Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “testing facility”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Embracing Safe Ground Test Facility Operations and Maintenance

Conducting integrated operations and maintenance in wind tunnel ground test facilities requires a balance of meeting due dates, efficient operation, responsiveness to the test customer, data quality, effective maintenance (relating to readiness and reliability), and personnel and facility safety. Safety is non-negotiable, so the balance must be an "and" with other requirements and needs. Pressure to deliver services faster at increasing levels of quality in under-maintained facilities is typical. A challenge for management is to balance the "need for speed" with safety and quality. It s especially important to communicate this balance across the organization - workers, with a desire to perform, can be tempted to cut corners on defined processes to increase speed. Having a lean staff can extend the time required for pre-test preparations, so providing a safe work environment for facility personnel and providing good stewardship for expensive National capabilities can be put at risk by one well-intending person using at-risk behavior. This paper documents a specific, though typical, operational environment and cites management and worker safety initiatives and tools used to provide a safe work environment. Results are presented and clearly show that the work environment is a relatively safe one, though still not good enough to keep from preventing injury. So, the journey to a zero injury work environment - both in measured reality and in the minds of each employee - continues. The intent of this paper is to provide a benchmark for others with operational environments and stimulate additional sharing and discussion on having and keeping a safe work environment.

Dunn, Steven C.↗

Cryogenic Optical Systems and Instrumentation IX (AM 116) Newly Modified Cryogenic Optical Test Facility at the Marshall Space Flight Center

Marshall Space Flight Center (MSFC) has maintained and operated a world-class x-ray optics and detector testing facility known as the X-ray Calibration Facility (XRCF) since the mid 1970's. The ground test and calibration of the Chandra X-ray Observatory optics and detectors were successfully completed at the XRCF in 1997. The beginning of the Next Generation Space Telescope (NGST) development programs (NMSD, SBMD, AMSD, etc.) and the establishment of the Space Optics Manufacturing Technology Center at MSFC have led to an XRCF modification. In 1999 the facility was upgraded to perform cryogenic testing of lightweight visible optics (without compromising the existing x-ray testing capability). A thermal enclosure capable of 20 degrees Kelvin and vibration isolated instrumentation mount were added. A vacuum-compatible five-axis motion table was modified to operate under cryogenic conditions. Optics up to two meters in diameter with radii of curvature of up to twenty meters can be accommodated. Facility characterization tests and one NGST program mirror test have been completed to date. By July 2000, two other mirrors will be tested. Optical wavefront measurements were made at < 35 degrees Kelvin with several instruments located at the test mirror's radius of curvature. The current wavefront measuring instruments include a Shack-Hartman wavefront sensor, a point diffraction interferometer, a point spread function-measuring device, and a radius of curvature measuring instrument. A vibration insensitive phase shifting interferometer is planned for future optical testing. This paper will present a brief history of the facility, a discussion of its current x-ray optic testing capabilities, and a complete description of the new capabilities in the visible optical testing regime.

Eng, Ronnie↗

Integrated Component-based Data Acquisition Systems for Aerospace Test Facilities

The Multi-Instrument Integrated Data Acquisition System (MIIDAS), developed by the NASA Langley Research Center, uses commercial off the shelf (COTS) products, integrated with custom software, to provide a broad range of capabilities at a low cost throughout the system s entire life cycle. MIIDAS combines data acquisition capabilities with online and post-test data reduction computations. COTS products lower purchase and maintenance costs by reducing the level of effort required to meet system requirements. Object-oriented methods are used to enhance modularity, encourage reusability, and to promote adaptability, reducing software development costs. Using only COTS products and custom software supported on multiple platforms reduces the cost of porting the system to other platforms. The post-test data reduction capabilities of MIIDAS have been installed at four aerospace testing facilities at NASA Langley Research Center. The systems installed at these facilities provide a common user interface, reducing the training time required for personnel that work across multiple facilities. The techniques employed by MIIDAS enable NASA to build a system with a lower initial purchase price and reduced sustaining maintenance costs. With MIIDAS, NASA has built a highly flexible next generation data acquisition and reduction system for aerospace test facilities that meets customer expectations.

