Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Active Learning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 343 records · Page 19

Connecting Satellite-Based Precipitation Estimates to Users

Beginning in 1997, the Merged Precipitation Group at NASA Goddard has distributed gridded global precipitation products built by combining satellite and surface gauge data. This started with the Global Precipitation Climatology Project (GPCP), then the Tropical Rainfall Measuring Mission (TRMM) Multi-satellite Precipitation Analysis (TMPA), and recently the Integrated Multi-satellitE Retrievals for the Global Precipitation Measurement (GPM) mission (IMERG). This 20+-year (and on-going) activity has yielded an important set of insights and lessons learned for making state-of-the-art precipitation data accessible to the diverse communities of users. Merged-data products critically depend on the input sensors and the retrieval algorithms providing accurate, reliable estimates, but it is also important to provide ancillary information that helps users determine suitability for their application. We typically provide fields of estimated random error, and recently reintroduced the quality index concept at user request. Also at user request we have added a (diagnostic) field of estimated precipitation phase. Over time, increasingly more ancillary fields have been introduced for intermediate products that give expert users insight into the detailed performance of the combination algorithm, such as individual merged microwave and microwave-calibrated infrared estimates, the contributing microwave sensor types, and the relative influence of the infrared estimate.

Huffman, George J.↗

SERFE PLSS Component Lessons Learned from ISS

NASA has been developing a new spacesuit, called the Exploration Extravehicular Mobility Unit (xEMU) for over a decade. This spacesuit is under development to support missions to the International Space Station (ISS) and also to the Moon. Improvements in the life and robustness of the Portable Life Support System (PLSS) has been a major objective of these efforts. The Suit Water Membrane Evaporator (SWME) was chosen as the technology to provide cooling to the xEMU and has undergone several iterations of development over this period. An ISS flight experiment centered around the SWME and other thermal control loop (TCL) technologies was developed and tested in an ISS EXpedite PRocessing of Experiments to the Space Station (EXPRESS) rack from November of 2020 to August of 2022. In addition to the SWME, the SWME EXPRESS Rack Flight Experiment (SERFE) contains several technologies from the xEMU project and demonstrated their performance in micro-gravity and over an extended duration. These included two dissimilar water pumps, custom check valves, custom bypass relieve valves, a custom thermal control valve, development pressure and temperature sensors, and the thermal loop controller. This paper presents PLSS component lessons learned after return of the SERFE flight unit in August of 2022. The SERFE team took the flight unit apart and handed hardware components over to hardware owners to see how parts of the TCL managed after almost 2 years on the ISS and 25 simulated EVAs (Exploration Extravehicular Activity) on orbit. The team performed inspection, testing, and analysis and provided lessons learned on PLSS components for NASA’s prototype spacesuit. This analysis included how well SWME maintained its heat rejection capability, as well as looked at the robustness of the other TCL hardware.

SERFE↗

SERFE PLSS Component Lessons Learned from ISS

NASA has been developing a new spacesuit, called the Exploration Extravehicular Mobility Unit (xEMU) for over a decade. This spacesuit is under development to support missions to the International Space Station (ISS) and also to the Moon. Improvements in the life and robustness of the Portable Life Support System (PLSS) has been a major objective of these efforts. The Suit Water Membrane Evaporator (SWME) was chosen as the technology to provide cooling to the xEMU and has undergone several iterations of development over this period. An ISS flight experiment centered around the SWME and other thermal control loop (TCL) technologies was developed and tested in an ISS EXpedite PRocessing of Experiments to the Space Station (EXPRESS) rack from November of 2020 to August of 2022. In addition to the SWME, the SWME EXPRESS Rack Flight Experiment (SERFE) contains several technologies from the xEMU project and demonstrated their performance in micro-gravity and over an extended duration. These included two dissimilar water pumps, custom check valves, custom bypass relieve valves, a custom thermal control valve, development pressure and temperature sensors, and the thermal loop controller. This paper presents PLSS component lessons learned after return of the SERFE flight unit in August of 2022. The SERFE team took the flight unit apart and handed hardware components over to hardware owners to see how parts of the TCL managed after almost 2 years on the ISS and 25 simulated EVAs (Exploration Extravehicular Activity) on orbit. The team performed inspection, testing, and analysis and provided lessons learned on PLSS components for NASA’s prototype spacesuit. This analysis included how well SWME maintained its heat rejection capability, as well as looked at the robustness of the other TCL hardware.

