Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “hierarchy”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

A Support Database System for Integrated System Health Management (ISHM)

The development, deployment, operation and maintenance of Integrated Systems Health Management (ISHM) applications require the storage and processing of tremendous amounts of low-level data. This data must be shared in a secure and cost-effective manner between developers, and processed within several heterogeneous architectures. Modern database technology allows this data to be organized efficiently, while ensuring the integrity and security of the data. The extensibility and interoperability of the current database technologies also allows for the creation of an associated support database system. A support database system provides additional capabilities by building applications on top of the database structure. These applications can then be used to support the various technologies in an ISHM architecture. This presentation and paper propose a detailed structure and application description for a support database system, called the Health Assessment Database System (HADS). The HADS provides a shared context for organizing and distributing data as well as a definition of the applications that provide the required data-driven support to ISHM. This approach provides another powerful tool for ISHM developers, while also enabling novel functionality. This functionality includes: automated firmware updating and deployment, algorithm development assistance and electronic datasheet generation. The architecture for the HADS has been developed as part of the ISHM toolset at Stennis Space Center for rocket engine testing. A detailed implementation has begun for the Methane Thruster Testbed Project (MTTP) in order to assist in developing health assessment and anomaly detection algorithms for ISHM. The structure of this implementation is shown in Figure 1. The database structure consists of three primary components: the system hierarchy model, the historical data archive and the firmware codebase. The system hierarchy model replicates the physical relationships between system elements to provide the logical context for the database. The historical data archive provides a common repository for sensor data that can be shared between developers and applications. The firmware codebase is used by the developer to organize the intelligent element firmware into atomic units which can be assembled into complete firmware for specific elements.

FROM↗

Quantitative risk assessment system (QRAS)

A quantitative risk assessment system (QRAS) builds a risk model of a system for which risk of failure is being assessed, then analyzes the risk of the system corresponding to the risk model. The QRAS performs sensitivity analysis of the risk model by altering fundamental components and quantifications built into the risk model, then re-analyzes the risk of the system using the modifications. More particularly, the risk model is built by building a hierarchy, creating a mission timeline, quantifying failure modes, and building/editing event sequence diagrams. Multiplicities, dependencies, and redundancies of the system are included in the risk model. For analysis runs, a fixed baseline is first constructed and stored. This baseline contains the lowest level scenarios, preserved in event tree structure. The analysis runs, at any level of the hierarchy and below, access this baseline for risk quantitative computation as well as ranking of particular risks. A standalone Tool Box capability exists, allowing the user to store application programs within QRAS.

Weinstock, Robert M↗

Detailed Analysis of Indian Summer Monsoon Rainfall Processes with Modern/High-Quality Satellite Observations

We examine, in detail, Indian Summer Monsoon rainfall processes using modernhigh quality satellite precipitation measurements. The focus here is on measurements derived from three NASA cloud and precipitation satellite missionslinstruments (TRMM/PR&TMI, AQUNAMSRE, and CLOUDSATICPR), and a fourth TRMM Project-generated multi-satellite precipitation measurement dataset (viz., TRMM standard algorithm 3b42) -- all from a period beginning in 1998 up to the present. It is emphasized that the 3b42 algorithm blends passive microwave (PMW) radiometer-based precipitation estimates from LEO satellites with infi-ared (IR) precipitation estimates from a world network of CEO satellites (representing -15% of the complete space-time coverage) All of these observations are first cross-calibrated to precipitation estimates taken from standard TRMM combined PR-TMI algorithm 2b31, and second adjusted at the large scale based on monthly-averaged rain-gage measurements. The blended approach takes advantage of direct estimates of precipitation from the PMW radiometerequipped LEO satellites -- but which suffer fi-om sampling limitations -- in combination with less accurate IR estimates from the optical-infrared imaging cameras on GEO satellites -- but which provide continuous diurnal sampling. The advantages of the current technologies are evident in the continuity and coverage properties inherent to the resultant precipitation datasets that have been an outgrowth of these stable measuring and retrieval technologies. There is a wealth of information contained in the current satellite measurements of precipitation regarding the salient precipitation properties of the Indian Summer Monsoon. Using different datasets obtained from the measuring systems noted above, we have analyzed the observations cast in the form of: (1) spatially distributed means and variances over the hierarchy of relevant time scales (hourly I diurnally, daily, monthly, seasonally I intra-seasonally, and inter-annually), (2) time series at these different time scales taken as area-averages over the hierarchy of relevant space scales (Indian sub-Division, Indian sub-continent, and Circumambient Indian Ocean), (3) principal autocorrelation and cross-correlation structures over various monsoon space-time domains, (4) diurnally modulated amplitude-phase properties of rain rates over different monsoon space-time domains, (5) foremost rain rate probability distributions intrinsic to monsoon precipitation, and (6) behavior of extreme events including occurrences of flood and drought episodes throughout the course of inter-annual monsoon processes.

