On the Role of Nitric Oxide for the Knock-Mitigation Effectiveness of EGR in a DISI Engine Operated with Various Gasoline Fuels.
Abstract not provided.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract not provided.
Abstract not provided.
The Midlatitude Continental Convective Clouds Experiment (MC3E) took place during the spring of 2011 centered in north-central Oklahoma, USA. The main goal of this field campaign was to capture the dynamical and microphysical characteristics of precipitating convective systems in the US Central Plains. A major component of the campaign was a six-site radiosonde array designed to capture the large-scale variability of the atmospheric state with the intent of deriving model forcing data sets. Over the course of the 46-day MC3E campaign, a total of 1362 radiosondes were launched from the enhanced sonde network. This manuscript provides details on the instrumentation used as part of the sounding array, the data processing activities including quality checks and humidity bias corrections and an analysis of the impacts of bias correction and algorithm assumptions on the determination of convective levels and indices. It is found that corrections for known radiosonde humidity biases and assumptions regarding the characteristics of the surface convective parcel result in significant differences in the derived values of convective levels and indices in many soundings. In addition, the impact of including the humidity corrections and quality controls on the thermodynamic profiles that are used in the derivation of a large-scale model forcing data set are investigated. The results show a significant impact on the derived large-scale vertical velocity field illustrating the importance of addressing these humidity biases.
It used to happen often, to us accelerator radiation protection staff, to be asked by a new radiation worker: ?How much dose am I still allowed?? And we smiled looking at the shocked reaction to our answer: ?You are not allowed any dose?. Nowadays, also thanks to improved training programs, this kind of question has become less frequent, but it is still not always easy to convince workers that staying below the exposure limits is not sufficient. After all, radiation is still the only harmful agent for which this is true: for all other risks in everyday life, from road speed limits to concentration of hazardous chemicals in air and water, compliance to regulations is ensured by keeping below a certain value. It appears that a tendency is starting to develop to extend the radiation approach to other pollutants (1), but it will take some time before the new attitude makes it way into national legislations.
Abstract Not Provided
Abstract not provided.
Explore the source record for details and available documents.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
During maintenance of nuclear power plants, and during their decommissioning period, a large quantity of radioactive metallic waste will accrue. On the other hand the capacity for final disposal of radioactive waste in Germany is limited as well as that in the US. That is why all procedures related to this topic should be handled with a maximum of efficiency. The German model of consistent recycling of the radioactive metal scrap within the nuclear industry therefore also offers high capabilities for facilities in the US. The paper gives a compact overview of the impressive results of melting treatment, the current potential and further developments. Thousands of cubic metres of final disposal capacity have been saved. The highest level of efficiency and safety by combining general surface decontamination by blasting and nuclide specific decontamination by melting associated with the typical effects of homogenization. An established process - nationally and internationally recognized. Excellent connection between economy and ecology. (authors)
The incorporation of remote operations into reactor operations is a topic of high interest among advanced and small modular reactor (A/SMR) vendors, with some considering it essential to the success of their business models. However, remote operations are a concept novel to the nuclear industry. While various technical aspects of remote operations have been explored, a significant gap remains in understanding the security implications of integrating remote operations into reactor designs, particularly concerning the security requirements for remote-operations facilities and infrastructure. This report aims to address this gap by first defining classes of remote operation based on the extent of remote access to reactor control systems and grounded in the existing regulatory framework with compatible terminology. Secondly, the report outlines the physical and cybersecurity requirements applicable to remote-operations facilities and infrastructure at each defined class. These requirements are based on existing licensing frameworks provided by 10 Code of Federal Regulations (CFR) Part 50 and 10 CFR Part 52, as well as the upcoming A/SMR licensing framework in the proposed Part 53. The assessment focuses specifically on security regulations, such as 10 CFR Part 73, which includes provisions for both cybersecurity (§ 73.54) and physical security (§ 73.55). This report proposes five classes of remote reactor operations. Class 1 involves remote monitoring only, with no control over reactor systems. Class 2 allows for the remote issuance of allowlisted commands to the reactor facility. Class 3 extends control to non-safety-significant, non-safety-related, or not important to safety systems and