Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “orbit maintenance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Shuttle user analysis (study 2.2). Volume 4: Standardized subsystem modules analysis

The capability to analyze payloads constructed of standardized modules was provided for the planning of future mission models. An inventory of standardized module designs previously obtained was used as a starting point. Some of the conclusions and recommendations are: (1) the two growth factor synthesis methods provide logical configurations for satellite type selection; (2) the recommended method is the one that determines the growth factor as a function of the baseline subsystem weight, since it provides a larger growth factor for small subsystem weights and results in a greater overkill due to standardization; (3) the method that is not recommended is the one that depends upon a subsystem similarity selection, since care must be used in the subsystem similarity selection; (4) it is recommended that the application of standardized subsystem factors be limited to satellites with baseline dry weights between about 700 and 6,500 lbs; and (5) the standardized satellite design approach applies to satellites maintainable in orbit or retrieved for ground maintenance.

Source record↗

Vibration detection of component operability

In order to prevent catastrophic failure and eliminate unnecessary periodic maintenance in the Space Shuttle Orbiter dynamic components, instrumentation for detecting incipient failure in these components is required. This study investigated the utilization of vibrational phenomena as one of the principal physical parameters on which to base the design of this instrumentation. Baseline vibration data was collected from three aircraft type fans and two aircraft type pumps over a frequency range from a few Hertz to greater than 300 kHz. The baseline data included spectrum analysis of the vibration and detected carrier signals, as well as several non-spectrum parameters. Several defects were introduced into the five test items, and all defects were detected by at least one of the parameters with a margin of at least 2:1 over the worst case baseline.

Baird, B.↗

New dimensions for man

The functions of man in space have been in a state of constant change since the first manned orbital flight. Initially, the onboard crewmen performed those tasks essential to piloting and navigating the spacecraft. The time devoted to these tasks has steadily decreased and the crewman's time is being allotted to functions other than orbital operations. The evolving functions include added orbital operational capabilities, experimentation, spacecraft maintenance, and fabrication of useful end items. The new functions will include routine utilization of the crewman to extend mission life, satellite retrieval and servicing, remote manipulator systems operations, and piloting of free-flying teleoperator systems. The most demanding tasks are anticipated to be associated with construction of large space structures. The projected changes will introduce innovative designs and revitalize the concepts for utilizing man in space.

Louviere, A. J.↗

Time-delayed operation of a telerobot via geosynchronous relay

Operation of a telerobot is compromised if a time delay of more than a few hundred milliseconds exists between the operator and remote manipulator. However, the most economically attractive way to perform telerobotic functions such as assembly, maintenance, and repair in Earth orbit is via geosynchronous relay satellites to a ground-based operator. This induces loop delays from one-half to two seconds, depending on how many relays are involved. Such large delays makes direct master-slave, force-reflecting teleoperated systems infeasible. Research at JPL on a useful telerobot that operates with such time delays is described.

Wilcox, Brian H.↗

Propellant-remaining modeling

A successful satellite mission is predicted upon the proper maintenance of the spacecraft's orbit and attitude. One requirement for planning and predicting the orbit and attitude is the accurate estimation of the propellant remaining onboard the spacecraft. Focuss is on the three methods that were developed for calculating the propellant budget: the errors associated with each method and the uncertainties in the variables required to determine the propellant remaining that contribute to these errors. Based on these findings, a strategy is developed for improved propellant-remaining estimation. The first method is based on Boyle's law, which related the values of pressure, volume, and temperature (PVT) of an ideal gas. The PVT method is used for the monopropellant and the bipropellant engines. The second method is based on the engine performance tests, which provide data that relate thrust and specific impulse associated with a propellant tank to that tank's pressure. Two curves representing thrust and specific impulse as functions of pressure are then generated using a polynomial fit on the engine performance data. The third method involves a computer simulation of the propellant system. The propellant flow is modeled by creating a conceptual model of the propulsion system configuration, taking into account such factors as the propellant and pressurant tank characteristics, thruster functionality, and piping layout. Finally, a thrust calibration technique is presented that uses differential correction with the computer simulation method of propellant-remaining modeling. Thrust calibration provides a better assessment of thruster performance and therefore enables a more accurate estimation of propellant consumed during a given maneuver.

