to their own, the core elements, governing principles and dynamics involved in managing and building a stellar safety conscious team remain identical.

Rogers, David G.↗

Video Analysis for Surveillance of Spacecraft Parachute Systems

The Commercial Crew Program (CCP) has established a surveillance methodology to ensure the reliability of spacecraft parachute systems. The implemented methodology relies on an interconnected framework consisting of imagery analysis, hardware inspections, and vehicle data analysis. Imagery analysis serves as a foundation for these core activities which provide a robust approach to the surveillance of spacecraft parachute systems. As the surveillance framework has been developed, the role of imagery has become more prominent, and therefore imagery requirements have changed. To complete photogrammetric analysis, careful consideration must be made to the role of imagery, required data, imagery requirements, the analysis process, and mission planning. The role of imagery will drive the required data, which will in turn drive imagery requirements. Imagery requirements are likely to drive mission planning through consideration to camera selection and placement. If onboard imagery is required, the camera and data system must be implemented prior to launch. If external imagery is required, the photography package must be implemented such that it can be positioned for a return and free of potential debris fields. For these reasons, an integrated approach must be used to build an imagery package around the required analysis with careful coordination with mission planners.

parachutes↗

Video Analysis for Surveillance of Spacecraft Parachute Systems

The Commercial Crew Program (CCP) has established a surveillance methodology to ensure the reliability of spacecraft parachute systems. The implemented methodology relies on an interconnected framework consisting of imagery analysis, hardware inspections, and vehicle data analysis. Imagery analysis serves as a foundation for these core activities which provide a robust approach to the surveillance of spacecraft parachute systems. As the surveillance framework has been developed, the role of imagery has become more prominent, and therefore imagery requirements have changed. To complete photogrammetric analysis, careful consideration must be made to the role of imagery, required data, imagery requirements, the analysis process, and mission planning. The role of imagery will drive the required data, which will in turn drive imagery requirements. Imagery requirements are likely to drive mission planning through consideration to camera selection and placement. If onboard imagery is required, the camera and data system must be implemented prior to launch. If external imagery is required, the photography package must be implemented such that it can be positioned for a return and free of potential debris fields. For these reasons, an integrated approach must be used to build an imagery package around the required analysis with careful coordination with mission planners.

parachutes↗

Design, building and test of one prototype and four final position sensor assemblies: Hall effect position sensors

This report covers the development of a three channel Hall effect position sensing system for the commutation of a three phase dc torquer motor. The effort consisted of the evaluation, modification and re-packaging of a commercial position sensor and the design of a target configuration unique to this application. The resulting design meets the contract requirements and, furthermore, the test results indicate not only the practicality and versatility of the design, but also that there may be higher limits of resolution and accuracy achievable.

Source record↗

Durability Characterization of Mechanical Interfaces in Solar Sail Membrane Structures

The construction of a solar sail from commercially available metallized film presents several challenges. The solar sail membrane is made by seaming together strips of metallized polymer film. This requires seaming together a preselected width and thickness of a base material into the required geometry, and folding the assembled sail membranes into a small stowage volume prior to launch. The sail membranes must have additional features for connecting to rigid structural elements (e.g., sail booms) and must be electrically grounded to the spacecraft bus to prevent charge build up. Space durability of the material and mechanical interfaces of the sail membrane assemblies will be critical for the success of any solar sail mission. In this study, interfaces of polymer/metal joints in a representative solar sail membrane assembly were tested to ensure that the adhesive interfaces and the fastening grommets could withstand the temperature range and expected loads required for mission success. Various adhesion methods, such as surface treatment, commercial adhesives, and fastening systems, were experimentally evaluated and will be discussed.

Interface↗

Air Traffic Control: Economics of Flight

Contents include the following: 1. Commercial flight is a partnership. Airlines. Pilots. Air traffic control. 2. Airline schedules and weather problems can cause delays at the airport. Delays are inevitable in de-regulated industry due to simple economics. 3.Delays can be mitigated. Build more runways/technology. Increase airspace supply. 4. Cost/benefit analysis determine justification.

