Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

High-Volume Airborne Fluids Handling Technologies to Fight Wildfires

NASA recently partnered with the U.S. Forest Service (USFS) on a project to examine mission suitability and recommend policies and procedures for the use of very large aerial firefighting aircraft such as the Boeing 747 and DC-10 aerial retardant delivery aircraft. The aircraft under study included a 10Tanker DC-10 and an Evergreen B-747. NASA's Dryden Flight Research Center and Ames Research Center worked with the USFS to help determine the safe flight envelope for these Very Large Air Tanker (VLAT) aircraft for the USFS and the Department of the Interior (DOI). This new generation of supertankers includes aircraft like these that have as much as four times the delivery capacity of the previous generation of aerial firefighting aircraft. Dryden performed operational test and evaluation assessments and reported findings and recommendations on these aircraft in cooperation with Ames. The team developed, implemented, and directed an evaluation test plan for use in flight test and in simulation. Ames provided support using pilot-in-the-loop simulations and coordinated simulator models, flight profiles, and data analysis with Dryden. The test plan was designed to evaluate the suitability of VLAT aircraft as a function of mission environment. Based on this analysis, NASA generated interim flight envelope limitations to enhance safety and operational utility in the fire-retardant delivery mission. These recommended flight limitations were adopted by the USFS. The 10Tanker DC-10 has been in use for several years with the California Department of Forestry and Fire Protection(Cal-Fire), but until NASA took on the challenge of reviewing VLAT capabilities and limitations, the USFS was hesitant to add them to the federal wildfire arsenal. The DC-10 delivery system is based on an externally mounted set of tanks and a bomb-bay style set of clamshell doors that are opened in precisely calibrated ways to deliver the amounts and concentrations of retardant called for by the specific wildfire situation. The system was manufactured by Jordan Air of Central Point, OR, and was installed by Victorville Aerospace in Victorville, CA. It can deliver 12,000 gallons (45.4 kL) of retardant in as little as eight seconds. The aircraft can deliver a partial load of retardant and make multiple drops on the same flight, or the entire load can be rapidly delivered in one pass if required for maximum coverage. The Evergreen 747 uses internal tankage and a pressurized delivery system to enable volume and coverage levels that also meet USFS requirements, but enables computer control of flow for desired precision. This system was designed and built by Adaptive Aerospace of Tehachapi, CA and can deliver about 20,000 gallons (75.7 kL) of retardant in approximately ten seconds. The 747 can also make multiple independent drops, or deliver the entire load at once. NASA found that both of these VLAT aircraft are compatible with the wildfire suppression mission when used to supplement other aerial retardant delivery platforms. The major recommendations for deployment that resulted from this study relate to terrain clearance, the type of terrain in the drop area, availability of qualified lead planes to guide the VLAT approach to the drop area, and low-altitude maneuvering limitations. NASA s analysis suggests that with the appropriate flight procedures, these aircraft will provide a powerful set of tools to fight wildfires.

Dickerson, Mark↗

Testing, Requirements, and Metrics

The criticality of correct, complete, testable requirements is a fundamental tenet of software engineering. Also critical is complete requirements based testing of the final product. Modern tools for managing requirements allow new metrics to be used in support of both of these critical processes. Using these tools, potential problems with the quality of the requirements and the test plan can be identified early in the life cycle. Some of these quality factors include: ambiguous or incomplete requirements, poorly designed requirements databases, excessive or insufficient test cases, and incomplete linkage of tests to requirements. This paper discusses how metrics can be used to evaluate the quality of the requirements and test to avoid problems later. Requirements management and requirements based testing have always been critical in the implementation of high quality software systems. Recently, automated tools have become available to support requirements management. At NASA's Goddard Space Flight Center (GSFC), automated requirements management tools are being used on several large projects. The use of these tools opens the door to innovative uses of metrics in characterizing test plan quality and assessing overall testing risks. In support of these projects, the Software Assurance Technology Center (SATC) is working to develop and apply a metrics program that utilizes the information now available through the application of requirements management tools. Metrics based on this information provides real-time insight into the testing of requirements and these metrics assist the Project Quality Office in its testing oversight role. This paper discusses three facets of the SATC's efforts to evaluate the quality of the requirements and test plan early in the life cycle, thus preventing costly errors and time delays later.

