Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “load management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Liquid Salt Combined-Cycle Pilot Plant Design

The work described in this report is responsive to the Office of Fossil Energy program ‘Energy Storage for Fossil Power Generation.’ This Phase I report has been prepared by Pintail Power LLC, with support from Nexant ECA, Electric Power Research Institute (EPRI) and Southern Company Services as a deliverable for the U.S. Department of Energy for NETL Award DE-FE-00320016. The Liquid Salt Combined Cycle™ (LSCC™) technology provides large-scale energy storage integrated with Fossil Electric Generating Units (FEGUs) to meet critical needs in the energy transition by providing: • the lowest cost large-scale storage for time-shifting of renewable energy, • superior fuel efficiency to reduce GHGs from dispatchable resources, • flexible capacity and ramping to balance variability of wind and solar resources, • essential grid stability services to assure reliability of a low-carbon grid. The LSCC approach: • employs equipment that has already been proven in utility service, • uses safe, non-toxic, non-degrading, perpetual-life storage medium, • leverages and repurposes existing FEGU assets, • expands the value stack of energy storage to reduce market, financing, and commodity risks. Pintail Power has developed the LSCC technology to meet the need for reliable, efficient, and cost-effective integration of Variable Renewable Energy (VRE) into a low-carbon electric grid by coupling proven thermal energy storage with proven gas turbines, steam turbines, and heat transfer equipment. This novel approach is intended to address the key issues facing the grid and operators of renewable and fossil generating units including: • Overgeneration and curtailment of renewables, • Need for fast ramping dispatchable resources, • Improved efficiency and flexibility of fossil units, • Additional peaking capacity to support electrification of transportation and heating, • Provision of reliability services to support high penetration of VRE, especially synchronous inertia and fast frequency response. A Technology Readiness assessment by EPRI confirmed that LSCC technology consists of commercially proven hardware used in industrial and utility applications. Although the novel LSCC approach has not yet been demonstrated as a complete system, interfaces between major components have been conservatively specified. A Phase III pilot is planned to demonstrate equipment integration and operation. The patented innovation is removal of the evaporator section from the exhaust heat recovery system, with the evaporation performed by stored energy in a separate steam generator. This arrangement couples renewable and fossil power generation via long-duration energy storage to deliver cost, performance, and operational synergies, including superior charging and discharging flexibility, reduced fuel consumption and lower CO 2 emissions compared to conventional Combined Cycle Power Plants, and low-cost, large-scale energy storage. The LSCC technology is composed of proven equipment integrated with gas turbine exhaust heat in a novel system. During charging, electric heaters raise the salt temperature as it flows from the Cold Salt Tank to the Hot Salt Tank. During discharging, hot salt produces steam from feedwater that is heated with gas turbine exhaust, which also superheats steam to drive a steam turbine. LSCC technology can be added to any combustion-turbine to integrate renewable energy, provide needed grid services, and increase the value of fossil electric generating units based on the technology’s following attributes: • Long-duration storage enables time-shifting of VRE to avoid curtailment and impairment of renewable assets. • Long storage duration combined with fast-charging capability increases arbitrage opportunities by storing more energy when the price is low and discharging more hours when the price is high. • Long storage duration allows resource adequacy to be supplied across multiple days to increase reliability and reduce risk. • The stored energy reduces fuel heat rate and GHG emissions, and increases merit, so the LSCC dispatches earlier and longer to increase the plant’s capacity factor and asset value. • The stored energy enables pre-heating and startup of the steam cycle, without operating the gas turbine, to enable fast startup and ramping when dispatched for discharge. • The steam turbine can operate without the gas turbine so it can provide valuable synchronous inertia during charging without consuming fuel. • Fast frequency response and regulation services can be provided during charging using solid-state heater and pump controls to vary the charge power input in response to grid signals. • The LSCC system can be configured for resilience including black start, islanded/micro-grid operation, and even self-recharging of storage using either gas turbine power or gas turbine exhaust heat. The commercialization plan is to add LSCC technology to existing simple cycle gas turbine power plants with the 50MW GE LM6000 aero-derivative gas turbine as the reference design basis. A Techno-economic assessment of the reference design evaluated the benefits (Levelized Avoided Cost of Energy) and costs (Levelized Cost of Energy). The plant definition included all major systems and budgetary vendor quotes. Pintail Power and NexantECA developed the overall cost estimate for the LSCC plant up to the total plant cost level, following the DOE-NETL cost estimate guidelines at AACE Class 3 (-20%/+30%). This includes the equipment cost, bulk material, direct and indirect labor costs to arrive at the bare erected cost. Engineering costs are factored from the BEC and added to it to arrive at the EPC cost. Process and project contingencies were then factored from the EPC cost and rolled-up to yield the total plant cost of $\$$184 million for 1746 MWh of discharge electricity. • At $\$$105/kWh, the reference plant costs less than any of the Energy Storage Systems evaluated by PNNL in 2020 for the Energy Storage Grand Challenge. Operations and Maintenance cost estimates were scaled from combined cycle practice, assuming that the LSCC unit was co-located with and sharing some labor expense with other units, to arrive at $\$$2.2 million per year. Plant economics were evaluated using prices from the ERCOT Day-Ahead Market for calendar year 2019 (excluding the market disruptions from the COVID pandemic and the February 2020 deep freeze event). Assuming economic dispatch in the ERCOT Day-Ahead market, the reference plant capacity factor would have discharged for 2777 hours at 91.9 MW, a 31.66% capacity factor, with a marginal cost of $\$$25.59/MWh, and a LACE of $\$$82.41/MWh. Fixed charges were calculated according to EIA guidelines to arrive at an LCOE of $\$$83.48. The benefit-to-cost ratio of 0.99 suggests that the reference plant would have been cost-effective and competitive in the market. EPRI interviewed selected utilities to gauge the need for, applicability of and interest in the LSCC system. Several utilities are currently managing increased load growth along with the inclusion of increasing levels of renewable generation, putting pressure on conventional generation by requiring increased turndown requirements and ultimately lower capacity factors. All of the utilities interviewed have CO 2 reduction targets in the 2030-2050 timeframe that will severely limit the participation of fossil generation and require better utilization of carbon free generation. While there is limited opportunity for storage in the current markets, the utilities interviewed stated that there will be a substantial need for long duration energy storage in the future given the expected trends. Utilizing an energy storage system will generally be preferred over new gas capacity in some cases, with the capabilities of the LSCC system being a potential option for retrofit to existing simple cycle gas turbine units, allowing them to deliver greater participation in the market with lower carbon intensity. A technology gap assessment and technology maturation plan identified a pilot-scale demonstration as the final step before commercialization. Key gaps to be addressed during the Phase II FEED (Front-End Engineering Design) are component selection and design, commissioning procedures, and operational procedures and the control system for LSCC charging and discharging. The project team has been expanded to include Wood Group PLC as EPC. The proposed Phase II work leads to a pilot-scale engineering demonstration (TRL 6) to be conducted at Southern Company’s Plant Rowan, where the prototype system will perform “all the functions that will be required of the operational system.” The proposed pilot will facilitate commercialization (TRL-9) by scale-up to utility-scale systems integrated with peaking GTs or directly to facility scale systems using industrial GTs. The conceptual design for the pilot plant focuses on the novel integration aspects of LSCC technology. A slipstream of gas turbine exhaust will feed a waste heat recovery unit coupled to a molten salt steam generator heated by stored energy. The pilot is intended to demonstrate all key operating modes of the LSCC technology during charging, discharging and standby. The pilot equipment will be approximately one-seventh scale of the LM6000 commercial target and is expected to have commercial off-ramp potential for facility-scale applications.

