Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “remediation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Adaptive Site Management Strategies for the Hanford Central Plateau Groundwater

Adaptive site management (ASM) is a systematic and iterative management approach that can be used to expedite the remediation of large and/or complex sites. ASM is defined as a formal and systematic project or site management approach centered on rigorous site planning and a firm understanding of site conditions and uncertainties, using science and technology to routinely re-evaluate and prioritize site remedial actions and characterization activities. The goal of the approach is to create a framework of structured and continuous planning, implementation, and assessment processes that accommodates new information and changing site conditions to develop effective and efficient cleanup approaches that achieves the required outcome(s) while optimizing costs, cleanup timeframe, and performance. Central to ASM is an evolving conceptual site model (CSM). Over time, incremental reductions in uncertainty associated with the CSM will occur, while supporting continued progress toward site cleanup and closure through remedy optimization and evaluation. ASM has the potential to expedite cleanup for the Central Plateau area at Hanford through a planned and systematic approach for reducing uncertainty with targeted characterization activities, while continuing remediation activities that advance cleanup for key risk-driving contaminants. A core component of cleanup within the Central Plateau is the 200 West Pump-and-Treat (P&T) system. Even with an active P&T remedy, uncertainty exists with respect to plume distributions, total mass in the aquifer, and currently known continuing sources. Additional uncertainty is associated with multiple contaminant source locations in the vadose zone, which have the potential to create new groundwater plumes in the absence of any source control measures, although not all contaminant fluxes to groundwater will result in contaminant concentrations above cleanup levels. Collectively, these uncertainties need to be addressed in the CSM to support effective and efficient site progress toward cleanup goal(s). Other nontechnical factors that may warrant an ASM approach at the Hanford Central Plateau are associated with the formation of operable units (OUs) used to manage cleanup. With the exception of the 200-ZP-1 OU, the three remaining groundwater OUs only have interim action records of decision. Nine vadose zone source area OUs are also in the early stages of the remedial investigation and feasibility study process, with pending characterization and technology identification activities. A set of proposed site objectives for the Central Plateau are provided in this document as an initial consideration/example and basis for discussion for ASM implementation. These example site objectives were selected with the goal of maintaining protectiveness at the Columbia River through confinement of contaminant plumes within an administratively controlled area below existing surface waste sites and waste disposal facilities. Although site decision makers and regulators need to provide concurrence, these site objectives are used in this document to describe the elements of an ASM approach, including selection of interim objectives and a long-term adaptive management plan. Interim objectives are also defined to yield measurable incremental progress toward the overall site goals. This document identifies initial technical considerations for developing an ASM framework for the Central Plateau cleanup decisions. These considerations are intended to facilitate more specific decisions, such as objectives, near- and long-term actions, and performance metrics, to develop an overall approach that maintains protectiveness but recognizes the uncertainty, long timeframe, and technical challenges that need to be considered in selecting, implementing, and managing remediation at the Hanford Central Plateau.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Bioavailable soil Pb minimized by in situ transformation to plumbojarosite

Exposure to lead (Pb) during early life has persistent adverse health effects. During childhood, ingestion of bioavailable Pb in contaminated soils can be a major route of Pb absorption. Remediation to alter physiochemical properties of soil-borne Pb can reduce Pb bioavailability. Our laboratory-based approach for soil Pb remediation uses addition of iron (Fe) sulfate and application of heat to promote formation of plumbojarosite (PLJ), a sparingly soluble Pb-Fe hydroxysulfate mineral. We treated two soils with anthropogenic Pb contamination and samples of clean topsoil spiked with various Pb compounds (i.e., carbonate, chloride, phosphate [P], or sulfate) to convert native Pb species to PLJ and used a mouse assay to assess relative bioavailability (RBA) of Pb in untreated (U) and remediated soils. Bone and blood Pb levels were significantly lower (P < 0.001, Student's t test) in mice that consumed diets amended with remediated soils than with U soils. Estimated RBA for Pb in both remediated natural soils and Pb-mineral spiked soils were reduced by >90% relative to Pb RBA for U soils, which is substantially more effective than other soil amendments, including P. X-ray absorption spectroscopy showed that >90% of all Pb species in remediated soils were converted to PLJ, and ingested PLJ was not chemically transformed during gastrointestinal tract transit. Post treatment neutralization of soil pH did not affect PLJ stability, indicating the feasibility in field conditions. These results suggest that formation of PLJ in contaminated soils can reduce the RBA of Pb and minimize this medium’s role as a source of Pb exposure for young children.

