Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installation tests”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

GeoLab: A Geological Workstation for Future Missions

The GeoLab glovebox was, until November 2012, fully integrated into NASA's Deep Space Habitat (DSH) Analog Testbed. The conceptual design for GeoLab came from several sources, including current research instruments (Microgravity Science Glovebox) used on the International Space Station, existing Astromaterials Curation Laboratory hardware and clean room procedures, and mission scenarios developed for earlier programs. GeoLab allowed NASA scientists to test science operations related to contained sample examination during simulated exploration missions. The team demonstrated science operations that enhance theThe GeoLab glovebox was, until November 2012, fully integrated into NASA's Deep Space Habitat (DSH) Analog Testbed. The conceptual design for GeoLab came from several sources, including current research instruments (Microgravity Science Glovebox) used on the International Space Station, existing Astromaterials Curation Laboratory hardware and clean room procedures, and mission scenarios developed for earlier programs. GeoLab allowed NASA scientists to test science operations related to contained sample examination during simulated exploration missions. The team demonstrated science operations that enhance the early scientific returns from future missions and ensure that the best samples are selected for Earth return. The facility was also designed to foster the development of instrument technology. Since 2009, when GeoLab design and construction began, the GeoLab team [a group of scientists from the Astromaterials Acquisition and Curation Office within the Astromaterials Research and Exploration Science (ARES) Directorate at JSC] has progressively developed and reconfigured the GeoLab hardware and software interfaces and developed test objectives, which were to 1) determine requirements and strategies for sample handling and prioritization for geological operations on other planetary surfaces, 2) assess the scientific contribution of selective in-situ sample characterization for mission planning, operations, and sample prioritization, 3) evaluate analytical instruments and tools for providing efficient and meaningful data in advance of sample return and 4) identify science operations that leverage human presence with robotic tools. In the first year of tests (2010), GeoLab examined basic glovebox operations performed by one and two crewmembers and science operations performed by a remote science team. The 2010 tests also examined the efficacy of basic sample characterization [descriptions, microscopic imagery, X-ray fluorescence (XRF) analyses] and feedback to the science team. In year 2 (2011), the GeoLab team tested enhanced software and interfaces for the crew and science team (including Web-based and mobile device displays) and demonstrated laboratory configurability with a new diagnostic instrument (the Multispectral Microscopic Imager from the JPL and Arizona State University). In year 3 (2012), the GeoLab team installed and tested a robotic sample manipulator and evaluated robotic-human interfaces for science operations.

Evans, Cynthia↗

2013 Groundwater Monitoring Report, Central Nevada Test Area Subsurface Corrective Action Unit 443

The Central Nevada Test Area was the site of a 0.2- to 1-megaton underground nuclear test in 1968. The surface of the site has been closed, but the subsurface is still in the corrective action process. The corrective action alternative selected for the site was monitoring with institutional controls. Annual sampling and hydraulic head monitoring of the well network are conducted as part of the subsurface corrective action strategy for the site. The monitoring well network was enhanced in 2013 with the installation of a new well MV-6. The site is currently in the fifth year of the 5-year proof-of-concept monitoring period. Analytical results from the 2013 monitoring are consistent with those of previous years indicating no tritium or 14 C concentrations above the required detection limits. Water level data from new wells MV-4 and MV-5 and recompleted well HTH-1RC indicate that hydraulic heads are still recovering from installation and testing. Data from wells MV-4 and MV-5 also indicate that head levels have not yet recovered from the 2011 sampling event during which several thousand gallons of water were purged. Low-flow bladder pumps were installed during the November 2013 sampling event to reduce the well purge volumes and the impact purging has on the water levels during sampling. The new bladder pumps allow the collection of groundwater samples using the low-flow sampling method and will allow head levels to recover to steadystate conditions. Despite the lack of steady-state groundwater conditions, hydraulic head data collected from site continue to support the conceptual model that the southeast-bounding graben fault acts as a barrier to groundwater flow at the site.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Alternate bearing design fabrication and test program, exhibit B

A 50 ft-lb-sec (FPS) reaction wheel was modified with an ironless armature brushless dc motor and a magnetic bearing suspension. The purpose was to demonstrate the performance of an alternate bearing concept, i.e., a magnetic bearing suspension, which could be used in Skylab type CMG's to meet the attitude control requirements of long term space stations. A magnetic suspension was built, installed and tested in the 50 FPS reaction wheel. A secondary effort included the build and test of a compatible reaction wheel motor. Performance characteristics of both are presented and discussed.

