Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “partnership development”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Development of Multi-Disciplinary Finite Element Method Analysis Courses at California State University, Los Angeles

The NASA Dryden Flight Research Center (DFRC) Partnership Awards Grant to California State University, Los Angeles (CSULA) has two primary goals that help to achieve NASA objectives. The overall objectives of the NASA Partnership Awards are to create opportunities for joint University NASA/Government sponsored research and related activities. One of the goals of the grant is to have university faculty researchers participate and contribute to the development of NASA technology that supports NASA goals for research and development (R&D) in Aeronautics and Astronautics. The other goal is technology transfer in the other direction, where NASA developed technology is made available to the general public and more specifically, targeted to industries that can profit from utilization of government developed technology. This years NASA Dryden Partnership Awards grant to CSULA entitled, "Computer Simulation of Multi-Disciplinary Engineering Systems", has two major tasks that satisfy overall NASA objectives. The first task conducts basic and applied research that contributes to technology development at the Dryden Flight Research Center. The second part of the grant provides for dissemination of NASA developed technology, by using the teaching environment created in the CSULA classroom. The second task and how this is accomplished is the topic of this paper. The NASA STARS (Structural Analysis Routines) computer simulation program is used at the Dryden center to support flight testing of high-performance experimental aircraft and to conduct research and development of new and advanced Aerospace technology.

McKinney, John↗

A Dual Launch Robotic and Human Lunar Mission Architecture

This paper describes a comprehensive lunar exploration architecture developed by Marshall Space Flight Center's Advanced Concepts Office that features a science-based surface exploration strategy and a transportation architecture that uses two launches of a heavy lift launch vehicle to deliver human and robotic mission systems to the moon. The principal advantage of the dual launch lunar mission strategy is the reduced cost and risk resulting from the development of just one launch vehicle system. The dual launch lunar mission architecture may also enhance opportunities for commercial and international partnerships by using expendable launch vehicle services for robotic missions or development of surface exploration elements. Furthermore, this architecture is particularly suited to the integration of robotic and human exploration to maximize science return. For surface operations, an innovative dual-mode rover is presented that is capable of performing robotic science exploration as well as transporting human crew conducting surface exploration. The dual-mode rover can be deployed to the lunar surface to perform precursor science activities, collect samples, scout potential crew landing sites, and meet the crew at a designated landing site. With this approach, the crew is able to evaluate the robotically collected samples to select the best samples for return to Earth to maximize the scientific value. The rovers can continue robotic exploration after the crew leaves the lunar surface. The transportation system for the dual launch mission architecture uses a lunar-orbit-rendezvous strategy. Two heavy lift launch vehicles depart from Earth within a six hour period to transport the lunar lander and crew elements separately to lunar orbit. In lunar orbit, the crew transfer vehicle docks with the lander and the crew boards the lander for descent to the surface. After the surface mission, the crew returns to the orbiting transfer vehicle for the return to the Earth. This paper describes a complete transportation architecture including the analysis of transportation element options and sensitivities including: transportation element mass to surface landed mass; lander propellant options; and mission crew size. Based on this analysis, initial design concepts for the launch vehicle, crew module and lunar lander are presented. The paper also describes how the dual launch lunar mission architecture would fit into a more general overarching human space exploration philosophy that would allow expanded application of mission transportation elements for missions beyond the Earth-moon realm.

Jones, David L.↗

Advanced Stirling Radioisotope Generator Life Certification Plan

An Advanced Stirling Radioisotope Generator (ASRG) power supply is being developed by the Department of Energy (DOE) in partnership with NASA for potential future deep space science missions. Unlike previous radioisotope power supplies for space exploration, such as the passive MMRTG used recently on the Mars Curiosity rover, the ASRG is an active dynamic power supply with moving Stirling engine mechanical components. Due to the long life requirement of 17 years and the dynamic nature of the Stirling engine, the ASRG project faced some unique challenges trying to establish full confidence that the power supply will function reliably over the mission life. These unique challenges resulted in the development of an overall life certification plan that emphasizes long-term Stirling engine test and inspection when analysis is not practical. The ASRG life certification plan developed is described.