Rosenberg, Linda↗

PLANNING FOR NUCLEAR TESTING AFTER CORE INTERNALS CHANGEOUT #6 IN THE ADVANCED TEST REACTOR

A series of physics tests were planned for the Advanced Test Reactor (ATR) after the sixth Core Internals Changeout (CIC) in 2021. These tests verify nuclear characteristics of the new reflector and shim mechanisms and are validation cases for core models. This work describes planning for these tests and compares the physics tests with those performed previously in ATR. This work also identifies unique characteristics of ATR that result in the need for unique tests.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Current Status and Plans for Test and Deployment of the First NASA SLR System

Over the last decade the Space Geodesy Project has been progressing toward the development and deployment of NASA’s next generation network of geodetic stations ( https://space-geodesy.nasa.gov ). The Satellite Laser Ranging (SLR) part of this effort is called Space Geodesy Satellite Laser Ranging (SGSLR). Significant progress has been made in the development of SGSLR’s nine subsystems, and many of these subsystems are completed or are nearing completion. The next major step will be the Integration and Testing (I&T) of all subsystems into the first SGSLR system which will start before the end of 2022. Verification testing (collocation) with NASA’s legacy operational SLR system, MOBLAS-7, is planned for early 2024. The first SGSLR system is being developed for Kartverket, also known as the Norwegian Mapping Authority (NMA). The system will be installed at Ny-Ålesund in Svalbard, Norway. The planned start of operations is early 2025. This presentation will give the current status of development, the testing and deployment plans, and the future of NASA’s SGSLR global network.

Satellite Laser Ranging↗

Laboratory Evaluation of Commercial Utility Microgrid Controller Test Results

The functional requirements of many microgrid controllers (MGCs) are expanding and evolving to meet growing utility and community needs. At a high level, the utility microgrid controller serves resilience and reliability use cases by coordinating transitions between grid-connected and islanded states and by managing the system during island operations. This includes control scenarios that require the microgrid controller to use flexible microgrid boundaries, maintain energy balance, coordinate with peer systems, and manage grid-forming (GFM) and grid-following (GFL) distributed energy resources (DER). In order to evaluate these functional enhancements, microgrid controller test plans must also be developed to ensure that the implemented controllers provide adequate performance. This report provides MGC test plans for both island operation and transition functions. The functions covered in this report include feeder level energy management, island constraint management, secondary voltage and frequency control, black start, and synchronized reconnection. This second edition update also includes results from applying the tests to a commercial utility microgrid controller. These results evaluate the performance and reliability of the controller under various operational scenarios. It identifies specific areas where the controller excels and highlights gaps that need to be addressed for future enhancements. The application of these test plans on real-world system behavior provides insights on commercial equipment readiness for field deployment. These test cases can be applied to utility-managed microgrid controllers that exclusively manage utility-owned equipment; the tests also apply to third-party managed microgrid controllers that coordinate with utility- and customer-owned equipment. The report can also be used by technology developers and project developers in industry to evaluate control strategies and performance characteristics for community microgrid controllers.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ChargeX Prescribed Testing Program at CharIN June 2024 Testival: Outcomes & Future Recommendations

In June 2024, the ChargeX Consortium developed an optional prescribed testing program for electric vehicle (EV) and electric vehicle supply equipment (EVSE) manufacturers that attended the CharIN Testival as testers. There were two driving purposes of this program; to introduce a new hybrid approach to testing events with both ad-hoc and prescribed testing offered, and to demonstrate the test cases and structure effectiveness of the EV-EVSE Interoperability Test Plan (EEITP) document developed within the ChargeX Testing Task Force. This program contained eight test scenarios to be performed during the final 30-minutes of a 90-minute testing slot with details like purpose, setup, pass criteria, etc. included within a written test plan document. A $2,000 rebate was offered to those who participated, and a ChargeX moderation force was present to collect EV and EVSE meta data, testing meta data, and testing results.

