Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scheduling and coordination”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

The Joint Aerosol-Monsoon Experiment (JAMEX): A Core Element for the Asian Monsoon Year (2008-2009)

The objective of the Joint Aerosol-Monsoon Experiment (JAMEX) is to unravel the physical mechanisms and multi-scale interactions associated with aerosol-monsoon water cycle in the Asian Indo-Pacific region towards improved prediction of rainfall in land regions of the Asian monsoon. JAMEX will be planned as a five-year (2007-201 1) multi-national aerosol-monsoon research project, aimed at promoting collaboration, partnership and alignment of ongoing and planned national and international programs. Two coordinated special observing periods (SOP), covering the pre-monsoon (April-May) and the monsoon (June-August) periods is tentatively targeted for 2008 and 2009. The major work on validation and reference site coordination will take place in 2007 through the spring of 2008. A major science workshop is planned after SOP-I1 in 2010. Modeling and satellite data utilization studies will continue throughout the entire period to help in design of the observation arrays and measurement platforms for SOPS. The tentative time schedule, including milestones and research activities is shown in Fig. 1. One of the unique aspects of JAMEX is that it stems from grass-root scientific and societal imperatives, and it bridges a gap in existing national and international research programs. Currently we have identified 10 major national and international projects/programs separately for aerosols and monsoon research planned in the next five years in China, India, Japan, Italy, and the US, that could be potential contributors or partners with JAMEX. These include the Asian-Indo- Pacific Ocean (AIPO) Project and Aerosol Research Project from China, Monsoon Asian Hydro- Atmospheric Science Research and predication Initiative (MAHASRI) from Japan, Continental Tropical Convergence Zone (CTCZ) and Severe Thunderstorm: Observations and Regional Modeling (STORM) from India, Share-Asia from Italy, Atmospheric Brown Cloud (ABC), Pacific Aerosol-Cloud-Dust Experiment (PACDEX), East Asia Study of Tropospheric Aerosol: an International Regional Experiment (East-AIRE), and Radiation Aerosol Joint Observations - Monsoon Experiments over the Gangetic Himalayas Area (Rajo-Megha: dust cloud in Sanskrit) from the US, and Monsoon Asia Integrated Regional Study (MAIR) under the Earth Systems I Science Partnership (ESSP) and WCRP. For JAMEX to succeed, it is crucial for an international body, such as CEOP or an organization under WCRP to provide the science oversight, data policy and stewardship, and to promote collaboration and partnership among national programs. It makes eminent sense for WCRP to expand the concept and the prototype proposed by JAMEX to include all monsoon countries to expand AMY08-09 into an International Monsoon Era (2008- 2013). Such an establishment followed by establishment of an international body for science oversight, and data stewardship will go a long way in promoting coordination and connection among various existing monsoon research programs within WCRP, and with burgeoning national programs on monsoon and aerosol research.

Lau, William K.M.↗

4-D guidance system design with application to STOL air traffic control.

A new guidance technique, referred to as 4-D guidance, is being developed to improve the operation of future STOL aircraft transportation systems. 4-D guidance refers to a technique of synthesizing a complex three-dimensional flight path from simple pilot inputs and flying the aircraft along the path according to an ATC specified time schedule. The two major elements of a 4-D guidance system are the trajectory synthesizer and the control law for flying the aircraft along the synthesized trajectory using the aircraft's autopilot and autothrottle. Inputs to the trajectory synthesizer are the three-dimensional coordinates of waypoints, the turning radius, the speed range, the acceleration limits and the arrival time at time control waypoints. First the three-dimensional trajectory is computed using circular arcs and straight lines. Then the airspeed profile, compensated for wind, is calculated to achieve the desired arrival times. The pilot is informed if the arrival times cannot be achieved. The synthesized trajectory is stored as a time sequence of reference states and controls which the aircraft is forced to track using a linear feedback law.