01 COAL, LIGNITE, AND PEAT↗

An Integrated Paradigm for the Management of Delivery Risk in Electricity Markets: From Batteries to Insurance and Beyond [Slides]

In wholesale electricity markets today, flexibility from a limited number of distributed energy resources (DERs) is offered daily, and the value of flexibility is not yet recognized for economic hedging of delivery risk. Under a three-year project funded by the ARPA-E PERFORM program, a collaborative team is working towards developing an integrated risk management framework that will leverage flexibility from distributed and bulk resources to cost-effectively and reliably manage delivery risk of intermittent resources. Two concepts are at the core of the proposed integrated risk management framework: (A) flexibility options, which are a novel type of options and enable wholesale electricity market participants to hedge uncertainty by buying flexibility. (B) DER flexibility scores, which provide a way for utilities or aggregators to classify assets in groups with different likelihood of delivering contracted flexibility. This report presentation will focus on the proposed ISO-product "flexibility options," which is complementary to ramp and other products being introduced by ISOs/RTOs to manage net load uncertainties. Participating resources with imbalance risk can buy flexibility options to hedge their production, whereas grid-connected resources that can provide physical flexibility can offer flexibility options. We will present basics of the formulation for a day-ahead ISO market that matches buyers and sellers of this hedge in coordination with existing capabilities to schedule energy and ancillary services, and outline how their settlements mitigate the impact of imbalance risk.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LLNL FESP Theory Highlights: August 2024