59 BASIC BIOLOGICAL SCIENCES↗

Soil Desiccation Treatability Testing at BC Waste Disposal Cribs

During Hanford’s production period, low-level waste products generated from chemical processing of uranium fuel rods were discharged directly to the ground through a system of cribs and trenches located in the 200-BC-1 Operable Unit (OU). The site consists of 6 cribs and 20 trenches that received more than 117,000 m3 of radioactive liquid waste discharged to the soil. These unlined infiltration galleries held volumes of liquid waste while it seeped into the ground, with the understanding that the 100 m (330 ft) thick vadose zone in the area would effectively capture the effluent and prevent groundwater impacts. A conceptual model showing the operation of cribs and trenches is shown in Figure 1. Data show effluent from the 26 cribs and trenches containing about 410 curies of Technetium-99 (Tc-99) is primarily located between 30 m and 70 m (98 ft and 230 ft) depth (Corbin et al., 2005; Ward et al., 2004). Despite no evidence indicating that the contamination has reached the groundwater at BC cribs and trenches, the mobility of Tc-99 had been demonstrated in laboratory tests and was recognized as a threat to groundwater at the site. Using data from numerical models, laboratory analyses, field investigations, and information on historical discharges, the EPA and Ecology identified Tc-99 and U contamination of the vadose zone as a remediation priority. The U.S. DOE was notified by EPA and Ecology regarding risks associated with Tc-99 contamination in a letter requesting development of a strategy for improved methods to understand the nature and extent of vadose zone contamination, specifically Tc-99, and to develop remedial options for addressing such contamination. To develop the appropriate technology for characterizing, remediating, and monitoring the deep vadose zone Tc-99 contamination, the U.S. DOE worked with the EPA and Ecology to create a Treatability Test Plan under a Remedial Investigation/Feasibility Study (RI/FS) for the Hanford 200 Areas. Under this RI/FS, it was determined that a treatability test for soil desiccation should be carried out as it was identified as a promising in-situ treatment technology for mitigating risks posed by Tc-99 contamination to the groundwater table. The BC Cribs and Trenches site was identified as a representative site for Tc-99 and U contamination and selected for the soil desiccation treatability test. In this chapter, we summarize the overlying regulatory framework of RI/FS and treatability tests and illustrate how development and experimentation supported the evaluation of selected remedies. We briefly discuss the RI/FS for the 200 Areas of the Hanford Site and focus on the soil desiccation treatability testing performed at the BC cribs and trenches site under the Deep Vadose Zone Treatability Test Plan for the Hanford Central Plateau (DVZ-TT). The DVZ-TT is one component of the remedial investigation/feasibility study for the Hanford 200 Areas and represents the underlying regulatory framework that drives site operations towards records of decision and site closure.