SERFE↗

Development of an Inertial Sensor-based Methodology for Spacesuited Geology Task Assessments during Simulated Lunar Extravehicular Activities

Lunar surface exploration during Artemis missions will require the specific skill set of geology sampling. Apollo astronauts had extensive training and used specialized tools to collect lunar rocks, core samples, pebbles, sand, and dust. The inflexibility of the pressurized Apollo spacesuits forced sampling to be taken at a standstill posture. However, new exploration spacesuits are expected to incorporate advanced materials and joint bearings, allowing for greater mobility and a wider range of functional postures. Thus, science and exploration during Artemis missions will likely involve a variety of standing, squatting, and kneeling postures. In preparation for future lunar exploration missions, NASA provides geologic training to astronauts and other mission personnel. This professional training with a spacesuit in simulated lunar environments will enhance performance and reduce risk of injury to astronauts on the lunar surface. However, anecdotally, untrained or newly trained people wearing prototype planetary spacesuits have been observed to performing motions differently than a trained geologist would when conducting the same geology sampling tasks. Therefore, a tool for evaluating geology postures at extravehicular activity (EVA) training facilities becomes required. In this paper, we introduce a novel inertial measurement unit (IMU)-based method of geology task assessments in spacesuited conditions during simulated lunar EVAs. As a case study, two subjects (one geologist and one non-geologist) participated and donned the Mark III prototype planetary spacesuit during offloading with the spreader bar gimbal in NASA’s Active Response Gravity Offload System (ARGOS). For automated geology task assessments, the spacesuit was instrumented with three wireless IMUs (APDM Opal, OR, USA): one on the chest and one each on the left and right ankle bearings. Then subjects performed geology tasks using various tools (rake, trench, hammer chisel, scoop, and drive tube) for 45 minutes each. The chest IMU measured the torso tilt angle in the sagittal plane. We used an ensemble learning method with the ankle IMUs to discriminate between standing and kneeling activities. IMU data were processed using custom MATLAB (Mathworks, MA, USA) software. In our case study, the developed method was able to discriminate differences in standing and kneeling activity levels between subjects who were all highly experienced with spacesuited testing. Our preliminary data showed one subject maintained the constant and lower range of the upper body tilt angle while both standing and kneeling, while the other subject showed more variation of the upper body tilt angle and preferred bending the upper body rather than changing from standing to kneeling posture and vice versa. While geology experience may be a factor, these results need further investigation as suit sizing and ARGOS offloading configurations have been proven to have a significant influence on suited ARGOS tasks. Also, more subjects will be needed to complete these tasks for validation. IMU-based geology task assessments can provide useful information for geology training programs. Additionally, our IMU-based posture analysis can provide new insights into how to evaluate spacesuited geology task characteristics of astronauts during simulated lunar EVAs.

Kyoung Jae Kim↗

Machine Learning for Extravehicular Mobility Unit (EMU) Glove Inspections

The Extravehicular Mobility Unit (EMU) Glove Machine Learning Inspection project utilizes machine learning to expedite the inspection, analysis, and recommendation for continued use of space suit gloves post spacewalks. Today, ISS glove photos are individually reviewed by a team of experts to determine the conditions of space suit gloves. For this project the Microsoft Azure platform is used to perform Automated Machine Learning (AutoML) to detect issues with tagged images from previous Extravehicular Activities (EVA’s) to build a predictive model. The model analyzes a test image and deems the glove GO or NO-GO for additional EVA’s. The goal for this ML project is to decrease the time spent reviewing images by ground personnel and crewmembers in high frequency EVA locations such as the Moon and Mars. For destinations such as the Moon and Mars the goal is to give crew autonomy in determining glove conditions with limited support from Earth. This paper will outline the results to date and future work needed to expand the capability for in-situ recommendations.