Erzberger, H.↗

NASA Goddard Space Flight Center

The NASA SLR Operational Center is responsible for: 1) NASA SLR network control, sustaining engineering, and logistics; 2) ILRS mission operations; and 3) ILRS and NASA SLR data operations. NASA SLR network control and sustaining engineering tasks include technical support, daily system performance monitoring, system scheduling, operator training, station status reporting, system relocation, logistics and support of the ILRS Networks and Engineering Working Group. These activities ensure the NASA SLR systems are meeting ILRS and NASA mission support requirements. ILRS mission operations tasks include mission planning, mission analysis, mission coordination, development of mission support plans, and support of the ILRS Missions Working Group. These activities ensure than new mission and campaign requirements are coordinated with the ILRS. Global Normal Points (NP) data, NASA SLR FullRate (FR) data, and satellite predictions are managed as part of data operations. Part of this operation includes supporting the ILRS Data Formats and Procedures Working Group. Global NP data operations consist of receipt, format and data integrity verification, archiving and merging. This activity culminates in the daily electronic transmission of NP files to the CDDIS. Currently of all these functions are automated. However, to ensure the timely and accurate flow of data, regular monitoring and maintenance of the operational software systems, computer systems and computer networking are performed. Tracking statistics between the stations and the data centers are compared periodically to eliminate lost data. Future activities in this area include sub-daily (i.e., hourly) NP data management, more stringent data integrity tests, and automatic station notification of format and data integrity issues.

Carter, David↗

A Proposed Strategy for the U.S. to Develop and Maintain a Mainstream Capability Suite ("Warehouse") for Automated/Autonomous Rendezvous and Docking in Low Earth Orbit and Beyond

The ability of space assets to rendezvous and dock/capture/berth is a fundamental enabler for numerous classes of NASA fs missions, and is therefore an essential capability for the future of NASA. Mission classes include: ISS crew rotation, crewed exploration beyond low-Earth-orbit (LEO), on-orbit assembly, ISS cargo supply, crewed satellite servicing, robotic satellite servicing / debris mitigation, robotic sample return, and robotic small body (e.g. near-Earth object, NEO) proximity operations. For a variety of reasons to be described, NASA programs requiring Automated/Autonomous Rendezvous and Docking/Capture/Berthing (AR&D) capabilities are currently spending an order-of-magnitude more than necessary and taking twice as long as necessary to achieve their AR&D capability, "reinventing the wheel" for each program, and have fallen behind all of our foreign counterparts in AR&D technology (especially autonomy) in the process. To ensure future missions' reliability and crew safety (when applicable), to achieve the noted cost and schedule savings by eliminate costs of continually "reinventing the wheel ", the NASA AR&D Community of Practice (CoP) recommends NASA develop an AR&D Warehouse, detailed herein, which does not exist today. The term "warehouse" is used herein to refer to a toolbox or capability suite that has pre-integrated selectable supply-chain hardware and reusable software components that are considered ready-to-fly, low-risk, reliable, versatile, scalable, cost-effective, architecture and destination independent, that can be confidently utilized operationally on human spaceflight and robotic vehicles over a variety of mission classes and design reference missions, especially beyond LEO. The CoP also believes that it is imperative that NASA coordinate and integrate all current and proposed technology development activities into a cohesive cross-Agency strategy to produce and utilize this AR&D warehouse. An initial estimate indicates that if NASA strategically coordinates the development of a robust AR&D capability across the Agency, the cost of implementing AR&D on a spacecraft could be reduced from roughly $70M per mission to as low as $7M per mission, and the associated development time could be reduced from 4 years to 2 years, after the warehouse is completely developed. Table 1 shows the clear long-term benefits to the Agency in term of costs and schedules for various missions. (The methods used to arrive at the Table 1 numbers is presented in Appendices A and B.)

Krishnakumar, Kalmanje S.↗

Plans for the Meter Class Autonomous Telescope and Potential Coordinated Measurements with Kwajalein Radars