Murphy, James R.↗

Process Optimization of Bismaleimide (BMI) Resin Infused Carbon Fiber Composite

Engineers today are presented with the opportunity to design and build the next generation of space vehicles out of the lightest, strongest, and most durable materials available. Composites offer excellent structural characteristics and outstanding reliability in many forms that will be utilized in future aerospace applications including the Commercial Crew and Cargo Program and the Orion space capsule. NASA's Composites for Exploration (CoEx) project researches the various methods of manufacturing composite materials of different fiber characteristics while using proven infusion methods of different resin compositions. Development and testing on these different material combinations will provide engineers the opportunity to produce optimal material compounds for multidisciplinary applications. Through the CoEx project, engineers pursue the opportunity to research and develop repair patch procedures for damaged spacecraft. Working in conjunction with Raptor Resins Inc., NASA engineers are utilizing high flow liquid infusion molding practices to manufacture high-temperature composite parts comprised of intermediate modulus 7 (IM7) carbon fiber material. IM7 is a continuous, high-tensile strength composite with outstanding structural qualities such as high shear strength, tensile strength and modulus as well as excellent corrosion, creep, and fatigue resistance. IM7 carbon fiber, combined with existing thermoset and thermoplastic resin systems, can provide improvements in material strength reinforcement and deformation-resistant properties for high-temperature applications. Void analysis of the different layups of the IM7 material discovered the largest total void composition within the [ +45 , 90 , 90 , -45 ] composite panel. Tensile and compressional testing proved the highest mechanical strength was found in the [0 4] layup. This paper further investigates the infusion procedure of a low-cost/high-performance BMI resin into an IM7 carbon fiber material and the optical, chemical, and mechanical analyses performed.

Ehrlich, Joshua W.↗

Building the Traffic, Navigation, and Situation Awareness System (T-NASA) for Surface Operations

We report the results of a part-task simulation evaluating the separate and combined effects of an electronic moving map display and newly developed HUD symbology on ground taxi performance, under moderate- and low-visibility conditions. Twenty-four commercial airline pilots carried out a series of 28 gate-to-runway taxi trials at Chicago O'Hare. Half of the trials were conducted under moderate visibility (RVR 1400 ft), and half under low visibility (RVR 700 ft). In the baseline condition, where navigation support was limited to surface features and a Jeppesen paper map, navigation errors were committed on almost half of the trials. These errors were virtually abolished when the electronic moving map or the HUD symbology was available; in addition, compare, the baseline condition, both forms of navigation aid yielded an increase in forward taxi speed. The speed increase was greater for HUD than the electronic moving map, and greater under low visibility than under moderate visibility. These results suggest that combination of electronic moving map and HUD symbology has the potential to greatly increase the efficiency of ground operations, particularly under low-visibility conditions.

McCann, Robert S.↗

An Improved Design for Air Removal from Aerospace Fluid Loop Coolant Systems

Aerospace applications with requirements for large capacity heat removal (launch vehicles, platforms, payloads, etc.) typically utilize a liquid coolant fluid as a transport media to increase efficiency and flexibility in the vehicle design. An issue with these systems however, is susceptibility to the presence of noncondensable gas (NCG) or air. The presence of air in a coolant loop can have numerous negative consequences, including loss of centrifugal pump prime, interference with sensor readings, inhibition of heat transfer, and coolant blockage to remote systems. Hardware ground processing to remove this air is also cumbersome and time consuming which continuously drives recurring costs. Current systems for maintaining the system free of air are tailored and have demonstrated only moderate success. An obvious solution to these problems is the development and advancement of a passive gas removal device, or gas trap, that would be installed in the flight cooling system simplifying the initial coolant fill procedure and also maintaining the system during operations. The proposed device would utilize commercially available membranes thus increasing reliability and reducing cost while also addressing both current and anticipated applications. In addition, it maintains current pressure drop, water loss, and size restrictions while increasing tolerance for pressure increases due to gas build-up in the trap.

Ritchie, Stephen M. C.↗