Torgovitsky, S.↗

Flight Dynamics Operations: Methods and Lessons Learned from Space Shuttle Orbit Operations

The Flight Dynamics Officer is responsible for trajectory maintenance of the Space Shuttle. This paper will cover high level operational considerations, methodology, procedures, and lessons learned involved in performing the functions of orbit and rendezvous Flight Dynamics Officer and leading the team of flight dynamics specialists during different phases of flight. The primary functions that will be address are: onboard state vector maintenance, ground ephemeris maintenance, calculation of ground and spacecraft acquisitions, collision avoidance, burn targeting for the primary mission, rendezvous, deorbit and contingencies, separation sequences, emergency deorbit preparation, mass properties coordination, payload deployment planning, coordination with the International Space Station, and coordination with worldwide trajectory customers. Each of these tasks require the Flight Dynamics Officer to have cognizance of the current trajectory state as well as the impact of future events on the trajectory plan in order to properly analyze and react to real-time changes. Additionally, considerations are made to prepare flexible alternative trajectory plans in the case timeline changes or a systems failure impact the primary plan. The evolution of the methodology, procedures, and techniques used by the Flight Dynamics Officer to perform these tasks will be discussed. Particular attention will be given to how specific Space Shuttle mission and training simulation experiences, particularly off-nominal or unexpected events such as shortened mission durations, tank failures, contingency deorbit, navigation errors, conjunctions, and unexpected payload deployments, have influenced the operational procedures and training for performing Space Shuttle flight dynamics operations over the history of the program. These lessons learned can then be extended to future vehicle trajectory operations.

Cutri-Kohart, Rebecca M.↗

The Ames-Lockheed orbiter processing scheduling system

A general purpose scheduling system and its application to Space Shuttle Orbiter Processing at the Kennedy Space Center (KSC) are described. Orbiter processing entails all the inspection, testing, repair, and maintenance necessary to prepare the Shuttle for launch and takes place within the Orbiter Processing Facility (OPF) at KSC, the Vehicle Assembly Building (VAB), and on the launch pad. The problems are extremely combinatoric in that there are thousands of tasks, resources, and other temporal considerations that must be coordinated. Researchers are building a scheduling tool that they hope will be an integral part of automating the planning and scheduling process at KSC. The scheduling engine is domain independent and is also being applied to Space Shuttle cargo processing problems as well as wind tunnel scheduling problems.

Zweben, Monte↗

Hubble Space Telescope maintenance and refurbishment planning analysis

This paper presents an updated analytical approach toward the identification of Hubble Space Telescope system failures and downstates, maintenance requirements, and overall support to maintenance mission planning. Different sparing options of Orbital Replacement Units are evaluated, and the optimum spares complement that satisfies the expected servicing requirements is identified. Specific Space Telescope Reliability and maintenance Simulation Computer Program (SPATEL) updates and refinements are reported, and input data updates relevant to failure rates, downstate ground rules, and maintenance policy are addressed. A summary of the latest SPATEL outputs is provided along with maintenance analysis results.

Pizzano, F.↗

STS-109 Crew Interviews - Carey

STS-109 pilot Duane G. Carey is seen during a prelaunch interview. He answers questions about his inspiration to become an astronaut and his career path. He gives details on the mission's goals and significance, as well as an extended description of his role in the Orbiter's return landing. As its primary objective, this mission has the maintenance of the Hubble Space Telescope (HST). Following the Columbia Orbiter's rendezvous with the telescope, extravehicular activities (EVA) will focus on repairs to and augmentation of the HST.

