Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “licenses”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

U-10Mo Monolithic Fuel Qualification Plan

The Material Management and Minimization (M3) Program’s primary objective within the U.S. Department of Energy/National Nuclear Security Administration is to achieve permanent threat reduction by minimizing and when possible, eliminating weapon-usable nuclear material around the world. Under M3’s Office of Conversion, the U.S. High Performance Research Reactor (USHPRR) Project, is pursuing a fuel qualification and licensing effort focused on converting high-performance research reactors in the United States from using highly enriched uranium (HEU) fuel to using low-enriched uranium (LEU) fuel. The body of this document is focused on defining the activities required for generic qualification of high density, LEU fuel that then allows reactor conversions to proceed for the four high-performance research reactors and the critical assembly that will operate using the U-10Mo monolithic fuel design (see Subsection 1.3): MITR, MURR, NBSR, ATR, and ATRC. Fuel qualification in this report means generic fuel acceptance of the U-10Mo monolithic fuel form by the NRC for use in reactor conversions in the United States, which allows the fuel to be used in subsequent reactor specific licensing requests. The U 10Mo Monolithic Fuel Research, Development, and Qualification Plan utilizes the functions and requirements of the USHPRR Project that was established in the Functions and Requirements Document (F&RD) [1] and expands on these requirements to ensure that planned tests have traceable results that will ensure the requirement has been met. The methods by which data will be collected to show that these requirements have been met are described in this document.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

NREL Helps Hydropower Projects Navigate Complex Regulatory Currents

Hydropower accounts for about 37% of U.S. renewable electricity generation. But before industry members can license and construct new projects or relicense existing projects, they must navigate complex approvals from federal, state, and tribal authorities. These regulations provide critical protections for water quality, species, cultural resources, and recreation, but they can also increase the costs, risks, and uncertainties to license or relicense projects.

HYDRO ENERGY↗

Multiscale Experiments and Multiphysics Simulation of Multiphase Flow for Transportable Small Modular Reactors

A new type of safe, small, transportable nuclear reactor would address the intense and ever-growing global demand for energy produced via a resilient, carbon-free energy source. In this regard, transportable small modular reactors (SMRs) are being designed and developed for electricity generation within small/micro-grid/off-grid isolated systems, as well as for heat generation in industrial/residential applications. These reactors feature the capability to be fully factory fabricated and then directly transported to utilities’ sites as “plug-and-play” systems. Research and development (R&D) programs are underway at Idaho National Laboratory (INL) to successfully design, develop, and demonstrate such safe-by-design mobile reactor technologies, in collaboration with partner organizations. Multiscale experimental facilities and multiphysics simulation tools are required for reactor design verification and validation (V&V), and licensing. These advanced reactors are intended to feature passive safety systems such as passive containment cooling systems (PCCS), which consist of multiphase flows and multispecies distributions. This seminar talk will focus on designing and analyzing transportable SMR PCCS by using multiscale experiments and multiphysics computational fluid dynamics (CFD) simulations to support reactor licensing and safety. The corresponding research challenges are addressed via supportive verification and validation results generated by the models and simulation tools in combination with selective parametric and uncertainty analysis. This solution approach could blaze the trail for commercial adoption of such technologies. The facilities, simulation capabilities, and research opportunities available at INL in regard to such reactors and the integrated energy systems with which they go hand in hand are also discussed briefly, and may spark interest in deeper research as well as new collaborative projects.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Flexible Plant Operation and Generation Technical Program Plan for FY2023