Mangel, Adam R.↗

Enhanced Attenuation of Uranium in the Subsurface

Over time, the focus for the Hanford Site has moved from production to decommissioning and site remediation. Several hundred metric tons of near-surface vadose zone sediment have been excavated from the 300 Area in an effort to remove the source of the uranium contamination (DOE/RL, 2011). Despite remediation efforts, uranium continues to be problematic with concentrations greater than the maximum contaminant level (MCL, which is 30 µg/L) for drinking water. Due to the close proximity of the Columbia River, the uranium continues to be a focus of investigation and remediation. After finding that the uranium concentrations were not decreasing as quickly as expected (based on the 1996 ROD) the Tri-Parties set new milestones, including an update of the conceptual model for the 300 Area uranium plume (Williams et al., 2007). In order to more accurately complete a feasibility study and identify how to remediate the uranium in the groundwater, the DOE authorized a remedial investigation/feasibility study (RI/FS). RI/FSs are designed to screen technologies to determine effectiveness, implementability, and cost (see Chapter 2b). These studies are designed to be conducted concurrently as part of the CERCLA process, so the data collected during site characterization (part of the RI) can inform the treatability studies and field tests conducted under the FS (EPA 1988). For the 300 Area, this study included laboratory, field, and modeling components as well as additional sediment and groundwater characterization to determine a suitable remediation strategy to reduce the uranium concentration in the groundwater plume within the expected time frame and cost.

300 area, uranium, polyphosphate, Hanford book pro↗

Results of a Soil Flushing Treatability Test for Hanford Site Hexavalent Chromium Removal - 20446

U.S. Department of Energy contractor CH2M Hill Plateau Remediation Company has made significant progress remediating hexavalent chromium in groundwater near the Columbia River through the operation of pump and treat facilities and source removal activities. To mitigate risks associated with hexavalent chromium contamination, which was identified in a CERCLA interim action record of decision as the primary groundwater contaminant of concern for the 100-KR-4 Operable Unit from discharging to the Columbia River, three ion-exchange pump and treat systems were installed between 1997 and 2009. Between 2010 and 2016, operation of the K West pump and treat system, located near the former 105K West plutonium production reactor, reduced concentrations below the groundwater remediation target for hexavalent chromium. In 2016, a rebound study was performed to evaluate the effectiveness of the pump and treat remedy and assess the potential for any residual hexavalent chromium sources continuing to contribute to groundwater contamination. As a result of the rebound study, a source of continued groundwater contamination was identified. To address this condition, a soil flushing treatability test was written and approved by the U.S. Department of Energy and the U.S. Environmental Protection Agency. The test included saturating about a 1-acre area of soil with treated water with the goal of forcing the residual hexavalent chromium to groundwater where existing extraction wells could remove it for treatment, accelerating the cleanup process. In spring and summer 2019, CH2M Hill Plateau Remediation Company installed and began operating a shallow underground leach system to support the treatability test. Preliminary sampling data show the test was effective in removing the residual contamination. Following further evaluation and analysis from the initial test, the process will be considered for implementation elsewhere on the Hanford Site, particularly at locations where there is a known or suspected continuing contamination source in the soil column. The paper will cover the goals of the study, as well as more details about the following: - Overview of pump and treat exit strategy (using U.S. Environmental Protection Agency guidance); - The design and installation of the soil flushing technology in the 100-K Area; - The testing process and results of sampling data; - Post-study evaluation and potential for implementation in other locations at the Hanford Site. Innovative solutions for cleanup, such as the soil flushing technology, have resulted in substantial progress in the removal of groundwater contaminants at the Hanford Site, potentially shortening the time frame required to meet cleanup goals and resulting in significant cost savings. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of Scalable Reactive Transport Framework for PFAS

Research on PFAS chemicals is extensive and covers all aspects, including analytical quantification, determination of properties, toxicology, ex situ treatment, and in situ remediation. PFAS chemicals are very stable and thus persistent/recalcitrant in the environment. Although there are many unknowns about PFAS chemicals, degradation pathways, reaction rates, etc., many different sorption, oxidation, reduction, biological, and innovative treatment approaches are being developed. Sorption with activated carbon is currently the only fully available in situ treatment technology for PFAS-impacted groundwater. Given the wide array of PFAS chemicals and transformation products, remediation may need multi-step treatment trains to fully address the PFAS contamination. The work here provides kinetic reaction modules that represent an initial cut at functionality representing PFAS migration and reaction in groundwater aquifer flow and transport models. One reaction kinetics module provides a method to model kinetically limited adsorption using a mass transfer model. The second reaction module represents biological transformation of 8:2 FTOH and daughter species, illustrating how a complex reaction pathway network can be represented. Both reaction modules allow for spatially variable parameter values so that a variety of remediation approaches (e.g., a PRB or volumetric treatment or variations in geochemical conditions) can be simulated. The intent with these PFAS reaction modules is to provide tools for practitioners to aid in the selection, design, and assessment of potential in situ PFAS remediation strategies. It is anticipated that, as PFAS remediation technologies and scientific understanding advances, these modules would be refined or replaced to match new knowledge.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

