Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid connected”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 325 records · Page 18

Universal Passive Synchronization Method for Grid-Forming Inverters Without Mode Transition

Power systems are transforming with increasing levels of inverter-based resources (IBRs). This transformation requires critical roles of grid-forming (GFM) inverters replacing synchronous generators for bulk power system stabilization and ancillary services, also allowing flexible power system operation, such as microgrid that is operated by multiple GFM IBRs to achieve system resilience against contingencies. To realize the resilient power systems allowing flexible in-and-out operation of GFM IBRs potentially programmed with different primary controls, a synchronization method universally applicable, i.e., independent of control types, would be beneficial to ease the integration process, but it has not been actively studied. To fill the gap, this paper proposes a universal synchronization method that achieves a passive synchronization to enable a smooth transition in a grid with off-nominal system parameters, i.e., voltage and frequency. The logic proposed requires no modification on the primary control, thus applicable to any type of GFMs with a voltage reference input. To validate the concept, a simulation of an IEEE 13-bus benchmark system modified with 3 GFM inverters is presented. It simulates an inverter-driven black start scenario in which GFM inverters autonomously turn on and connect to the grid under heavy loading, using the synchronization logic. The case study demonstrates that GFM inverters can tune their voltage reference to smoothly synchronize without severe transients, and contribute to a seamless black start of the grid under unbalanced load conditions. Two GFM methods - Droop and dispatchable virtual oscillator control - are used for the demo to validate feasibility and interoperability of the passive synchronization.

black start↗

Technology in Focus: Power-to-X

Power-to-X is the process that converts electricity into energy carriers that can be used in industries and applications not connected to the electricity grid. By creating a product with direct process connected generation, contracted generation, or grid-delivered electricity that is in excess of current demand, production of electricity can be managed to time arbitrage energy and mitigate generation curtailment or inefficient operational reductions. In addition, creating a product potentially develops a secondary revenue stream that aids economics of the facility. This document is a high-level factsheet that provides an overview of what Power-to-X is and what it means.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electrifying Connection, Managing Impacts to Transit & the Grid

This brochure describes the potential impacts at scale electrified transportation may have on the grid by analyzing current deployments and provides recommendations onthe available resources or solutions to help stabilize the grid in other regions.

Source record↗

An Analysis of Post Attack Impacts and Effects of Learning Parameters on Vulnerability Assessment of Power Grid

Due to the increasing number of heterogeneous devices connected to electric power grid, the attack surface increases the threat actors. Game theory and machine learning are being used to study the power system failures caused by external manipulation. Most of existing works in the literature focus on one-shot process of attacks and fail to show the dynamic evolution of the defense strategy. In this paper, we focus on an adversarial multistage sequential game between the adversaries of the smart electric power transmission and distribution system. We study the impact of exploration rate and convergence of the attack strategies (sequences of action that creates large scale blackout based on the system capacity) based on the reinforcement learning approach. We also illustrate how the learned attack actions disrupt the normal operation of the grid by creating transmission line outages, bus voltage violations, and generation loss. This simulation studies are conducted on IEEE 9 and 39 bus systems. The results show the improvement of the defense strategy through the learning process. The results also prove the feasibility of the learned attack actions by replicating the disturbances created in simulated power system.

attack impacts↗

Of Actors, Cities and Energy Systems: Advancing the Transformative Potential of Urban Electrification

The electrification of transportation and the integration of electric vehicles (EVs) with buildings connected to clean grids has been touted as one of the key solutions to the global decarbonization challenge. Cities are on the frontlines of current and future electrification, as they depend on and drive electricity generation, distribution, and use. City actors also occupy a central role in the actions to enable electrification to support energy transitions in efficient, equitable, environmentally sound, and resilient ways. Currently, however, research and development on the interactions between actors, cities and energy systems is predominantly conducted in disciplinary siloes. This topical review analyzes the transformational potential of urban electrification. It focuses on efforts to electrify transportation and integrate EVs with buildings connected to a clean grid. We find that actions in these area are driving change; they are adopted by wealthier populations and on an experimental basis by specific communities. Their larger-scale growth is constrained by institutional, behavioral, and infrastructural factors. We also find that existing siloed disciplinary approaches are often incompatible with advancing holistic research. To achieve that, divergent communities of scholars need to come together to integrate their research and create broader perspectives. Through incorporation of the social sciences, these perspectives need to consider the societal limits and potentials brought to bear by human behavior and decision making. Only then can urban electrification be understood as the empirically rich and socially complex topic that it is. And only with this understanding will innovations and smart policy actions be able to tap into the transformational potential of urban electrification.

cities↗

Power HIL Validation of a MW-Scale Grid-Forming Inverter's Stabilization of Otherwise Unstable Cases of the Maui Transmission System