Smith, Eric A.↗

Optimal Planning and Problem-Solving

CTAEMS MDP Optimal Planner is a problem-solving software designed to command a single spacecraft/rover, or a team of spacecraft/rovers, to perform the best action possible at all times according to an abstract model of the spacecraft/rover and its environment. It also may be useful in solving logistical problems encountered in commercial applications such as shipping and manufacturing. The planner reasons around uncertainty according to specified probabilities of outcomes using a plan hierarchy to avoid exploring certain kinds of suboptimal actions. Also, planned actions are calculated as the state-action space is expanded, rather than afterward, to reduce by an order of magnitude the processing time and memory used. The software solves planning problems with actions that can execute concurrently, that have uncertain duration and quality, and that have functional dependencies on others that affect quality. These problems are modeled in a hierarchical planning language called C_TAEMS, a derivative of the TAEMS language for specifying domains for the DARPA Coordinators program. In realistic environments, actions often have uncertain outcomes and can have complex relationships with other tasks. The planner approaches problems by considering all possible actions that may be taken from any state reachable from a given, initial state, and from within the constraints of a given task hierarchy that specifies what tasks may be performed by which team member.

Clemet, Bradley↗

Asia from Space: New Ideas for Exploration

Megafans, also known (incorrectly) as inland deltas, are partial cones of fluvial sediment with radii >~100 km. Each is generated by a formative river avulsing across a lowland. The alluvial tract (channel, levee, overbank, etc.) is the building block for megafans. Planform and sectional analyses, based on SRTM data, reveal their conical, low-angle morphology. Megafans are not geologically rare as often assumed but a normal feature in the hierarchy of fluvial features that is slowly beginning to be understood. Our global survey contains a total of >150 examples worldwide, in all tectonic basin types, with a majority of smaller, more easily distinguished megafans occupying classic foreland basins (54%) which may explain the general view that megafans only form in Himalaya-like foreland basins, especially since the Kosi Megafan in the Indogangetic Plain is one of the best known in the geological literature. Recent research has shown that all actively alluviating basins are occupied by fanlike sediment masses, from the well known smaller and steeper alluvial fan (level 8 in Miall s hierarchy of fluvial forms), to the much larger megafan feature (level 9). A close relationship exists between upland basin size and fan size and slope. Larger upland drainage basins give rise to low-slope megafan sedimentation, which can cover very large areas where the receptacle basin exists individual megafan areas are 10(sup 3-5) square kilometers, and collectively cover 1.2 million square kilometers in South America, for example. The habitat of megafans is now sufficiently well understood that prediction of some modern cryptic megafan locations has been successfully achieved. Underground prediction therefore seems possible, where sufficient data exists. It seems necessary to distinguish megafans from (i) steep, coarse-grained mountain-front alluvial fans which are overwhelmingly coarse-grained, (ii) deltas, since megafans lack distal shoreline processes), and (iii) confined floodplains which lack radial drainage. Numerous other differences can be identified. As a normal component of the modern fluvial environment, megafans must exist in the subsurface. Megafan size, predictable channel patterns of the formative river, and the gradation from coarser to finer sediments from apex to toe of megafans are characteristics that ought to assist in understanding subsurface patterns of hydrocarbon host rocks, and possibly source rocks as well. We show examples from various producing basins. A roughness map of Asia, based on an algorithm developed for Mars, shows megafan landscapes to be dominated by short baseline roughness and low slopes, consistent with megafan-dominated plains worldwide. Interestingly, this a unique signature for a larger continental landform.