The 2024 ABOUND SciDAC and BOUT++ combined workshop was held August 5-9 th 2024 at the University of California Livermore Collaboration Center (UCLC) in Livermore. Bringing together leading scientists and researchers from across the globe, this pivotal event focused on advancing plasma physics and boundary plasma dynamics within the context of fusion energy research. Key discussions throughout the meeting highlighted significant advancements in the BOUT++ framework, including enhanced simulations of small Edge Localized Modes (ELMs) and the initiation of integrating the integration of the 5D GEM gyrokinetic turbulence core code with the 2D SOLPS-ITER boundary transport code. These developments are crucial for managing heat loads in fusion reactors and supporting the longevity of plasma-facing components. The event also featured a session on Inter-SciDAC Collaborations, where principal investigators from multiple U.S. FES SciDAC tokamak projects explored opportunities for cross-collaboration. Additionally, the meeting showcased cutting-edge advancements in GPU acceleration and AI/ML technologies, poised to drive the next generation of fusion research. In his closing remarks, Dr. Xueqiao Xu emphasized the importance of the collaborative efforts and discussions that took place, noting their potential to shape future breakthroughs in fusion energy. The event underscored the global nature of the BOUT++ collaboration, with contributions from over 57 institutions worldwide. The 2024 BOUT++ and ABOUND Joint Hybrid Meeting continues to drive forward the research and innovations needed to achieve fusion energy, setting the stage for future collaboration and discovery.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

An Integrated Paradigm for the Management of Delivery Risk in Electricity Markets: From Batteries to Insurance and Beyond

If power systems transition to integrate higher amounts of variable renewable energy sources, storage technologies, and distributed energy resources (DERs), new risk management frameworks are necessary to ensure cost-effective and reliable power system operations. Projects funded by the Advanced Research Projects Agency-Energy (ARPA-E) Performance-based Energy Resource Feedback, Optimization, and Risk Management (PERFORM) program aim to contribute new risk management frameworks by developing methods to quantify and manage risk at grid asset and system levels. The National Renewable Energy Laboratory (NREL) led a PERFORM project in collaboration with the Johns Hopkins University, the Electric Power Research Institute (EPRI), kWh Analytics, Packetized Energy, and Imperial Consultants (ICON). The project addressed two challenges related to risk management in electricity markets: managing net load imbalances and flexibility from DERs. This final technical report presents a list of project accomplishments, activities, and outputs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Statistical evaluation of the effects of fall and winter flows on the spring condition of rainbow and brown trout in the green river downstream of Flaming Gorge Dam.