Source record↗

Development of a Direct Neutral Density Diagnostic for Fusion Edge Plasmas

As magnetically confined plasmas progress towards ignition and long pulse experiments, measurement and control of the neutral density in the plasma edge has become a critical issue for stability, formation of transport barriers, and fueling. Recent experiments by our research group have demonstrated that is possible to use two-photon absorption laser induced fluorescence (TA-LIF) to directly measure the density of neutral hydrogen in helicon sources and in the HIT-SI3 spheromak. While those experiments validated key elements of a diagnostic system that would enable similar measurements in tokamak plasmas, they did not fully address the issue of performance optimization in the presence of intense background light at the fluorescence wavelength and they also identified a number of other issues that must be resolved before successful TALIF neutral density measurements in a tokamak are likely to be achieved. Additional specific concerns raised during design reviews with the leadership of the DIII-D tokamak facility included: the minimum detection threshold for this TALIF diagnostic (currently ~ 5 x 10 15 m -3 ) and the rate at which neutral density measurements could be obtained. Improving the system performance to reduce the minimum detection threshold and demonstrating a faster rate of density determination are required to advance this diagnostic to the level where it could be considered for implementation on a major tokamak facility in the USA. The key issues that will be addressed through additional technological development are: validation of a new, chromatic aberration-free, xenon calibration scheme; increasing the output power of the laser; and suppression of background emission at the fluorescence wavelength through optimization of the collection optics and gating of the photomultiplier detector with a goal of obtaining a minimum detection threshold of 5 x 10 14 m -3 . Another key technological development, so far only tested in helicon source experiments, is the validation of Doppler-free TALIF as a means of obtaining higher speed, calibrated, neutral density measurements in tokamak-like conditions at the full cadence of the pulsed TALIF laser. In this work, we propose to complete these technological advancements through installation and testing of our prototype TALIF system on the proto-MPEX experiment at Oak Ridge National Laboratory (ORNL). The proto-MPEX facility will provide plasma conditions similar to the edge plasma of a major tokamak experiment but with pulse lengths and pulse repetition rates ideally suited for extensive development of a TALIF neutral density diagnostic. Measurement of the absolute neutral density in the edge of a magnetically confined plasma is necessary for plasma density control; calculation of charge-exchange power losses; control of plasma-wall interactions; determination of the braking of plasma flow; determination of the fuel mixture in deuterium-tritium plasma; and understanding the dynamics of the divertor region in the plasma edge. In terms of potential impact on the worldwide fusion program, we note that in burning plasma experiments, such as ITER, a 100 mJ/pulse Doppler-free TALIF diagnostic should be capable of directly measuring the deuterium/tritium (D/T) isotope ratio in the outer 0.5 to 1.0 m of the plasma radius. The D/T ratio is a critically important parameter for the control and optimization of burning plasmas. Therefore, development of the diagnostic system proposed here is also relevant to long-term US participation in diagnostic development for large tokamaks.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Full-Scale Testing of a Mercury Oxidation Catalyst Upstream of a Wet FGD System