Wilkinson, M. Justin↗

NASA Risk Management Handbook

The purpose of this handbook is to provide guidance for implementing the Risk Management (RM) requirements of NASA Procedural Requirements (NPR) document NPR 8000.4A, Agency Risk Management Procedural Requirements [1], with a specific focus on programs and projects, and applying to each level of the NASA organizational hierarchy as requirements flow down. This handbook supports RM application within the NASA systems engineering process, and is a complement to the guidance contained in NASA/SP-2007-6105, NASA Systems Engineering Handbook [2]. Specifically, this handbook provides guidance that is applicable to the common technical processes of Technical Risk Management and Decision Analysis established by NPR 7123.1A, NASA Systems Engineering Process and Requirements [3]. These processes are part of the \Systems Engineering Engine. (Figure 1) that is used to drive the development of the system and associated work products to satisfy stakeholder expectations in all mission execution domains, including safety, technical, cost, and schedule. Like NPR 7123.1A, NPR 8000.4A is a discipline-oriented NPR that intersects with product-oriented NPRs such as NPR 7120.5D, NASA Space Flight Program and Project Management Requirements [4]; NPR 7120.7, NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements [5]; and NPR 7120.8, NASA Research and Technology Program and Project Management Requirements [6]. In much the same way that the NASA Systems Engineering Handbook is intended to provide guidance on the implementation of NPR 7123.1A, this handbook is intended to provide guidance on the implementation of NPR 8000.4A. 1.2 Scope and Depth This handbook provides guidance for conducting RM in the context of NASA program and project life cycles, which produce derived requirements in accordance with existing systems engineering practices that flow down through the NASA organizational hierarchy. The guidance in this handbook is not meant to be prescriptive. Instead, it is meant to be general enough, and contain a sufficient diversity of examples, to enable the reader to adapt the methods as needed to the particular risk management issues that he or she faces. The handbook highlights major issues to consider when managing programs and projects in the presence of potentially significant uncertainty, so that the user is better able to recognize and avoid pitfalls that might otherwise be experienced.

Dezfuli, Homayoon↗

Challenges of Sustaining the International Space Station Through 2020 and Beyond: Reassessing Confidence Targets for System Availability

The International Space Station (ISS) was originally designed to operate until 2015 with a plan for deorbiting the ISS in 2016. Currently, the international partnership has agreed to extend the operations until 2020 and discussions are underway to extend the life even further to 2028. Each partner is responsible for the sustaining engineering, sparing, and maintenance of their own segments. National Aeronautics and Space Administration's (NASA's) challenge is to purchase the needed number of spares to maintain the functional availability of the ISS systems necessary for the United States On-Orbit Segment s contribution. This presentation introduces an analytical approach to assessing uncertainty in ISS hardware necessary to extend the life of the vehicle. Some key areas for consideration are: establishing what confidence targets are required to ensure science can be continuously carried out on the ISS, defining what confidence targets are reasonable to ensure vehicle survivability, considering what is required to determine if the confidence targets are too high, and whether sufficient number of spares are purchased. The results of the analysis will provide a methodological basis for reassessing vehicle subsystem confidence targets. This analysis compares the probability of existing spares exceeding the total expected unit demand of the Orbital Replacement Unit (ORU) in functional hierarchies approximating the vehicle subsystems. In cases where the functional hierarchies' availability does not meet subsystem confidence targets, the analysis will further identify which ORUs may require additional spares to extend the life of the ISS. The resulting probability is dependent upon hardware reliability estimates. However, the ISS hardware fleet carries considerable epistemic uncertainty which must be factored into the development and execution of sparing risk postures. In addition, it is also recognized that uncertainty in the assessment is due to disconnects between modeled functions and actual subsystem operations. Perhaps most importantly, it is acknowledged that conservative confidence targets per subsystem are currently accepted. This presentation will also discuss how subsystem confidence targets may be relaxed based on calculating the level of uncertainty for each corresponding ORU-function. The presentation will conclude with the various strengths and limitations for implementing the analytical approach in sustaining the ISS through end of life; 2020 and beyond.