CARA Risk Assessment Thresholds

Warning remediation threshold (Red threshold): Pc level at which warnings are issued, and active remediation considered and usually executed. Analysis threshold (Green to Yellow threshold): Pc level at which analysis of event is indicated, including seeking additional information if warranted. Post-remediation threshold: Pc level to which remediation maneuvers are sized in order to achieve event remediation and obviate any need for immediate follow-up maneuvers. Maneuver screening threshold: Pc compliance level for routine maneuver screenings (more demanding than regular Red threshold due to additional maneuver uncertainty).

conjunction↗

2023 Land Use Control Inspections Report

2023 Land Use Control (LUC) Inspections Report for John F. Kennedy Space Center (KSC), Florida. This letter report documents the quarterly LUC inspections the KSC Remediation Group conducts at Remediation Sites. No LUC findings occurred in 2023. A Corrective Action to address arsenic-impacted soil at the KSC Child Development Center was performed in July 2023. This letter report provides a summary and documents the field activities for that Corrective Action. Copies of the formal LUC Implementation Plans (LUCIPs) for 71 Remediation Sites at KSC are presented in this letter report. For the Remediation Sites that do not have formal LUCIPs, the report documents that informal LUCs that the Remediation Group has implemented at these sites.

Christopher Adkison↗

3-D Radiological Data Acquisition, Visualization and Modeling - 20211

The U.S. Army Corps of Engineers (USACE) was tasked to investigate and remediate low activity radiological contamination from research and production of the nation's first nuclear weapons at the former DuPont Chambers Works Formerly Utilized Sites Remedial Action Program (FUSRAP) site (DuPont). The DuPont site had several buildings used for the Manhattan project that were demolished in the 1940's and 1950's apparently using heavy earthmoving equipment. Some of the contaminated rubble from the demolition appears to have been spread out by this equipment resulting in somewhat random scattering of radiologically contaminated soil and debris along with aqueous spills. Traditional investigative methods such as soil borings, test pits and 2-dimensional gamma walkovers were only partially successful in delineating the radiological contamination at the site. It was feared that even 'chasing' the contamination during remediation would miss contamination if the demolition resulted in discontinuous trails of radiologically contaminated soils. In evaluating the data generated over the interceding decades, the USACE determined that a better method to collect and process the remedial action radiological data was needed to enable the project team to optimize predictive planning and meet documentation expectations. The purpose of this paper is to provide an overview of the effort and progress to combine and organize radiological survey methods into a highly flexible sampling, modeling, and decision analysis approach that emphasizes the quality of decision-making during remediation. This innovative system blends multiple tools to develop a methodology that can extend MARRSIM [1] into the subsurface and provide tools that can be applied to other sites. (authors)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Application of Fe-doped biochar in Cr(VI) removal from washing wastewater and residual Cr(VI) immobilization in contaminated soil

High-content Cr(VI)-contaminated soils are challenging to remediate using a single remediation technique. This study combined soil washing and immobilization to remediate high-content (3440 mg kg -1 ) Cr(VI)-contaminated soil, which investigated the effects of operating time, temperature, and liquid-solid ratio (LSR) on the Cr(VI) removal efficiency of soil washing and evaluated the potential of Fe-doped biochar (FeBC) in soluble Cr(VI) removal from the washing wastewater and residual Cr(VI) immobilization in the washed soil. The Cr(VI) removal efficiency of soil washing increased with the operating time, temperature, and LSR, but still cannot remove Cr(VI) to achieve the safety content (<100 mg kg -1 ). FeBC showed satisfactory potential in both Cr(VI) removal and immobilization from wastewater and soil, in which the main mechanisms involve ion exchange, redox, and coprecipitation. These results demonstrate applying soil washing & immobilization to remediate high-content Cr(VI)-contaminated soil is a promising alternative method.