Rusick, Jeffrey J.↗

Advanced Stirling Radioisotope Generator Life Certification Plan

An Advanced Stirling Radioisotope Generator (ASRG) power supply is being developed by the Department of Energy (DOE) in partnership with NASA for potential future deep space science missions. Unlike previous radioisotope power supplies for space exploration, such as the passive MMRTG used recently on the Mars Curiosity rover, the ASRG is an active dynamic power supply with moving Stirling engine mechanical components. Due to the long life requirement of 17 years and the dynamic nature of the Stirling engine, the ASRG project faced some unique challenges trying to establish full confidence that the power supply will function reliably over the mission life. These unique challenges resulted in the development of an overall life certification plan that emphasizes long-term Stirling engine test and inspection when analysis is not practical. The ASRG life certification plan developed is described.

Rusick, Jeffrey J.↗

Featured Invention: Laser Scaling Device

In September 2003, NASA signed a nonexclusive license agreement with Armor Forensics, a subsidiary of Armor Holdings, Inc., for the laser scaling device under the Innovative Partnerships Program. Coupled with a measuring program, also developed by NASA, the unit provides crime scene investigators with the ability to shoot photographs at scale without having to physically enter the scene, analyzing details such as bloodspatter patterns and graffiti. This ability keeps the scene's components intact and pristine for the collection of information and evidence. The laser scaling device elegantly solved a pressing problem for NASA's shuttle operations team and also provided industry with a useful tool. For NASA, the laser scaling device is still used to measure divots or damage to the shuttle's external tank and other structures around the launchpad. When the invention also met similar needs within industry, the Innovative Partnerships Program provided information to Armor Forensics for licensing and marketing the laser scaling device. Jeff Kohler, technology transfer agent at Kennedy, added, "We also invited a representative from the FBI's special photography unit to Kennedy to meet with Armor Forensics and the innovator. Eventually the FBI ended up purchasing some units. Armor Forensics is also beginning to receive interest from DoD [Department of Defense] for use in military crime scene investigations overseas."

Dunn, Carol Anne↗

Current NASA In-Situ Resource Utilization (ISRU) Strategic Vision

Perform development to TRL 5/6 through ground demonstration in relevant environment. Perform component/subscale subsystem flight demonstrations on small/mid-size landers. Assess and characterize water in volatiles in lunar polar shadowed regions and craters. Reduce risk of ISRU for mission critical consumables through Integrated End-to-End Flight Demonstrations (pilot scale). Establish initial Human Mission Scale production capability to promote sustainable operations and as anchor for commercial involvement. Identify and characterize polar region environment and resources/volatiles for Science and future Exploration/Commercial applications. Provide ground-truth physical, mineral, and water/volatile resource characteristic information at multiple locations to provide geological context for science-focused theories of volatile placement and initial mining assessments.Test technologies and processes to reduce risk of future extraction/mining systems. Quantify concentration and lateral/vertical distribution of resources/volatiles. Utilize ISRU capabilities to Extend and Enhance Human Lunar Exploration Missions. Provide oxygen (and fuel) to enable reusable human lunar lander (10+ MT/yr O2)Process carbon-based crew waste/trash into gases and propellants; can reduce logistics while minimizing public perception issues (alternative is conversion to radiation shielding). Scavenge unused propellants and hardware from spent landers. Metal extraction from regolith as feedstock for in situ and in space manufacturing demonstrations. Civil engineering and construction aimed at future outpost/infrastructure build-up. Develop and Demonstrate ISRU for Human Mars Missions. ISRU for propellant production (10-15 MT/yr); Liquefy, store, transfer, and refuel ascent vehicle. Use Moon for operational experience and mission validation for Mars: Pre-deployment & remote activation and operation without crew. Storing and transferring mission consumables Landing crew with empty tanks with ISRU propellants already made and waiting. Support/Promote Commercialization of Space. Large scale polar ice mining (100+ MT/yr water)O2/H2 propulsion for landers/cis-lunar transportation with surface and in space depots. In situ construction and energy expansion at mining and human outpost site(s). ISRU Ground Development. Develop and advance ISRU technologies to enable acquisition of resources and processing into mission consumables. Utilize Multi-center collaboration with a portfolio that includes internal NASA work, external contracts, and collaborative agreements/partnerships. Where appropriate, develop lunar ISRU components and subsystems with a Mars-forward application. Engage industry through public-private partnerships to lay the foundation for long-term lunar and space economic development. Spin-in/spin-out technologies for terrestrial applications and industry (mining, oil & gas, alternative energy, construction). Flight Demonstration Path to Operational ISRU. Utilize small demonstrations with near off-the-shelf hardware to obtain critical information quickly on lunar resources and operations. Demonstrate critical technologies and processes that interact with lunar materials and environments. Perform 'pilot plant' demonstrations at architecture relevant scales and durations to reduce the risk for ISRU-provided products for critical human mission applications.