This document presents and discusses results from Cooperative Agreement DE-FC26-06NT42778, 'Full-scale Testing of a Mercury Oxidation Catalyst Upstream of a Wet FGD System,' which was conducted over the time-period July 24, 2006 through June 30, 2010. The objective of the project was to demonstrate at full scale the use of solid honeycomb catalysts to promote the oxidation of elemental mercury in pulverized-coal-fired flue gas. Oxidized mercury is removed downstream in wet flue gas desulfurization (FGD) absorbers and collected with the byproducts from the FGD system. The project was co-funded by EPRI, the Lower Colorado River Authority (LCRA), who also provided the host site, Great River Energy, Johnson Matthey, Southern Company, Salt River Project (SRP), the Tennessee Valley Authority (TVA), NRG Energy, Ontario Power and Westar. URS Group was the prime contractor and also provided cofunding. The scope of this project included installing and testing a gold-based catalyst upstream of one full-scale wet FGD absorber module (about 200-MW scale) at LCRA's Fayette Power Project (FPP) Unit 3, which fires Powder River Basin coal. Installation of the catalyst involved modifying the ductwork upstream of one of three wet FGD absorbers on Unit 3, Absorber C. The FGD system uses limestone reagent, operates with forced sulfite oxidation, and normally runs with two FGD modules in service and one spare. The full-scale catalyst test was planned for 24 months to provide catalyst life data. Over the test period, data were collected on catalyst pressure drop, elemental mercury oxidation across the catalyst module, and mercury capture by the downstream wet FGD absorber. The demonstration period began on May 6, 2008 with plans for the catalyst to remain in service until May 5, 2010. However, because of continual increases in pressure drop across the catalyst and concerns that further increases would adversely affect Unit 3 operations, LCRA decided to end the demonstration early, during a planned unit outage. On October 2, 2009, Unit 3 was taken out of service for a fall outage and the catalyst upstream of Absorber C was removed. This ended the demonstration after approximately 17 months of the planned 24 months of operation. This report discusses reasons for the pressure drop increase and potential measures to mitigate such problems in any future application of this technology. Mercury oxidation and capture measurements were made on Unit 3 four times during the 17-month demonstration. Measurements were performed across the catalyst and Absorber C and 'baseline' measurements were performed across Absorber A or B, which did not have a catalyst upstream. Results are presented in the report from all four sets of measurements during the demonstration period. These results include elemental mercury oxidation across the catalyst, mercury capture across Absorber C downstream of the catalyst, baseline mercury capture across Absorber A or B, and mercury re-emissions across both absorbers in service. Also presented in the report are estimates of the average mercury control performance of the oxidation catalyst technology over the 17-month demonstration period and the resulting mercury control costs.

01 COAL, LIGNITE, AND PEAT↗

NREL/University of Delaware Offshore Wind R&D Collaboration: Cooperative Research and Development Final Report, CRADA Number CRD-10-393

Specifically, the work under this CRADA includes, but is not limited to, the development of test procedures for an offshore test site in Delaware waters; testing of installed offshore wind turbines; performance monitoring of those turbines; and a program of research and development on offshore wind turbine blades, components, coatings, foundations, installation and construction of bottom-fixed structures, environmental impacts, policies, and more generally on means to enhance the reliability, facilitate permitting, and reduce costs for offshore wind turbines. This work will be conducted both at NREL's National Wind Technology Center and participant facilities, as well as the established offshore wind test sites.

17 WIND ENERGY↗

JT9D-7A (SP) jet engine performance deterioration trends

The levels, trends, and causes of engine performance deterioration were investigated. A series of installed engine calibrations (both on-the-ground and in-flight) were performed on two new Pan American World Airways 747 SP aircraft. The performance data gathered covered from before the first flight through approximately 1000 flight cycles and 6900 flight hours. To accomplish the calibrations a special instrumentation system for ground testing of installed engines over a broad power range was used along with performing concurrent in-flight engine calibrations under revenue service conditions. Results of the analysis of the data, which provide a better understanding of short and long term performance deterioration of both engines and modules are presented.