This report presents the Technical Program Plan for Fiscal Years 2023-2027 (FY2023 to FY2027) for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability Program—Flexible Plant Operation and Generation Research Pathway. The objective of this pathway is to carry out the research needed to help nuclear power plants diversify revenue generation for the life of these plants. The purpose of these research and development activities is two fold: (1) to reduce the technical and economic risks of implementing FPOG applications and (2) to provide guidance on relevant safety and environmental operating license reviews, amendments, and renewals. This pathway provides a clear understanding of the benefits of nuclear energy beyond electricity markets. A detailed description of the research and development activities that have been completed and that are planned for FY2023—FY2027 are presented in this report. These activities include completing the development of analysis tools to perform technical and economic assessments of realistic market opportunities for producing secondary energy products near nuclear power plants. They also include developing and demonstrating engineering systems and control concepts to dispatch thermal and electrical power to an industrial user. Additionally, this plan includes developing guidance for addressing potential regulatory and licensing requirements. In addition, the formation, purpose, and activities of a group referred to as the Hydrogen Regulatory Research and Review Group is discussed. An overview is also provided on the potential benefits of the Infrastructure Investment and Jobs Act (IIJA) Bill that will support the commencement of Regional Clean Hydrogen Hubs, and the Inflation Reduction Act (IRA) that provides compelling production tax credits for nuclear electricity and clean hydrogen using nuclear energy.

08 HYDROGEN↗

Phase II Development of the Surveillance Test Articles to Improve the Design, Fabrication, and Testing

Advanced reactors, such as the molten salt reactor (MSR), require materials that will withstand harsher environments than the materials used for lower temperature water reactors. Materials used in MSR construction need not only withstand elevated temperature, temperature cycling, and neutron radiation, but must be able to withstand the corrosive molten salt environment. Significant materials research has been driven by the materials needs of the MSR due to the harsh environment and the material data requirements to support licensing. Limited operation experience with MSRs has made this challenging work. Information is very limited on materials degradation due to irradiation, molten salt corrosion, elevated temperature, and the resulting fatigue, creep, and creep-fatigue loading during operation. While efforts are underway to better understand the effects of this harsh environment on construction materials, the Advanced Reactors Technologies (ART) Program has been working to develop materials surveillance test articles that could be used in a materials surveillance program and allow for the collection of information on the materials degradation during plant operation and could support timely licensing of these advanced reactors.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Comparison of Human Error Probabilities Collected from HuREX and SHEEP Frameworks

This paper discusses how different are the HEPs collected from HuREX and SHEEP frameworks. This study is a preceding research to infer full-scope HRA data based on the data collected from the SHEEP framework. For the comparison, we used HEPs in the HuREX database published in KAERI-TR-6649 [6]. The HEPs have been collected from actual licensed operators when manipulating MCR simulators of Westinghouse type and Optimized Power Reactor (OPR1000) type in South Korea. For the HEPs based on the SHEEP framework, these have been collected from actual licensed operators and students when using a simplified simulator, i.e., Rancor Microworld.

99 GENERAL AND MISCELLANEOUS↗

Fission Product Transport in TRISO Particles and Pebbles

This document demonstrates completion of the goals described in the technical narrative of the FOA project titled: ”Modeling and Simulation Development Pathways to Accelerating KP-FHR Licensing” regarding fission product transport in the Kairos-proposed fuel pebble by INL and Kairos Power. Showcased in this report are code developments and simulations in BISON that extend the state of the art in computation and understanding of fission product transport in a TRISO fuel particle and pebble. These enhancements lay the foundation for making predictions of fission product transport that can be used as input in the fuel licensing process. This was achieved by installing existing fuel material models originally used in PARFUME, developing a new failure probability method that is efficient and multi-dimensional, employing material homogenization, and expanding verification and validation simulations to demonstrate the efficacy of the work. All this work is leveraged to spotlight the main deliverable; a three-dimensional model and corresponding demonstration simulation of a pebble, which will serve as the starting point for models used to predict fission product release.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Plan to Qualify New Fuel for the High Flux Isotope Reactor for Material Minimization

