Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “plant operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Geothermal research and development program of the US Atomic Energy Commission

Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrate on development of resource utilization and advanced research and technology as the areas most suitable to the expertise of its staff and that of the National Laboratories. The Commission's work in geothermal energy is coordinated with that of other agencies by the National Science Foundation, which has been assigned lead agency by the Office of Management and Budget. The objective of the Commission's program, consistent with the goals of the total federal program is to facilitate, through technological advancement and pilot plant operations, achievement of substantial commercial production of electrical power and utilization of geothermal heat by the year 1985. This will hopefully be accomplished by providing, in conjunction with industry, credible information on the economic operation and technological reliability of geothermal power and use of geothermal heat.

Werner, L. B.↗

The hydrogen sulfide emissions abatement program at the Geysers Geothermal Power Plant

The scope of the hydrogen sulfide (H2S) abatement program at The Geysers Geothermal Power Plant and the measures currently under way to reduce these emissions are discussed. The Geysers steam averages 223 ppm H2S by weight and after passing through the turbines leaves the plant both through the gas ejector system and by air-stripping in the cooling towers. The sulfide dissolved in the cooling water is controlled by the use of an oxidation catalyst such as an iron salt. The H2S in the low Btu ejector off gases may be burned to sulfur dioxide and scrubbed directly into the circulating water and reinjected into the steam field with the excess condensate. Details are included concerning the disposal of the impure sulfur, design requirements for retrofitting existing plants and modified plant operating procedures. Discussion of future research aimed at improving the H2S abatement system is also included.

Allen, G. W.↗

Aspects of job scheduling

A mathematical model for job scheduling in a specified context is presented. The model uses both linear programming and combinatorial methods. While designed with a view toward optimization of scheduling of facility and plant operations at the Deep Space Communications Complex, the context is sufficiently general to be widely applicable. The general scheduling problem including options for scheduling objectives is discussed and fundamental parameters identified. Mathematical algorithms for partitioning problems germane to scheduling are presented.

Phillips, K.↗

Waste heat utilization in industrial processes

A survey is given of new developments in heat exchangers and heat pumps. With respect to practical applications, internal criteria for plant operation are discussed. Possibilities of government support are pointed out. Waste heat steam generators and waste heat aggregates for hot water generation or in some cases for steam superheating are used. The possibilities of utilization can be classified according to the economic improvements and according to their process applications, for example, gascooling. Examples are presented for a large variety of applications.

Weichsel, M.↗

The impact of H2S emissions on future geothermal power generation - The Geysers region, California

The future potential for geothermal power generation in the Geysers region of California is as much as 10 times the current 502 MW(e) capacity. However, environmental factors such as H2S emissions and institutional considerations may play the primary role in determining the rate and ultimate level of development. In this paper a scenario of future geothermal generation capacity and H2S emissions in the Geysers region is presented. Problem areas associated with H2S emissions, H2S abatement processes, plant operations, and government agency resources are described. The impact of H2S emissions on future development and the views of effected organizations are discussed. Potential actions needed to remove these constraints are summarized.

Leibowitz, L. P.↗

The dish-Rankine SCSTPE program (Engineering Experiment no. 1)

Activities planned for phase 2 Of the Small Community Solar Thermal Power Experiment (PFDR) program are summarized with emphasis on a dish-Rankine point focusing distributed receiver solar thermal electric system. Major design efforts include: (1) development of an advanced concept indirect-heated receiver;(2) development of hardware and software for a totally unmanned power plant control system; (3) implementation of a hybrid digital simulator which will validate plant operation prior to field testing; and (4) the acquisition of an efficient organic Rankine cycle power conversion unit. Preliminary performance analyses indicate that a mass-produced dish-Rankine PFDR system is potentially capable of producing electricity at a levelized busbar energy cost of 60 to 70 mills per KWh and with a capital cost of about $1300 per KW.

Pons, R. L.↗

ISPM X-band uplink technology demonstration. Part 1: Overview

The ground and spacecraft hardware research, design, and implementation lead to an end to end in flight technology demonstration on the International Solar Polar Mission spacecraft. An introduction to the overall effort is given and the flight experiment objectives are established. The expected improvements in the telecommunications performance are summarized. Also presented is a conceptual mission operations plant.

Komarek, T. A.↗

Coal desulfurization by low temperature chlorinolysis, phase 3

Laboratory scale, bench scale batch reactor, and minipilot plant tests were conducted on 22 bituminous, subbituminous, and lignite coals. Chemical pretreatment and post treatment of coals relative to the chlorination were tried as a means of enhancing desulfurization by the chlorinolysis process. Elevated temperature (500-700 C) hydrogen treatment of chlorinolysis-processed coal at atmospheric pressure was found to substantially increase coal desulfurization up to 90 percent. Sulfur forms, proximate and ultimate analyses of the processed coal are included. Minipilot plant operation indicates that the continuous flow reactor provides coal desulfurization results comparable to those obtained in the batch reactor. Seven runs were conducted at coal feed rates of 1.5 to 8.8 kg per hour using water and methylchloroform solvents, gaseous chlorine feed of 3 to 31.4 SCFH at 21 to 70 C, and atmospheric pressure for retention times of 20 to 120 minutes.