Flaming Gorge Dam, a hydroelectric facility operated by the Bureau of Reclamation (Reclamation), is located on the Green River in Daggett County, northeastern Utah. In recent years, single peak releases each day or steady flows have been the operational pattern during the winter period. A double-peak pattern (two flow peaks each day) was implemented during the winter of 2006-2007 by Reclamation. Because there is no recent history of double-peaking at Flaming Gorge Dam, the potential effects of double-peaking operations on the body condition of trout in the dam's tailwater are not known. A study plan was developed that identified research activities to evaluate potential effects from double-peaking operations during winter months. Along with other tasks, the study plan identified the need to conduct a statistical analysis of existing data on trout condition and macroinvertebrate abundance to evaluate potential effects of hydropower operations. This report presents the results of this analysis. We analyzed historical data to (1) describe temporal patterns and relationships among flows, benthic macroinvertebrate abundance, and condition of brown trout (Salmo trutta) and rainbow trout (Oncorhynchus mykiss) in the tailwaters of Flaming Gorge Dam and (2) to evaluate the degree to which flow characteristics (i.e., flow volumes and flow variability) and benthic macroinvertebrate abundance affect the condition of trout in this area. This information, together with further analyses of size-stratified trout data, may also serve as baseline data to which the effects of potential future double-peaking flows can be compared. The condition (length, weight and/or relative weight) of rainbow trout (Oncorhynchus mykiss) at two sites in the Green River downstream of Flaming Gorge Dam (Tailrace and Little Hole) and weight of brown trout (Salmo trutta) at the Little Hole site has been decreasing since 1990 while the abundance of brown trout has been increasing at the two sites. At the same time, flow variability in the river has decreased and the abundance of total benthic macroinvertebrates at the Tailrace site has increased. The condition of trout in spring (averaged across all sampled trout) was positively correlated with fall and winter flow variability (including within-day skewness, within-season skewness and/or change in flow between days) at both locations. No negative correlations between trout condition and any measure of flow variability were detected. The length and weight of rainbow trout at the Little Hole site were negatively correlated with increasing fall and winter flow volume. The condition of brown trout at Little Hole and the condition of brown and rainbow trout at Tailrace were not correlated with flow volume. Macroinvertebrate variables during October were either positively correlated or not correlated with measures of trout condition at the Tailrace and Little Hole sites. With the exception of a positive correlation between taxa richness of macroinvertebrates in January and the relative weight of brown trout at Tailrace, the macroinvertebrate variables during January and April were either not correlated or negatively correlated with measures of trout condition. We hypothesize that high flow variability increased drift by dislodging benthic macroinvertebrates, and that the drift, in turn, resulted in mostly lower densities of benthic macroinvertebrates, which benefited the trout by giving them more feeding opportunities. This was supported by negative correlations between benthic macroinvertebrates and flow variability. Macroinvertebrate abundance (with the exception of ephemeropterans) was also negatively correlated with flow volume. The change in trout condition from fall to spring, as measured by the ratio of spring to fall relative weight, was evaluated to determine their usefulness as a standardized index to control for the initial condition of the fish as they enter the winter period. The ratio values were less correlated with the fall condition values than the spring condition values and did not show the same relationships to flows, to macroinvertebrates, or across years as the above-mentioned spring relative weight values. We found that the condition ratio of rainbow trout at Tailrace was positively correlated with within-day flow variability but was not correlated with flow volume, between-day-, or within-season flow variability. The condition ratios of rainbow trout at Little Hole and of both trout species at Tailrace were not correlated to any of the measured flow variables. The condition ratios of both trout species were positively correlated with the abundance of January benthic macroinvertebrates at the Little Hole site and with January dipterans (brown trout) or total coleopterans (rainbow trout) at the Tailrace site. The relationships among flows, macroinvertebrates, and trout condition were varied among species and locations.

13 HYDRO ENERGY↗

Weather forecast-based optimization of integrated energy systems.

In this work, we establish an on-line optimization framework to exploit detailed weather forecast information in the operation of integrated energy systems, such as buildings and photovoltaic/wind hybrid systems. We first discuss how the use of traditional reactive operation strategies that neglect the future evolution of the ambient conditions can translate in high operating costs. To overcome this problem, we propose the use of a supervisory dynamic optimization strategy that can lead to more proactive and cost-effective operations. The strategy is based on the solution of a receding-horizon stochastic dynamic optimization problem. This permits the direct incorporation of economic objectives, statistical forecast information, and operational constraints. To obtain the weather forecast information, we employ a state-of-the-art forecasting model initialized with real meteorological data. The statistical ambient information is obtained from a set of realizations generated by the weather model executed in an operational setting. We present proof-of-concept simulation studies to demonstrate that the proposed framework can lead to significant savings (more than 18% reduction) in operating costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Final Report - Independent Verification Survey Report for the Waste Loading Area, Former Hazardous Waste Management Facility, Brookhaven National Laboratory, Upton, New York

The objective of the verification survey was to obtain evidence by means of measurements and sampling to confirm that the final radiological conditions were less than the established release criteria. This objective was achieved via multiple verification components including document reviews to determine the accuracy and adequacy of FSS documentation.