Ross, Richard W.↗

Measurement and modeling of beam transport in the FODO line of the Spallation Neutron Source Beam Test Facility

Ongoing studies at the Spallation Neutron Source (SNS) Beam Test Facility (BTF) seek to understand and model bunch dynamics in a high-power LINAC front-end. The BTF has recently been upgraded with a reconfiguration from a U-shaped line to a Straight line. We report the current state of model benchmarking, with a focus on RMS beam sizes within the FODO line. The beam measurement is obtained via three camera/screen pairs in the FODO line. This presentation discusses the methodology and results of this measurement.

Thompson, Trent↗

Thermostructural test facilities for reentry vehicle nose tip materials

To provide a cost effective means of assessing the thermostructural performance of nosetip materials, the Air Force has developed and utilized two types of thermostructural facilities: ground simulation facilities and laboratory facilities. The capabilities of the currently available test facilities are summarized and compared.

Budde, C. L.↗

Investigation of hypersonic ramjet propulsion cycles using a ram accelerator test facility

Experimental research on hypersonic propulsion using a ram accelerator test facility is presented. The gasdynamics of the ram accelerator has been studied experimentally in a 38-mm bore facility over the Mach number range of 2.5 to 8.5, using methane- and ethylene-based propellant mixtures. Three different propulsive modes, centered on the Chapman-Jouguet (C-J) detonation speed of the combustible gas, have been experimentally observed. Projectiles have been accelerated smoothly from velocities below to above the C-J speed within a single propellant mixture.

Bruckner, A. P.↗

Modeling of the High Temperature Test Facility PG-26 Transient Using RELAP-7

The High Temperature Test Facility (HTTF) is an electrically heated, helium cooled, experimental facility located at Oregon State University (OSU). Modeling of the HTTF PG-26 transient using a multi-app approach utilizing MOOSE and RELAP-7 was conducted. A 3-D model of the HTTF core, reflector, core barrel, and RPV was generated, and 3-D heat conduction throughout the structure was coupled to 1-D fluid flow results from RELAP-7. The model was able to accurately predict peak ceramic core temperatures experienced during the transient which helps validate the capability of RELAP-7 to model advanced gas-cooled nuclear reactors.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

2022 Annual Site Environmental Report for Sandia National Laboratories, Kaua'i Test Facility, Hawai'i

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the. U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at the Sandia National Laboratories Kaua'i Test Facility in Hawai'i. Activities at the site are conducted in support of U.S. Department of Energy weapons programs., and the site has operated as a rocket preparation launching and tracking facility since 1962. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection, restoration, and monitoring programs in place at Sandia National Laboratories, Kaua'i Test Facility, during calendar year 2022. Environmental topics include cultural resource management, chemical management, air quality, meteorology, ecology, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, wastewater discharge, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety and Health Reporting and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

2023 Annual Site Environmental Report for Sandia National Laboratories, Kaua‘i Test Facility, Hawai‘i

Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration. The National Nuclear Security Administration’s Sandia Field Office administers the contract and oversees contractor operations at the Sandia National Laboratories Kaua‘i Test Facility in Hawai‘i. Activities at the site are conducted in support of U.S. Department of Energy weapons programs, and the site has operated as a rocket preparation launching and tracking facility since 1962. The U.S. Department of Energy and its management and operating contractor are committed to safeguarding the environment, assessing sustainability practices, and ensuring the validity and accuracy of the monitoring data presented in this annual site environmental report. This report summarizes the environmental protection, restoration, and monitoring programs in place at Sandia National Laboratories, Kaua‘i Test Facility, during calendar year 2023. Environmental topics include cultural resource management, chemical management, air quality, meteorology, ecology, oil storage, site sustainability, terrestrial surveillance, waste management, water quality, wastewater discharge, and implementation of the National Environmental Policy Act. This report is prepared in accordance with and as required by DOE O 231.1B, Admin Change 1, Environment, Safety and Health Reporting, and has been approved for public distribution.