The High Flux Isotope Reactor (HFIR) at Oak Ridge National Laboratory (ORNL) is one of five high power research reactors the Office of Material Management and Minimization (M3) Program, Office of Conversion is working to convert from using highly enriched uranium (HEU) fuel to using low-enriched uranium (LEU) fuel. This effort stems from the primary objective within the U.S. Department of Energy (DOE) National Nuclear Security Administration (NNSA) to achieve permanent threat reduction by minimizing, and when possible, eliminating weapon-usable nuclear material around the world. Under M3’s Office of Conversion, the U.S. High Performance Research Reactor (USHPRR) Project is pursuing fuel qualification and licensing of the high-performance reactors to operate with LEU fuels. All high-performance reactors except HFIR will be converted to LEU monolithic uranium-molybdenum alloy fuel. HFIR will be evaluated for conversion to LEU using a uranium silicide fuel, namely, U3Si2-Al dispersion fuel.The mission of the USHPRR Project is to develop the technology needed to reduce, and eventually eliminate, worldwide use of HEU in civilian applications. The goal is to develop the technical means needed to use low enriched uranium (LEU) instead of HEU fuel in research and test reactors without significant penalties in performance, economics, or safety of the reactors. The USHPRR Project has four major elements, called Pillars: Fuel Qualification (FQ) managed at Idaho National Laboratory (INL), Fuel Fabrication (FF) managed at Pacific Northwest National Laboratory (PNNL), Reactor Conversion (RC) managed at Argonne National Laboratory (Argonne), and Cross-Cutting (CC) managed at Savannah River National Laboratory (SRNL). FQ is responsible for the qualification of the fuel type. RC is responsible for supporting reactor conversion analysis and overseeing licensing submittals leading to conversions of domestic reactors to LEU fuel. For the FQ effort, FQ (INL) worked in collaboration with RC (Argonne) and ORNL to develop the plan for the uranium silicide fuel qualification for HFIR.The resulting HFIR Fuel Qualification Plan provides the general approach for the USHPRR team to move the selected uranium silicide fuel design for HFIR conversion through qualification. Authorization and use in HFIR will be approved through the DOE’s Office of Science. Uranium silicide fuel was previously qualified in NUREG-1313 at an approximate maximum heat flux of 1.4 MW/m2 and a maximum fuel section temperature of about 130°C. In addition to the different regulator process utilized by DOE, these upper limits will be exceeded in HFIR; therefore, further testing will be necessary to ensure the fuel can meet HFIR qualification requirements. The HFIR fuel loading may exceed 4.8 gU/cm3 which was determined in the NUREG-1313 safety evaluation to be acceptable for use in non-power NRC-regulated reactors provided there exist no other safety considerations. In addition, the uranium silicide fuel will need to be qualified in a HFIR-specific design. This plan includes the currently available information from the USHPRR Project Functions and Requirements document and expands these requirements to ensure that planned tests have traceable results providing evidence that the requirements have been met. Data collection methods are discussed as well as the process to show that the requirements have been met. This document is designed to provide a pathway for researchers to obtain data necessary and at the appropriate quality level for HFIR fuel qualification.

Shokes, Tamara↗

AGR-1, AGR-2, AGR-3/4, and AGR-5/6/7 DimensionalChange Analysis

A series of fuel irradiation experiments have been planned in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) to support the licensing and operation of the Advanced Reactor Technologies high temperature gas-cooled reactor. The advanced gas reactor (AGR) experiments are comprised of multiple independent capsules containing multiple cylindrical fuel compacts, placed inside of a graphite cylinder in ATR. The purpose of the AGR experiments is to provide data on fuel performance under irradiation, support fuel process development, qualify the fuel for normal operating conditions, provide irradiated fuel for accident testing, and support the development of fuel performance and fission product transport models. The advanced graphite creep (AGC) experiments provide irradiation creep data for design and licensing. To date, six irradiation campaigns have been completed: AGR-1 (December, 2006 – November, 2009); AGR-2 (June, 2010 – October, 2013); AGR-3/4 (December, 2011 – April, 2014); AGC-1 (September, 2009 – January, 2011); AGC-2 (April, 2011 – May, 2012); and AGC-3 (November, 2012 – April, 2014).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