Kalvinskas, J. J.↗

A variable-gain output feedback control design methodology

A digital control system design technique is developed in which the control system gain matrix varies with the plant operating point parameters. The design technique is obtained by formulating the problem as an optimal stochastic output feedback control law with variable gains. This approach provides a control theory framework within which the operating range of a control law can be significantly extended. Furthermore, the approach avoids the major shortcomings of the conventional gain-scheduling techniques. The optimal variable gain output feedback control problem is solved by embedding the Multi-Configuration Control (MCC) problem, previously solved at ICS. An algorithm to compute the optimal variable gain output feedback control gain matrices is developed. The algorithm is a modified version of the MCC algorithm improved so as to handle the large dimensionality which arises particularly in variable-gain control problems. The design methodology developed is applied to a reconfigurable aircraft control problem. A variable-gain output feedback control problem was formulated to design a flight control law for an AFTI F-16 aircraft which can automatically reconfigure its control strategy to accommodate failures in the horizontal tail control surface. Simulations of the closed-loop reconfigurable system show that the approach produces a control design which can accommodate such failures with relative ease. The technique can be applied to many other problems including sensor failure accommodation, mode switching control laws and super agility.

Halyo, Nesim↗

Tuning maps for setpoint changes and load disturbance upsets in a three capacity process under multivariable control

Tuning maps are an aid in the controller tuning process because they provide a convenient way for the plant operator to determine the consequences of adjusting different controller parameters. In this application the maps provide a graphical representation of the effect of varying the gains in the state feedback matrix on startup and load disturbance transients for a three capacity process. Nominally, the three tank system, represented in diagonal form, has a Proportional-Integral control on each loop. Cross coupling is then introduced between the loops by using non-zero off-diagonal proportional parameters. Changes in transient behavior due to setpoint and load changes are examined by varying the gains of the cross coupling terms.

Litt, Jonathan S.↗

Lunar oxygen - The reduction of glass by hydrogen

The direct reduction of volcanic glass by hydrogen has been proposed as a method of extracting oxygen from the lunar soil. Experiments using lunar simulant glasses reacted with flowing hydrogen gas have demonstrated reduction at temperatures from 1000 to 1200 C. For melted samples ferrous iron was reduced to the metal, which formed large crystals at the expense of the glass. Samples held below the melting point rapidly devitrified, and iron was formed from submicrometer crystals of ilmenite and pyroxene. Weight losses of 3.6 - 4.5 percent, depending on glass composition, were achieved in 3 hours at 1100 C. A lunar oxygen plant operating at this efficiency and utilizing Apollo 17 orange glass as a feedstock could produce 50 kg of oxygen per ton of soil. The processes of reduction and sintering of lunar soil are synergistic, and could be combined to produce both oxygen and construction material at a moon base.

Allen, Carlton C.↗

Treatability Study of Pentaborane(9)

Procedures for the safe destruction of liquid pentaborane(9), B5H9, by solvolysis were investigated. The objective of the study was to establish the optimum conditions for a pilot plant operation that would use water, or alcohol, or water-alcohol mixtures as the solvolysis reagent. Small amounts of B5H9 sprayed from a syringe will not necessarily enflame, nor will a small pool on a spot plate. Therefore, a procedure was developed to reproducibly demonstrate the flammability of B5H9. In these tests every sample of neat B5H9 ignited and burned with a very sooty flame till the sample was consumed. The spontaneous self-ignition of B5H9 was quenched by the addition of small concentrations of ethers THF (tetrahydrofuran) or DME (1,2-dimethoxy ethane). It was found that ten percent (volume) of either provided total quenching with a large margin of safety. When these stabilized solutions were exposed to air, they decomposed and evaporated leaving a residue that was identified by nuclear magnetic resonance (NMR) analysis as boric acid. Most of the laboratory solvolysis experiments used the 90 percent B5H9, 10 percent THF solution. This mixture was safer to handle and its solvolysis reactivity was virtually identical to that of 100 percent B5H9. Reaction rates were analyzed by measurement of hydrogen evolved during the solvolysis reactions. In terms of the minimum overall complete reaction time, the data indicate that 50/50 alcohol/water is the optimum solvolysis reagent. This reaction produced a mixture of boric acid, B(OH)3, and triethoxyborane, B(OEt)3[Et = C2H5], and mixed exchange derivatives thereof.