Lutomski, Michael G.↗

Challenges of Sustaining the International Space Station through 2020 and Beyond: Including Epistemic Uncertainty in Reassessing Confidence Targets

This paper introduces an analytical approach, Probability and Confidence Trade-space (PACT), which can be used to assess uncertainty in International Space Station (ISS) hardware sparing necessary to extend the life of the vehicle. There are several key areas under consideration in this research. We investigate what sparing confidence targets may be reasonable to ensure vehicle survivability and for completion of science on the ISS. The results of the analysis will provide a methodological basis for reassessing vehicle subsystem confidence targets. An ongoing annual analysis currently compares the probability of existing spares exceeding the total expected unit demand of the Orbital Replacement Unit (ORU) in functional hierarchies approximating the vehicle subsystems. In cases where the functional hierarchies availability does not meet subsystem confidence targets, the current sparing analysis further identifies which ORUs may require additional spares to extend the life of the ISS. The resulting probability is dependent upon hardware reliability estimates. However, the ISS hardware fleet carries considerable epistemic uncertainty (uncertainty in the knowledge of the true hardware failure rate), which does not currently factor into the annual sparing analysis. The existing confidence targets may be conservative. This paper will also discuss how confidence targets may be relaxed based on the inclusion of epistemic uncertainty for each ORU. The paper will conclude with strengths and limitations for implementing the analytical approach in sustaining the ISS through end of life, 2020 and beyond.

Anderson, Leif↗

Interactive robot control system and method of use

A robotic system includes a robot having joints, actuators, and sensors, and a distributed controller. The controller includes command-level controller, embedded joint-level controllers each controlling a respective joint, and a joint coordination-level controller coordinating motion of the joints. A central data library (CDL) centralizes all control and feedback data, and a user interface displays a status of each joint, actuator, and sensor using the CDL. A parameterized action sequence has a hierarchy of linked events, and allows the control data to be modified in real time. A method of controlling the robot includes transmitting control data through the various levels of the controller, routing all control and feedback data to the CDL, and displaying status and operation of the robot using the CDL. The parameterized action sequences are generated for execution by the robot, and a hierarchy of linked events is created within the sequence.

Sanders, Adam M.↗

Development of Hybrid Product Breakdown Structure for NASA Ground Systems

The Product Breakdown Structure is traditionally a method of identification of the products of a project in a tree structure. It is a tool used to assess, plan, document, and display the equipment requirements for a project. It is part of a product based planning technique, and attempts to break down all components of a project in as much detail as possible, so that nothing is overlooked. The PBS for ground systems at the Kennedy Space Center is being developed to encompass the traditional requirements including the alignment of facility, systems, and components to the organizational hierarchy. The Ground Operations Product Breakdown Structure is a hybrid in nature in that some aspects of a work breakdown structure will be incorporated and merged with the Architecture Concept of Operations, Master Subsystem List, customer interface, and assigned management responsibility. The Ground Operations Product Breakdown Structure needs to be able to identify the flexibility of support differing customers (internal and external) usage of ground support equipment within the Kennedy Space Center launch and processing complex. The development of the Product Breakdown Structure is an iterative activity Initially documenting the organization hierarchy structure and relationships. The Product Breakdown Structure identifies the linkage between the customer program requirements, allocation of system resources, development of design goals, and identification logistics products. As the Product Breakdown Structure progresses the incorporation of the results of requirement planning for the customer occurs identifying facility needs and systems. The mature Product Breakdown Structure is baselined with a hierarchical drawing, the Product Breakdown Structure database, and an associated document identifying the verification of the data through the life cycle of the program/product line. This paper will document, demonstrate, and identify key aspects of the life cycle of a Hybrid Product Breakdown Structure. The purpose is to show how a project management and system engineering approach can be utilized for providing flexible customer service in an evolving manned space flight launch processing environment.

