Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “summary”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Summary, volume 1 Final report

Voyager project study summaries on spacecraft powered by radioisotope thermoelectric generators, planetary quarantine, redundancy, and data management and control

Oleary, K. C.↗

Gemini Summary Conference

The Gemini Summary Conference was held on February 1 and 2, 1967, at the NASA Manned Spacecraft Center, Houston, Tex. The conference emphasized the highlights of the Gemini Program and especially the flight results of the last five missions. This report contains the 21 technical papers presented at the conference as well as an introduction by George E. Mueller and concluding remarks by George M. Low. The technical papers are divided into five sections: the first describes the rendezvous, docking, and tethered-vehicle operations involving the spacecraft and a target vehicle; the second presents various aspects of extravehicular activity; the third concerns the operational support of the missions ; the fourth cover the experiments conducted during the missions; and the fifth compares the astronaut flight and simulation experiences and relates the Gemini results to the Apollo Program.

structural integrity↗

Lunar Orbiter 4 - Photographic Mission Summary

Photographic summary report of Lunar Orbiter 4 mission. The fourth of five Lunar Orbiter spacecraft was successfully launched from Launch Complex 13 at the Air Force Eastern Test Range by an Atlas-Agena launch vehicle at 22:25 GMT on May 4, 1967. Tracking data from the Cape Kennedy and Grand Bahama tracking stations were used to control and guide the launch vehicle during Atlas powered flight. The Agena-spacecraft combination was boosted to the proper coast ellipse by the Atlas booster prior to separation. Final maneuvering and acceleration to the velocity required to maintain the 100-nauticalmile- altitude Earth orbit was controlled by the preset on-board Agena computer. In addition, the Agena computer determined the maneuver and engine-burn period required to inject the spacecraft on the cislunar trajectory 20 minutes after launch. Tracking data from the downrange stations and the Johannesburg, South Africa station were used to monitor the boost trajectory.

Source record↗

Lunar Orbiter 5. Photographic Mission Summary

Selected photographs and mission summary of Lunar Orbiter 5. The last of five Lunar Orbiter spacecraft was successfully launched from Launch Complex 13 at the Air Force Eastern Test Range by an Atlas-Agena launch vehicle at 22:33 GMT on August 1, 1967. Tracking data from the Cape Kennedy and Grand Bahama tracking stations were used to control and guide the launch vehicle during Atlas powered flight. The Agena-spacecraft combination was boosted to the proper coast ellipse by the Atlas booster prior to separation. Final maneuvering and acceleration to the velocity required to maintain the 100-nautical-mile-altitude Earth orbit were controlled by the preset on-board Agena computer. In addition, the Agena computer determined the maneuver and engine-bum period required to inject the spacecraft on the cislunar trajectory about 33 minutes after launch. Tracking data from the downrange stations and the Johannesburg, South Africa station were used to monitor the boost trajectory.

Source record↗