Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pallet”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

320 records · Page 18

Assessment of a Surface Propellant Transportation System Concept for Operations on Mars

NASA is working to define the architecture needed for a Mars exploration campaign. One potential architecture option allows for pre-deployment of essential cargo and equipment to support a crew landing, including the pre-positioning of a Mars Ascent Vehicle (MAV). This MAV is likely to represent the largest single payload that must be landed on the Martian surface. Its size would be influenced by the amount of mass that state-of-the-art Entry, Descent, and Landing (EDL) systems would be capable of placing on Mars. One possible method of increasing the usable size of the MAV without exceeding available EDL capabilities is to land the MAV without its ascent propellant on board. Following such a method may necessitate a strategy to acquire sufficient ascent propellant to allow a crew to safely depart the Martian surface. This presentation describes a conceptual return propellant strategy that uses a liquid transportation skid, or pallet, to be used in conjunction with a rover mobility system to transfer cryogenic propellant, consisting of oxygen and methane, across the Martian surface from a delivery lander to the MAV to enable its launch. Design considerations, concept of operations, and rover energetics will be discussed in this presentation.

Surface↗

Lunar Nuclear Reactor Neutron Fluence and Gamma Dose Estimates

NASA aims to deploy a fission reactor on the lunar surface by 2030 to generate 100 kWe of power for at least 10 years without maintenance or refueling. To assess system and subsystem survivability according to those requirements, a model of the reactor pallet was created in the radiation transport code MCNP to determine the neutron fluences and gamma doses that the materials and systems would be exposed to. The model was based on the 2025 government design. The model indicated that the control drum motors, Brayton cycle engines, and pipes and valves would be exposed to neutron fluences of 1×10 15 – 1×10 16 n/cm 2 per year and gamma doses ranging from 10 to 500 Mrad per year. The electronics box housing the instrumentation and control elements is expected to receive 1×10 14 – 1×10 15 n/cm 2 per year and gamma doses in the range of 1–5 Mrad per year. These doses necessitate that the control drum motors, Brayton cycle engines, valve components, control electronics, and other components be radiation-hardened (>10 16 n/cm 2 and >10 Mrad gamma dose) or additionally shielded to survive the 10-year lunar mission.

Radiation-Hardened Materials↗

RCRA Part B Permit Application Nevada National Security Site (NNSS) for Waste Management Activities at the NNSS Hazardous Waste Storage Unit (HWSU)

This volume of the permit application by the DOE’s National Nuclear Security Administration Nevada Field Office (NNSA/NFO) to the Nevada Division of Environmental Protection (NDEP) focuses on the Area 5 Hazardous Waste Storage Unit (HWSU). The HWSU was established to support testing, research, and remediation activities at the Nevada National Security Site (NNSS), a large-quantity generator of hazardous waste. The HWSU, located adjacent to the Area 5 Radioactive Waste Management Complex (RWMC), is a prefabricated, rigid steel-framed, roofed shelter used to store hazardous nonradioactive waste generated on the NNSS. No offsite-generated wastes are managed at the HWSU. Waste managed at the HWSU includes the following: Flammables/Combustibles, Acid Corrosives, Alkali Corrosives, Oxidizers/Reactives, Toxics/Poisons, and Other Regulated Materials (ORMs). A list of regulated waste codes accepted for storage at the HWSU is provided in this volume. Hazardous wastes are stored at the HWSU in containers that are compliant with U.S. Department of Transportation (DOT) regulations and compatible with the stored waste. Waste packages (e.g., drums) without inner closed containers of waste remain closed except during inspection or sampling. Transfer of uncontainerized waste between waste packages at the HWSU is prohibited. Closed inner containers may be transferred or consolidated into larger waste packages, and small closed containers may be placed into larger containers. Containers are stored on secondary containment pallets, and the unit is inspected monthly. For safety and security reasons, some of the contents of the full application are not available for public viewing. This public version of the application contains most, but not all, of the contents as submitted to the regulatory agencies.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Compact Superconducting RF Accelerator for Electron Beam and X-ray Irradiation

As commercial and industrial applications of electron beam and x-ray irradiation have developed, new applications have emerged that require very high beam power to create the required radiation field. These new applications require dependable, efficient, high-energy, high-power electron accelerators. Recent developments in Superconducting Radio-Frequency (SRF) technology can now enable accelerators with lower costs and improved performance. Cryogenic heat loads are dramatically reduced through use of new materials and improved component designs. New cooling methods allow the replacement of complex systems requiring cryogenic fluids with simple robust systems with no fluids. New RF sources can greatly reduce the cost of RF power. Each of these developments has been individually proven and an effort is underway at the Illinois Accelerator Research Center at Fermilab to integrate them into the first prototype of an entirely new class of industrial SRF-based accelerators. These accelerators will enable robust, turn-key operation with very high electrical efficiency. The accelerator prototype under design will be capable of 10 MeV beam, CW operation, and 250 kW of electron beam power. These modular systems are small enough to be palletized and transported to the point of use. Their high electrical efficiency mean that portable power generation systems can be enable their use in mobile applications. The goal is a compact, cost-effective, high-power accelerator suitable for many of the applications covered by this conference. Fermilab is actively working to build the prototype. The end-product will be a commercially available, robust, turn-key system for applications requiring reliable electron beam or X-ray irradiation. Keywords: accelerator, applications, conduction-cooling, cryogen-free, industrial, super-conducting RF.