Source record↗

STV fueling options

Lunar vehicles that will be space based and reusable will require resupply of propellants in orbit. Approximately 75 pct. of the total mass delivered to low earth orbit will be propellants. Consequently, the propellant management techniques selected for Space Exploration Initiative (SEI) orbital operations will have a major influence on the overall SEI architecture. Five proposed propellant management facility (PMF) concepts were analyzed and compared in order to determine the best method of resupplying reusable, space based Lunar Transfer Vehicles (LTVs). The processing time needed at the Space Station to prepare LTV for its next lunar mission was estimated for each of the PMF concepts. The estimated times required to assemble and maintain the different PMF concepts were also compared. The results of the maintenance analysis were similar, with co-orbiting depots needing 100 to 350 pct. more annual maintenance. The first few external tanks mating operations at KSC encountered many problems that could cause serious lunar mission schedule delays. The use of drop tanks on lunar vehicles increases by a factor of four the number of critical propellant interface disturbances.

Flemming, Ken↗

Concepts for space maintenance of OTV engines

In this paper, concepts for space maintainability of Orbital Transfer Vehicles engines are examined. An engine design is developed which is driven by space maintenance requirements and by a Failure Modes and Effects Analysis (FMEA). Modularity within the engine is shown to offer cost benefits and improved space maintenance capabilities. Space-operable disconnects are conceptualized for both engine change-out and for module replacement. Through FME mitigation the modules are conceptualized to contain the most often replaced engine components. A preliminary space maintenance plan is developed around a Controls and Condition Monitoring system using advanced sensors, controls, and conditioning monitoring concepts.

Martinez, A.↗

TDRSS Onboard Navigation System (TONS) flight qualification experiment

The National Aeronautics and Space Administration (NASA) Goddard Space Flight Center (GSFC) is currently developing an operational Tracking and Data Relay Satellite (TDRS) System (TDRSS) Onboard Navigation System (TONS) to provide realtime, autonomous, high-accuracy navigation products to users of TDRSS. A TONS experiment was implemented on the Explorer Platform/Extreme Ultraviolet Explorer (EP/EUVE) spacecraft, launched June 7, 1992, to flight qualify the TONS operational system using TDRSS forward-link communications services. This paper provides a detailed evaluation of the flight hardware, an ultrastable oscillator (USO) and Doppler extractor (DE) card in one of the TDRSS user transponders and the ground-based prototype flight software performance, based on the 1 year of TONS experiment operation. The TONS experiment results are used to project the expected performance of the TONS 1 operational system. TONS 1 processes Doppler data derived from scheduled forward-link S-band services using a sequential estimation algorithm enhanced by a sophisticated process noise model to provide onboard orbit and frequency determination and time maintenance. TONS 1 will be the prime navigation system on the Earth Observing System (EOS)-AM1 spacecraft, currently scheduled for launch in 1998. Inflight evaluation of the USO and DE short-term and long-term stability indicates that the performance is excellent. Analysis of the TONS prototype flight software performance indicates that realtime onboard position accuracies of better than 25 meters root-mean-square are achievable with one tracking contact every one to two orbits for the EP/EUVE 525-kilometer altitude, 28.5 degree inclination orbit. The success of the TONS experiment demonstrates the flight readiness of TONS to support the EOS-AM1 mission.

Gramling, C. J.↗

Circumlunar Free-Return Cycler Orbits for a Manned Earth-Moon Space Station

Multiple free-return circumlunar cycler orbits were designed to allow regular travel between the Earth and Moon by a manned space station. The presented cycler orbits contain circumlunar free-return "figure-8" segments and yield lunar encounters every month. Smaller space "taxi" vehicles can rendezvous with (and depart from) the cycling Earth-Moon space station to enter lunar orbit (and/or land on the lunar surface), return to Earth, or reach destinations including Earth-Moon L1 and L2 halo orbits, near-Earth objects (NEOs), Venus, and Mars. To assess the practicality of the selected orbits, relevant cycler characteristics (including (Delta)V maintenance requirements) are presented and compared.