This presentation summarizes MW-scale power hardware-in-the-loop experiments using a 2.2 MW grid-forming inverter connected to a real-time electromagnetic transient simulation of the Maui transmission system. The hardware inverter used is a commercially available "off-the-shelf" inverter from a major manufacturer that is capable of operating in grid-forming mode or grid-following mode. The hardware inverter was connected via power hardware-in-the-loop to a real-time model of the year-2023 Maui power system, which consists of a networked transmission system with diverse generation sources. The results of the simulations indicate that with sufficient synchronous machines online, the system is stable without grid-forming inverters, but that as the amount of synchronous machines is reduced, the system becomes unstable. Changing the hardware inverter (scaled up to represent a 30 MW plant) into grid-forming mode mitigates the instability in various low-inertia cases, including a zero-inertia scenario with 100% of generation from PV and wind. This result broadly agrees with pure simulation results.

battery energy storage system↗

A Real-Time ANPC Inverter Digital Twin with Integrated Design-For-Trust

The demand for renewable energy has increased over the last few years, and so has the demand for greater expectations within the energy market. This increasing trend has been accompanied by more significant usage of internet-connected devices (IoT), leading to critical electrical infrastructure being connected to the internet. Implementing internet connectivity with such devices and systems provides benefits such as improving the system's performance, facilitating irregularity and anomaly mitigation, and providing additional situational awareness for enhanced decision-making. However, enhancing the connected system with IoT introduces a drawback – a greater vulnerability to cyber-attacks. Cyber-attacks targeting critical infrastructure in the electrical sector have occurred in the United States and Ukraine. These cyber-attacks highlight and expose vulnerabilities that a system inherits when connecting to the internet. These attacks left thousands of customers without electricity for hours until operators could regain control of the electric utility grid. Therefore, to address the vulnerabilities of an internet-connected power electronic device, this work focused on the hardware layer of the system. Implementing a cyber-control system inside the hardware layer can significantly reduce the possibility of an attacker patching malicious controller firmware into a photovoltaic grid-connected inverter, thus mitigating the likelihood that the inverter becomes inactive a cyber-attack scenario. With this mitigation technique, if a cyberattack is successful and an attacker gains control of the network, a cyber-defense technique is in place to mitigate the impact of the cyber-attack. This additional protection layer was developed based on an innovative concept known as Digital Twin (DT). A DT, in this case, replicates an Active-Neutral Point Clamped (ANPC) inverter and was designed using a hardware language known as VHDL (Very High-Speed Integrated Circuit Hardware Description Language) and applied to Field-Programmable-GateArray (FPGA). The DT is embedded within the FPGA and contained in a controller board, the UCB (Unified Controller Board), developed by the University of Arkansas electrical engineering team. This UCB also contains two Digital Signal Processors (DSPs) responsible for generating associated signals to control an authentic physical inverter. These DSP signals are received and processed by the FPGA that implements the DT of an ANPC; in other words, it simulates in realtime the expected output of an actual ANPC inverter using the signals from the DSP. When a new firmware is ready to be patched, the DT provides output signals simulating behavior that a real ANPC inverter would generate with the new firmware. The new firmware is tested to check if it meets all the operational requirements established using a Design-For-Trust technique (DFTr). If the new firmware fails in at least one of the DFT tests, it is considered malicious and must be rejected. This work is divided into sections, such as Background, which explains the pieces that were used and the strategy behind this work; Process and Procedure, which explains the methodology that was adopted to prove the reliability and effectiveness of this work; Results and Discussion, where the simulations and results are described and explained; followed by Conclusion and Future work section, which concludes this work and adds possible future projects to continue this work further.

do Amaral Custodio, Paulo Vitor↗

Power Electronics as an Enabler of the Current and Future Grid: Control Instead of Copper

Power electronics are becoming more pervasive in the power system. Solar, wind and battery energy storage systems regularly connect to the grid using power electronic interfaces. Loads are also increasingly power electronic-based. These changes, coupled with the change in the power system's operating characteristics as more and more renewable energy is integrated into the power system, offer a challenge to power electronic and power system engineers alike - how do we design and operate the power system moving forward?

direct connect↗

Modular Isolated Soft-Switching Medium Voltage String Inverter for Large-Scale PV Farm

This paper presents a single-stage modular isolated soft-switching medium voltage string inverter (MVSI) with tri-port configuration to interconnect PV and storage to medium voltage (MV) grid. The modular MVSI provides advanced functionalities such as energy storage elements integration without additional converters, connection to MV grid resulting in lower distribution losses in the PV farm, high-frequency galvanic isolation, independent control of PV, storage and grid power, high modularity and scalability. The topology of the MVSI, operation principle and model-predictive priority-switching (MPPS) control to achieve fast dynamic balancing across stacked modules are discussed. The independent power control is validated in PLECS simulation and the operation of stacked MVSI with MPPS control is verified through Hardware-in-the-loop (HIL) simulation. Here, the hardware prototype of 25 kVA MVSI building block is developed. 18 kW experimental results of single building block verifying tri-ports operation and 20 kW experimental results of two modules stacked operation are presented. A clean sinusoidal waveform with negligibly low THD in both tests is obtained. A low dv/dt of <; 1kV/us and soft-switching are achieved.