equipment. Class 4 permits remote control of safety-significant systems. Finally, Class 5 allows remote control of safety-related systems. It is important to note that these classes were defined purely with functionality in mind, without considering the practicality or feasibility of implementation for each class under current or upcoming regulatory guidance. The intention behind this approach is to enable an assessment of which security requirements apply to each class, allowing readers to evaluate the implementation possibilities for their specific use cases. Following the definition of remote-operation classes, the report assesses the specific physical and cybersecurity requirements applicable to the remote-operations facility and infrastructure within each defined class. This includes defining the types and locations of operators that are possible at each class of operation and, based on operator type and location, as well as functionality within each class, outlining the physical and cybersecurity requirements. By detailing the security requirements by class, the report provides readers with the information needed to determine the type of security program they may need to implement for their desired concept of operation. The next contribution of this report was to assess the practicality of implementing each proposed class of remote operations based upon the security requirement assessment. In short, three of the five proposed remote-operation classes were found to possibly have a practical path forward to implementation under the U.S. regulatory framework. Class 1 remote operations are currently in use in the U.S. while Class 2 and 3 remote operations may be logistically possible to implement under the U.S. regulatory framework. The final two Classes, 4 and 5, would likely be logistically difficult, if not infeasible to implement within the current U.S. physical- and cybersecurity regulatory framework. Given the results of the feasibility assessment, an example architecture is proposed for both Class 2, remote allowlisted commands, and Class 3, remote control of non-safety systems as well as security implication assessments of each architecture. These example implementations are not meant to be prescriptive in terms of how Class 2 or Class 3 remote operations should be deployed; instead, they are intended to be informative to stakeholders on how Class 2 or Class 3 could potentially be applied in order to inform their system design. An example architecture for Class 1 remote monitoring was not provided as Class 1 in already in use in U.S. nuclear operations. Example architectures for Class 4 and Class 5 were not provided due to their assessment of being likely infeasible to implement. The final contribution is an assessment of the physical- and cybersecurity implications of introducing autonomous operations into an A/SMR. What was found was that the security implications can be separated into two cases. Autonomous operations supported by SSCs located only at the reactor site, and autonomous operations supported by SSCs outside of the reactor site. For the first case, the introduction of autonomous systems will likely not change the facility’s requirement to comply with existing cyber and physical security regulation
Operational characteristics represent the set of responses that a nuclear system exhibits during normal operation. Operators rely on this behavior to assess the status of the system and to predict the consequences of off-normal events. These characteristics largely refer to the relationship between power and system operating conditions. The static and dynamic behavior of a chain-reacting system, operating at sufficient power, is primarily governed by reactivity effects. The science of reactor physics has identified and evaluated a number of such effects, including Doppler broadening and shifts in the thermal neutron spectrum. Often these reactivity effects are quantified in the form of feedback coefficients that serve as coupling coefficients relating the neutron population and the physical mechanisms that drive reactivity effects, such as fissile material temperature and density changes. The operational characteristics of such nuclear systems usually manifest themselves when perturbations between system power (neutron population) and system operating conditions arise. Successful operation of such systems requires the establishment of steady equilibrium conditions. However, prior to obtaining the desired equilibrium (steady-state) conditions, an approach from zero-power (startup) must occur. This operational regime may possess certain limiting system conditions that must be maintained to achieve effective startup. Once steady-state is achieved, a key characteristic of this operational regime is the level of stability that the system possesses. Finally, a third operational regime, shutdown, may also possess limiting conditions of operation that must be maintained. This report documents the operational characteristics of a “generic” Accelerator Driven Fissile Solution (ADFS) system during the various operational regimes of startup, steady-state operation, and shutdown. Typical time-dependent behavior for each operational regime will be illustrated, and key system parameters, such as response times, will be quantified. A generalized linear systems analysis of steady-state operations will be performed to evaluate the level of stability of ADFS systems. This information should provide a basic understanding of typical ADFS system operational behavior, and facilitate the development of monitoring procedures and operator aids.