Circumlunar Free-Return↗

Autonomous Assembly of Modular Structures in Space and on Extraterrestrial Locations

The fulfillment of the new US. National Vision for Space Exploration requires many new enabling technologies to accomplish the goal of utilizing space for commercial activities and for returning humans to the moon and extraterrestrial environments. Traditionally, flight structures are manufactured as complete systems and require humans to complete the integration and assembly in orbit. These structures are bulky and require the use of heavy launch vehicles to send the units to the desired location, e.g. International Space Station (ISS). This method requires a high degree of safety, numerous space walks and significant cost for the humans to perform the assembly in orbit. For example, for assembly and maintenance of the ISS, 52 Extravehicular Activities (EVA's) have been performed so far with a total EVA time of approximately 322 hours. Sixteen (16) shuttle flights haw been to the ISS to perform these activities with an approximate cost of $450M per mission. For future space missions, costs have to be reduced to reasonably achieve the exploration goals. One concept that has been proposed is the autonomous assembly of space structures. This concept is an affordable, reliable solution to in-space and extraterrestrial assembly operations. Assembly is autonomously performed when two components containing onboard electronics join after recognizing that the joint is appropriate and in the precise position and orientation required for assembly. The mechanism only activates when the specifications are correct and m a nominal range. After assembly, local sensors and electronics monitor the integrity of the joint for feedback to a master controller. To achieve this concept will require a shift in the methods for designing space structures. In addition, innovative techniques will be required to perform the assembly autonomously. Monitoring of the assembled joint will be necessary for safety and structural integrity. If a very large structure is to be assembled in orbit, then the number of integrity sensors will be significant. Thus simple, low cost sensors are integral to the success of this concept. This paper will address these issues and will propose a novel concept for assembling space structures autonomously. The paper will present Several autonomous assembly methods. Core technologies required to achieve in space assembly will be discussed and novel techniques for communicating, sensing, docking and assembly will be detailed. These core technologies are critical to the goal of utilizing space in a cost efficient and safe manner. Finally, these technologies can also be applied to other systems both on earth and extraterrestrial environments.

Alhorn, Dean C.↗

The Space Shuttle Main Engine and its maintenance features

The Space Shuttle Main Engine (SSME) is a reusable, high-performance rocket engine being developed to satisfy the performance, life, reliability, and operational requirements of the Space Shuttle Orbiter. The design includes simple, low-cost maintenance features resulting from a viable maintainability program dedicated to minimizing engine cost per flight.

Wheelock, V. J.↗

Operations research investigations of satellite power stations

A systems model reflecting the design concepts of Satellite Power Stations (SPS) was developed. The model is of sufficient scope to include the interrelationships of the following major design parameters: the transportation to and between orbits; assembly of the SPS; and maintenance of the SPS. The systems model is composed of a set of equations that are nonlinear with respect to the system parameters and decision variables. The model determines a figure of merit from which alternative concepts concerning transportation, assembly, and maintenance of satellite power stations are studied. A hybrid optimization model was developed to optimize the system's decision variables. The optimization model consists of a random search procedure and the optimal-steepest descent method. A FORTRAN computer program was developed to enable the user to optimize nonlinear functions using the model. Specifically, the computer program was used to optimize Satellite Power Station system components.

Cole, J. W.↗

Offshore Space Center (offshore launch site)

Any activity requiring the development of the HLLV can benefit by operations from an offshore space center (OSC) since operating near the equator provides a twenty percent increase in payload in an ecliptic plan orbit. Some OSC concepts considered include a moored floating (semisubmersible) design, a stationary design supported by fixed piles, and a combination of these two. The facility supports: a 15,000 foot long, 300 foot wide runway, designed to accommodate a two staged winged launch vehicle, with a one million pound payload capacity to low earth orbit; an industrial area for HLLV maintenance; an airport terminal, control and operation center, and observation tower; liquid hydrogen and liquid oxygen production and storage, and fuel storage platforms; a power generation station, docks with an unloading area; two separate launch sites; and living accommodations for 10,000 people. Potential sites include the Paramount Seamount in the Pacific Ocean off the north coast of South America. Cost estimates are considered.

Harvey, D. G.↗

Space Station operations

An evaluation of the success of the Space Station will be based on the service provided to the customers by the Station crew, the productivity of the crew, and the costs of operation. Attention is given to details regarding Space Station operations, a summary of operational philosophies and requirements, logistics and resupply operations, prelaunch processing and launch operations, on-orbit operations, aspects of maintainability and maintenance, habitability, and questions of medical care. A logistics module concept is considered along with a logistics module processing timeline, a habitability module concept, and a Space Station rescue mission.

Gray, R. H.↗