A Survey of Multizone Airflow Simulation Software

H-Canyon simulates the building and process ventilation to ensure positive contamination control for any modifications as well as evaluating off-normal conditions. Simulations can also be used to identify air quality of personnel occupied areas. The models can be classified into two groups, single and multi-zone models. As the name states, a single zone model assumes that the building can be described by a single, well-mixed zone. Whereas large buildings have structures that must be described as multizone. Multizone airflow models deal with the difficulty of flows in a building by distinguishing the effects of internal flow restrictions. Several models have been developed that take internal partitions into account. CONTAM (currently used) is a multizone airflow program created by NIST to determine airflows including infiltration, exfiltration, wind pressures acting outside the building, buoyancy effects caused by the indoor and outdoor air temperature difference. COMIS is a multizone air infiltration, ventilation, and contaminant transport model that was developed at Lawrence Berkeley National Laboratory. COMIS deals with applied pressure distribution, airflow components, HVAC systems, schedules, and contaminant transport. EnergyPlus is designed by DOE. It supports flexible component level configuration of HVAC models and simulates sub-hourly time steps to control fast dynamic systems. The program features include providing accurate environmental performance data including energy consumption and carbon emissions, and reporting solar gains on surfaces. Heavent is used to model industrial ventilation systems to control airborne contaminants. It's designed based on the American Conference of Governmental Industrial Hygienists (ACGIH) Ventilation manual. DesignBuilder is the most recognized and advanced user interface to EnergyPlus. It gives access to all of the most frequently required simulation capabilities covering building fabric, thermal mass, glazing, shading renewables, and HVAC analysis. The objective of this study is to identify all relevant software available including commercially licensed, freely licensed, and open source, that can be used to simulate large, complex process facility ventilation systems. All discovered software tools are evaluated for salient features and compared to the software tool currently used to simulate the H-Canyon ventilation system. The design criteria of a ventilation system has two basic requirements: Supplying fresh air for the occupants and changing the air in the room sufficiently; therefore, the smells, fumes, and contaminants will be removed. In this study, first, whether the software simulates airflow (infiltration, natural ventilation, and interzonal) or considers them to be inputs is discussed. Second, if indoor contaminant levels are considered; and finally suggestions on how airflow analysis can be more appropriately accounted for when performing airflow simulation of a building. All of the airflow software reviewed for this study can account for constant infiltration and natural ventilation rates that are not affected by changes in indoor and outdoor conditions. Modelling infiltration in EnergyPlus or DesignBuilder are applicable for small buildings and not appropriate for larger buildings like the H-Canyon. The effect of wind on external pressures, infiltration, and natural and mechanical ventilation, can also be calculated using all of these software. These programs have control options to switch between natural to mechanical ventilation modes or both (hybrid). Interzonal airflow can be applied which means one zone can be specified to receive a fixed amount of air from another zone. The following ventilation modeling software is recommended for further testing: CONTAM, COMIS, Heavent. The next step in evaluating the software will consist of creating test facility simulations using evaluation copies of the software.

42 ENGINEERING↗

Use of Multi-Attribute Utility Analyses to Assess Transportation Routes from ISFSIs - 20535

With two consolidated interim storage facilities for used nuclear fuel (UNF) having applied for storage licenses, there is the potential need to transport UNF in the U.S. from shutdown reactor sites to complete the site cleanup and from operating reactor sites who may be running out of storage options (e.g., spent fuel pools are nearly full and dry storage facilities are reaching licensed capacity). At some of the shutdown reactor sites, only the independent spent fuel storage installation (ISFSI) exists and often there remains a degraded transportation infrastructure for performing shipments from these sites. At other sites (e.g., operating reactor plants), the existing transportation infrastructure on the site is unchanged and sufficient for moving UNF, but the environment around the route may have changed (e.g., what was once a rural setting has transformed into a more urban setting) and/or local stakeholders want their input taken into consideration in UNF transportation activities. So, although preliminary evaluations have been performed to identify viable modes of transport from these sites using rail, barge, and/or heavy haul truck, if multiple options exist for moving the UNF from the site (e.g., multiple truck routes or a truck and a barge route both exist) then an evaluation that takes input from multiple stakeholders should be considered to identified the preference (e.g., ranking) of routes from a site. Orano has supported the development of several studies examining the viable routes for removing UNF from some of these sites and has utilized a multi-attribute utility analysis (MUA) to establish a ranking of routes and associated modes to move the UNF from the ISFSIs to a Class I rail carrier. The ultimate result from the MUA is a list(s) of the most to the least favored/preferred routes from the site. This paper provides an overview of the MUA methodology and provides an example of its application to a site with a shutdown reactor. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using FLAC{sup R} Modeling Software to Analyze the Stability of a LLRW Disposal Facility - 20031