EVA↗

Simulation Training Versus Real Time Console Training for New Flight Controllers

For new flight controllers, the two main learning tools are simulations and real time console performance training. These benefit the new flight controllers in different ways and could possibly be improved. Simulations: a) Allow for mistakes without serious consequences. b) Lets new flight controllers learn the working style of other new flight controllers. c) Lets new flight controllers eventually begin to feel like they have mastered the sim world, so therefore they must be competent in the real time world too. Real time: a) Shows new flight controllers some of the unique problems that develop and have to be accounted for when dealing with certain payloads or systems. b) Lets new flight controllers experience handovers - gathering information from the previous shift on what the room needs to be aware of and what still needs to be done. c) Gives new flight controllers confidence that they can succeed in the position they are training for when they can solve real anomalies. How Sims could be improved and more like real-time ops for the ISS Operations Controller position: a) Operations Change Requests to review. b) Fewer anomalies (but still more than real time for practice). c) Payload Planning Manager Handover sheet for the E-1 and E-3 reviews. d) Flight note in system with at least one comment to verify for the E-1 and E-3 reviews How the real time console performance training could be improved for the ISS Operations Controller position: a) Schedule the new flight controller to be on console for four days but with a different certified person each day. This will force them to be the source of knowledge about every OCR in progress, everything that has happened in those few days, and every activity on the timeline. Constellation program flight controllers will have to learn entirely from simulations, thereby losing some of the elements that they will need to have experience with for real time ops. It may help them to practice real time console performance training in the International Space Station or Space Shuttle to gather some general anomaly resolution and day-to-day task management skills.

Heaton, Amanda↗

A Machine Learning Approach to Objective Identification of Dust in Satellite Imagery

Airborne dust has broad adverse effects on human activity, including aviation, human health, and agriculture. Remote sensing observations are used to detect dust and aerosols in the atmosphere using long established techniques. False color Red-Green-Blue (RGB) imagery using band differences sensitive to dust absorption (Dust RGB) is currently used operationally to assist forecasters and decision-makers in identifying dust at night, but there are still limitations, subjectivity, and nuances to image interpretation making night-time dust identification difficult even for experts. This study applies machine learning to the problem of night-time dust detection with a simple random forest (RF) model using Geostationary Operational Environmental Satellite-16 (GOES-16) Advanced Baseline Imager (ABI) infrared imagery, band differences sensitive to dust absorption, and Dust RGB color components as inputs to the model. The RF model achieves an Area-Under-Curve (AUC) of 0.97 with a standard deviation of 0.04 for dust cases. For images with dust present, the model correctly labels 85% of dust pixels and 99.96% of no-dust pixels for all dust images in the validation data set. The addition of a single null case to the training data set drastically reduces error in labeling no-dust pixels as dust from 45% to 14.5%. Application of the machine learning model to the April 13–14, 2019 dust event demonstrates the ability of the model to identify dust during night-time hours when visual dust detection is limited by the cooling ground surface characteristics.

dust↗

Lessons Learned from the Space Shuttle Engine Cutoff System (ECO) Anomalies

The Space Shuttle Orbiter's main engine cutoff (ECO) system first failed ground checkout in April, 2005 during a first tanking test prior to Return-to-Flight. Despite significant troubleshooting and investigative efforts that followed, the root cause could not be found and intermittent anomalies continued to plague the Program. By implementing hardware upgrades, enhancing monitoring capability, and relaxing the launch rules, the Shuttle fleet was allowed to continue flying in spite of these unexplained failures. Root cause was finally determined following the launch attempts of STS-122 in December, 2007 when the anomalies repeated, which allowed drag-on instrumentation to pinpoint the fault (the ET feedthrough connector). The suspect hardware was removed and provided additional evidence towards root cause determination. Corrective action was implemented and the system has performed successfully since then. This white paper presents the lessons learned from the entire experience, beginning with the anomalies since Return-to-Flight through discovery and correction of the problem. To put these lessons in better perspective for the reader, an overview of the ECO system is presented first. Next, a chronological account of the failures and associated investigation activities is discussed. Root cause and corrective action are summarized, followed by the lessons learned.