33 ADVANCED PROPULSION SYSTEMS↗

Preparing for Human Missions to Mars: The role of ISS and Artemis as Analogs for Research and Technology Testing

The hazards of spaceflight to the human system are present in in varying degrees on different spaceflight platforms: altered gravity, isolation and confinement, distance from Earth, radiation, and hostile closed environments. A strategic view of the fidelity of hazards experienced on different platforms can shape the testing plans for human research and technology demonstration related to crew health and performance. Working across the international partnership, the International Space Station (ISS) is planning periods of modified operations to improve the fidelity of Mars simulations. To understand transit durations as an independent variable, a series of 1-year, 6-month and 30-45 day missions are being planned on ISS. Standard measurements across ISS missions of different durations, lunar missions and ground analogs offers the opportunity to distinguish different hazards and their effects in the context of the relevance to future mission concepts. The ISS partnership is planning for additional test cases that are aligned with Mars mission plans. (1) Evaluating crew performance capabilities when transitioning to gravity after long durations in microgravity representative of a Mars transit. (2) Simulating crew medical care under Mars-like autonomous operations. (3) Identification and testing of operations under communications delay and autonomy expected for Mars missions and the linked effects on behavioral health and performance of the crew. Artemis missions serve as a valuable analogs for Mars surface operations, with partial gravity and deep space radiation hazards, but with crewmembers that are probably more physically capable than their counterparts would be after a Mars transit. Getting unobtrusive data from early Artemis missions, and knowledge gained from operational experience as Artemis operations develop can improve engineering design, medical requirements and countermeasures, and ultimately ensure mission success on Mars. Linking Mars architectures with the plans and capabilities for ISS and Artemis allows us to plan to most operationally relevant tests of crew health and performance on current spaceflight missions to inform planning for future missions to Mars. By using human spaceflight platforms as well as ground simulation in an integrated way, the international community can improve exploration readiness, develop countermeasures and reduce risks of future human space missions.

International Space Station↗

Design document for shuttle task 501. Shuttle carrier aircraft transceiver console (SED 36115353-301)

The flight data for the space shuttle orbiter (SSO) is transmitted via S band to a transceiver in the shuttle carrier aircraft (SCA) for relay to the ground during the mated portion of the approach and landing test (ALT). The transceiver is mounted in the SCA transceiver console for shuttle task 501 testing. This document defines the requirements for the SCA transceiver console, the design description, test plan for the console prior to installating the spacecraft equipment in the console, and the test plan for acceptance tests.

Doland, G. D.↗

An Online Resource for Flight Test Safety Planning

A viewgraph presentation describing an online database for flight test safety techniques is shown. The topics include: 1) Goal; 2) Test Hazard Analyses; 3) Online Database Background; 4) Data Gathering; 5) NTPS Role; 6) Organizations; 7) Hazard Titles; 8) FAR Paragraphs; 9) Maneuver Name; 10) Identified Hazard; 11) Matured Hazard Titles; 12) Loss of Control Causes; 13) Mitigations; 14) Database Now Open to the Public; 15) FAR Reference Search; 16) Record Field Search; 17) Keyword Search; and 18) Results of FAR Reference Search.

Lewis, Greg↗

Results for Gamma-Ray Spectroscopy Characterization of Residual Radioactivity on Personal Protective Clothing

In early 2019, Health Physics Services (HPS) personnel put together a test plan to use the shielded gamma-ray spectroscopy instruments in the Health Physics Services Technical Laboratory (HPSTL) to perform a series of measurements on laundered personal protective clothing used in radiological areas at the Savannah River Site (SRS). That test plan describes the methodology used to determine the quantities of laundry to be obtained from operational facilities, the methods for quality control checking the instruments throughout the measurement period, and the physical arrangement of samples in the counting shields. The test plan is documented in SRNS-J6700-2019-00037 (Reference 1).