30 DIRECT ENERGY CONVERSION↗

SiC Based Modular Transformer-less MW-Scale Power Conditioning System and Control for Flexible CHP System

This project aims at developing a SiC-based, modular, transformer-less (60-Hz-transformers-free), MW-scale, four-wire DC/AC power conditioning system (PCS) converter, and a corresponding control system for flexible-CHP (F-CHP) systems. With the help of an F-CHP controller and power electronics converters, different CHP sources, renewable sources, and batteries can be assembled to the DC grid, which is then connected to the medium voltage (MV) AC grid through the PCS converter. To meet grid support and performance requirements, the F-CHP controller design and PCS converter design follow IEEE 1547 and IEEE 2030.7 standards. Five main tasks, including PCS converter design, F-CHP controller development, PCS converter prototype building and testing, F-CHP controller testing, and PCS paralleling, have been carried out. In this project, the F-CHP controller testing has been completed in simulation, HIL and HTB, and the PCS converter prototypes have been successfully built and tested.

24 POWER TRANSMISSION AND DISTRIBUTION↗

EV Charging Infrastructure Energization: An Overview of Approaches for Simplifying Processes and Accelerating Timelines to Processing EV Charging Load Service Requests

The United States has seen significant growth in electric vehicle (EV) adoption, leading to increased demand for EV charging infrastructure and electricity. Growth in electricity demand from EV charging, coupled with growth in other sectors like data centers and electrification of other sectors, is impacting electricity infrastructure and load service request processes after two decades of relatively flat electricity demand. While most electric vehicle charging occurs at home, enroute and depot charging for medium and heavy-duty vehicles, both using high-powered EV charging, are critical to meet electric vehicle operational needs. Over the past decade, EV charging infrastructure site developers, site hosts, and electric distribution utilities have navigated the process to integrate chargers onto the electric grid. Site developers and site hosts have expressed distress that the integration process for high-powered EV charging projects does not meet the needs of the EV market for timeliness or cost. High-powered charging stations typically require a load service request or an agreement with the local utility to connect to the grid. The process of energizing a new high-powered charging site can be complex and time consuming, often taking up to 2 years. This timeline is the result of current utility energization processes having been designed for construction projects that take longer to build (i.e., buildings). The specific challenges stem from various factors, including compartmentalization in application processes, the integration of EV charging process approvals with other distributed energy resources (DERs), and the need to ensure grid reliability. The energization process needs to evolve to meet the growing demand for high-powered EV charging. This white paper compiles information gathered through various conversations with key stakeholders, including utilities, utility regulators, EV charging operators, site developers, and authorities having jurisdiction (AHJ) as well as through an extensive literature review. This document identifies the challenges and provides potential solutions to streamline the process of connecting EV charging infrastructure to the power grid in the United States, serving as a starting point for future conversations around these solutions.

33 ADVANCED PROPULSION SYSTEMS↗

Frequency Shaping Control for Weakly-Coupled Grid-Forming IBRs

Here, we consider the problem of controlling the frequency of low-inertia power systems via inverter-based resources (IBRs) that are weakly connected to the grid. We propose a novel grid-forming control strategy, the so-called frequency shaping control, that aims to shape the frequency response of synchronous generators (SGs) to load perturbations so as to efficiently arrest sudden frequency drops. Our solution relaxes several existing assumptions in the literature and is able to navigate trade-offs between peak power requirements and maximum frequency deviations. Finally, we analyze the robustness to imperfect knowledge of network parameters, while particularly highlighting the importance of accurate estimation of these parameters.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DynaShape: Dynamic Shaping of Grid Response with Inverters

We consider the problem of controlling the frequency of low-inertia power systems via inverter-based resources (IBRs) that are weakly connected to the grid. We propose a novel grid-forming control strategy, the so-called frequency shaping control, that aims to shape the frequency response of synchronous generators (SGs) to load perturbations so as to efficiently arrest sudden frequency drops. Our solution relaxes several existing assumptions in the literature and is able to navigate trade-offs between peak power requirements and maximum frequency deviations. Finally, we analyze the robustness to imperfect knowledge of network parameters, while particularly highlighting the importance of accurate estimation of these parameters.

frequency-shaping control↗

Overcoming the Technical Challenges of Coordinating Distributed Load Resources at Scale (Final Report)

