Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

SU-F-T-23: Correspondence Factor Correction Coefficient for Commissioning of Leipzig and Valencia Applicators with the Standard Imaging IVB 1000

Purpose: To determine the correction factor of the correspondence factor for the Standard Imaging IVB 1000 well chamber for commissioning of Elekta’s Leipzig and Valencia skin applicators. Methods: The Leipzig and Valencia applicators are designed to treat small skin lesions by collimating irradiation to the treatment area. Published output factors are used to calculate dose rates for clinical treatments. To validate onsite applicators, a correspondence factor (CFrev) is measured and compared to published values. The published CFrev is based on well chamber model SI HDR 1000 Plus. The CFrev is determined by correlating raw values of the source calibration setup (Rcal,raw) and values taken when each applicator is mounted on the same well chamber with an adapter (Rapp,raw). The CFrev is calculated by using the equation CFrev =Rapp,raw/Rcal,raw. The CFrev was measured for each applicator in both the SI HDR 1000 Plus and the SI IVB 1000. A correction factor, CFIVB for the SI IVB 1000 was determined by finding the ratio of CFrev (SI IVB 1000) and CFrev (SI HDR 1000 Plus). Results: The average correction factors at dwell position 1121 were found to be 1.073, 1.039, 1.209, 1.091, and 1.058 for the Valencia V2, Valencia V3, Leipzig H1, Leipzig H2, and Leipzig H3 respectively. There were no significant variations in the correction factor for dwell positions 1119 through 1121. Conclusion: By using the appropriate correction factor, the correspondence factors for the Leipzig and Valencia surface applicators can be validated with the Standard Imaging IVB 1000. This allows users to correlate their measurements with the Standard Imaging IVB 1000 to the published data. The correction factor is included in the equation for the CFrev as follows: CFrev= Rapp,raw/(CFIVB*Rcal,raw). Each individual applicator has its own correction factor, so care must be taken that the appropriate factor is used.

60 APPLIED LIFE SCIENCES↗

TU-AB-BRC-04: Commissioning of a New MLC Model for the GEPTS Monte Carlo System: A Model Based On the Leaf and Interleaf Effective Density

Purpose: To commission a new MLC model for the GEPTS Monte Carlo system. The model is based on the concept of leaves and interleaves effective densities Methods: GEPTS is a Monte Carlo system to be used for external beam planning verification. GEPTS incorporates detailed photon and electron transport algorithms (Med.Phys. 29, 2002, 835). A new GEPTS model for the Varian Millennium MLC is presented. The model accounts for: 1) thick (1 cm) and thin (0.5 cm) leaves, 2) tongue-and-groove design, 3) High-Transmission (HT) and Low-Transmission (LT) interleaves, and 4) rounded leaf end. Leaf (and interleaf) height is set equal to 6 cm. Instead of modeling air gaps, screw holes, and complex leaf heads, “effective densities” are assigned to: 1) thin leaves, 2) thick leaves, 3) HT-, and 4) LT-interleaves. Results: The new MLC model is used to calculate dose profiles for Closed-MLC and Tongue-and-Groove fields at 5 cm depth for 6, 10 and 15 MV Varian beams. Calculations are compared with 1) Pin-point ionization chamber transmission ratios and 2) EBT3 Radiochromic films. Pinpoint readings were acquired beneath thick and thin leaves, and HT and LT interleaves. The best fit of measured dose profiles was obtained for the following parameters: Thick-leaf density = 16.1 g/cc, Thin-leaf density = 17.2 g/cc; HT Interleaf density = 12.4 g/cc, LT Interleaf density = 14.3 g/cc; Interleaf thickness = 1.1 mm. Attached figures show comparison of calculated and measured transmission ratios for the 3 energies. Note this is the only study where transmission profiles are compared with measurements for 3 different energies. Conclusion: The new MLC model reproduces transmission measurements within 0.1%. The next step is to implement the MLC model for real plans and quantify the improvement in dose calculation accuracy gained using this model for IMRT plans with high modulation factors.