54 ENVIRONMENTAL SCIENCES↗

End State: Vision for Future Land Use at Hanford

An end state vision is influenced by practical constraints associated with technology limitations, resource availability, costs, timing, and unintended consequences of remedial actions, and a site’s next intended use. Therefore, subsurface environmental remediation goals often need to be balanced against the risks and costs of contaminant removal versus leaving contamination in place. For example, in regions where contaminant concentrations are high but immobile, the intended site use should be evaluated in conjunction with the risk of re-mobilization with an aggressive remedy. By contrast, the technological challenges, cost, and time to reach remedial objectives of cleaning up low levels of contamination distributed over large areas in the subsurface may require different considerations for a site’s next intended use.

environmental remediation, environmental managemen↗

Chemical-Biological Cyclic Process for Hexavalent Chromium Reduction to Trivalent Chromium in Aqueous Medium - 20224

Conventional treatment of chromium contamination focuses on immobilization of the highly toxic and water-soluble form Cr(VI), by reducing it to the relatively less toxic and less mobile trivalent form, Cr(III), using reducing compounds like ferrous sulfate or ferrous iron, Fe(II). The Cr(VI) also respond to biodegradation and subsequent reduction. During the reduction reaction, Fe(II) is oxidized to ferric, Fe(III), which, being at the highest oxidation state, has no ability to reduce Cr(VI), and therefore remediation process terminates. The good news is that metal-reducing bacteria, S. oneidensis MR-1, can regenerate Fe(II) from Fe(III) with the help of an organic electron donor in an appropriate bacterial media. Thus, in the Cr(VI) chemical remediation process, Fe(II) to Fe(III) conversion is reversed by the biological process, regenerating Fe(II) and the Cr(VI) chemical reduction process continues in a cyclic fashion. This study presents the results of regeneration of Fe(II) from fresh Fe(III) as well as from the reaction products of Cr(VI) and Fe(II). Both fresh Fe(III) and reaction product Fe(III) exhibited the same reduction behavior. Fe(II) production increased with the increase of initial concentration of Fe(III), resulting in 87.5% Fe(II) regeneration. The extent of Fe(III) reduction (Fe(II)t/Fe(III)0.hour) was 21 times higher than the extent of Cr(VI) reduction (Cr(VI)t/Cr(VI)0.hour) by S. oneidensis MR-1. In a cyclic process of sequential Cr(VI) addition, the amount of Fe(II) regeneration decreased with the increase in cycle number, a fixed quantity of starting S. oneidensis MR-1 could regenerate Fe(II) at least five times in a ten-hour period. More importantly, regenerated Fe(II) instantly reduced Cr(VI) to Cr(III). So, Fe(II) regeneration with metal-reducing bacteria has a good potential for application in groundwater and wastewater remediation in reducing Cr(VI) to Cr(III). As a comparison of chemical to biological transformation, chemical transformation of Cr(VI) by Fe(II) was almost 600 times greater than that of biological transformation. Therefore a chemical-biological cyclic process offers potential applications for remediation of groundwater and hexavalent chromium contaminated waste sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Hanford's Purex Tunnel 2 Structural Stabilization Project - 20509