In the current nuclear power plants (NPPs), most of the critical safety functions are provided by many active safety systems. However, in order to meet the futuristic goals of safety, relying on these active safety systems alone does not seem to be viable. As passive system has a strength on the mitigation of station black out accident and it also contributes to increase the diversity of mitigation way, application of passive system becomes a paramount in the nuclear industry to enhance the nuclear plant safety. Recently, many researches for developing passive systems and operation strategies have been carried out in the nuclear field. General passive systems and strategies, however, have a critical limitation, especially for passive injection systems. As these systems use gravity as their driving force, it is difficult to inject coolant in a passive way in a high-pressure condition thus depressurization has to be preferentially performed to do passive injection. The problem is that depressurization inevitably causes the loss of core inventory thus it is not preferred in order to secure plant safety. Hybrid safety injection tank (H-SIT) system was newly suggested a few years ago to passively inject the coolant into the reactor coolant system (RCS) without depressurization in a high-pressure condition. The H-SIT system is planned to be integrated into advanced power reactor plus (APR+). Generally, the H-SIT system can inject water using the pressure from nitrogen gas as a conventional safety-injection tank in low-pressure accidents, such as large and medium-break loss of coolant accidents (LOCA). Additionally, the H-SIT system can also inject water using gravitational force in high-pressure accidents. If a high pressure accident occurs, the pressure of each H-SIT is equalized with pressure of pressurizer through equalizing pipes, thus allowing the H-SITs to inject water by gravitational force. In the target plant, four H-SITs are planned to be installed. Each has a 2.5 in diameter equalizing pipe and it can be operated manually. Long-term cooling of core is an ultimate goal of all mitigation actions for plant safety and feed and bleed (F and B) operation strategy is one of the long-term cooling strategies in conventional pressurized water reactor (PWR). The important point of F and B operation is that injection for feed operation is performed by only high pressure safety injection (HPSI) pump because operation of low pressure safety injection (LPSI) pump needs the depressurization and it causes core dry out. As H-SIT is passively operated in an accident situation, it was originally designed for mitigation of station black out accident. Besides, operator can use the H-SIT system same as high pressure injection pump in any accident situations. Thus, function of high pressure injection by H-SIT can be used for feed operation when HPSI pumps fail. If it is possible, H-SIT can make up the core during depressurization then LPSI pumps can be used for F and B operation. In this study, F and B operation strategy with LPSI and HSIT is developed. This is a new concept for the long-term cooling operation. If this strategy is applied, low pressure injection pump can be successfully used for F and B operation thus operator has the additional mitigation way. As this strategy make plant safe even though HPSI and PAFS are both failed, it can effectively enhance the plant safety. For this strategy two RCGVSs and two POSRVs are needed as a depressurization system for bleed operation and only one LPSI is enough for feed operation. H-SIT operation is also needed to make up core inventory during bleed operation. For this operation, four H-SITs have to be used to make up core safely. Based on the risk analysis using PSA method, if this strategy is applied, core damage frequency is 1.868 e-6 which declined 7 percent from original model. (authors)
Washington River Protection Solutions (WRPS) manages the underground waste storage tanks at the Hanford site in Washington State on behalf of the DOE Office of River Protection. There are 177 tanks distributed among 18 tank farms spread across an area of desert scrub covering about 20 square miles. A single evaporator facility supports the tanks to provide waste reduction activities. Farms and associated equipment, including exhausters, have been operated locally since installation. Upgrades over time introduced limited automation, but using inconsistent platforms, and providing isolated control locations around the farms. However, as the Tank Farms move from maintenance operations to production operations, with increased numbers of waste transfers and evaporator campaigns, and also prepare for integration with the adjacent Hanford Waste Treatment Plant, then operational improvements were planned and are being implemented. Infrastructure improvement projects included upgrades of control systems to a common platform, and installation of a fiber optic based local area network to the majority of farms, which together provided a distributed control system supporting tank farms. This new infrastructure provided the basis to propose consolidation of control and monitoring operations to a single location. More than a single location, the new Central Control Room was to increase effectiveness of operations by providing full status of all activities being performed across the Tank Farms and the Evaporator. The recent addition of productivity e-tools also would provide capability for management, supervisors and operators to make informed decisions regarding facility operations, through custom online applications designed to provide real time information derived from operational data. For example, tracking turnover activities between shifts, and maintaining compliance with limited conditions for operations. The Central Control Room would also have a single supervisor able to effectively manage the status of all assets and processes. The expected benefits of this arrangement include increased operator utility, increased situational awareness, improved response time for upset conditions, improvement in operator environment, and reductions in operating costs. The projected ROI for the Central Control Room when fully operational was projected to be about two years based on reduced costs from freeing up operations staff to perform other work plus the time and material savings realized by operations being performed with increased situational awareness. So the Central Control Room would become a hub for monitoring and controlling facility operations while responding to real time information affecting productivity and performance, from a centralized location customized to a fresh working environment. Over a 14-month period, WRPS developed the concept and engineering, procured over 500 items, modified and installed in renovated building, and completed transition and testing of this new Central Control Room, turning over the initial phase to Operations for 24/7 use in April 2014. (authors)