60 APPLIED LIFE SCIENCES↗

WE-H-207B-01: Commissioning and QC

In recent years, steady progress has been made towards the implementation of MRI in external beam radiation therapy for processes ranging from treatment simulation to in-room guidance. Novel procedures relying mostly on MR data are currently implemented in the clinic. This session will cover topics such as (a) commissioning and quality control of the MR in-room imagers and simulators specific to RT, (b) treatment planning requirements, constraints and challenges when dealing with various MR data, (c) quantification of organ motion with an emphasis on treatment delivery guidance, and (d) MR-driven strategies for adaptive RT workflows. The content of the session was chosen to address both educational and practical key aspects of MR guidance. Learning Objectives: Good understanding of MR testing recommended for in-room MR imaging as well as image data validation for RT chain (e.g. image transfer, filtering for consistency, spatial accuracy, manipulation for task specific); Familiarity with MR-based planning procedures: motivation, core workflow requirements, current status, challenges; Overview of the current methods for the quantification of organ motion; Discussion on approaches for adaptive treatment planning and delivery. T. Stanescu - License agreement with Modus Medical Devices to develop a phantom for the quantification of MR image system-related distortions.; T. Stanescu, N/A.

60 APPLIED LIFE SCIENCES↗

Sci-Thur PM – Brachytherapy 04: Commissioning and Implementation of a Cobalt-60 High Dose Rate Brachytherapy Source

An Eckert & Ziegler Bebig Co0.A86 cobalt 60 high dose rate (HDR) brachytherapy source was commissioned for clinical use. Long-lived Co-60 HDR sources offer potential logistical and economic advantages over Ir-192 sources, and should be considered for low to medium workload brachytherapy departments where modest increases in treatment times are not a factor. In optimized plans, the Co-60 source provides a similar dose distribution to Ir-192 despite the difference in radiation energy. By switching to Co-60, source exchange frequency can be reduced by a factor of 20, resulting in overall financial savings of more than 50% compared to Ir-192 sources. In addition, a reduction in Physicist QA workload of roughly 200 hours over the 5 year life of the Co-60 source is also expected. These benefits should be considered against the modest increases in average treatment time compared to those of Ir-192 sources, as well as the centre-specific needs for operating room shielding modification.

60 APPLIED LIFE SCIENCES↗

Sci-Sat AM: Radiation Dosimetry and Practical Therapy Solutions - 11: Commissioning of a system for the measurement of electron stopping powers

Purpose: To develop the techniques required to experimentally determine electron stopping powers for application in primary standards and dosimetry protocols. Method and Materials: A large-volume HPGe detector system (>80% efficiency) was commissioned for the measurement of high energy (5–35 MeV) electron beams. As a proof of principle the system was used with a Y-90/Sr-90 radioactive source. Thin plates of absorbing material (< 0.1 gcm-2) were then placed between the source and detector and the emerging electron spectrum was acquired. The full experimental geometry was modelled using the EGSnrc package to validate the detector design, optimize the experimental setup and compare measured and calculated spectra. Results: The biggest challenge using a beta source was to identify a robust spectral parameter to determine for each measurement. An end-point-fitting routine was used to determine the maximum energy, Emax, of the beta spectrum for each absorber thickness t. The parameter dEmax/dt is related to the electron stopping power and the same routine was applied to both measured and simulated spectra. Although the standard uncertainty in dEmax/dt was of the order of 5 %, by taking the ratio of measured and Monte Carlo values for dEmax/dt the uncertainty of the fitting routine was eliminated and the uncertainty was reduced to less than 2 %. The agreement between measurement and simulation was within this uncertainty estimate. Conclusion: The investigation confirmed the experimental approach and demonstrated that EGSnrc could accurately determine correction factors that will be required for the final measurement setup in a linac beam.

61 RADIATION PROTECTION AND DOSIMETRY↗

Analysis on linac quadrupole misalignment in FACET commissioning 2012

In this note, the analysis on linac quadrupole misalignment is presented for the FACET linac section LI05-09 plus LI11-19. The effectiveness of the beam-based alignment technique is preliminarily confirmed by the measurement. Beam-based alignment technique was adopted at SLAC linac since SLC time. Here the beam-based alignment algorithms are further developed and applied in the FACET commissioning during 2012 run.

43 PARTICLE ACCELERATORS↗

Commissioning of the Fresno, California, Retrofit Unoccupied Test House

Commissioning of instrumentation and limited short-term testing have been completed on a retrofit unoccupied test house in Fresno, California. This house is intended to be used as a laboratory in which several different methods of space conditioning distribution will be evaluated. This report provides background on the project, including specifications of the house and models used in its development, along with models to be evaluated through its operation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Commissioning of the Fresno, California, Retrofit Unoccupied Test House

Commissioning of instrumentation and limited short-term testing have been completed on a retrofit unoccupied test house in Fresno, California. This house is intended to be used as a laboratory in which several different methods of space conditioning distribution will be evaluated. This report provides background on the project, including specifications of the house and models used in its development, along with models to be evaluated through its operation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Transitioning the California Energy Commission Eligible Equipment List to a National Platform