Richter, G. P.↗

Demontration of Integrated Optimization Software at the Baldwin Energy Complex

This project encompassed the design, development, and demonstration of integrated online optimization systems at Dynegy Midwest Generation's Baldwin Energy Complex (BEC) located in Baldwin, Illinois. The overall project objective was to improve coal-based generation's emission profile, efficiency, maintenance requirements and plant asset life in order to enhance the long-term viability of the United States abundant coal resources. Five separate but integrated optimization products were developed, addressing combustion, sootblowing, SCR operations, overall unit thermal performance, and plant-wide availability optimization. Optimization results are inherently unit-specific and cannot be known for a particular generating unit in advance. However, NeuCo believed that the following were reasonable targets for the completed, integrated set of products: Furnace NOx reduction improvement by 5%, Heat rate improvement by 1.5%, Increase of annual Available MWh by 1.5%, Commensurate reductions in greenhouse gases, mercury, and particulates; and Commensurate increases in profitability from lower costs, improved reliability, and greater commercial availability. The goal during Phase I was to establish each system and demonstrate their integration in unified plant optimization. Efforts during Phase I focused on: (1) developing, deploying, integrating, and testing prototypes for each of the five products; (2) identifying and addressing issues required for the products to integrate with plant operations; and (3) systematically collecting and assimilating feedback to improve subsequent product releases. As described in the Phase II continuation application NeuCo successfully achieved the goal for Phase I. The goal of Phase II was to improve upon the products installed and tested in Phase I and to quantify the benefits of the integrated system. As this report documents, NeuCo has also successfully achieved the goal for Phase II. The overall results of the project, compared with the project goals, are: (1) NOx Reduction: The 5% target for NOx reduction was exceeded with average CEMS and SCR Inlet (furnace) NOx reduction of between 12% and 14%. (2) Heat Rate Improvement: The optimization systems delivered an average heat rate improvement of between 0.67% and 0.7%. This falls short of the 1.5% heat rate improvement target largely because Cyclone Stability (availability) and CEMS and SCR Inlet NOx were prioritized over heat rate in the event they needed to be traded-off with one another. A different prioritization of objectives could have driven a different balance, thereby meeting the target of 1.5% improvement. There were also several factors that could have been masking greater heat rate improvements such as the decrease in fuel density over the course of the project and the impact of actions taken as a result of advice provided by the optimizers that are difficult to quantify. (3) Increased Annual Available MWh: Although difficult to measure precisely, the target of increasing available MWh's by 1.5% was met by providing prioritized alerts and knowledge-based diagnostics for a wide array of plant equipment and process anomalies; helping the plant to move from high sulfur, high Btu Illinois coal to PRB and run that fuel at low stoichiometries without derates; and improved management of cyclone flame quality as well as improved vigilance with respect to cyclone conditions which avoided some degree of temporary de-rate due to cyclone slag build up. (4) Commensurate Reductions in Greenhouse Gases, Mercury, and Particulates: Reductions in all three of these indices can be associated directly with the optimization leverage observed in the heat rate and NOx reductions. (5) Commensurate Increases in Profitability from Lower Costs, Improved Reliability, and Greater Commercial Availability: Commensurate improvements in costs, reliability and availability resulted from the previously described benefits. Also playing a role were the sustained operation of the cyclones while using more available, less expensive but off-design fuel; more effective catalytic reduction of NOx; and the reduced time required to discover, prioritize and diagnose plant equipment issues. The total annual dollar value of the benefits associated with the products installed, refined, and commercialized at BEC are estimated to range from $1.8 to $3.2 million dollars per-unit, and $7.2 to $8.1 million dollars per year plant-wide depending on whether CO{sub 2} benefits are included. In summary, the NeuCo project at BEC was successfully completed and has demonstrated that advanced optimization technologies can play an important role in improving the environmental footprint of coal-based power generation while achieving other important operating objectives.

01 COAL, LIGNITE, AND PEAT↗

San Diego Tribal Energy Collaborative [Slides]

The project involves the installation and activation of 42 roof-top or ground mount solar photovoltaic systems. The system will use a combination of roof-top photovoltaic panels and ground-mounted panels that will be installed on 40 tribal homes and 2 tribal buildings throughout the three participating reservations. The scope of work includes site preparation, equipment installation, system testing, and inspection by a third-party inspector, system activation, troubleshooting, and final activation. It also includes any electrical system upgrades, which are anticipated to accommodate the new PV system. The system will displace at least 50% of the combined total of electricity needed by the participating structures. Implementing these systems will also provide hands-on solar installation training to at least 20 Tribal community volunteers and job trainees.

