Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “planned”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Site 300 Small Firearms Training Facility Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL) Project Management Office (PMO) is planning to execute a construction project at the Small Firearms Training Facility within LLNL's Experimental Test Site, Site 300 (S300). The proposed project will include extensive dirt work from a removal of a berm, the installation of a cinder block wall, and the replacement of a canopy and a fence with an access gate. This Sampling and Analysis Plan (SAP) outlines the procedures to collect environmental samples for the management and/or disposition of excess soil generated from the project site and geotechnical samples for building pad and pavement designs. This SAP has been prepared and is organized to be consistent with LLNL's Soil Screening and Management Plan (SSMP) (LLNL, 2021), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) programs (EPA, 2006).

54 ENVIRONMENTAL SCIENCES↗

U328 Electrical Reliability Project Soil Sampling and Analysis Plan

Lawrence Livermore National Laboratory's (LLNL’s) Project Management Office (PMO) is planning to install an underground electrical duct bank at the 3200 block of the Livermore Site (project). The proposed project will include a new electrical substation and feeders, demolition and replacement of the U328C utility building with a new structure to the west, re-routing of utilities, and update of the parking lot. This Sampling and Analysis Plan (SAP) outlines the procedures to collect and evaluate environmental samples for disposition of the excavated soil during the project and geotechnical samples for pavement design. This SAP has been prepared and is organized to be consistent with LLNL's Soils Screening and Management Plan (SSMP) (LLNL, 2022), as well as the U.S. Environmental Protection Agency's (EPA) Data Quality Objectives (DQO) process (EPA, 2006). In addition to the environmental samples, geotechnical samples will be collected by Consolidated Engineering Laboratories (CEL) on behalf of PMO. Geotechnical samples will be collected from a dedicated geotechnical boring location or co-located with environmental samples. Collection and evaluation of the geotechnical samples is determined by CEL and is therefore not discussed in this SAP.

54 ENVIRONMENTAL SCIENCES↗

Analytics Supporting Stockpile and Enterprise Planning [Slides]

A robust and growing modeling effort supports Los Alamos weapons leadership as well as NNSA (NA18, NA12, NA19) and DoD (DASD-NM, USSTRATCOM). Current work are valuable to several key NNSA working groups supporting strategic planning: Stockpile Stewardship Management Plan (SSMP); Requirements & Planning Document (RPD) analysis; Requirements and Capacity Working Group (RCWG); Production Integration Collaboration Working Group (PICWG); Enterprise Modeling and Analysis Consortium (EMAC); Cost Estimating Analysis Group (CEAG).

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Cultural Resource Management Plan for Brookhaven National Laboratory

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references the facets and interrelationships of cultural resources at BNL. Management strategies included within this CRMP are designed to adequately identify the cultural resources that BNL and DOE consider significant and to acknowledge associated management actions. A principal objective of the CRMP is to reduce the need for additional regulatory documents and to serve as the basis for a formal agreement between the DOE and the New York State Historic Preservation Officer (NYSHPO). The BNL CRMP is designed to be a “living document.” Each section includes identified gaps in the management plan, with proposed goals and actions for addressing each gap. The plan will be periodically revised to incorporate new documentation. The current (2023) update incorporates new findings and/or updated text based on completed or ongoing projects related to cultural resources at BNL since inception of the last updated CRMP in 2013. Historically, Brookhaven National Laboratory had little need for cultural resource management because many of its buildings were less than 50 years old. Most of the features that are potentially eligible for inclusion in the National Register of Historic Places were protected simply by avoiding the features. Compliance with cultural resource laws and regulations has included archeological surveys, such as those associated with the 1977 Final Environmental Impact Statement for Brookhaven National Laboratory and the 1978 Final Environmental Impact Statement for the Proton-Proton Storage Accelerator Facility (ISABELLE). In 1979, World War I trenches associated with the former Camp Upton and located near ISABELLE were determined to be eligible for inclusion in the National Register of Historic Places; however, many of these trenches had been destroyed by construction work. In 1991, the NYSHPO provided BNL with a letter indicating that only three structures and features were likely to be eligible for inclusion in the National Register of Historic Places. Between 1991 and 1999, little work associated with cultural resource management was accomplished. Beginning in 1999, awareness for the need of a program to manage cultural resources grew out of the realization that over half of the buildings at BNL were either 50 years old or were reaching that age and were, therefore, subject to the requirements in Section 106 of the National Historic Preservation Act. This fact, concomitant with the decontamination and decommissioning of the Brookhaven Graphite Research Reactor (BGRR) and the subsequent determination of BGRR’s eligibility for listing as an historical site, fueled the need for developing and implementing a more structured program for managing cultural resources at BNL.