61 RADIATION PROTECTION AND DOSIMETRY↗

Development of Design Standards and Guidelines for Electromagnetic Compatibility and Lightning Protection for Spacecraft Utilizing Composite Materials

This final report presents information concerning technical accomplishments by Tec-Masters, Inc. (TMI) for this contract effort. This effort included the accomplishment and/or submission by TMI of the following items: (1) Literature Survey Report, Electrical Properties of Non-Metallic Composites by Mr. Hugh W. Denny; (2) Interim Report, Composite Materials - Conductivity, Shielding Effectiveness, and Current Carrying Capability by Mr. Ross W. Evans; (3) Fault Current Test Plan by Mr. Ross W. Evans (4) Fault Current Test Procedure by Mr. Ross W. Evans (5) Test Report, Fault Current Through Graphite Filament Reinforced Plastic, NASA CR-4774, Marshall Space Flight Center, Alabama, September 1996, by Mr. Ross W. Evans; (6) Test Plan, Lightning Effects on Composite Materials by Mr. Ross W. Evans; (7) Test Report, Lightning Effects on Composite Materials, NASA CR-4783, Marshall Space Flight Center, Alabama, February 1997, by Mr. Ross W. Evans; (8) Design Guidelines for Shielding Effectiveness, Current Carrying Capability, and the Enhancement of Conductivity of Composite Materials, NASA CR-4784, Marshall Space Flight Center, Alabama, September 1996, by Mr. Ross W. Evans. These items are not attached but are considered to be a part of this final report. Efforts on two additional items were accomplished at no increase in cost to NASA/MSFC. These items consisted of updating the 'MSFC EMC Design and Interference Control Handbook,' and revising the 'Design Guidelines for Shielding Effectiveness, Current Carrying Capability, and the Enhancement of Conductivity of Composite Materials.'

Camp, Dennis W.↗

Anomalous Thrust Production from an RF Test Device Measured on a Low-Thrust Torsion Pendulum

This paper describes the eight-day August 2013 test campaign designed to investigate and demonstrate viability of using classical magnetoplasmadynamics to obtain a propulsive momentum transfer via the quantum vacuum virtual plasma. This paper will not address the physics of the quantum vacuum plasma thruster, but instead will describe the test integration, test operations, and the results obtained from the test campaign. Approximately 30-50 micro-Newtons of thrust were recorded from an electric propulsion test article consisting primarily of a radio frequency (RF) resonant cavity excited at approximately 935 megahertz. Testing was performed on a low-thrust torsion pendulum that is capable of detecting force at a single-digit micronewton level, within a stainless steel vacuum chamber with the door closed but at ambient atmospheric pressure. Several different test configurations were used, including two different test articles as well as a reversal of the test article orientation. In addition, the test article was replaced by an RF load to verify that the force was not being generated by effects not associated with the test article. The two test articles were designed by Cannae LLC of Doylestown, Pennsylvania. The torsion pendulum was designed, built, and operated by Eagleworks Laboratories at the NASA Johnson Space Center of Houston, Texas. Approximately six days of test integration were required, followed by two days of test operations, during which, technical issues were discovered and resolved. Integration of the two test articles and their supporting equipment was performed in an iterative fashion between the test bench and the vacuum chamber. In other words, the test article was tested on the bench, then moved to the chamber, then moved back as needed to resolve issues. Manual frequency control was required throughout the test. Thrust was observed on both test articles, even though one of the test articles was designed with the expectation that it would not produce thrust. Specifically, one test article contained internal physical modifications that were designed to produce thrust, while the other did not (with the latter being referred to as the "null" test article). Test data gathered includes torsion pendulum displacement measurements which are used to calculate generated force, still imagery in the visible spectrum to document the physical configuration, still imagery in the infrared spectrum to characterize the thermal environment, and video imagery. Post-test data includes static and animated graphics produced during RF resonant cavity characterization using the COMSOL Multiphysics® software application. Excerpts from all of the above are included and discussed in this paper. Lessons learned from test integration and operations include identification of the need to replace manual control of the resonant cavity target frequency with an automated frequency control capability. Future test plans include the development of an automatic frequency control circuit. Test results indicate that the RF resonant cavity thruster design, which is unique as an electric propulsion device, is producing a force that is not attributable to any classical electromagnetic phenomenon and therefore is potentially demonstrating an interaction with the quantum vacuum virtual plasma. Future test plans include independent verification and validation at other test facilities.