61 RADIATION PROTECTION AND DOSIMETRY↗

Resource Form Factor and Installation of GFA Controllers

The focus of this task is to optimize the form and placement of a controller comprising the Grid Friendly™ appliance (GFA) controller, power supply and power relay (and/or a solid-state power electronic switch) that would command a domestic water heater to shed its load in response to stress on the electric power grid. The GFA controller would disconnect the water heater from its supply circuit whenever it senses a low voltage signal or other indicators of system stress communicated via the electric power distribution system. Power would be reconnected to the appliance when the GFA controller senses the absence of these signals. This project has also considered more frequent cycling of this controller’s relay switch to perform demand-side frequency regulation. The principal criteria considered in this optimization are reliability, cost and life expectancy of the GFA components. The alternative embodiments of the GFA equipment under consideration are: Option 1- installation inside the insulation space of the water heater between the tank and jacket Option 2 containment in a separate nearby electrical enclosure Option 3 - as a modification or adjunct to the distribution panel housing and/or the breaker that protects the water heater supply circuit.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Grid FriendlyTM Device Model Development and Simulation

In late 2007, the Bonneville Power Administration (BPA) contracted Pacific Northwest National Laboratory (PNNL) to complete a research project titled Grid-Responsive Demand-Side Control Using Grid Friendly Appliance Technologies [Hammerstrom 2009, DeSteese and Hammerstrom 2009]. Cosponsors included Portland General Electric (PGE) and Puget Sound Energy (PSE). The project focused on applications of the Grid Friendly Appliance (GFA) controller, which is an autonomous controller that was designed to advise devices like appliances concerning valuable demand-side grid services that should be conducted. The controller bases its advice on observations it makes from the ac voltage signal. Electric tank water heaters were selected to be controlled by the GFA controller in this project. Two autonomous responses are addressed herein. First, an under-voltage-responsive water heater is able to recognize sudden reductions in feeder circuit voltage at each water heater and may curtail any electric load that is being consumed by the water heater. These under-voltage events are usually induced by nearby electrical faults. An under-voltage response is necessarily specified by the set of voltage thresholds at which the responsive water heaters would respond. The set of voltages at which the curtailment would be released must also be specified. Additionally, any delays prior to the water heater load becoming curtailed or again released must be specified. For example, a delay may be intentionally imposed prior to curtailing water heater loads to avoid responses during the fault itself. Much longer and randomized delays should be imposed prior to the release of curtailments in order to re-establish diversity of the water heater loads and soften what could otherwise be an abrupt reintroduction of a large aggregated electrical load into the already stressed grid region.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Wind Ramping Product Formulations in a Ramp-Constrained Power Grid

Flexible ramping products are designed to compensate the variability and uncertainty of load and intermittent generation. Since their market implementation by the California Independent System Operator (CAISO) and Midcontinent System Operator (MISO), flexible ramping products have garnered much attention. However, it is still unclear how to best formulate wind power plants’ participation in the ramping requirement. This paper investigates different wind ramping product formulations and increasing wind power penetration in the context of a security-constrained unit commitment (SCUC) model. We demonstrate that the ramping model that captures both the intra- and inter-temporal output ramp capability of individual wind power plants reflects the true ramp contribution of the wind fleet. With increasing wind penetration, wind generation curtailments can support the grid’s ramping needs. In addition, we found that increased wind penetration has the potential of lowering ramping and production costs. Numerical case studies performed on the TAMU 2000-bus synthetic network support the findings.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

State Estimation in Low-Observable Distribution Systems Using Matrix Completion: Preprint

The need for distribution system state estimation is on the rise because of the increased penetration of distributed energy resources and flexible load. To manage the distribution systems in real time, operators need to first overcome the challenge of low observability in distribution systems. Also, because of the amount of data present from smart meters, distributed generation measurements, switches, etc., the ideal distribution state estimation methods need to be able to process heterogeneous data. In this paper, an algorithm is developed for voltage phasor estimation in low-observability distribution systems. The algorithm is based on the matrix completion approach from signal processing. The traditional matrix completion formulation is augmented with power-flow constraints to improve results while requiring less data. This method can also use all types of measurements (voltage magnitude, voltage angle, real power, reactive power) to complete the state matrix.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Dynamic Thermal Performance Analysis of PCM Products Used for Energy Efficiency and Internal Climate Control in Buildings