Waste Control Specialists (WCS) wished to amend its existing LLRW disposal license such that it might use gravel aggregate instead of concrete as backfill around large component (LC) parts from decommissioned nuclear reactors. A classical mechanics evaluation of the strength of the LCs was presented to the Texas Commission on Environmental Quality (TCEQ), demonstrating that the LCs had adequate capacity to withstand the loads within the facilities, and that concrete was unnecessary for structural support. TCEQ requested that additional analyses of the LCs within the facilities be performed using FLAC{sup R} finite difference modeling software. Because FLAC{sup R} has the capability of modeling the support provided by the lateral earth pressures, the factors of safety against failure for the LCs increased. TCEQ found the FLAC{sup R} analyses presented in this report to be satisfactory, and granted WCS' license amendment request. This work demonstrates that FLAC{sup R} may be used advantageously to more accurately represent the complexities of the physical situation being modeled. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimization of the Post-Operational Phase on Two Belgian Multi-Unit Nuclear Power Plants: the Case of the Non-Fissile Irradiated Core Items - 20156

The current legal framework in Belgium foresees the progressive phase out of nuclear power between October 2022 (Doel 3) and December 2025 (Doel 2). Upon its definitive shutdown, each unit of the Tihange and Doel sites will enter a Post-Operational Phase (POP) and be prepared for its Decontamination and Decommissioning (D and D). Prior to obtaining the D and D license, the Operator Electrabel is legally required to remove any non-fissile irradiated core items stored in the deactivation pools. The non-fissile irradiated core items consist essentially of control rods, poison rods and source thimbles as well as thimble plugs and foreign materials irradiated during operation: - Their significant content in highly radiant radionuclides (up to 6 TBq of Co-60 per kg of irradiated material) renders all existing operational waste management processes inadequate due to insufficient biological shielding; - Their high concentrations in long-lived radionuclides call for their disposal in a geological repository for which no final design nor waste acceptance criteria are expected prior to 2050. Uncertainties in the Belgian energy supply and security, however, require the Operator to be prepared for a partial nuclear phase out, where one or more units would benefit from lifetime extension while the remaining units would undergo decommissioning. The present paper aims at presenting how Electrabel, in partnership with Tractebel, addressed this challenge by maximizing the use of synergies within the respective sites as well as between both sites themselves, all the while accounting for site specificities. The most recent results and state of progress of the project will be detailed and the first lessons learned will be shared. The project has been split in multiple tasks and phased as follows: - An inventory phase aimed at mapping the contents, origin, composition and history of the non-fissile irradiated core items; - A pre-characterization phase based on neutron activation models; - A waste sorting phase aimed at separating waste forms for which an evacuation route exists from those for which such route does not exist; - A feasibility phase aimed at exploring all possible scenarios for the management of non-fissile irradiated core items and identifying the optimal feasible solution for each site; - A preparation phase (currently ongoing), developing further the optimal solution and ensuring that back-up solutions are available for any foreseeable change of context (licensing issue, modification in the nuclear phase-out program, etc.) and initiating early contacts with potential subcontractors for segmentation works and cask manufacturers, as well as the Belgian regulatory body and waste management agency. This phase also foresees the investigation of destructive and non-destructive radiological measurements to support the detailed characterization of the waste forms; - A realization phase (future work). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oil and Natural Gas Development near and beneath Uranium Tailings Cells and Other Remediated Sites - 20358