The National Aeronautics and Space Administration's (NASA) Orbital Debris Program Office is teaming with the US Air Force Research Laboratory's (AFRL) Maui Optical Site to deploy a moderate field-of-view, 1.3 m aperture, optical telescope for orbital debris applications. The telescope will be located on the island of Legan in the Kwajalein Atoll and is scheduled for completion in the Spring of 2011. The telescope is intended to sample both low inclination/high eccentricity orbits and near geosynchronous orbits. The telescope will have a 1 deg diagonal field-of-view on a 4K x 4K CCD. The telescope is expected to be able to detect 10-cm diameter debris at geosynchronous altitudes (5 sec exposure assuming a spherical specular phase function w/ albedo =0.13). Once operational, the telescope has the potential of conducting simultaneous observations with radars operated by the US Army at Kwajalein Atoll (USAKA) and located on the island of Roi-Namur, approximately 55 km to the north of Legan. Four radars, representing 6 frequency bands, are available for use: ALTAIR (ARPA-Long Range Tracking and Instrumentation Radar) operating at VHF & UHF, TRADEX (Target Resolution and Discrimination Experiment) operating at L-band and S-band, ALCOR (ARPA-Lincoln C-band Observables Radar) operating at S-band, and MMW (Millimeter Wave) Radar operating at Ka-band. Also potentially available is the X-band GBRP (Ground Based Radar-Prototype located 25 km to the southeast of Legan on the main island of Kwajalein.

Stansberry, Gene↗

Results of using the global positioning system to maintain the time and frequency synchronization in the Deep Space Network

There are two hydrogen maser clocks located at each signal processing center (SPC) in the DSN. Close coordination of the time and frequency of the SPC clocks is needed to navigate spacecraft to the outer planets. A recent example was the Voyager spacecraft's encounter with Uranus in January 1986. The clocks were adjusted with the goal of minimizing time and frequency offsets between the SPCs at encounter. How time and frequency at each SPC is estimated using data acquired from the Global Positioning System Timing Receivers operating on the NBS-BIH (National Bureau of Standards-Bureau International de l'Heure) tracking schedule is described. These data are combined with other available timing receiver data to calculate the time offset estimates. The adjustment of the clocks is described. It was determined that long range hydrogen maser drift is quite predictable and adjustable within limits. This enables one to minimize time and frequency differences between the three SPCs for many months by matching the drift rates of the three standards. Data acquisition and processing techniques using a Kalman filter to make estimates of time and frequency offsets between the clocks at the SPCs and UTC(NBS) (Coordinated Universal Time realized at NBS) are described.

Clements, P. A.↗

A typical pointed observation in IRAS designed to fit into a 15 minute window

A typical pointed observation in the Infrared Astronomical Satellite (IRAS) was designed to fit into a 15 minute window. Observing constraints, however, did not always permit targets from the scientific program to be observed on exactly 15 minute centers and a few months into the mission it was realized that the automatic scheduling program left times when no observations were being made. In order to use this potentially wasted observing time, a mode of pointed observations, the 'filler' mode, with shorter observation duration was initiated. Locations were picked on an arbitrary grid, spaced relatively uniformly in ecliptic coordinates, and the telescope was pointed to one of these sites whenever a gap potentially occurred. One of us (GXN) was the coordinator of this effort (the FL sub-group). There are a total of 22 FL fields, 13 of which have more than 50 component observations. These 13 fields cover about 30 square degrees. It was proposed to concentrate on one filler field, FL29, a field with 53 coverages which thus had among the deepest coverage of those observed in this mode. This field was also observed extensively at various non-infrared wavelengths by a variety of techniques. Because the IRAS observations of FL29 were made at the limits of the survey sensitivity and at different twist angles it was necessary to make significant technical advances in the methods used in the processing and analyzing the data. In particular, if normal IRAS coaddition procedures were used, the noise resulting from coaddition of the multiple frames did not decrease in the manner expected once significantly different twist angles were included in the coaddition. The technical effort needed to reduce the observations of FL29 was completed and now the noise behavior is understood and well behaved. The reduction of the field FL29 observations is done.

Neugebauer, G.↗

Role of the Controller in an Integrated Pilot-Controller Study for Parallel Approaches

Closely spaced parallel runway operations have been found to increase capacity within the National Airspace System but poor visibility conditions reduce the use of these operations [1]. Previous research examined the concepts and procedures related to parallel runways [2][4][5]. However, there has been no investigation of the procedures associated with the strategic and tactical pairing of aircraft for these operations. This study developed and examined the pilot s and controller s procedures and information requirements for creating aircraft pairs for closely spaced parallel runway operations. The goal was to achieve aircraft pairing with a temporal separation of 15s (+/- 10s error) at a coupling point that was 12 nmi from the runway threshold. In this paper, the role of the controller, as examined in an integrated study of controllers and pilots, is presented. The controllers utilized a pairing scheduler and new pairing interfaces to help create and maintain aircraft pairs, in a high-fidelity, human-in-the loop simulation experiment. Results show that the controllers worked as a team to achieve pairing between aircraft and the level of inter-controller coordination increased when the aircraft in the pair belonged to different sectors. Controller feedback did not reveal over reliance on the automation nor complacency with the pairing automation or pairing procedures.