54 ENVIRONMENTAL SCIENCES↗

HIFiRE Direct-Connect Rig (HDCR) Phase I Scramjet Test Results from the NASA Langley Arc-Heated Scramjet Test Facility

A series of hydrocarbon-fueled direct-connect scramjet ground tests has been completed in the NASA Langley Arc-Heated Scramjet Test Facility (AHSTF) at simulated Mach 8 flight conditions. These experiments were part of an initial test phase to support Flight 2 of the Hypersonic International Flight Research Experimentation (HIFiRE) Program. In this flight experiment, a hydrocarbon-fueled scramjet is intended to demonstrate transition from dual-mode to scramjet-mode operation and verify the scramjet performance prediction and design tools A performance goal is the achievement of a combusted fuel equivalence ratio greater than 0.7 while in scramjet mode. The ground test rig, designated the HIFiRE Direct Connect Rig (HDCR), is a full-scale, heat sink test article that duplicates both the flowpath lines and a majority of the instrumentation layout of the isolator and combustor portion of the flight test hardware. The primary objectives of the HDCR Phase I tests were to verify the operability of the HIFiRE isolator/combustor across the simulated Mach 6-8 flight regime and to establish a fuel distribution schedule to ensure a successful mode transition. Both of these objectives were achieved prior to the HiFIRE Flight 2 payload Critical Design Review. Mach 8 ground test results are presented in this report, including flowpath surface pressure distributions that demonstrate the operation of the flowpath in scramjet-mode over a small range of test conditions around the nominal Mach 8 simulation, as well as over a range of fuel equivalence ratios. Flowpath analysis using ground test data is presented elsewhere; however, limited comparisons with analytical predictions suggest that both scramjet-mode operation and the combustion performance objective are achieved at Mach 8 conditions.

Cabell, Karen↗

Lunar Development & Test Facility, JSC B351

In anticipation of extended operations on the lunar sur-face, JSC Building B351 has been prepared to meet test needs to mature technologies that extract resources from lunar regolith, handle lunar regolith or must perform in a dusty lunar environment. Domains such as In-Situ Re-source Utilization (ISRU), dust mitigation, power generation and distribution, robotics and surface tools will all require testing with lunar regolith/simulants to demonstrate flight readiness. The Lunar Development and Test Facility (LDTF) houses environmental test capabilities, including lunar simulants, geared toward advancing Technical Readiness Level (TRL) of these lunar surface technologies. Seen as an agency need to enable and demonstrate new technologies, a portion of the facility capability was developed under the “Dirty Lunar Surface Simulation “project in FY2020, funded by the NASA Game Changing Development program. Some current uses include testing of an oxygen extraction from lunar regolith test, a spacesuit cleaning tool evaluation, and a study to measure dust effects on space radiators (thermal management).

Michael Reddington↗

A unique integrated flight testing facility for advanced control/display research

NASA is engaged in programs aimed at developing avionic concepts and systems technology for air transportation systems of the 1980's and beyond. A part of these programs is related to the development of advanced concepts and avionics technology for integrated displays and controls. In support of these efforts an interactive Flight Display Research System (FDRS) has been developed as an integral part of integrated flight test facilities which have been used in evaluation studies of integrated display and control concepts in support of a VTOL Approach and Landing Technology (VALT) program and current Terminal Configured Vehicle (TCV) program. A description is provided of several of the advanced integrated display and control concepts that have evolved within the VALT, TCV, and general aviation programs, as well as the integrated flight test facilities.

Batson, V. M.↗

Beam Commissioning and Integrated Test of the PIP-II Injector Test Facility

The PIP-II Injector Test (PIP2IT) facility is a near-complete low energy portion of the Superconducting PIP-II linac driver. PIP2IT comprises the warm front end and the first two PIP-II superconducting cryomodules. PIP2IT is designed to accelerate a 2 mA H⁻ beam to an energy of 20 MeV. The facility serves as a testbed for a number of advanced technologies required to operate PIP-II and provides an opportunity to gain experience with commissioning of the superconducting linac, significantly reducing project technical risks. Some PIP2IT components are contributions from international partners, who also lend their expertise to the accelerator project. The project has been successfully commissioned with the beam in 2021, demonstrating the performance required for the LBNF/DUNE. In this paper, we describe the facility and its critical systems. We discuss our experience with the integrated testing and beam commissioning of PIP2IT, and present commissioning results. This important milestone ushers in a new era at Fermilab of proton beam delivery using superconducting radio-frequency accelerators.

43 PARTICLE ACCELERATORS↗