DOE LM is responsible for maintaining remedies at more than 50 remediated sites that require active long-term surveillance and maintenance (LTS and M). Institutional controls (ICs) were established to limit human and environmental exposures to residual contamination by controlling land use, restricting access to potential hazards, and making the public aware of potential dangers from the residual contamination. ICs for each site were developed based on current and foreseeable conditions; however, these controls should evolve to mitigate potential human health and other environmental risks from unanticipated changes in activities or site conditions. Activities conducted beyond the DOE long-term care boundaries by non-DOE parties may impact the effectiveness of ICs or even the long-term stability of disposal cells and groundwater remedies. Several sites that LM manages or that will transfer to LM for LTS and M are in active oil and gas production basins. The sites are associated with uranium ore milling or nuclear test sites and have been remediated or are in the process of remediation and have no ongoing DOE mission. Particularly since 2005, hydraulic fracturing ('fracking') combined with directional drilling has dramatically increased oil and natural gas (oil/gas) production in the United States, now making it the number one hydrocarbon-producing country. Fracking has allowed production from shale and other rocks of low natural permeability that were historically not considered viable oil/gas resources. Also, because wellbores can now be drilled as many as 5 kilometers or more horizontally, hydrocarbons can be recovered from zones without having access to the surface above them. Drilling activity near Rulison, Colorado, the location of an underground nuclear detonation managed by LM, has raised public concerns that remnant radioactivity in the detonation zone could migrate to producing wells and enter the natural gas distribution system. At sites like the Falls City, Texas, Disposal site, transitioned to LM with a split estate, increased production in the region has resulted in wellbores beneath the long-term care boundary of the site. While the DOE license for Falls City was approved by the NRC in 1997 without the acquisition of the subsurface rights, NRC has raised concerns on whether this activity impacts the integrity of the cell and/or groundwater remedies. In Wyoming, LM is anticipating receiving the license for the Bear Creek site and manages the Spook site, both locations of uranium mill tailings disposal cells. These Wyoming sites are in an active region of major oil and gas development. This change in surrounding land use will require LM to work collaboratively with NRC to address these concerns. At several DOE sites radioactive waste, and often intermixed nonradioactive constituents, is permanently isolated in engineered disposal cells. At other sites, residual contamination can be present in groundwater, blast cavities, and infinite amounts within soil. Areas targeted for oil and gas development at the Texas and Wyoming sites range from depths of 2440 to 3350 meters (8000-11000 feet) below ground surface. When most site remedies were designed, oil and gas development was not considered to be an issue within the site boundary. With the more recent uses of directional drilling, fracking, and associated wastewater injections, the evaluative criteria for incoming sites and ICs for managing long-term protectiveness and regulatory compliance are changing. Although DOE surface ownership was previously thought to be a robust IC to prevent surface and subsurface development, particularly at disposal sites, that may no longer be the case. Whereas the subsurface development at Texas and Wyoming sites is currently occurring at thousands of meters beneath the surface, shallower and direct onsite development would be more of a concern for LM. The energy introduced when a well is hydraulically fractured causes microseismic events (magnitude -2 to 1.0) as the fractures propagate but does not directly cause seismic events (earthquakes) of sufficient magnitude to damage surface structures. Additionally, the extent of the hydraulic fractures is limited to the targeted depths, which are far below the surface. However, earthquakes of sufficient magnitude to damage surface structures have been attributed to the injection of wastewater into disposal wells. States that have experienced these effects have enacted regulations that limit the rate and pressures that wastewater can be injected into disposal wells. Items LM may consider are the need for monitoring the volume of water injected into nearby disposal wells and possibly installing seismic stations at sites most susceptible to damage. While the need to demonstrate that no impact from oil and gas extraction activities on a site groundwater remedy or disposal cells will vary from site to site, LM is assessing risk criteria for this activity. Though LM has not experienced an issue yet at a uranium tailings disposal site, it cannot assume that there will be none, and must address NRC concerns. LM is building on past experiences at other sites and beginning to form new processes with the hope that these concepts can be applied for other future sites. (authors)