Monaghan, Mark W.↗

Imagine Moving Off the Planet

Moving off the planet will be a defining moment of this century as landing on the Moon was in the last. For that to happen for humans to go where humans cannot go-- simulation is the sole solution. NASA supports simulation for life-cycle activities: design, analysis, test, checkout, operations, review and training. We contemplate time spans of a century and more, teams dispersed to different planets and the need for systems that endure or adapt as missions, teams and technology change. Without imagination such goals are impossible. But with imagination we can go outside our present perception of reality to think about and take action on what has been, is and, especially, what might be. Consciously maturing an imagined, possibly workable, idea through framing it to optimization to design, and building the product provides us with a new approach to innovation and simulation fidelity. We address options, analyze, test and make improvements in how we think and work. Each step includes increasingly exact information about costs, schedule, who will be needed, where, when and how. NASA i integrating such thinking into its Exploration Product Realization Hierarchy for simulation and analysis, test and verification, and stimulus response goals. Technically NASA follows a timeline of studies, analysis, definition, design, development and operations with concurrent documentation. We have matched this Product Realization Hierarchy with a continuum from image to realization that incorporates commitment, current and needed research and communication to ensure superior and creative problem solving as well as advances in simulation. One result is a new approach to collaborative systems. Another is a distributed observer network prototyped using game engine technology bringing advanced 3-D simulation of a simulation to the desktop enabling people to develop shared consensus of its meaning. Much of the value of simulation comes from developing in people their ability to make good decisions and reflexes supporting impressive achievement. Synthesizing imagination systematically into our work - and thus our success - is a challenge. NASA engineers have inventive minds, and the task is determining how best to enable them to devise the simulation and other innovations that will make a story so clear and so intellectually sound that people can carry out the mission for 50-100 years. This demands skills and knowledge traditionally under-respected and under-represented in technology organizations. But we are beginning to see that the process encourages efficiency and enables us to attain more effective results. We have to elicit imaginative, intelligent and effective ways to make better use than ever of the minds we have and will have available. We have to accept the challenge to accomplish tasks among dispersed interdisciplinary teams who must overcome changing priorities and technology, time and distance in order to maximize interactivity and innovation as never before. Attention to the process of innovation is a practical means to increase the efficiency of our intelligence. We have an obligation to reexamine and improve the process by which we approach and exercise innovation as we accept the charge to move off the planet.

Elfrey, Priscilla R.↗

Development of Hybrid Product Breakdown Structure for NASA Ground Systems

The Product Breakdown Structure is traditionally a method of identification of the products of a project in a tree structure. It is a tool used to assess, plan, document, and display the equipment requirements for a project. It is part of a product based planning technique, and attempts to break down all components of a project in as much detail as possible, so that nothing is overlooked. The PBS for ground systems at the Kennedy Space Center is being developed to encompass the traditional requirements including the alignment of facility, systems, and components to the organizational hierarchy. The Ground Operations Product Breakdown Structure is a hybrid in nature in that some aspects of a work breakdown structure will be incorporated and merged with the Architecture Concept of Operations, Master Subsystem List, customer interface, and assigned management responsibility. The Ground Operations Product Breakdown Structure needs to be able to identify the flexibility of support differing customers (internal and external) usage of ground support equipment within the Kennedy Space Center launch and processing complex. The development of the Product Breakdown Structure is an iterative activity Initially documenting the organization hierarchy structure and relationships. The Product Breakdown Structure identifies the linkage between the customer program requirements, allocation of system resources, development of design goals, and identification logistics products. As the Product Breakdown Structure progresses the incorporation of the results of requirement planning for the customer occurs identifying facility needs and systems. The mature Product Breakdown Structure is baselined with a hierarchical drawing, the Product Breakdown Structure database, and an associated document identifying the verification of the data through the life cycle of the program/product line. This paper will document, demonstrate, and identify key aspects of the life cycle of a Hybrid Product Breakdown Structure. The purpose is to show how a project management and system engineering approach can be utilized for providing flexible customer service in an evolving manned space flight launch processing environment.

Monaghan, Mark W.↗

Hierarchical Robot Control System and Method for Controlling Select Degrees of Freedom of an Object Using Multiple Manipulators

A robotic system includes a robot having manipulators for grasping an object using one of a plurality of grasp types during a primary task, and a controller. The controller controls the manipulators during the primary task using a multiple-task control hierarchy, and automatically parameterizes the internal forces of the system for each grasp type in response to an input signal. The primary task is defined at an object-level of control, e.g., using a closed-chain transformation, such that only select degrees of freedom are commanded for the object. A control system for the robotic system has a host machine and algorithm for controlling the manipulators using the above hierarchy. A method for controlling the system includes receiving and processing the input signal using the host machine, including defining the primary task at the object-level of control, e.g., using a closed-chain definition, and parameterizing the internal forces for each of grasp type.