In 2019, U.S. Department of Energy (DOE) contractor CH2M Hill Plateau Remediation Company (CHPRC) completed structurally stabilizing the Plutonium Uranium Extraction Plant (Purex) waste storage Tunnel 2 with engineered grout. This action significantly reduced risk to Hanford workers, the surrounding community and environment by preventing future collapse of the tunnel and possible release of radioactive materials. Decades of plutonium production at the Purex facility required construction of two large underground tunnels for storage of highly contaminated plutonium processing equipment that had failed during the operation of Purex and other facilities across the Hanford Site. Following the partial collapse of Purex Tunnel 1 on May 9, 2017, DOE and CHPRC took immediate action to safely stabilize the collapsed section of the tunnel. The hole in the tunnel was filled the next day as a temporary stabilization measure, and no contamination was detected as a result of the partial collapse of the tunnel. Workers then stabilized Tunnel 1 in its entirety by filling with engineered grout, which also encapsulated the radioactive equipment and railcars within the tunnel. Grouting eliminated the risk of further collapse and stabilized the tunnel contents, all while not precluding future remedial actions or final closure decisions. While conducting an integrity analysis of Tunnel 1 by using construction drawings, photos and other historical documents, project teams also analyzed the much larger Purex Tunnel 2. The analysis found Tunnel 2 did not meet current codes for structural integrity, and it may not be able to bear the weight of the soil above the tunnel. Therefore, it was determined that Tunnel 2 was also at risk of collapse. DoE's independent panel of experts determined grouting to be the best choice for stabilizing Tunnel 2 because it provides the highest level of stability and protection, and does not preclude future remedial actions. DOE authorized CHPRC to commence work and the Purex Tunnel 2 Structural Stabilization Project was launched in December of 2017. The paper will discuss the process of recognizing the following critical aspects and risks associated with stabilizing Tunnel 2, and the actions taken by the project team to mitigate these risks, including: - Tunnel investigation and data collection to assist with future remediation; - On-site batching and mock-ups to provide the large quantity of grout required for stabilizing the tunnel; - Workforce involvement and innovative actions that mitigated the project's most significant potential hazards, including traffic control; - Project team high level of execution translated into successful project execution. Sharing lessons learned from this critical risk-reduction effort can enhance the safety and efficiency of other complex and hazardous projects across the DOE complex. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Feedback on Forty-year Long Clean-up Operations of a Contaminated Soil for Environmental Purpose - 20026

One of the CEA facilities in France is the place of miscellaneous mapping and clean-up operations since the 1980's. The final purpose of the conducted work deals with the environmental remediation of the building. In France, the absence of a regulatory framework for the management of sites polluted by radioactive substances, especially as the lack of release thresholds, has led to develop different approaches of soil radiological characterization. The geostatistical approach is part of them. Preliminary investigations are an unavoidable step prior to clearance and remediation. First, historical analysis enables to define site perimeters to investigate as well as to precisely locate expected contaminated parts. For radioactive pollutants, the media (water, soil, air) and transfer routes participate in the definition of the investigation perimeter and thus also need to be identified through a geological study. At the same time, functional analysis leads to choose the best measurement means which could provide useful information when combined with visual inspection. An equipment well adapted to easy-to-measure radionuclides as gamma emitters, such as gamma probe or on-site gamma spectrometry, is usually selected as a non-destructive assay. Coupled with spatial positions, processed on-site radiological data can be mapped. Data processing consists in mapping and kriging before a geostatistical analysis in order to identify the zones of interest to be targeted. Selected zones are not only linked to high level count rates but also to low level ones so that a pollution-free reference is known in the area. This data processing also enables to categorize waste types according to their origin and contamination levels. An expected volume of different waste then follows as well as the waste characterization equipments. In-depth investigations, e.g. core drillings and samplings, naturally ensue to aim at remediation optimization through the assessment of environmental impact. After clean-up operations, non-destructive assays as well as destructive samplings enable to check the effective clearance. Following this methodology in the present remediation work, results of the first non-destructive assay campaign highlighted a long-lived transuranic radionuclides contamination in the concrete flagstone. Successive non-destructive assays were then performed in the defined zones of interest. Count rates measured with a surface probe were first mapped. The best localization of destructive assays, i.e. core drillings at a 1 meter depth, came from this surface mapping followed by a geostatistical analysis. The concrete flagstone was totally removed. Then, the depth of soil to remove under the flagstone was optimized from the results of radiological activities measured in core drillings samples. A new surface mapping was then drawn after this partial soil excavation. The sand and demolition rubble samples, homogeneously constituted from the flagstone fragments, were analyzed by gamma spectrometry. Meanwhile, waste drums and other containers were also measured by gamma spectrometry and passive neutron measurement devices. All these results have brought miscellaneous pieces of information. In this context, major issues appear in terms of physical constraints such as the premises tininess as well as of soil sampling techniques and in terms of measurement performances assessment and the representativeness of homogeneous samples. The choice of radiological soil and waste characterization devices is described in the light of enhanced performances by keeping in mind radiation protection requirements and a willing to always optimize waste categories (very low level waste) and volume. The improvement of the characterization methods appears through this forty-year long work while sharing the feedback of encountered difficulties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Middlesex South FUSRAP Site: Collaboration Towards Beneficial Reuse - 20338