54 ENVIRONMENTAL SCIENCES↗

United States cool surfaces deployment plan

Solar-reflective building envelope surfaces, such as cool roofs and walls, can be especially helpful in disadvantaged communities that often have poorly insulated older homes, aging or absent air conditioning units, steep utility bills, polluted air, and high vulnerability and exposure to extreme heat. With support from the U.S. Department of Energy, our project seeks to dramatically increase the climate-appropriate deployment of cool surfaces across the United States with an emphasis on their application to disadvantaged communities. First, we sought to identify cool-surface deployment barriers, opportunities, and models by (a) reviewing the history of cool-surface deployment activities, (b) interviewing cool-surface stakeholders, (c) researching successful energy-efficiency/green building deployment models; and (d) interviewing the actors who have implemented these models. Second, we conducted a workshop to engage stakeholders in development of a deployment plan. Third, we asked several U.S. federal agencies (a) how cool surfaces and cool surface stakeholders could support their missions and (b) how agency activities could support cool-surface deployment. Fourth, we identified a set of transformative ideas that form the core of the deployment plan. Transformative ideas include but are not limited to initiatives to (a) launch an educational campaign to make the general public and building professionals aware of how cool roofs and walls exclude unwanted solar heat; (b) create a “Cool Roof Prize” stimulating the development of affordable, high-performance cool asphalt roofing shingles; (c) conduct high-profile, large-scale demonstration programs that bring cool surfaces to disadvantaged heat-vulnerable communities; and (d) support local, regional, and state climate action (heat mitigation) plans with cool surfaces.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

National Electric Vehicle Infrastructure Formula Program Annual Report: Plan Year 2022-2023

The National Electric Vehicle Infrastructure (NEVI) Formula Program provides nearly $5 billion over 5 years to help states, the District of Columbia, and Puerto Rico (hereafter referred to as “states”) create a network of fast EV charging stations along designated Federal Highway Administration (FHWA) Alternative Fuel Corridors (AFCs), with emphasis along the Interstate Highway System. The first-year deployment plans were submitted to and reviewed by the Joint Office and FHWA and certified by FHWA in September 2022. To support the rollout of the NEVI Formula Program, the Joint Office has been providing technical assistance to the states since February 2022 and has developed DriveElectric.gov to serve as the front door for federal efforts to build out a national charging network. This report summarizes the key activities of the Joint Office in relation to the NEVI program and provides an individual and collective overview of the first-year deployment plans. The Joint Office will utilize the summary of these plans to inform program improvement and future technical assistance activities to support the states as they begin to implement their EV charging infrastructure.

33 ADVANCED PROPULSION SYSTEMS↗

Preliminary Per- and Polyfluoroalkyl Substances Sampling Plan for Pantex Plant

Leidos prepared this Preliminary Per- and Polyfluoroalkyl Substances (PFAS) Sampling Plan for the U.S Department of Energy (DOE) Pantex Plant Consolidated Nuclear Security, LLC (CNS) Pantex, the operations and maintenance (O&M) contractor of Pantex Plant commissioned the Preliminary PFAS Sampling Plan to evaluate the potential risks at the facility and collect preliminary groundwater data at areas within the Plant with the highest potential for PFAS. This plan presents findings from research conducted to assess past and current use of materials containing PFAS and identify areas where these materials were potentially stored, handled, used, or released at Pantex Plant. Pantex Plant is located in Carson County in the Texas Panhandle (Figure 1-1).