Significant recent research has investigated the potential for loads to provide balancing services to the grid. However, this research has not addressed key issues that may arise when such schemes are applied at scale including: 1. Distribution Network Issues. Coordination of large numbers of loads could result in power flows that violate distribution network constraints; 2. Stability Issues. Certain strategies to control loads can exhibit nonlinearity in the form of period-adding bifurcations and chaos. Other control strategies can potentially synchronize the behavior of large numbers of loads. In both cases, the outcome can be power oscillations and instability; 3. Communication Network Issues. Bidirectional low-latency communication channels between a central controller (or several distributed controllers) and each resource are expensive and likely not necessary for effective coordination. Our research questions were: What network, stability, and communication issues might arise in practice when we coordinate large aggregations of loads? How can we coordinate loads to achieve performance objectives in a cost effective manner while avoiding these issues? The ultimate technical goal of the project was the development of network-aware, communication-constrained, non-disruptive load control strategies with stability guarantees that achieve the performance requirements of typical balancing services at a sufficiently low cost to enable the load aggregator and customer to profit. The overall goal was to establish credibility for load control at scale and contribute to U.S. energy security and environmental goals. The team succeeded in answering these research questions and developing these control strategies. The overall approach was based on the development of three testing environments: a simulation testbed, an experimental testbed (20 physical model houses with window-box air conditioners) coupled with the simulation testbed, and a field testbed (100 actual homes in Austin, TX) coupled with the simulation testbed, which enabled controller testing, identification of issues, controller development, and controller validation. The resulting controller was used to demonstrate fast timescale grid balancing (frequency regulation) by aggregations of physical and virtual air conditioners, with sufficient quality to participate in the electricity market. Cost benefit analysis showed overall benefits to the participating households, load aggregators, and the grid, especially if the control technology was integrated directly into existing programmable communicating thermostats. The project provides a variety of wider benefits. Our technology transfer and outreach activities lead us to choose an open-source licensing commercialization pathway, enabling the project results to be available to researchers, industry, and the public. Furthermore, new grid balancing technologies will increase grid flexibility and will enable higher penetrations of intermittent renewable energy resources, such as wind and solar, to be connected to the grid, reducing its environmental impact, and mitigating climate change to the benefit of society.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Impact of Blockchain Delay on Grid-Tied Solar Inverter Performance: Preprint

This paper investigates the impact of the delay resulting from a blockchain, a promising security measure, for a hierarchical control system of inverters connected to the grid. The blockchain communication network is designed at the secondary control layer for resilience against cyberattacks. To represent the latency in the communication channel, a model is developed based on the complexity of the blockchain framework. Taking this model into account, this work evaluates the plant’s performance subject to communication delays, introduced by the blockchain, among the hierarchical control agents. In addition, this article considers an optimal model-based control strategy that performs the system’s internal control loop. The work shows that the blockchain’s delay size influences the convergence of the power supplied by the inverter to the reference at the point of common coupling. In the results section, real-time simulations on OPAL-RT are performed to test the resilience of two parallel inverters with increasing blockchain complexity.

41 EE - Solar Energy Technologies Office (EE-4S)↗

Generator Interconnection Cost Analysis in the Midcontinent Independent System Operator (MISO) territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the Midcontinent Independent System Operator (MISO), representing nearly 50% of all projects requesting interconnection from 2010 to 2020. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Interconnection Cost Analysis in the PJM Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data from interconnection studies for the PJM Territory, representing nearly 86% of all new unique generators requesting interconnection from 2000 to 2022. Project-level cost summary data are available for download on this page. We find: -Average interconnection costs have grown as the number of interconnection requests have escalated -Projects that have completed all required interconnection studies have the lowest cost compared to applicants still actively working through the interconnection process or those that have withdrawn. -Broader network upgrade costs are the primary driver of recent cost increase. -Potential interconnection costs for wind, storage, and solar are larger than for natural gas -Larger generators have greater interconnection costs in absolute terms, but economies of scale exist on a per kW basis. -Interconnection costs vary by location Berkeley Lab will publish a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Generator Interconnection Cost Analysis in the Southwest Power Pool (SPP) Territory

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 845 projects from interconnection studies for the Southwest Power Pool (SPP) Territory. The studies were performed between 2002 and 2023 and include all of the most refined cost estimates available. Project-level cost summary data are available for download on this page. We find: -Project-specific interconnection costs can differ widely. -Average interconnection costs are stable for projects that complete all interconnection studies but have escalated for those that withdraw. -Broader network upgrade costs are the primary driver of recent cost increases, especially for withdrawn projects. -Potential interconnection costs of all solar and wind requests have been greater than those of storage and natural gas projects. -Economies of scale exist for completed wind and solar projects but not for other fuel types or withdrawn projects. -Interconnection costs vary by location. Berkeley Lab publishes a series of short analytical papers of generator interconnection costs to the transmission system for MISO, PJM, SPP, ISO-NE and NYISO, which you can find at https://emp.lbl.gov/interconnection_costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