The Energy Commission called on the National Renewable Energy Laboratory's (NREL)'s Solar Technical Assistance Team to explore various pathways for supporting continued evolution of the list. NREL staff utilized the Database of State Incentives for Renewables and Efficiency (DSIRE), California Solar Initiative (CSI) data, and information from in-depth interviews to better understand the impact of a lack of an updated list and suggest potential solutions. A total of 18 people from state energy offices, rebate program administrators, utilities, national testing laboratories, private companies, nonprofit organizations, and the federal government were interviewed between July and September 2013. CSI data were analyzed to illustrate the monetary benefits of the algorithm behind calculating performance of PV modules included on the list. The primary objectives of this study are to: 1) Determine the impact of not maintaining the list, and 2) Explore alternatives to the State of California's maintenance of the list.

14 SOLAR ENERGY↗

Pumped Storage Hydropower FAST Commissioning Technical Analysis

This report is designed to address barriers and solutions to modern pumped storage hydropower (PSH) development by establishing baseline project development knowledge, defining key aspects of project development, and identifying opportunities to reduce project timelines, costs, and risks. This report’s scope includes post-licensing activities and excludes factors related to permitting or licensing. The U.S. PSH fleet is composed of 43 projects providing the majority (95%) of utility-scale electricity storage in the US. However, only one new PSH facility has become operational in the past 20 years. Several factors contribute to diminishing PSH growth in the US, including the magnitude of project costs and financing interest during development and construction; the length of time from project investment until project revenue; permitting challenges and construction risks; competition from other storage technologies; and unrecognized energy storage valuation. Although innovative PSH concepts (including underground, small, and modular systems) have been investigated, widespread application has yet to occur. In short, the time, cost, and risk associated with modern PSH development has resulted in limited recent growth in the United States, despite the rising energy storage demand from increased deployment of variable renewable technologies. To address these challenges, the US Department of Energy’s (DOE) Water Power Technologies Office initiated the PSH Furthering Advancements to Shorten Time to (FAST) Commissioning project, aimed at catalyzing new solutions, designs, and strategies to accelerate PSH development. This report uses available data from previous license applications, ongoing project cost data, and other global PSH project information based on a typical closed-loop PSH project.

13 HYDRO ENERGY↗

Enhancing Performance Contracts with Monitoring-Based Commissioning (MBCx)

To support federal and commercial building owners in understanding, procuring, and implementing monitoring-based commissioning (MBCx) software tools, this report provides an overview of their capabilities, the MBCx process, and how MBCx can be integrated into—and benefit—each phase of a performance contract. This report is intended to spur increased use of MBCx in performance contracts, whether an agency has previously installed or is considering adding MBCx at the time of their project. Additionally, case studies illustrate successful experiences using MBCx within performance contracts at a university campus and across a large number of buildings managed by the General Services Administration.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Furthering Advancements to Shorten the Time (FAST) to Commissioning for Pumped Storage Hydropower (PSH) Prize: Cooperative Research and Development (Final Report)

The National Renewable Energy Laboratory initiated a Prize with support from Argonne National Laboratory (ANL), Oak Ridge National Laboratory (ORNL), and Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO) to encourage ideas to reduce the time to commissioning for PSH projects. As a result, nine finalists have been chosen to develop their concepts in advance of the FAST Prize Pitch Contest to be held on October 7, 2019. The National Labs will provide technical and business advisement to the noted FAST Prize finalists in preparation for this Pitch Contest.

16 TIDAL AND WAVE POWER↗

RAMSES II: RAMan Search for Extragalactic Symbiotic Stars Project Concept, Commissioning, and Early Results from the Science Verification Phase

Symbiotic stars (SySts) are long-period interacting binaries composed of a hot compact star, an evolved giant star, and a tangled network of gas and dust nebulae. They represent unique laboratories for studying a variety of important astrophysical problems, and have also been proposed as possible progenitors of SNIa. Presently, we know of 257 SySts in the Milky Way and 69 in external galaxies. However, these numbers are still in striking contrast with the predicted population of SySts in our Galaxy. Because of other astrophysical sources that mimic SySt colors, no photometric diagnostic tool has so far demonstrated the power to unambiguously identify a SySt, thus making the recourse to costly spectroscopic follow-up still inescapable. In this paper we present the concept, commissioning, and science verification phases, as well as the first scientific results, of RAMSES II—a Gemini Observatory Instrument Upgrade Project that has provided each GMOS instrument at both Gemini telescopes with a set of narrow-band filters centered on the Raman O vi 6830 Å band. Continuum-subtracted images using these new filters clearly revealed known SySts with a range of Raman O vi line strengths, even in crowed fields. RAMSES II observations also produced the first detection of Raman O vi emission from the SySt LMC 1 and confirmed Hen 3-1768 as a new SySt—the first photometric confirmation of a SySt. Via Raman O vi narrow-band imaging, RAMSES II provides the astronomical community with the first purely photometric tool for hunting SySts in the local universe.