54 ENVIRONMENTAL SCIENCES↗

Risk-based System Upgrade Planning for AOT-IC Presentation [Slides]

The number of deployed systems and different HW/SW form factors makes it difficult to maintain a complete understanding of their health which leads to a reduced level of certainty when assessing risk and trying to prioritize system upgrade efforts. AOT-IC must constantly plan and execute system upgrade and replacement projects to ensure the longevity of the control system. There are many more projects needed than the group can realistically accomplish given schedule and resource constraints. The group must prioritize their upgrade projects to choose only the highest priority projects to execute each year. Currently plans upgrade and replacement projects based on alignment with mission needs, group vision, resource availability, and qualitative risk assessments based on SME estimates. The group maintains a risk register. This is useful as a tool for shaping strategic planning but currently lacks the quantitative data and process needed to generate accurate risk assessments.

43 PARTICLE ACCELERATORS↗

Lessons Learned From the Planning of Recent Wind Energy Technologies Office Field Campaigns

The U.S. Department of Energy (DOE) Wind Energy Technology Office (WETO) has funded several wind-energy-focused field campaigns in recent years. While essential to advance our understanding of the interactions between atmosphere and wind turbines, the planning of such campaigns has presented several challenges to the institutions involved in these efforts. In this document, we focus on the planning phase of the field campaigns and summarize the lessons learned from the recent AWAKEN, RAAW, and WFIP-3 field projects. We cover a variety of aspects to offer a proposed methodological pipeline that we recommend is followed when future similar endeavors are planned.

17 WIND ENERGY↗

Microreactor Transportation Emergency Planning Challenges

This report discusses microreactor transportation emergency planning and response challenges. The emphasis of the report is on transporting a microreactor containing irradiated fuel by highway and rail. The report first discusses microreactors in general, including microreactor fuel types and the use of hazardous material in microreactor designs. The report presents a microreactor concept of operations for transport highway, rail, and vessel and presents several transportation regulatory challenges associated with microreactors. Updates contained in this report include the transportation implications of revising the uranium lung absorption category for tri-structural isotropic (TRISO) particle fuel, discussion of exercises and drills including the 2024 Naval Spent Nuclear Fuel Transportation Accident Demonstration with the Shoshone-Bannock Tribes and the State of Idaho, and Tribal and State perspectives on microreactor transportation emergency response planning. Additional microreactor transportation external engagement activities conducted during FY2024 are also discussed. The report discusses the implications of the recent East Palestine, Ohio, rail accident for transportation emergency response planning. Included in this update is a discussion of H.R. 8996, the Railroad Safety Enhancement Act of 2024.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Grid Expansion Optimal Planning Tools (GridEO): Manual for Users and Developers

This report describes Grid Expansion Optimal Planning Tools (GridEO). GridEO is a Python package for electric power grid capacity expansion modeling. With GridEO, the user can build and solve instances of the Capacity Expansion Planning (CEP) problem to determine an optimal plan of investment in capacity of various types of power grid equipment.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Recommendations for a Fundamental Nuclear Material Control (FNMC) Plan for TRISO Fuel Fabrication Facilities Under NRC Regulations