In-situ Resource Utilization↗

Stirling to Flight Initiative

NASA has a consistent need for radioisotope power systems (RPS) to enable robotic scientific missions for planetary exploration that has been present for over four decades and will continue into the foreseeable future, as documented in the most recent Planetary Science Decadal Study Report. As RPS have evolved throughout the years, there has also grown a desire for more efficient power systems, allowing NASA to serve as good stewards of the limited plutonium-238 (238Pu), while also supporting the ever-present need to minimize mass and potential impacts to the desired science measurements. In fact, the recent Nuclear Power Assessment Study (NPAS) released in April 2015 resulted in several key conclusion regarding RPS, including affirmation that RPS will be necessary well into the 2030s (at least) and that 238Pu is indeed a precious resource requiring efficient utilization and preservation. Stirling Radioisotope Generators (SRGs) combine a Stirling cycle engine powered by a radioisotope heater unit into a single generator system. Stirling engine technology has been under development at NASA Glenn Research Center (GRC) in partnership with the Department of Energy (DOE) since the 1970's. The most recent design, the 238Pu-fueled Advanced Stirling Radioisotope Generator (ASRG), was offered as part of the NASA Discovery 2010 Announcement of Opportunity (AO). The Step-2 selections for this AO included two ASRG-enabled concepts, the Titan Mare Explorer (TiME) and the Comet Hopper (CHopper), although the only non-nuclear concept, InSight, was ultimately chosen. The DOE's ASRG contract was terminated in 2013. Given that SRGs utilize significantly less 238Pu than traditional Radioisotope Thermoelectric Generators (RTGs) - approximately one quarter of the nuclear fuel, to produce similar electrical power output - they provide a technology worthy of consideration for meeting the aforementioned NASA objectives. NASA's RPS Program Office has recently investigated a new Stirling to Flight (S2F) initiative with the objective of developing a 100-500 We Stirling generator system. Additionally, a different approach is being devised for this initiative to avoid pitfalls of the past, and apply lessons learned from the recent ASRG experience. Two key aspects of this initiative are a Stirling System Technology Maturation Effort, and a Surrogate Mission Team (SMT) intended to provide clear mission pull and requirements context. The S2F project seeks to lead directly into a DOE flight system development of a new SRG. This paper will detail the proposed S2F initiative, and provide specifics on the key efforts designed to pave a forward path for bringing Stirling technology to flight.

Robotics↗

A New Business Model for Problem Solving-Infusing Open Collaboration and Innovation Health and Human Services

This slide presentation reviews the Space Life Sciences Directorate (SLSD) new business model for problem solving, with emphasis on open collaboration and innovation. The topics that are discussed are: an overview of the work of the Space Life Sciences Directorate and the strategic initiatives that arrived at the new business model. A new business model was required to infuse open collaboration/innovation tools into existing models for research, development and operations (research announcements, procurements, SBIR/STTR etc). This new model involves use of several open innovation partnerships: InnoCentive, Yet2.com, TopCoder and NASA@work. There is also a new organizational structure developed to facilitate the joint collaboration with other NASA centers, international partners, other U.S. Governmental organizations, Academia, Corporate, and Non-Profit organizations: the NASA Human Health and Performance Center (NHHPC).