McDonald, Joseph K.↗

Treatability Study of Pentaborane(9)

Procedures for the safe destruction of liquid pentaborane(9), B5H9, by solvolysis were investigated. The objective of the study was to establish the optimum conditions for a pilot plant operation that would use water, or alcohol, or water-alcohol mixtures as the solvolysis reagent Small amounts of B5H9 sprayed from a syringe will not necessarily enflame, nor will a small pool on a spot plate. Therefore, a procedure was developed to reproducibly demonstrate the flammability of B5H9 In these tests every sample of neat B5H9 ignited and burned with a very sooty flame till the sample was consumed. The spontaneous self-ignition of B5H9 was quenched by the addition of small concentrations of the ethers THF (tetrahydrofuran) or DME (1,2-dimethoxy ethane). It was found that 10% (volume) of either provided total quenching with a large margin of safety. When these stabilized solutions were exposed to air, they decomposed and evaporated leaving a residue that was identified by NMR analysis as boric acid. Most of the laboratory solvolysis experiments used the 90% B5H9, 10% THF solution. This mixture was safer to handle and its solvolysis reactivity was virtually identical to that of 100% B5H9. Reaction rates were analyzed by measurement of hydrogen evolved during the solvolysis reactions. In terms of the minimum overall complete reaction time, the data indicate that 50150 alcohol/water is the optimum solvolysis reagent. This reaction produced a mixture of boric acid, B(OH)3, and triethoxyborane, B(OEt)3 [Et = C2H5], and mixed exchange derivatives thereof.

McDonald, Joseph K.↗

Energy Recovery System

Cogeneration system is one in which the energy ordinarily wasted in an industrial process is recovered and reused to create a second form of energy. Such an energy recovery system is in use at Crane Company's plant in Ferguson, KY, which manufactures ceramic bathroom fixtures. Crane's system captures hot stack gases from the company's four ceramic kilns and uses them to produce electrical power for plant operations.

Source record↗

Hidden Markov Models and Neural Networks for Fault Detection

Continuous online monitoring of complex dynamic systems is common in applications as diverse as industrial plant operations, telecommunications network, and biomedical health monitoring. For monitoring purposes, the exact nature of the system under observation is typically not relevant provided there exist some measurements or symptoms which provide diagnostics information regarding the underlying system state.

Markov Fault Detection↗

Development and Applications of a Stage Stacking Procedure

The preliminary design of multistage axial compressors in gas turbine engines is typically accomplished with mean-line methods. These methods, which rely on empirical correlations, estimate compressor performance well near the design point, but may become less reliable off-design. For land-based applications of gas turbine engines, off-design performance estimates are becoming increasingly important, as turbine plant operators desire peaking or load-following capabilities and hot-day operability. The current work develops a one-dimensional stage stacking procedure, including a newly defined blockage term, which is used to estimate the off-design performance and operability range of a 13-stage axial compressor used in a power generating gas turbine engine. The new blockage term is defined to give mathematical closure on static pressure, and values of blockage are shown to collapse to curves as a function of stage inlet flow coefficient and corrected shaft speed. In addition to these blockage curves, the stage stacking procedure utilizes stage characteristics of ideal work coefficient and adiabatic efficiency. These curves are constructed using flow information extracted from computational fluid dynamics (CFD) simulations of groups of stages within the compressor. Performance estimates resulting from the stage stacking procedure are shown to match the results of CFD simulations of the entire compressor to within 1.6% in overall total pressure ratio and within 0.3 points in overall adiabatic efficiency. Utility of the stage stacking procedure is demonstrated by estimation of the minimum corrected speed which allows stable operation of the compressor. Further utility of the stage stacking procedure is demonstrated with a bleed sensitivity study, which estimates a bleed schedule to expand the compressors operating range.

Kulkarni, Sameer↗

Lunar Water Extraction Via Lunar Auger Dryer ISRU (LADI)

In 2009, the Lunar Reconnaissance Orbiter (LRO) and Lunar Crater Observation and Sensing Satellite (LCROSS) provided definitive proof of water in the Lunar’s southern permanently shadowed region (PSR)1. Both the 2020 NASA Technology Taxonomy2 and the Lunar Surface Innovation Initiative (LSII) team identified capability gaps in icy regolith transfer and reactor processing in Permanently Shadowed Region (PSR) environmental conditions. A water processing plant operating inside the PSR can continuously process water (and volatiles) for both breathable air and propellant. NASA’s Johnson Space Center (JSC) fabricated a unique breadboard test stand for validating the feasibility of this concept,developed a lunar auger dryer sizing tool, and identified the physical flow and thermal models required to design an Engineering Development Unit (EDU) for environmental testing. Over the two years this project was active, models were developed including: a) a sizing tool that scales the auger parameters based on production targets, b) accurate thermal models in both lab and lunar conditions, c) a Discreet Element Model (DEM) for observing particle effects in low-g, and d) incorporated these subsystem models into a MATLAB parametric Modular Open System Approach (MOSA) system model. These models were validated by testing the auger in both a mechanical and thermal system configuration. The results of this testing increased the Technology Readiness Level (TRL) of the Lunar Auger Dryer ISRU (LADI) system to TRL 4.

Lunar↗