A fundamental nuclear material control (FNMC) plan, which is required for all fuel fabrication facilities that are authorized to possess more than 1 effective kg of special nuclear material, describes how material control and accounting (MC&A) requirements will be met to comply with US Nuclear Regulatory Commission (NRC) regulations. Tristructural isotropic (TRISO) fuel fabrication facilities are likely to have issues in meeting MC&A requirements because of the new processes and fuel types their work involves. This report provides recommendations for an FNMC plan specifically for a TRISO fuel fabrication facility under NRC regulations and includes a draft outline of an FNMC plan. This report was produced for the Materials Protection, Accounting, and Control Technologies (MPACT) program under the Nuclear Fuel Cycle Technologies programs within the US Department of Energy’s Office of Nuclear Energy.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Plan for the Development and Application of a Risk Assessment Approach for Transportation Package Approval of a Transportable Nuclear Power Plant for Maritime Shipment (Rev. 1)

This plan proposes a strategy for licensing a transportable nuclear power plant, containing its unirradiated and irradiated fuel, as a transportation package for maritime transport using a probabilistic risk assessment framework in order to meet the regulatory requirements of 10 CFR Part 71. It is anticipated that initially, the deterministic transportation package licensing approach will be challenging due to the functional requirements of the transportable nuclear power plant. As such, a partial exemption request from the U.S. Nuclear Regulatory Commission coupled with applied compensatory measures are anticipated in support of providing equivalent safety to the public, worker, and environment. A plan is outlined as to how this would be demonstrated and a pathway is primarily outlined using the accompanying low accident rates which in turn support very low probabilities of release for a maritime application. Wherever possible, the proposed plan is supported by actual accident (casualty) data. Additional supporting information regarding a highway transportation probabilistic risk assessment in support of the Project Pele demonstration reactor that is currently under development is also referenced and discussed.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

McGrath Community Energy Planning

The City of McGrath, a remote Alaskan community reliant on diesel fuel, developed a Community Energy Plan through the Energy Technologies Innovation Partnership Project (ETIPP) to address high energy costs, infrastructure vulnerabilities, and long-term sustainability. Guided by community-led priorities and technical assistance from partners including NREL, REAP, and ANTHC, the plan identifies eight focus areas: distribution system upgrades, solar and battery integration, river energy potential, emergency backup power, housing efficiency, water system losses, independent power producer models, and targeted funding strategies. The plan combines local knowledge with technical analysis to chart a path toward a more resilient, affordable, and sustainable energy future for McGrath.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Research Development and Partnership Pilot (RDPP): Developing plans and partnerships for incorporating tree reproduction to understand Earth system change

The goals for this Research Development and Partnership Pilot (RDPP) proposal were to i) learn about Department of Energy (DOE) research and use the PI’s expertise on patterns and environmental drivers of tree reproduction as a basis to make connections with individuals and research groups at DOE National Laboratories, and ii) to develop plans and form partnerships that will both enhance the PI’s research. The objectives of the proj ect were for the PI to i) participate in the Department of Energy's Office of Science program in Biological and Environmental Research training and outreach activities, ii) conduct directed fact-finding on Earth and Environmental Systems Sciences Division (EESSD) research projects and new partnerships with individuals and groups at National Laboratories, ii) conduct meetings with potential collaborators at National Laboratories to discuss EESSD-relevant research ideas, and iv) to develop a plan for future research efforts. During the period of the award, the objectives of the proposal were met, as the PI attended Environmental System Sciences meetings, American Geophysical Union meetings, SPRUCE experiment meetings, and visited the Oak Ridge National Lab. These activities led to increased understanding of the research being conducted by DOE scientists and the PI had meetings with potential collaborators to develop future research plans that leverage expertise at DOE and the research interests of the PI to increase understanding of the role of tree reproduction in future carbon allocation and in tree regeneration models in boreal ecosystems.