Verma, Savvy↗

Methods for Determining Aircraft Surface State at Lesser-Equipped Airports

Tactical departure scheduling within a terminal airspace must accommodate a wide spectrum of surveillance and communication capabilities at multiple airports. The success of such a scheduler is highly dependent upon the knowledge of a departure's state while it is still on the surface. Airports within a common Terminal RAdar CONtrol (TRACON) airspace possess varying levels of surface surveillance infrastructure which directly impacts uncertainties in wheels-off times. Large airports have access to surface surveillance data, which is shared with the TRACON, while lesser-equipped airports still rely solely on controllers in Air Traffic Control Towers (Towers). Coordination between TRACON and Towers can be greatly enhanced when the TRACON controller has access to the surface surveillance and the associated decision-support tools at well-equipped airports. Similar coordination at lesser-equipped airports is still based on verbal communications. This paper investigates possible methods to reduce the uncertainty in wheels-off time predictions at the lesser-equipped airports through the novel use of Over-the-Air (OTA) data transmissions. We also discuss the methods and equipment used to collect sample data at lesser-equipped airports within a large US TRACON, as well as the data evaluation to determine if meaningful information can be extracted from it.

departure scheduling↗

Deep Reinforcement Learning Enabled Physical-Model-Free Two-Timescale Voltage Control Method for Active Distribution Systems

Active distribution networks are being challenged by frequent and rapid voltage violations due to renewable energy integration. Conventional model-based voltage control methods rely on accurate parameters of the distribution networks, which are difficult to achieve in practice. This paper proposes a novel physical-model-free two-timescale voltage control framework for active distribution systems. To achieve fast control of PV inverters, the whole network is first partitioned into several subnetworks using voltage-reactive power sensitivity. Then, the scheduling of PV inverters in the multiple sub-networks is formulated as Markov games and solved by a multi-agent soft actor-critic (MASAC) algorithm, where each subnetwork is modeled as an intelligent agent. All agents are trained in a centralized manner to learn a coordinated strategy while being executed based on only local information for fast response. For the slower time-scale control, OLTCs and switched capacitors are coordinated by a single agent-based SAC algorithm using the global information with considering control behaviors of the inverters. Particularly, the two-level agents are trained concurrently with information exchange according to the reward signal calculated from the data-driven surrogate model. Comparative tests with different benchmark methods on IEEE 33-and 123-bus systems and 342-node low voltage distribution system demonstrate that the proposed method can effectively mitigate the fast voltage violations and achieve systematical coordination of different voltage regulation assets without the knowledge of accurate system model.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Project Manager Who Saved His Country

George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

Baniszewski, John↗

Robust Scheduling of Networked Microgrids for Economics and Resilience Improvement

The benefits of networked microgrids in terms of economics and resilience are investigated and validated in this work. Considering the stochastic unintentional islanding conditions and conventional forecast errors of both renewable generation and loads, a two-stage adaptive robust optimization is proposed to minimize the total operating cost of networked microgrids in the worst scenario of the modeled uncertainties. By coordinating the dispatch of distributed energy resources (DERs) and responsive demand among networked microgrids, the total operating cost is minimized, which includes the start-up and shut-down cost of distributed generators (DGs), the operation and maintenance (O&M) cost of DGs, the cost of buying/selling power from/to the utility grid, the degradation cost of energy storage systems (ESSs), and the cost associated with load shedding. The proposed optimization is solved with the column and constraint generation (C&CG) algorithm. The results of case studies demonstrate the advantages of networked microgrids over independent microgrids in terms of reducing total operating cost and improving the resilience of power supply.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Synthesis of Correct Digital Controller Models from Specifications by Model Transformation (21-0320)