04 OIL SHALES AND TAR SANDS↗

Updates to a Preliminary Probabilistic Performance Assessment Model for Radiological and Chemical Contamination at the West Valley Site, New York - 20420

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351-ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States at the WNYNSC. NFS built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg (640 metric tons) of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations halted in 1972 and never restarted, leaving behind radioactive and chemical wastes. The U.S. Department of Energy (DOE) was required to complete certain waste management activities under the West Valley Demonstration Project (WVDP) Act of 1980 including decommissioning of WVDP facilities. As collaborating agencies, NYSERDA and the DOE are tasked with making decisions about decommissioning and risk reduction for the West Valley Site. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) model to assist the agencies in their decision making process for decommissioning the WVDP and WNYNSC. One important tool that is needed in order to inform the decision-making process is a science-based model of the West Valley Site that evaluates potential future consequences for human health and the environment. This forms the core of the spatial domain of the West Valley PPA Model. The PPA Model, developed using the GoldSim system modeling software, is a tool intended to provide support for decision making that evaluates uncertainty, in a manner that is transparent, defensible, and robust. The PPA Model includes contaminant transport and health effects components, and is organized around geographically-grouped contaminated facilities. These include the waste disposal areas licensed by the U.S. Nuclear Regulatory Commission and the State of New York, a waste tank farm for storage of high level radioactive waste resulting from reprocessing operations, and several areas contaminated with radioactive and chemical constituents. The PPA Model evaluates contaminant transport from these sources to points of exposure across the site and into receiving surface waters and sediments. Hypothetical people and wildlife could be exposed to contamination at these locations, and the effects of these exposures are evaluated. Contaminant transport processes to be evaluated in the PPA Model include groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The evaluation of exposures to people in this preliminary model is limited to a resident farmer scenario, and ecological assessment is performed at the level of a screening analysis. The results of these preliminary evaluations inform future model developments. PPA Model results are subjected to sensitivity analysis in order to determine those pathways and parameters that are most significant in influencing the results. This information allows analysts and decision makers to focus on those aspects of Site behavior and processes. With this information, the decision makers can drive informed, defensible decisions regarding decommissioning of the Site. This paper includes an update of the information presented at WM2019 [1]. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Dose Assessment Model for Radioactive Waste Exposed by Gully Erosion at West Valley - 20513