79 ASTRONOMY AND ASTROPHYSICS↗

Commissioning the James Webb Space Telescope Observatory

The James Webb Space Telescope (JWST) is going through final integration and testing and is planned to launch in 2021. The last remaining optical challenge for JWST is to fully align the observatory in flight to meet the optical requirements but this effort involves many system considerations to do this safely and efficiently and the entire effort will take several months. This talk will cover what it takes to deploy and optically commission the telescope including the many interactions and constraints of deployment, thermal, optical, attitude control and contamination properties of the observatory. The talk will cover the final optical requirements that the telescope will need to meet and will provide the roadmap of timelines, cooldown profiles, Wavefront Sensing and Control steps, system constraint considerations, and implementation of lessons learned from the ground test campaign that will result in meeting those optical requirements. The talk will also cover the organizational structure and processes in place to assure this process will be successful and efficient.

Commissioning JWST OBS↗

The James Webb Space Telescope: Its Commissioning and Technology

The James Webb Space Telescope (JWST) launched on December 25th, 2021. During the first 120 days of the mission the telescope and mirrors were deployed and the 18 primary segments and secondary mirror were aligned from millimeters to nanometers. This process led to an optical system that is limited only by the laws of physics. JWST is the first segmented, large cryogenic telescope that has been in flown in space and its deployment was an incredible first step in the advancement of large space telescopes. This talk will discuss the origin of several key technologies as well as the commissioning process from the perspective of the telescope including launch, deployments, alignments. It will culminate with a summary of how well the telescope is performing.

James Webb Space Telescope↗

Vibrational measurement for commissioning SRF Accelerator Test Facility at Fermilab

The commissioning of two cryomodule components is underway at Fermilab's Superconducting Radio Frequency (SRF) Accelerator Test Facility. The research at this facility supports the next generation high intensity linear accelerators such as the International Linear Collider (ILC), a new high intensity injector (Project X) and other future machines. These components, Cryomodule No.1 (CM1) and Capture Cavity II (CC2), which contain 1.3 GHz cavities are connected in series in the beamline and through cryogenic plumbing. Studies regarding characterization of ground motion, technical and cultural noise continue. Mechanical transfer functions between the foundation and critical beamline components have been measured and overall system displacement characterized. Baseline motion measurements given initial operation of cryogenic, vacuum systems and other utilities are considered.

43 PARTICLE ACCELERATORS↗

Commissioning and performance of the BNL EBIS LLRF system

The Electron Beam Ion Source (EBIS) LLRF system utilizes the RHIC LLRF upgrade platform to achieve the required functionality and flexibility. The LLRF system provides drive to the EBIS high-level RF system, employs I-Q feedback to provide required amplitude and phase stability, and implements a cavity resonance control scheme. The embedded system provides the interface to the existing Controls System, making remote system control and diagnostics possible. The flexibility of the system allows us to reuse VHDL codes, develop new functionalities, improve current designs, and implement new features with relative ease. In this paper, we will discuss the commissioning process, issues encountered, and performance of the system.

43 PARTICLE ACCELERATORS↗

PERFORMANCE OF THE DIAGNOSTICS FOR NSLS-II LINAC COMMISSIONING

The National Synchrotron Light Source II (NSLS-II) is a state of the art 3-GeV third generation light source currently under construction at Brookhaven National Laboratory. The NSLS-II injection system consists of a 200 MeV linac, a 3-GeV booster synchrotron and associated transfer lines. The transfer lines not only provide a means to deliver the beam from one machine to another, they also provide a suite of diagnostics and utilities to measure the properties of the beam to be delivered. In this paper we discuss the suite of diagnostics that will be used to commission the NSLS-II linac and measure the beam properties. The linac to booster transfer line can measure the linac emittance with a three screens measurement or a quadrupole scan. Energy and energy spread are measured in a dispersive section. Total charge and charge uniformity are measured with wall current monitors in the linac and transformers in the transfer line. We show that the performance of the diagnostics in the transfer line will be sufficient to ensure the linac meets its specifications and provides a means of trouble shooting and studying the linac in future operation.

200 MeV linac↗