The design of high consequence controllers (in weapons systems, autonomy, etc.) that do what they are supposed to do is a significant challenge. Testing simply does not come close to meeting the requirements for assurance. Today circuit designers at Sandia (and elsewhere) typically capture the core behavior of their components using state models in tools such as STATEFLOW. They then check that their models meet certain requirements (e.g. “The system bus must not deadlock” or “both traffic lights at an intersection must not be green at the same time”) using tools called model checkers. If the model checker returns “yes” then the property is guaranteed to be satisfied by the model. However, there are several drawbacks to this industry practice: (1) there is a lot of detail to get right, this is particularly challenging when there are multiple components requiring complex coordination (2) any errors returned by the model checker have to be traced back through the design and fixed, necessitating rework, (3) there are severe scalability problems with this approach, particularly when dealing with concurrency. All this places high demands on the designers who now face not only an accelerated schedule but also controllers of increasing complexity. This report describes a new and fundamentally different approach to the construction of safety-critical digital controllers. Instead of directly constructing a complete model and then trying to verify it, the designer can start with an initial abstract (think “sketch”) model plus the requirements, from which a correct concrete model is automatically synthesized. There is no need for post-hoc verification of required functional properties. Having tool to carry this out will significantly impact the nation’s ability to ensure the safety of high-consequence digital systems. The approach has been implemented in a prototype tool, along with a suite of examples, including ones that reflect actual problems faced by designers. Our approach operates on a variant of Statecharts developed at Sandia called Qspecs. Statecharts are a widely used formalism for developing concurrent reactive systems, supporting scalability through allowing state models containing composite states, which are the serial or parallel composition of substates which can themselves contain statecharts. Statecharts enable an incremental style of development, in which states are progressively refined to incorporate greater detail in an incremental model of software development. Our approach formulates a set of constraints from the structure of the models and the requirements and propagates these constraints to a fixpoint. The solution to the constraints is an inductive invariant along with guards on the transitions. We also show how our approach extends to implementation refinement, decomposition, composition, and elaboration. We currently handle safety requirements written in LTL (Linear Temporal Logic)

42 ENGINEERING↗

Comparison of X-31 flight, wind-tunnel, and water-tunnel yawing moment asymmetries at high angles of attack

The X-31 aircraft are being used in the enhanced fighter maneuverability (EFM) research program, which is jointly funded by the (U.S.) Advanced Research Projects Agency (ARPA) and Germany's Federal Ministry of Defense (FMOD). The flight test portion of the program, which involves two aircraft, is being conducted by an International Test Organization (ITO) comprising the National Aeronautics and Space Administration (NASA), the U.S. Navy, the U.S. Air Force, Rockwell International, and Deutsche Aerospace (DASA). The goals of the flight program are to demonstrate EFM technologies, investigate close-in-combat exchange ratios, develop design requirements, build a database for application to future fighter aircraft, and develop and validate low-cost prototype concepts. For longitudinal control the X-31 uses canards, symmetrical movement of the trailing-edge flaps, and pitch deflection of the thrust vectoring system. The trim, inertial coupling, and engine gyroscopic coupling compensation tasks are performed primarily by the trailing-edge flaps. For lateral-directional control the aircraft uses differential deflection of the trailing-edge flaps for roll coordination and a conventional rudder combined with the thrust vectoring system to provide yaw control. The rudder is only effective up to about 40 deg angle of attack (alpha), after which the thrust vectoring becomes the primary yaw control effector. Both the leading-edge flaps and the inlet lip are scheduled with the angle of attack to provide best performance.

Brent R Cobleigh↗

The Temporal Configuration of Airline Networks

The deregulation of US aviation in 1978 resulted in the reconfiguration of airline networks into hub-and-spoke systems, spatially concentrated around a small number of central airports or 'hubs' through which an airline operates a number of daily waves of flights. A hub-and-spoke network requires a concentration of traffic in both space and time. In contrast to the U.S. airlines, European airlines had entered the phase of spatial network concentration long before deregulation. Bilateral negotiation of traffic fights between governments forced European airlines to focus their networks spatially on small number of 'national' airports. In general, these star-shaped networks were not coordinated in time. Transfer opportunities at central airports were mostly created 'by accident'. With the deregulation of the EU air transport market from 1988 on, a second phase of airline network concentration started. European airlines concentrated their networks in time by adopting or intensifying wave-system structures in their flight schedules. Temporal concentration may increase the competitive position of the network in a deregulated market because of certain cost and demand advantages.