Davis, Jeffrey R.↗

Deep Space 1 Ion Engine Completed a 3-Year Journey

A xenon ion engine and power processor system, which was developed by the NASA Glenn Research Center in partnership with the Jet Propulsion Laboratory and Boeing Electron Dynamic Devices, completed nearly 3 years of operation aboard the Deep Space 1 spacecraft. The 2.3-kW ion engine, which provided primary propulsion and two-axis attitude control, thrusted for more than 16,000 hr and consumed more than 70 kg of xenon propellant. The Deep Space 1 spacecraft was launched on October 24, 1998, to validate 12 futuristic technologies, including the ion-propulsion system. After the technology validation process was successfully completed, the Deep Space 1 spacecraft flew by the small asteroid Braille on July 29, 1999. The final objective of this mission was to encounter the active comet Borrelly, which is about 6 miles long. The ion engine was on a thrusting schedule to navigate the Deep Space 1 spacecraft to within 1400 miles of the comet. Since the hydrazine used for spacecraft attitude control was in short supply, the ion engine also provided two-axis attitude control to conserve the hydrazine supply for the Borrelly encounter. The comet encounter took place on September 22, 2001. Dr. Marc Rayman, project manager of Deep Space 1 at the Jet Propulsion Laboratory said, "Deep Space 1 plunged into the heart of the comet Borrelly and has lived to tell every detail of its spinetingling adventure! The images are even better than the impressive images of comet Halley taken by Europe's Giotto spacecraft in 1986." The Deep Space 1 mission, which successfully tested the 12 high-risk, advanced technologies and captured the best images ever taken of a comet, was voluntarily terminated on December 18, 2001. The successful demonstration of the 2-kW-class ion propulsion system technology is now providing mission planners with off-the-shelf flight hardware. Higher power, next generation ion propulsion systems are being developed for large flagship missions, such as outer planet explorers and sample-return missions.

Sovey, James S.↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems and preparing to retire the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo-Saturn and Space Shuttle programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as legacy knowledge gained from nearly 50 years' experience developing space hardware. Early next decade, the Ares I will launch the new Orion Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both Ares I and Ares V are being designed to support longer future trips to Mars. The Exploration Launch Projects Office is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also discusses riskbased, management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it summarizes several notable accomplishments since October 2005, when the Exploration Launch Projects effort officially kicked off, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

A New Heavy-Lift Capability for Space Exploration: NASA's Ares V Cargo Launch Vehicle

The National Aeronautics and Space Administration (NASA) is developing new launch systems in preparation for the retirement of the Space Shuttle by 2010, as directed in the United States (U.S.) Vision for Space Exploration. The Ares I Crew Launch Vehicle (CLV) and the Ares V heavy-lift Cargo Launch Vehicle (CaLV) systems will build upon proven, reliable hardware derived from the Apollo Saturn (1961 to 1975) and Space Shuttle (1972 to 2010) programs to deliver safe, reliable, affordable space transportation solutions. This approach leverages existing aerospace talent and a unique infrastructure, as well as the vast amount of legacy knowledge gained from almost a half-century of hard-won experience in the space enterprise. Beginning early next decade, the Ares I will launch the new Crew Exploration Vehicle (CEV) to the International Space Station (ISS) or to low-Earth orbit for trips to the Moon and, ultimately, Mars. Late next decade, the Ares V's Earth Departure Stage will carry larger payloads such as the lunar lander into orbit, and the Crew Exploration Vehicle will dock with it for missions to the Moon, where astronauts will explore new territories and conduct science and technology experiments. Both the Ares I and Ares V systems are being designed to support longer future trips to Mars. The Exploration Launch Projects Office, located at NASA's Marshall Space Flight Center, is designing, developing, testing, and evaluating both launch vehicle systems in partnership with other NASA Centers, Government agencies, and industry contractors. This paper provides top-level information regarding the genesis and evolution of the baseline configuration for the Ares V heavy-lift system. It also touches on risk-based management strategies, such as building on powerful hardware and promoting common features between the Ares I and Ares V systems to reduce technical, schedule, and cost risks, as well as development and operations costs. Finally, it gives a summary of several notable accomplishments over the past year, since the Exploration Launch Projects effort officially kicked off in October 2005, and looks ahead at work planned for 2007 and beyond.