Abdallah, Muhammad E.↗

Improved Convergence and Robustness of USM3D Solutions on Mixed Element Grids (Invited)

Several improvements to the mixed-element USM3D discretization and defect-correction schemes have been made. A new methodology for nonlinear iterations, called the Hierarchical Adaptive Nonlinear Iteration Scheme (HANIS), has been developed and implemented. It provides two additional hierarchies around a simple and approximate preconditioner of USM3D. The hierarchies are a matrix-free linear solver for the exact linearization of Reynolds-averaged Navier Stokes (RANS) equations and a nonlinear control of the solution update. Two variants of the new methodology are assessed on four benchmark cases, namely, a zero-pressure gradient flat plate, a bump-in-channel configuration, the NACA 0012 airfoil, and a NASA Common Research Model configuration. The new methodology provides a convergence acceleration factor of 1.4 to 13 over the baseline solver technology.

Pandya, Mohagna J.↗

A Vision for Spaceflight Reliability: NASA's Objectives Based Strategy

In defining the direction for a new Reliability and Maintainability standard, OSMA has extracted the essential objectives that our programs need, to undertake a reliable mission. These objectives have been structured to lead mission planning through construction of an objective hierarchy, which defines the critical approaches for achieving high reliability and maintainability (R M). Creating a hierarchy, as a basis for assurance implementation, is a proven approach; yet, it holds the opportunity to enable new directions, as NASA moves forward in tackling the challenges of space exploration.

Strategy↗

Neutrino Physics from the Cosmic Microwave Background and Large Scale Structure

This is a report on the status and prospects of the quantification of neutrino properties through the cosmological neutrino background for the Cosmic Frontier of the Division of Particles and Fields Community Summer Study long-term planning exercise. Experiments planned and underway are prepared to study the cosmological neutrino background in detail via its influence on distance-redshift relations and the growth of structure. The program for the next decade described in this document, including upcoming spectroscopic galaxy surveys eBOSS and DESI and a new Stage-IV CMB polarization experiment CMB-S4, will achieve sigma (sigma*mass(sub v)= 16 meV and sigma (Effective number of neutrino species) = 0.020. Such a mass measurement will produce a high significance detection of non-zero sigma*mass(sub v), whose lower bound derived from atmospheric and solar neutrino oscillation data is about 58 meV. If neutrinos have a minimal normal mass hierarchy, this measurement will definitively rule out the inverted neutrino mass hierarchy, shedding light on one of the most puzzling aspects of the Standard Model of particle physics - the origin of mass. This precise a measurement of Neff will allow for high sensitivity to any light and dark degrees of freedom produced in the big bang and a precision test of the standard cosmological model prediction that the effective number of neutrino species = 3.046.

Neutrinos↗

Spaceflight Reliability: An Objectives-Based Strategy

In defining the direction for a new Reliability and Maintainability standard, OSMA has extracted the essential objectives that our programs need, to undertake a reliable mission. These objectives have been structured to lead mission planning through construction of an objective hierarchy, which defines the critical approaches for achieving high reliability and maintainability (R M). Creating a hierarchy, as a basis for assurance implementation, is a proven approach; yet, it holds the opportunity to enable new directions, as NASA moves forward in tackling the challenges of space exploration.

Reliability and Maintainability↗

Improved Convergence and Robustness of USM3D Solutions on Mixed-Element Grids

Several improvements to the mixed-elementUSM3Ddiscretization and defect-correction schemes have been made. A new methodology for nonlinear iterations, called the Hierarchical Adaptive Nonlinear Iteration Method, has been developed and implemented. The Hierarchical Adaptive Nonlinear Iteration Method provides two additional hierarchies around a simple and approximate preconditioner of USM3D. The hierarchies are a matrix-free linear solver for the exact linearization of Reynolds-averaged Navier-Stokes equations and a nonlinear control of the solution update. Two variants of the Hierarchical Adaptive Nonlinear Iteration Method are assessed on four benchmark cases, namely, a zero-pressure-gradient flat plate, a bump-in-channel configuration, the NACA 0012 airfoil, and a NASA Common Research Model configuration. The new methodology provides a convergence acceleration factor of 1.4 to 13 over the preconditioner-alone method representing the baseline solver technology.

Pandya, Mohagna J.↗