Burghouwt, Guillaume↗

Multi-Agent Control Planes for Quantum Networks: A Scalable Architecture for Autonomous Quantum Internet Management

Quantum networks are expected to enable distributed quantum computing, secure communication, and global entanglement distribution. However, operating such networks presents significant challenges, including stochastic quantum processes, fragile entanglement resources, dynamic topology, and cross-layer control requirements. Current quantum network control architectures largely rely on centralized or hierarchical controllers inspired by classical software-defined networking (SDN). While effective for small testbeds, these approaches face scalability, latency, and reliability limitations as quantum networks grow. This paper proposes a multi-agent control plane architecture for quantum networks. In this design, intelligent software agents operate at quantum nodes, repeaters, and orchestration layers, collectively managing entanglement generation, routing, purification, and scheduling. The distributed intelligence of the agent system allows the network to adapt dynamically to quantum hardware variability and environmental noise. We argue that multi-agent systems provide significant advantages over centralized control approaches, including scalability, resilience, local autonomy, and real-time adaptation. The paper discusses architectural design principles, agent coordination mechanisms, and research challenges in deploying multi-agent control planes for the emerging quantum Internet.

Alnajjar, Anees [ORNL] (ORCID:0000000237101601)↗

Robotic and Human-Tended Collaborative Drilling Automation for Subsurface Exploration

Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. Human operators listen and feel drill string vibrations coming from kilometers underground. Abundant mass and energy make it possible for terrestrial drilling to employ brute-force approaches to failure recovery and system performance issues. Space drilling will require intelligent and autonomous systems for robotic exploration and to support human exploration. Eventual in-situ resource utilization will require deep drilling with probable human-tended operation of large-bore drills, but initial lunar subsurface exploration and near-term ISRU will be accomplished with lightweight, rover-deployable or standalone drills capable of penetrating a few tens of meters in depth. These lightweight exploration drills have a direct counterpart in terrestrial prospecting and ore-body location, and will be designed to operate either human-tended or automated. NASA and industry now are acquiring experience in developing and building low-mass automated planetary prototype drills to design and build a pre-flight lunar prototype targeted for 2011-12 flight opportunities. A successful system will include development of drilling hardware, and automated control software to operate it safely and effectively. This includes control of the drilling hardware, state estimation of both the hardware and the lithography being drilled and state of the hole, and potentially planning and scheduling software suitable for uncertain situations such as drilling. Given that Humans on the Moon or Mars are unlikely to be able to spend protracted EVA periods at a drill site, both human-tended and robotic access to planetary subsurfaces will require some degree of standalone, autonomous drilling capability. Human-robotic coordination will be important, either between a robotic drill and humans on Earth, or a human-tended drill and its visiting crew. The Mars Analog Rio Tinto Experiment (MARTE) is a current project that studies and simulates the remote science operations between an automated drill in Spain and a distant, distributed human science team. The Drilling Automation for Mars Exploration (DAME) project, by contrast: is developing and testing standalone automation at a lunar/martian impact crater analog site in Arctic Canada. The drill hardware in both projects is a hardened, evolved version of the Advanced Deep Drill (ADD) developed by Honeybee Robotics for the Mars Subsurface Program. The current ADD is capable of 20m, and the DAME project is developing diagnostic and executive software for hands-off surface operations of the evolved version of this drill. The current drill automation architecture being developed by NASA and tested in 2004-06 at analog sites in the Arctic and Spain will add downhole diagnosis of different strata, bit wear detection, and dynamic replanning capabilities when unexpected failures or drilling conditions are discovered in conjunction with simulated mission operations and remote science planning. The most important determinant of future 1unar and martian drilling automation and staffing requirements will be the actual performance of automated prototype drilling hardware systems in field trials in simulated mission operations. It is difficult to accurately predict the level of automation and human interaction that will be needed for a lunar-deployed drill without first having extensive experience with the robotic control of prototype drill systems under realistic analog field conditions. Drill-specific failure modes and software design flaws will become most apparent at this stage. DAME will develop and test drill automation software and hardware under stressful operating conditions during several planned field campaigns. Initial results from summer 2004 tests show seven identifi distinct failure modes of the drill: cuttings-removal issues with low-power drilling into permafrost, and successful steps at executive control and initial automation.

Glass, Brian↗