Brady, David↗

The analytical control program for the NASA Space Station Freedom Environmental Control and Life Support System (ECLSS) Water Recovery Test

NASA-Marshall has striven to maximize quality assurance and quality control measures in the course of Water Recovery Test (WRT) development for the Space Station Freedom ECLSS. The WRT was subjected to an independent analytical control program that is governed by the Analytical Control Test Plan and the Microbiological Methods for Water Recovery Testing Plan. Attention is given to analysis results for volatiles, sodium, and conductivity.

Tatara, James D.↗

Control of Technology Transfer at JPL

Controlled Technology: 1) Design: preliminary or critical design data, schematics, technical flow charts, SNV code/diagnostics, logic flow diagrams, wirelist, ICDs, detailed specifications or requirements. 2) Development: constraints, computations, configurations, technical analyses, acceptance criteria, anomaly resolution, detailed test plans, detailed technical proposals. 3) Production: process or how-to: assemble, operated, repair, maintain, modify. 4) Manufacturing: technical instructions, specific parts, specific materials, specific qualities, specific processes, specific flow. 5) Operations: how-to operate, contingency or standard operating plans, Ops handbooks. 6) Repair: repair instructions, troubleshooting schemes, detailed schematics. 7) Test: specific procedures, data, analysis, detailed test plan and retest plans, detailed anomaly resolutions, detailed failure causes and corrective actions, troubleshooting, trended test data, flight readiness data. 8) Maintenance: maintenance schedules and plans, methods for regular upkeep, overhaul instructions. 9) Modification: modification instructions, upgrades kit parts, including software

Jet Propulsion Laboratory (JPL)↗

Optical Closed-Loop Propulsion Control System Development

The overall objective of this program was to design and fabricate the components required for optical closed-loop control of a F404-400 turbofan engine, by building on the experience of the NASA Fiber Optic Control System Integration (FOCSI) program. Evaluating the performance of fiber optic technology at the component and system levels will result in helping to validate its use on aircraft engines. This report includes descriptions of three test plans. The EOI Acceptance Test is designed to demonstrate satisfactory functionality of the EOI, primarily fail-safe throughput of the F404 sensor signals in the normal mode, and validation, switching, and output of the five analog sensor signals as generated from validated optical sensor inputs, in the optical mode. The EOI System Test is designed to demonstrate acceptable F404 ECU functionality as interfaced with the EOI, making use of a production ECU test stand. The Optical Control Engine Test Request describes planned hardware installation, optical signal calibrations, data system coordination, test procedures, and data signal comparisons for an engine test demonstration of the optical closed-loop control.

Poppel, Gary L.↗

Plans and Status of Wind-Tunnel Testing Employing an Aeroservoelastic Semispan Model

This paper presents the research objectives, summarizes the pre-wind-tunnel-test experimental results to date, summarizes the analytical predictions to date, and outlines the wind-tunnel-test plans for an aeroservoelastic semispan wind-tunnel model. The model is referred to as the Supersonic Semispan Transport (S4T) Active Controls Testbed (ACT) and is based on a supersonic cruise configuration. The model has three hydraulically-actuated surfaces (all-movable horizontal tail, all-movable ride control vane, and aileron) for active controls. The model is instrumented with accelerometers, unsteady pressure transducers, and strain gages and will be mounted on a 5-component sidewall balance. The model will be tested twice in the Langley Transonic Dynamics Tunnel (TDT). The first entry will be an "open-loop" model-characterization test; the second entry will be a "closed-loop" test during which active flutter suppression, gust load alleviation and ride quality control experiments will be conducted.

Perry, Boyd, III↗