H-Canyon Jumper Gasket Sealing Evaluation
H-Canyon Documented Safety Analysis approved December 2019 credits the leak integrity of HCanyon (HCA) process tanks, piping, and jumpers in preventing the release of radioactive material in a post seismic environment. Demonstration of leak tightness capability for this equipment was achieved through substantial analytical effort. However, one potential weak point that affects leak integrity exists at the gasketed joint between Hanford Connectors (HC) and nozzles. Review of the HCA Crane Log over a three-year period indicates the HCs periodically leak. Savannah River National Laboratory (SRNL) was requested to perform gasket compression tests that evaluate gasket relaxation characteristics, i.e., creep, and provide improvements to the HC installation process that can reduce or eliminate the frequency of leaks at HCs. A HC torque value of 312 ft-lbf is the target value used because it is the minimum torque value, with 95% confidence, when an unlubricated HC is impacted for standard sealing period of 9 seconds.