43 PARTICLE ACCELERATORS↗

Hanford Immobilized Low-Activity Waste Transportation System Testing Results - 20043

The immobilized low-activity waste (ILAW) transportation system is a first-of-a-kind system that is being designed and tested to transport ILAW glass-filled containers from Hanford's Waste Treatment and Immobilization Plant (WTP) Low-Activity Waste (LAW) Facility to the Integrated Disposal Facility (IDF) burial trench for permanent disposal. A prototype design and fabrication of one transport trailer and four engineered ILAW pallets was completed in mid-2018. Prototype qualification testing to verify adequacy of the design was completed in 2019 by Washington River Protection Solutions (WRPS) and affiliate ATKINS SNC-Lavalin Group. Prototype testing was completed to advance design maturation across all operational and facility interfaces, and under adverse environmental and operating conditions, including thermal assessment of the system at peak projected temperatures. Test design, observation, and feedback was well represented and supported by all ILAW Transportation System interfacing organizations: WTP constructor Bechtel National, Inc.; IDF operator CH2M (CHPRC); transportation contractor Mission Support Alliance (MSA); the U. S. Department of Energy Richland Operations Office (DOE/RL) and Office of River Protection (DOE/ORP); and Washington State Department of Ecology. This paper presents the results of prototype qualification testing and opportunities for design improvements based on testing. Changes to the final design as a result of prototype testing include improvements in safety, ergonomics, operational flexibility, and As-Low-As-Reasonably-Achievable (ALARA) applications. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FAILURE ANALYSIS: WASTEWATER DRUM BULGING

A 55 gallon wastewater drum lid was found to be bulged during storage in a remote area. Drum samples were obtained for analysis. The interior surface of these samples revealed blistering and holes in the epoxy phenolic drum liner and corrosion of the carbon steel drum. It is suspected that osmotic pressure drove permeation of the water through the epoxy phenolic coating which was weakened from exposure to low pH water. The coating failed at locations throughout the drum interior. Subsequent corrosion of the carbon steel released hydrogen which pressurized the drum causing deformation of the drum lid. Additional samples from other wastewater drums on the same pallet were also evaluated and limited corrosion was visible on the interior surfaces. It is suspected that, with time, the corrosion would have advanced to cause pressurization of these sealed drums.

08 HYDROGEN↗

CH Packaging Operations Manual

This procedure provides instructions forassembling the following CH packaging payload: Drum payload assembly Standard Waste Box (SWB) assembly Ten-Drum Overpack (TDOP)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing SWB Payload Assembly; and 1.7, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10.1)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CNS 10-160B RH Cask Program Guidance (Rev. 2)

The purpose of this document is to provide guidelines and to define responsibilities for use, operation, inspection, and maintenance of the 10-160B cask and directly related components used for shipments of DOE controlled TRU waste. This document complies with the minimum requirements specified in the Safety Analysis Report (SAR) for Model 10-160B Type B Radwaste Shipping Cask and U.S. Nuclear Regulatory Commission (NRC) Certificate of Compliance (C of C) 9204. In the event of a conflict between this document and the SAR or C of C, the C of C shall govern.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Response of human renal tubular cells to cyclosporine and sirolimus: A toxicogenomic study

The molecular mechanisms involved in the potentially nephrotoxic response of tubular cells to immunosuppressive drugs remain poorly understood. Transcriptional profiles of human proximal tubular cells exposed to cyclosporine A (CsA), sirolimus (SRL) or their combination, were established using oligonucleotide microarrays. Hierarchical clustering of genes implicated in fibrotic processes showed a clear distinction between expression profiles with CsA and CsA + SRL treatments on the one hand and SRL treatment on the other. Functional analysis found that CsA and CsA + SRL treatments preferentially alter biological processes located at the cell membrane, such as ion transport or signal transduction, whereas SRL modifies biological processes within the nucleus and related to transcriptional activity. Genome wide expression analysis suggested that CsA may induce an endoplasmic reticulum (ER) stress in tubular cells in vitro. Moreover we found that CsA exposure in vivo is associated with the upregulation of the ER stress marker BIP in kidney transplant biopsies. In conclusion, this toxicogenomic study highlights the molecular interaction networks that may contribute to the tubular response to CsA and SRL. These results may also offer a new working hypothesis for future research in the field of CsA nephrotoxicity. Further studies are needed to evaluate if ER stress detection in tubular cells in human biopsies can predict CsA nephrotoxicity.

60 APPLIED LIFE SCIENCES↗