Ground support equipment and launch installations at John F. Kennedy Space Center, NASA, for the manned lunar landing program
Ground support equipment and launch installations for manned lunar landing program at Cape Kennedy
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Ground support equipment and launch installations for manned lunar landing program at Cape Kennedy
Dynamic characteristics of systems for automatic control of air-conditioning installations
Adjustable tool facilitates the installation of Marmon clamps. It provides sufficient mechanical advantage to force the clamps into place, permitting one man operation. Two handles provide the major leverage, and a pivoting arm with a slot enables snap-out action.
Multiconductor instrumentation cable in which the conducting wires are routed through two concentric copper tube sheaths, employing a compressed insulator between the conductors and between the inner and outer sheaths, is durable and easily installed in high thermal or nuclear radiation area. The double sheath is a barrier against moisture, abrasion, and vibration.
Detailed ground station construction and equipment installation procedures for Deep Space Communication
Deep Space Stations construction and equipment installation
Flat conductor cable manufacturing and installation techniques
Ground installations for development, qualification and checkout testing of Apollo space vehicle
Pipe plug for remote installation in an open-ended pipe used in a hazardous environment provides a gastight seal by expanding a rubber seal against the inside surface of the pipe opening, with mechanical clamps contacting the pipe flange for positive retention of the plug.
Rolling-type spacers in the form of steel balls retained in appropriate sleeves affixed at intervals to the exterior of the transfer line facilitate the installation of a vacuum-jacketed line. They act as standoffs to position the transfer line concentrically within the vacuum jacket line.
Installation and fairing of flush, static pressure orifices on wing surfaces of supersonic aircraft
Wind tunnel tests of airframe installation effects on F-106B scale model with simulated underwing engine nacelles at Mach 0.56 to 1.46
Wind tunnel installation effects on isolated afterbodies at Mach numbers from 0.56 to 1.5
Brazing process attaches thermocouples to slot in type-347 stainless steel tube flush around its circumference. Electrolytic flashing with gold enhances brazing process. This installation procedure does not significantly change calibration of thermocouples used and does not cause major wear spots in the thin-walled devices.
Detailed specifications for installing laboratory strain gages are compiled into handy reference manual that provides laboratory technicians with ready source of instructions on techniques and procedures for cementing a wide variety of strain gages onto most of the commonly encountered engineering materials.
Bolt installation and removal tool for space stations and underwater use
Summary of work accomplished on design of insulation and manufacture of tooling for fabrication and installation of insulation panels
Airframe installation effects on variable flap ejector nozzle of underwing engine nacelle