Martinez, Hugo E.↗

Atmospheric detectives: Atlas 2 teacher's guide with activities. For use with middle-school students

Can you imagine doing a science project in space? This is the challenging and exciting situation that researchers experience in Spacelab, the laboratory carried inside the Shuttle. Here, hundreds of kilometers above Earth's surface, the crews of the ATLAS missions scan, probe, and measure concentrations of chemicals and water vapor in Earth's protective bubble. So far, one ATLAS crew has rocketed into the atmosphere, watching many sunrises and sunsets come and go while activating delicate instruments and conducting experiments that monitor the complicated interactions between the Sun, the atmosphere, and Earth. We, the crew of ATLAS 2, will continue this important work aboard the Space Shuttle. Together, we will gather data that will be compared with information from satellites, balloons, and instruments on the ground. As part of the National Aeronautics and Space Administration's (NASA's) contribution to Mission to Planet Earth, ATLAS 2 will help develop a thorough picture of the Sun's output, its interaction with the atmosphere, and the well-being of Earth's middle atmosphere. Because the health of the atmosphere is of vital importance to all Earth's inhabitants, everyone should be part of this investigation. You can be active participants in exciting and vital activities: recycling and practicing other conservation methods and gathering information to learn more about how you can keep our atmosphere healthy now, as students, and in the future as informed citizens, scientists, technicians, and mathematicians.

Source record↗

International Space Station Multi-Element Integrated Test

The International Space Station offers a unique challenge for integrated testing since the entire station is not launched as an integrated vehicle. The ISS design evolved for over 10 years from the station Freedom program that was based on a "ship and shoot" approach. Ship and shoot assumed the program would accept the hardware for launch and integrate the vehicle on orbit without any ground element-to-element integrated testing. Element-to-Element powered-on integrated testing is needed to identify operational problems on the ground rather than once the hardware is on orbit. The industry is accustomed to testing an integrated vehicle and then verifying it is ready for its operational missions. These tests require ground element emulators to represent on-orbit elements. The ISS Multi-Element Integrated Tests (MEIT) are element-to-element integrated tests bringing together hardware representing several flights. The major purpose of these tests is: 1) Element-to-Element interface compatibility, 2) Systems end-to-end operability and functionality and 3) utilize on-orbit procedures with the crew and mission control center. Execution of these tests is critical since the hardware is available for only a limited period of time. Test configurations are defined which test specific interfaces or functionality. These tests develop operational confidence in the Element-to-Element interfaces and identify major problems on the ground to avoid on-orbit anomalies that could threaten mission success, element survivability or assembly activities. This paper addresses the MEIT process, configurations and lessons-learned from these tests.

Filler, Russell E.↗

Exploring the Extreme Universe! (2nd Edition)

A large array of web sites devoted to the science that the NASA Goddard Space Flight Center Laboratory for High Energy Astrophysics (LHEA) studies have been frozen in time and included on this CD. Featured are five of our 'Understanding the Extreme Universe' sites, which offer explanations about cosmic ray, gamma ray, and X-ray science and satellites, as well as cosmic distances. They also include images and engaging activities that are great for helping both children and adults to learn more about science and basic physical principles. The 'Missions That Take Us There' section contains web sites on the satellite, balloon-borne, International Space Station, and rocket missions in our Laboratory that study X-rays, gamma rays, and cosmic rays. There are also two multi-mission sites and an experiment that measures Earth's UV light in preparation for a future cosmic ray mission. Most of the sites on this CD contain high-resolution images that are great for scientific presentations, study, or just your own enjoyment. This CD shows our web sites as they existed in April of 2001. We have made sure to include the WWW address for every site, so you will know where to go to access the most current versions of them.

White, Nicholas E.↗

NASA Vision

The political, economic, and enivronmental conditions of the twenty-first century demand new goals for NASA. These goals include the imaging of habitable extrasolar planets, expanded commercialization of low earth orbit, clean and rapid air transportation, environment protection, and distance learning. The presentation recommends strategies for pursuing these goals, and summarizes activities at NASA Langley Research Center (LaRC).