14 SOLAR ENERGY↗

6-ft High-Power Electric Propulsion Test Port, EPL Tank 5 Installed

High-power electric propulsion is a critical component of NASA s proposed missions to the outer planets. Mission studies have shown that high-power, high-specific-impulse propulsion systems can deliver 2000 kg of scientific payload to Pluto with trip times on the order of 10 years. Of greater significance is the ability of these propulsion systems to place this science payload in orbit around the planet, rather than making the fast fly-bys associated with traditional chemical propulsion systems. Significant ground test programs are required to develop the new technologies needed for thrusters operating at power levels exceeding 20 kW, an order of magnitude above the state of the art.

Grisnik, Stanley P.↗

Hardware Testing for the Optical PAyload for Lasercomm Science (OPALS)

Hardware for several subsystems of the proposed Optical PAyload for Lasercomm Science (OPALS), including the gimbal and avionics, was tested. Microswitches installed on the gimbal were evaluated to verify that their point of actuation would remain within the acceptable range even if the switches themselves move slightly during launch. An inspection of the power board was conducted to ensure that all power and ground signals were isolated, that polarized components were correctly oriented, and that all components were intact and securely soldered. Initial testing on the power board revealed several minor problems, but once they were fixed the power board was shown to function correctly. All tests and inspections were documented for future use in verifying launch requirements.

optical communications↗

Slicing of Silicon into Sheet Material. Silicon Sheet Growth Development for the Large Area Silicon Sheet Task of the Low Cost Silicon Solar Array Project

Tests on mineral oil slurries show that the potential for workability and low cost is present. However, slurries tested to date which had sufficient lubricity exhibited wafer breakage problems near the end of the run for as-yet unknown reasons. The first test of the large prototype saw under cutting force control was largely successful in that the controller worked perfectly. Unfortunately a technique error (excessive stroke shortening) caused blade breakage and low yield. The latest run of the large saw pointed up the fact that an indication of end-of-stoke vertical motion, or bounce, is necessary. A circuit to provide such indication was fabricated and installed. Preliminary tests show it to be excessively noise sensitive; therefore, work on grounding and shielding to reduce this sensitivity is in progress.

Fleming, J. R.↗

International Fusion Materials Irradiation Facility injector acceptance tests at CEA/Saclay: 140 mA/100 keV deuteron beam characterization

In the framework of the ITER broader approach, the International Fusion Materials Irradiation Facility (IFMIF) deuteron accelerator (2 × 125 mA at 40 MeV) is an irradiation tool dedicated to high neutron flux production for future nuclear plant material studies. During the validation phase, the Linear IFMIF Prototype Accelerator (LIPAc) machine will be tested on the Rokkasho site in Japan. This demonstrator aims to produce 125 mA/9 MeV deuteron beam. Involved in the LIPAc project for several years, specialists from CEA/Saclay designed the injector based on a SILHI type ECR source operating at 2.45 GHz and a 2 solenoid low energy beam line to produce such high intensity beam. The whole injector, equipped with its dedicated diagnostics, has been then installed and tested on the Saclay site. Before shipment from Europe to Japan, acceptance tests have been performed in November 2012 with 100 keV deuteron beam and intensity as high as 140 mA in continuous and pulsed mode. In this paper, the emittance measurements done for different duty cycles and different beam intensities will be presented as well as beam species fraction analysis. Then the reinstallation in Japan and commissioning plan on site will be reported.