Sumrall, John P.↗

New directions in the NASA program

This paper reports on the current activities of the U.S. National Aeronautics and Space Administration (NASA), and discusses several new directions in NASA's program. The Space Transportation System (STS) is operational and is now performing a wide variety of missions, including repair of spacecraft on orbit. A family of upper stages are available for missions requiring higher energy than the Shuttle alone can provide. With routine access to space assured by the STS, the U.S. is ready to take its next logical step into space with development of a permanently manned Space Station. In addition, NASA is supporting a program for increased commercial development of space through a government-industry partnership.

Sakss, U. J.↗

Issues in NASA program and project management. Special report: 1995 conference

This volume is the tenth in an ongoing series on aerospace project management at NASA. Articles in this volume cover the 1996 Conference as follows: international partnerships; industry/interagency collaboration; technology transfer; and project management development process. A section on resources for NASA managers rounds out the publication.

Hoffman, Edward J.↗

NASA's National Center for Advanced Manufacturing

An investment in the future, NASA has designated a new initiative where government, industry, and academia collaborate to meet the manufacturing needs of future space systems. The Marshall Space Flight Center in Huntsville, Alabama has the principal responsibility for implementation of the National Center for Advanced Manufacturing (NCAM). The mission of the NCAM is to build partnerships that will jointly conduct program planning and develop strategies to perform manufacturing research and technology development for critical national missions.

Vickers, John H.↗

Aviation Weather Information Overview and Status

This paper presents the weather accident prevention project review during the period of June 5, through June 7, 2001. The topics include: 1) Background; 2) Guidance; 3) Plan; 4) System Elements; 5) AWIN System; 6) Market Segments; 7) Technology Development Level; 8) Aviation Safety Program Organization; 9) Partnerships; 10) NASA Facilities; 11) Timeline; 12) AWIN Research Areas; and 13) Cooperative Research with FAA. This paper is in viewgraph form.

Stough, Paul↗

NEXUS Education/Outreach Program

The NEXUS E/PO program will consist of an integrated set of partnerships with schools and science centers and the development of education products. This will include working with schools, including NASA Explorer Schools on "challenges" oriented around open-ended problem solving and communication skills and with technical content related to NEXUS. We will provide teacher internships though the SUNBEAMS program, and develop a small exhibit and interactive materials for science centers concerning the Sun and related science.

Kucera, Therese↗

USGS and NASA Digital Imagery Product Characterization

This paper presents viewgraphs about a partnership between USGS and NASA who are jointly developing an airborne digital imagery characterization capability. The topics include: 1) USGS-NASA Product Characterization Approach; 2) Stennis Character Range; 3) Stennis Geodetic Targets; 4) Stennis Manhole Covers; 5) Stennis Edge Target; 6) Stennis Characterization Site; 7) Delivered Data; 8) Other Data Considerations; 9) Status; 10) Geopositional Assessment Approach; 11) Spatial Assessment Approach; 12) Edge Response; and 13) Results to Date.

Zanoni, Vicki↗

Hybrid Power Management Program Evaluated Ultracapacitors for the Next Generation Launch Transportation Project

The NASA Glenn Research Center initiated baseline testing of ultracapacitors to obtain empirical data in determining the feasibility of using ultracapacitors for the Next Generation Launch Transportation (NGLT) Project. There are large transient loads associated with NGLT that require a very large primary energy source or an energy storage system. The primary power source used for this test was a proton-exchange-membrane (PEM) fuel cell. The energy storage system can consist of batteries, flywheels, or ultracapacitors. Ultracapacitors were used for these tests. NASA Glenn has a wealth of experience in ultracapacitor technology through the Hybrid Power Management (HPM) Program, which the Avionics, Power and Communications Branch of Glenn s Engineering Development Division initiated for the Technology Transfer and Partnership Office. HPM is the innovative integration of diverse, state-ofthe- art power devices in optimal configurations for space and terrestrial applications. The appropriate application and control of the various advanced power devices (such as ultracapacitors and fuel cells) significantly improves overall system performance and efficiency. HPM has extremely wide potential. Applications include power generation, transportation systems, biotechnology systems, and space power systems. HPM has the potential to significantly alleviate global energy concerns, improve the environment, and stimulate the economy.

Eichenberg, Dennis J.↗