The US Department of Energy (DOE) Office of Legacy Management (LM) manages DoE's post-closure responsibilities and ensures the future protection of human health and the environment with respect to sites that have no continuing DOE mission after undergoing remediation. LM's beneficial reuse program promotes the LM strategic goal to sustainably manage and optimize use of public lands. The beneficial reuse program aims to repurpose former contaminated sites to restore the environment, protect the public health, revitalize communities, and spur economic growth. Benefits from the reuse of a site may increase the local tax base, facilitate job growth, utilize existing infrastructure, and enhance or protect natural resources. Beneficial reuse also promotes protectiveness by ensuring activities are compatible with long-term maintenance and protection of public health and the environment, as well as by retaining good stewardship of natural resources. LM actively participates in promoting the economic development vision of the surrounding communities by collaborating with local communities to promote regional or municipal initiatives. The Borough of Middlesex, New Jersey, has prepared the Lincoln Boulevard Redevelopment Plan, which will reinvent a once-viable downtown and enhance the quality of life for the community. The Middlesex South, New Jersey, Formerly Utilized Sites Remedial Action Program (FUSRAP) site lies within the boundaries of this redevelopment area. In support of this development plan, the Borough is interested in acquiring the site for its Department of Public Works and to increase street access in the future commercial district to be built near adjacent properties. The opportunity to put the FUSRAP site into productive use aligns with LM's mission and strategic goals. In support of beneficial reuse activities, DOE can dispose of excess real property using several mechanisms. The two disposal options applicable to the Middlesex south site include (1) utilizing the US General Services Administration (GSA) or (2) using the Title 10 Code of Federal Regulations Section 770, 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development' (known as a '770 transfer') process. Using the 770 transfer requires economic development as the primary driver, and a specific redevelopment proposal must be submitted. If there is no interest in specific economic development, the GSA option becomes the default mechanism for disposal of the property. In the case of the Middlesex south site, the 770 transfer process is being utilized and the Borough has submitted its economic development proposal to LM. Although LM is encouraged by the opportunity to put the site into productive use, the Middlesex south site is currently on the US Environmental Protection Agency (EPA) National Priorities List and remediation is being performed by the US Army Corp of Engineers (USACE) under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). Consequently, any property transfer must meet the requirements under CERCLA Section 120(h), 'Property Transferred by Federal Agencies.' As the groundwater remedy will not be in place for several years, approval would be required from the US EPA administrator and the governor of the state of New Jersey to perform an early transfer of the site (before all response actions have been completed). The time frame for these approvals to occur under the normal process conflicts with the proposed redevelopment schedule; therefore, various options for expedited sale, transfer, or lease of portions of the site to the Borough were evaluated. The subsequent decision on a mutually beneficial path forward was the result of a collaborative effort between LM, USACE, the Borough and its redevelopment team, EPA, and the New Jersey Department of Environmental Protection. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Metal-organic-framework and walnut shell biochar composites for lead and hexavalent chromium removal from aqueous environments