43 PARTICLE ACCELERATORS↗

Thin film thermocouples for high temperature turbine application

The objective is to develop thin film thermocouples (TFTC) for Space Shuttle Main Engine (SSME) components such as the high pressure fuel turbopump (HPFTP) blades and to test TFTC survivability and durability in the SSME environment. The purpose for developing TFTC's for SSME components is to obtain blade temperatures for computational models developed for fluid mechanics and structures. The TFTC must be able to withstand the presence of high temperature, high pressure hydrogen as well as a severe thermal transient due to a cryogenic to combustion temperature change. The TFTC's will eventually be installed and tested on SSME propulsion system components in the SSME test bed engine. The TFTC's were successfully fabricated on flat coupons of MAR-M 246 (Hf+), which is the superalloy material used for HPFTP turbine blades. The TFTC's fabricated on flat coupons survived thermal shock cycling as well as testing in a heat flux measurement facility which provided a rapid thermal transient. The same fabrication procedure was used to deposit TFTC's on HPFTP first stage rotor blades. Other results from the experiments are presented, and future testing plans are discussed.

Martin, Lisa C.↗

Non-invasive Polarimetry and Magnetometry

CRADA Objective: To build a non-invasive polarimeter and receiver and test them on Jlab’s beamline. CRADA Statement of Work: “Electrodynamic has a timeline for the development of hardware due to its SBIR with the DOE. The equipment developed will be made available to the Jefferson Lab as it is constructed. Because this equipment is expected to be used in ongoing accelerator commissioning activities and experiments, there is a high likelihood of its use during the project period. Equipment installed at CEBAF will remain at CEBAF. Equipment installed at test stands can be removed and returned to Electrodynamic if requested. Data sharing from the equipment’s use will provide Electrodynamic with invaluable performance data. The capabilities of the equipment provided will enhance JLAB’s ability to monitor and manipulate its beam.”

47 OTHER INSTRUMENTATION↗

Description of a Pressure Measurement Technique for Obtaining Surface Static Pressures of a Radial Turbine

The aerodynamic performance of a solid uncooled version of a cooled radial turbine was evaluated in the Small Engine Components Test Facility Turbine rig at the NASA Lewis Research Center. Specifically, an experiment was conducted to rotor surface static pressures. This was the first time surface static pressures had been measured on a radial turbine at NASA Lewis. These pressures were measured by a modified Rotating Data Package (RDP), a standard product manufactured by Scanivalve, Inc. Described here are the RDP, and the modifications that were made, as well as the checkout, installation, and testing procedures. The data presented are compared to analytical results obtained from NASA's MERIDL TSONIC BLAYER (MTSB) code.

Dicicco, L. Danielle↗

Description of a pressure measurement technique for obtaining surface static pressures of a radial turbine

The aerodynamic performance of a solid uncooled version of a cooled radial turbine was evaluated in the Small Engine Components Test Facility Turbine rig at the NASA Lewis Research Center. Specifically, an experiment was conducted to rotor surface static pressures. This was the first time surface static pressures had been measured on a radial turbine at NASA Lewis. These pressures were measured by a modified Rotating Data Package (RDP), a standard product manufactured by Scanivalve, Inc. Described here are the RDP, and the modifications that were made, as well as the checkout, installation, and testing procedures. The data presented are compared to analytical results obtained from NASA's MERIDL TSONIC BLAYER (MTSB) code.

Dicicco, L. D.↗

Advanced Bent Crystal Collimation Studies at the Tevatron (T-980)

The T-980 bent crystal collimation experiment at the Tevatron has recently acquired substantial enhancements. First, two new crystals - a 16-strip one manufactured and characterized by the INFN Ferrara group and a quasi-mosaic crystal manufactured and characterized by the PNPI group. Second, a two plane telescope with 3 high-resolution pixel detectors per plane along with corresponding mechanics, electronics, control and software has been manufactured, tested and installed in the E0 crystal region. The purpose of the pixel telescope is to measure and image channeled (CH), volume-reflected (VR) and multiple volume-reflected (MVR) beam profiles produced by bent crystals. Third, an ORIGIN-based system has been developed for thorough analysis of experimental and simulation data. Results of analysis are presented for different types of crystals used from 2005 to present for channeling and volume reflection including pioneering tests of two-plane crystal collimation at the collider, all in comparison with detailed simulations.

43 PARTICLE ACCELERATORS↗