Prior, Edwin J.↗

The Seasonal Cycle of Satellite Chlorophyll Fluorescence Observations and its Relationship to Vegetation Phenology and Ecosystem Atmosphere Carbon Exchange

Mapping of terrestrial chlorophyll uorescence from space has shown potentialfor providing global measurements related to gross primary productivity(GPP). In particular, space-based fluorescence may provide information onthe length of the carbon uptake period that can be of use for global carboncycle modeling. Here, we examine the seasonal cycle of photosynthesis asestimated from satellite fluorescence retrievals at wavelengths surroundingthe 740nm emission feature. These retrievals are from the Global OzoneMonitoring Experiment 2 (GOME-2) flying on the MetOp A satellite. Wecompare the fluorescence seasonal cycle with that of GPP as estimated froma diverse set of North American tower gas exchange measurements. Because the GOME-2 has a large ground footprint (40 x 80km2) as compared with that of the flux towers and requires averaging to reduce random errors, we additionally compare with seasonal cycles of upscaled GPP in the satellite averaging area surrounding the tower locations estimated from the Max Planck Institute for Biogeochemistry (MPI-BGC) machine learning algorithm. We also examine the seasonality of absorbed photosynthetically-active radiation(APAR) derived with reflectances from the MODerate-resolution Imaging Spectroradiometer (MODIS). Finally, we examine seasonal cycles of GPP as produced from an ensemble of vegetation models. Several of the data-driven models rely on satellite reflectance-based vegetation parameters to derive estimates of APAR that are used to compute GPP. For forested sites(particularly deciduous broadleaf and mixed forests), the GOME-2 fluorescence captures the spring onset and autumn shutoff of photosynthesis as delineated by the tower-based GPP estimates. In contrast, the reflectance-based indicators and many of the models tend to overestimate the length of the photosynthetically-active period for these and other biomes as has been noted previously in the literature. Satellite fluorescence measurements therefore show potential for improving model GPP estimates.

Joiner, J.↗

Spacecraft Line-of-Sight Jitter Management and Mitigation Lessons Learned and Engineering Best Practices

Predicting, managing, controlling, and testing spacecraft line-of-sight (LoS) jitter caused by micro-vibrations due to on-board internal disturbance sources is a formidable multidisciplinary engineering task. It is especially challenging for those missions hosting high-performance (e.g., nano-radian/milli-arcsecond class), vibration-sensitive optical sensor payloads with stringent pointing stability requirements. The Nation Aeronautics and Space Administration (NASA) and the European Space Agency (ESA) are planning technically aggressive spaceflight missions that include ultra-high-performance optical payloads with delicate, highly vibration-sensitive scientific and observational instruments. The guidance, navigation, and control community of practice will need to leverage collective experiences and document their best practices and lessons learned to address future micro-vibration challenges. To identify lessons learned and best practices the NASA Engineering & Safety Center sponsored a 2-day Spacecraft LoS Jitter Workshop in late 2019. The workshop’s goal was to provide a multidisciplinary forum to elicit deeper understanding of the issues related to addressing the spacecraft LoS jitter/micro-vibration problem. The primary objective was to identify, document, and share lessons learned, best practices, and preferred options for jitter-related analysis and test activities. Representatives from NASA, ESA, along with NASA’s industrial partners, independent consultant subject matter experts, and members of academia participated in the workshop. This paper describes the motivation for the workshop and summarize the identified findings and recommendations.

Lessons Learned↗

A Newly Developing Community-Oriented Data System from NASA GES DISC

Data services are essential to facilitate data access and to aid efficiency of conducting research and application activities. With emerging technologies such as cloud computing and AI/ML (Artificial Intelligence/Machine Learning) leading the pace of the data world, the NASA Goddard Earth Sciences Data and Information Services Center (GES DISC), home to the permanent archive for multidisciplinary Earth Observation (EO) geospatial data to study atmospheric composition, weather and climate variability, and water and energy cycles is no exception.Interfacing directly with users as part of data center work, we understand the challenges for the required time and effort to discover, visualize, and analyze large varieties and quantities of Earth Observation information for research, monitoring, and decision-making, largely due to the existing data and information systems aim to support experienced users, but has been proved difficult for non-earth scientists and new users that are unfamiliar with the variety of formats and structures in which data, metadata, and information are stored, as well as the required methods to use them. To address these challenges, I will update our latest activities with regard to water-and energy-related products and community-oriented and user-friendly services at the GES DISC, including our plans for the emerging technologies.