Extensive research in recent years has explored the realm of porous carbon composites for various applications, including electrochemistry, structural materials, environmental remediation, and more. In particular, the fabrication of porous carbon composites using a metal-organic framework (MOF) and biochar (BC) for aqueous remediation is a fairly new avenue of research. In this study, a MOF-BC composite was synthesized with unmodified and chemically modified BCs using solvothermal synthesis. The composites were used as adsorbents to remediate heavy metals, such as lead (II) and chromium (VI), from aqueous environments. Here, it was verified that the MOF was homogeneously deposited onto the BC's surface using various material characterization techniques. Lead and chromium adsorption studies revealed a high adsorption capacity with greater than 99% removal for lead and ∼65% for chromium, respectively. Impressively, for lead, the highest observed experimental adsorption capacity of the MOF-chemically modified BC composite was 535 mg/g, compared to 240 mg/g for pristine BC. Meanwhile, the adsorption capacity of the same MOF-BC composite for chromium ions was low at 18 mg/g, compared to 80 mg/g for the chemically modified BC. The MOF-BC had a rapid adsorption rate, achieving equilibrium at only 150 min of reaction time for lead ions. MOF-BCs have higher adsorption for cationic lead through physisorption and ion-exchange mechanisms, whereas, for anionic chromium, removal is dominated only by physisorption mechanisms. The outcomes and methodological developments attained in this study offer a novel and compelling approach for synthesizing MOF-BC composites for aqueous remediation applications.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Arsenic stabilization performance of a novel starch-modified Fe-Mn binary oxide colloid

Arsenic (As) is an environmentally hazardous contaminant and can be a serious threat to human health. In China, remediation needs for a large number of As-contaminated sites renders a strong demand for efficient remedial reagents and cost effective approaches. In this study, a novel starch-modified Fe-Mn binary oxide (SFM), an amorphous colloidal material, has been synthesized as a remedial reagent and its As stabilization performance has been evaluated. A set of laboratory batch experiments were carried out by directly adding SFM of different dosages into three contaminated soils. Results demonstrated that SFM could transform As in soil from non-specifically and specifically sorbed fractions to the more stable form bounded to amorphous iron hydrous oxides, thus reducing the As concentration in TCLP leachates by 42.0-93.2%. Results from adsorption tests and microscopic analysis indicated that the interactions between SFM and As are mainly controlled by adsorption, oxidation, and precipitation processes. SFM has abundant surface hydroxyl groups, with excellent adsorption properties for both As(V) and As(III), with the maximum adsorption capacities of 160.63 and 284.64 mg/g respectively at pH 7.0. The adsorption process closely fitted pseudo second-order kinetics and Freundlich isotherm model. SFM could increase soil Eh and oxidize As(III) to As(V), which facilitated the As stabilization in soilColloidal iron-based material directly used for stabilization in As contaminated soils is reported here for the first time. Starch modification improves both the reactivity and mobility of SFM in soil. Our findings propose an efficient and convenient reagent for As remediation in soil.

Yan, Xiulan↗

Desorption and Co–Dissolution of Uranium–Bearing Solids During Alkalinity–Enhanced Flushing of Contaminated Sediments

Elevated uranium concentrations in groundwater remain a persistent challenge at contaminated sites. Several sites rely on natural flushing of uranium as a remediation strategy. Uncertainties in conceptual models can cause remediation strategies to underestimate timeframes required to reach remediation goals. In this study, laboratory experiments were conducted to investigate uranium flushing of sediments from a site with persistent groundwater contamination. Six columns were used to simulate alkalinity-enhanced flushing of uranium from sediments, by switching influent alkalinity after ~12 pore volumes. About 20% to 31% of sediment uranium was consistently flushed from the sediments. K d values varied greatly (5.3 to 117 L/kg) but were consistently lower (20% to 50%) during influents with elevated alkalinity. The mass of uranium recovered from the columns also was consistently higher (5% to 80%) during alkalinity-enhanced flushing periods. However, column experiments with sequentially increasing alkalinity showed diminishing returns in uranium elution at higher carbonate concentrations. The loss of flushing efficiency is attributed to significant calcite precipitation at higher alkalinities. Furthermore, the results show that alkalinity-enhanced flushing of uranium could be employed as a viable remediation scheme if calcite precipitation could be minimized in a field application.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