54 ENVIRONMENTAL SCIENCES↗

ARM FY2025 Radar Plan

The U.S. Department of Energy (DOE) Atmospheric Radiation Measurement (ARM) user facility is dedicated to delivering high-quality radar data that significantly advance our understanding of cloud and precipitation processes, improving climate models. With radars operating across diverse frequencies, scanning modes, and global climate conditions, extensive staffing is essential for effective management. Due to current staffing constraints, achieving the expected level of operational excellence requires a more strategic approach. To address this challenge, ARM has developed an operational radar plan for the upcoming Fiscal Year 2025 (FY25) based on budget and staffing considerations. This report summarizes the Fiscal Year 2024 (FY24) ARM radar-related activities and outlines the strategic plan for FY25. It presents a comprehensive radar plan that includes detailed activities, priorities, and a projected timeline aligned with the ARM radar roadmap. Key tasks, detailed in Table 1, cover various radar operational stages and coordinated efforts among ARM teams.

54 ENVIRONMENTAL SCIENCES↗

Multi-Sensor Optimal Motion Planning for Radiological Contamination Surveys by Using Prediction-Difference Maps

Distributed and networked mobile sensor platforms using unmanned aerial and/or ground vehicles to survey areas of interest offer a safer and more efficient method for radiological contamination mapping; however, most applications rely on uniformly sweeping of the area in a raster-type motion without utilizing the information available in a dynamic sense. We have developed a fully autonomous optimal motion planning procedure for networks with two or more mobile sensors. The procedure utilizes well-established concepts of Gaussian processes in combination with control laws based on centroidal Voronoi tessellations to achieve optimal next-iteration sensor movements. A new method of informing optimal motion planning is proposed, whereby the absolute difference between the prior and current full-map prediction, referred to as the prediction-difference map, is used as the spatial density function within each Voronoi cell, providing immediate and iterative feedback for dynamic use of available information. The Gaussian process regression model used to estimate the contamination in unvisited locations also provides prediction uncertainties, and can be used as a quantitative metric to assess the confidence in the calculated contamination map; these estimates and prediction uncertainties are unavailable for standard uniform survey routines as they can only produce maps in the vicinity of observed locations. We present through simulation the achievable performance gains from using this new method by directly comparing to a uniform survey method. Results show that using the prediction-difference maps to inform motion planning procedures offers a faster rate of producing an accurate and convergent map relative to a uniform survey route.

47 OTHER INSTRUMENTATION↗

Planning Amidst Uncertainty: Identifying Core CCS Infrastructure Robust to Storage Uncertainty

Carbon Capture and Storage (CCS) is a critical technology for reducing anthropogenic CO2 emissions, but its large-scale deployment is complicated by uncertainties in geological storage performance. These uncertainties pose significant financial and operational risks, as underperforming storage sites can lead to costly infrastructure modifications, inefficient pipeline routing, and economic shortfalls. To address this challenge, we propose a novel optimization workflow that is based on mixed-integer linear programming and explicitly integrates probabilistic modeling of storage uncertainty into CCS infrastructure design. This workflow generates multiple infrastructure scenarios by sampling storage capacity distributions, optimally solving each scenario using a mixed-integer linear programming model, and aggregating results into a heatmap to identify core infrastructure components that have a low likelihood of underperforming. A risk index parameter is introduced to balance trade-offs between cost, CO2 processing capacity, and risk of underperformance, allowing stakeholders to quantify and mitigate uncertainty in CCS planning. Applying this workflow to a CCS dataset from the US Department of Energy’s Carbon Utilization and Storage Partnership project reveals key insights into infrastructure resilience. Reducing the risk index from 15% to 0% is observed to lead to an 83.7% reduction in CO2 processing capacity and a 77.1% decrease in project profit, quantifying the trade-off between risk tolerance and project performance. Furthermore, our results highlight critical breakpoints, where small adjustments in the risk index produce disproportionate shifts in infrastructure performance, providing actionable guidance for decision-makers. Unlike prior approaches that aimed to cheaply repair underperforming infrastructure, our workflow constructs robust CCS networks from the ground up, ensuring cost-effective infrastructure under storage uncertainty. These findings demonstrate the practical relevance of incorporating uncertainty-aware optimization into CCS planning, equipping decision-makers with a tool to make informed project planning decisions.

Olson, Daniel↗