The Western New York Nuclear Service Center (WNYNSC), located approximately 48 km south of Buffalo, New York, is the site of a former nuclear fuel reprocessing and radioactive waste disposal facility. Spent nuclear fuel was processed there from 1966 to 1972, leaving behind radioactive and chemical wastes in two disposal areas and a waste tank farm. Site operations also resulted in releases of radioactivity to site soils, groundwater, and to surface waters draining the site. The New York State Energy Research and Development Authority (NYSERDA) and the U.S. Department of Energy (DOE) are collaborating in a process of decision making for decommissioning those facilities remaining at the WNYNSC following the completion of Phase 1 decommissioning. Neptune and Company, Inc. (Neptune) was contracted to develop a probabilistic performance assessment (PPA) computer model to assist the agencies in this process. The PPA Model includes a contaminant transport component focusing on the movement of contaminants within and among environmental media including groundwater and surface water transport, contaminant translocation by plants and animals, diffusion, and erosion. The model also includes evaluation of potential exposure and health effects for a Resident Farmer exposure scenario, where the Resident Farmer represents a critical group, described as that group of individuals reasonably expected to receive the greatest exposure to residual radioactivity for any applicable set of circumstances. The West Valley Site is located in the glaciated Allegheny Plateau region of western New York State. The waste reprocessing and disposal areas were constructed on a relatively fat area of plateau dissected by drainages of Buttermilk Creek, including Erdman Brook, Franks Creek, and Quarry Creek. An important aspect of the contaminant transport component of the PPA model is consideration of erosive processes such as slumping of the stream slopes and the advance of gullies from these streams. These erosion processes remove material from the plateau, growing the size of the creek valleys and making them wider and deeper. Of particular interest for the impact of erosion is radioactive waste contained in the Nuclear Regulatory Commission (NRC)-Licensed Disposal Area (NDA), the New York State-Licensed Disposal Area (SDA), and residual radiological inventory in the underground storage tanks at the Waste Tank Farm (WTF). The PPA Model is organized around geographically-defined facilities which were constructed upon the plateau, including the NDA, SDA, and WTF. Ongoing stream erosion processes will potentially transfer radioactive waste and residual inventory from these facilities to the ground surface on adjacent hillslope areas where erosion has breached the facility. Hence, it is important to evaluate the consequences of potential exposures to a Resident Farmer on the hillslopes below a breached facility. Two interrelated aspects of the dose assessment model related to hillslope exposure are discussed: 1) representation of the physical processes related to transport of radionuclides from facilities onto the hillslopes, and from the hillslopes into adjoining creeks where contaminated material migrates downstream with surface water and sediment, and; 2) adaptation of the activities associated with the Resident Farmer scenario to assess potential exposures to contamination in the hillslope areas. This discussion will cover the conceptual basis of the hillslope exposure and transport models, and also implementation in the PPA computer model. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alloy 709 Advanced Austenitic Stainless Steel

Provide material solutions to enabling design, construction, licensing and operation of advanced reactors Including Fast Reactors, Gas-cooled Reactors and Molten Salt Reactors (solid or liquid fuel) Could be of modular or micro designs, and from hundreds of MWe to kWe Provide technical bases needed for design and licensing of advanced reactor components Develop & validate improved high temperature design methodology Provide qualification data (to NQA-1 or equivalent) on structural materials Utilize consensus standards when appropriate (e.g., ASME, ASTM, etc.) Target resolution of issues needed for near to mid-term deployment of advanced reactors

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Drop Analysis of Department of Energy Standard Canister with Fort Saint Vrain SNF

DOE manages over 300 types of SNF, most of which are located at the INL site. The Idaho Cleanup Project and INL are collaborating on the Road-Ready Capability Demonstration Project, which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF at the INL site for ?road-ready dry storage?. ?Road-ready dry storage? is a SNF management concept where SNF is packaged into dry and sealed canisters, which are then placed in on-site storage in anticipation of later transportation. The forward-looking goal of the Demonstration is establishing the foundation for a large-scale road-ready dry storage program at the INL site. The Demonstration will first package Fort Saint Vrain SNF currently stored at INL into several DOE Standard Canisters. These Standard Canisters will then be loaded into another commercial transportation or storage containment system (e.g., storage cask or transportation package). The Standard Canister is a class of standardized canisters designed for containing the large variety of DOE-managed SNF during interim storage, transportation and/or disposal at a geological repository. One critical aspect of road-ready dry storage is the ability to license the DOE Standard Canisters and its associated transportation package to 10 CFR 71. Depending on the SNF and transportation strategy, the Standard Canisters may have to maintain structural integrity under normal conditions of transport and hypothetical accident scenarios (i.e., drop events). The Standard Canisters have been tested and analyzed under various SNF loading configurations and accident drop events in support of the Idaho Spent Fuel Facility and other DOE programs. However, no analysis has been completed to support the recent Demonstration. This analysis will consider the Ø0.5 m × 5.1 m Standard Canister under drop scenario(s) considered in previous INL tests and analyses, including the 9 m drop at 80 degree off vertical. However, this analysis will consider the more recent Fort Saint Vrain loading configurations proposed for the Demonstration. This analysis will performed using strain-based acceptance criteria established by the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section III, Division 3. It will be compared to previous analyses and form the foundation of further formal calculations that will be used to support licensing efforts of the road-ready dry storage system at INL.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