Jennifer Wei↗

Integration and Testing Challenges of Small, Multiple Satellite Missions: Experiences from the Space Technology 5 Project

The ST5 technology demonstration mission led by GSFC of NASA's New Millennium Program managed by JPL consisted of three micro satellites (approximately 30 kg each) deployed into orbit from the Pegasus XL launch vehicle. In order to meet the launch date schedule of ST5, a different approach was required rather than the standard I&T approach used for single, room-sized satellites. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center. It was determined that there was insufficient time in the schedule to perform three spacecraft I&T activities in series using standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus had the experience and knowledge to safely execute I&T for spacecraft #2 and #3. The integration team was extremely versatile; each member could perform many different activities or work any spacecraft, when needed. ST5 was successfully integrated, tested and shipped to the launch site per the I&T schedule that was planned three years previously. The I&T campaign was completed with ST5's successful launch on March 22, 2006.

Sauerwein, Timothy A.↗

Summer of Seasons Workshop Program for Emerging Educators in Earth System Science

Norfolk State University BEST Lab successfully hosted three Summer of Seasons programs from 1998-2001. The Summer of Seasons program combined activities during the summer with additional seminars and workshops to provide broad outreach in the number of students and teachers who participated. Lessons learned from the each of the first two years of this project were incorporated into the design of the final year's activities. The "Summer of Seasons" workshop program provided emerging educators with the familiarity and knowledge to utilize in the classroom curriculum materials developed through NASA sponsorship on Earth System Science. A special emphasis was placed on the use of advanced technologies to dispel the commonly held misconceptions regarding seasonal, climactic and global change phenomena.

Chaudhury, S. Raj↗

Integration and Testing Challenges of Small Satellite Missions: Experiences from the Space Technology 5 Project

The Space Technology 5(ST5) payload was successfully carried into orbit on an OSC Pegasus XL launch vehicle, which was carried aloft and dropped from the OSC Lockheed L-1011 from Vandenberg Air Force Base March 22,2006, at 9:03 am Eastern time, 6:03 am Pacific time. In order to reach the completion of the development and successful launch of ST 5, the systems integration and test(I&T) team determined that a different approach was required to meet the project requirements rather than the standard I&T approach used for single, room-sized satellites. The ST5 payload, part of NASA's New Millennium Program headquartered at JPL, consisted of three micro satellites (approximately 30 kg each) and the Pegasus Support Structure (PSS), the system that connected the spacecrafts to the launch vehicle and deployed the spacecrafts into orbit from the Pegasus XL launch vehicle. ST5 was a technology demonstration payload, intended to test six (6) new technologies for potential use for future space flights along with demonstrating the ability of small satellites to perform quality science. The main technology was a science grade magnetometer designed to take measurements of the earth's magnetic field. The three spacecraft were designed, integrated, and tested at NASA Goddard Space Flight Center with integration and environmental testing occurring in the Bldg. 7-1 0-15-29. The three spacecraft were integrated and tested by the same I&T team. The I&T Manager determined that there was insufficient time in the schedule to perform the three I&T spacecraft activities in series used standard approaches. The solution was for spacecraft #1 to undergo integration and test first, followed by spacecraft #2 and #3 simultaneously. This simultaneous integration was successful for several reasons. Each spacecraft had a Lead Test Conductor who planned and coordinated their spacecraft through its integration and test activities. One team of engineers and technicians executed the integration of all three spacecraft, learning and gaining knowledge and efficiency as spacecraft #1 integration and testing progressed. They became acutely familiar with the hardware, operation and processes for I&T, thus each team member had the experience and knowledge to safely execute I&T for spacecraft #2 and #3 together. The integration team was very versatile and each member could perform many different activities or work any spacecraft, when needed. Daily meetings between the three Lead TCs and technician team allowed the team to plan and implement activities efficiently. The three (3) spacecraft and PSS were successfully integrated and tested, shipped to the launch site, and ready for launch per the I&T schedule that was planned three years previously.

Sauerwein, Timothy A.↗