PCMs are attractive for the future generation of buildings, where energy efficiency targets and thermal comfort expectations are increasingly prioritized. Experimental analysis of local thermal processes in these dynamic components and whole-building energy consumption predictions are essential for the proper implementation of PCMs in buildings. This paper discusses the experimental analysis of the thermophysical characteristics of both a latent heat storage material (PCM) and a product containing this PCM. The prototype product under investigation is a panelized PCM technology containing inorganic, salt-hydrate-based PCM. The thermal analysis includes studies of melting and freezing temperatures, enthalpy changes during phase change processes, nucleation intensity, sub-cooling effects, and PCM stability. The PCM’s stability is also investigated, as is the ability of PCM products to control local temperatures and peak load transmission times. Two inorganic PCM formulations based on calcium chloride hexahydrate (CaCl 2 .6H 2 O) were prepared and tested in laboratory conditions. Material-scale testing results were compared with outcomes from the system-scale analysis, using both laboratory test methods as well as field exposure in test huts. This work demonstrates that PCM technologies used in buildings can effectively control both the magnitude of thermal storage capacity as well as the time of the peak thermal load. It was found that commonly used material-scale testing methods may not always be beneficial in assessing the dynamic thermal performance characteristics of building technologies containing PCMs.

42 ENGINEERING↗

Intelligent Control of Thermal Energy Storage in the Manufacturing Sector for Plant-Level Grid Response

Industrial facilities are seeking new strategies that help in providing savings mechanisms for demand charges. Demand charges are the charges incurred by industrial facilities as a result of power usage. Thermal energy storage has advanced significantly with lots of new applications, garnering the interest of many industrial facilities. These applications could be used to shave the industrial facilities’ peak electric demand and reduce their demand charges. This paper aims to demonstrate the efficacy of thermal energy storage in reducing demand charges and highlight new developments in the integration of smart control systems with thermal energy storage. The study compares energy consumption and peak demand for a facility equipped with and without thermal energy storage tanks using a fixed schedule for charging and discharging. Additionally, the paper examines the impact of incorporating a smart controller to determine when to charge and discharge the tank based on the facility’s real-time power usage and a given setpoint. The results indicate cost savings from the use of thermal energy storage tanks under two proposed scenarios, reflected in the reduced cost of power consumption for the studied facility. The incorporation of a smart controller with the thermal energy storage tank in the facility studied could provide estimated savings of 3.3% per year of power consumption charges, without considering the contribution of any incentives. The estimated savings provided by the fixed schedule scenario are 2.7% per year.

25 ENERGY STORAGE↗

The characteristics of the planned National Transonic Facility

The National Transonic Facility is a high Reynolds number transonic wind tunnel designed to satisfy the research and development needs of NASA, DOD, and industry. The facility design incorporates the cryogenic approach to achieving high Reynolds numbers with manageable model loads. By using temperature as a test variable, a unique capability to clearly separate aeroelastic, Reynolds number, and Mach number effects will be possible. This capability will open new horizons in transonic aerodynamic research. The tunnel design including unique features and operating envelopes is described. A brief overview of the general operating arrangement and the schedule for facility construction is presented.

Mckinney, L. W.↗

Performance results of Grumman prototype Space Station Space Erectable Radiator System ground test articles

The paper addresses individual-radiator performance results of the prototype Space Erectable Radiator System (SERS) in both ambient and thermal vacuum environments. The radiator design utilizing a two-phase fluid loop is outlined, along with SERS design requirements, radiator panel hardware, and whiffletree clamp hardware providing a dry-contact interface of the SERS panel with the heat exchanger of the thermal bus. It is observed that throughout integrated thermal-bus tests, SERS panels managed the load demands whether interfacing with twin condensers, in parallel-flow configuration, or with shear-flow condensers, in a cross-flow configuration. It is found that the insulation losses in the integrated and stand-alone test points are approximately 2 to 6 pct. The motorized whiffletree clamp is seen as performing satisfactorily during remote operations as well as maintaining 28,800-lb force throughout the test duration without requiring further adjustments.

Gisondo, Francine↗

Probabilistic load simulation: Code development status

The objective of the Composite Load Spectra (CLS) project is to develop generic load models to simulate the composite load spectra that are included in space propulsion system components. The probabilistic loads thus generated are part of the probabilistic design analysis (PDA) of a space propulsion system that also includes probabilistic structural analyses, reliability, and risk evaluations. Probabilistic load simulation for space propulsion systems demands sophisticated probabilistic methodology and requires large amounts of load information and engineering data. The CLS approach is to implement a knowledge based system coupled with a probabilistic load simulation module. The knowledge base manages and furnishes load information and expertise and sets up the simulation runs. The load simulation module performs the numerical computation to generate the probabilistic loads with load information supplied from the CLS knowledge base.

Newell, J. F.↗